Polmadie Footbridge to be demolished – and possibly replaced

Polmadie Footbridge

Polmadie Footbridge is to be demolished, or the deck is to be removed, leaving the piers, with work commencing on 12 October.

This will allow the riverside path to be reopened.  Funding options for a replacement are now being considered – see 151005 Polmadie Footbridge – Letter from GCC.