<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Cambridge St &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/cambridge-st/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Thu, 24 Nov 2022 15:06:26 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 124, 24 November 2022</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-124-24-november-2022-18829</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 24 Nov 2022 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[bikehangars]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[Cycle parking]]></category>
		<category><![CDATA[Dobbie&#039;s Loan]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[tro]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=18829</guid>

					<description><![CDATA[Following orders… A short issue as the festive season approaches. Glasgow is still following up its Spaces for People projects with Traffic Regulation Orders, including Royston Rd and Cambridge St. The latter looks better than last year&#8217;s proposed plan but there are still questions about how the council, and its partner agencies, follow guidelines and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-124-24-november-2022-18829" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 124, 24 November 2022"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Following orders…</h2>



<p>A short issue as the festive season approaches. Glasgow is still following up its Spaces for People projects with Traffic Regulation Orders, including Royston Rd and Cambridge St. The latter looks better than last year&#8217;s proposed plan but there are still questions about how the council, and its partner agencies, follow guidelines and share information. For example, compare the Cambridge St/Cowcaddens Rd junction in the TRO and Avenues Plus plans. Both Pitt St and Raeberry St TROs and the Avenues Plus consultation finish tomorrow.</p>



<p>There&#8217;s an early Christmas present for some tenement dwellers as more Bikehangars are installed in parts of the city.</p>



<span id="more-18829"></span>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one">Cowcaddens Road &amp; Dobbie’s Loan (Avenues Plus)</a></li></ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#two-one">New Bikehangars for Glasgow</a></strong></li><li><strong><a href="#two-two">Glasgow Active Travel Forum</a></strong></li><li><strong><a href="#two-three">South Lanarkshire Cycling Partnership</a></strong></li></ol>



<h4 class="wp-block-heading">3: Proposed Traffic Calming/Traffic Regulation Orders</h4>



<ol class="wp-block-list"><li><a href="#three-one">East Dunbartonhire TROs</a></li><li><strong><a href="#three-two">Glasgow City Traffic Calming/TROs</a></strong></li><li><a href="#three-three">North Lanarkshire TROs</a></li><li><a href="#three-four">Renfrewshire Traffic Calming</a></li></ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Cowcaddens Road &amp; Dobbie’s Loan (Avenues Plus)</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Area:</strong>&nbsp;The length of Cowcaddens Rd from Cambridge St to Caledonian Uni. A section of Dobbie’s Loan between N Hanover St and Canal St.<br><strong>Subject:</strong>&nbsp;Part of the&nbsp;<a href="https://glasgow.gov.uk/index.aspx?articleid=29102" target="_blank" rel="noreferrer noopener">Avenues Plus project</a>, which also covers Duke St/John Knox Street and S Portland St (which had a&nbsp;<a href="https://twitter.com/GlasgowCC/status/1529070975584804864" target="_blank" rel="noreferrer noopener">consultation event in May 2022</a>). Cowcaddens Rd and Dobbie’s Loan both link to N Hanover St and have a joint consultation. The plans for Cowcaddens Rd look promising, especially the radical redesign options for the Port Dundas Rd junction (in featured image at top). The Dobbie’s Loan plans also add two-way protected lanes (especially useful for students at Glasgow Caledonian Uni and its nearby halls). However, the lanes stop short of the trunk road junction, which leads under the M8 to Craighall Rd and Port Dundas. The boards include an updated Avenues phasing map (now with Block D added). A very&nbsp;<a href="https://twitter.com/GoBikeGlasgow/status/1586778089836650499" target="_blank" rel="noreferrer noopener">short notice consultation event</a>&nbsp;took place on 31 October.<br><strong>Website links:&nbsp;</strong><a href="http://www.ironsidefarrar.com/glasgowavenues/consultation.html" target="_blank" rel="noreferrer noopener">Consultation landing page</a>,&nbsp;<a href="https://www.surveymonkey.co.uk/r/VNZKJWY" target="_blank" rel="noreferrer noopener">survey</a>,&nbsp;<a href="http://www.ironsidefarrar.com/glasgowavenues/consultation_boards.pdf" target="_blank" rel="noreferrer noopener">boards (PDF)</a>,&nbsp;<a href="http://www.ironsidefarrar.com/glasgowavenues/concept_plans.pdf" target="_blank" rel="noreferrer noopener">plans (PDF)</a>,&nbsp;<a href="https://view.mylumion.com/?p=gjqazc4l43blj75m" target="_blank" rel="noreferrer noopener">3D panoramas</a>&nbsp;and&nbsp;<a href="https://www.youtube.com/channel/UCvAPtjaJ12VoEFlwshQyckw/videos" target="_blank" rel="noreferrer noopener">3D fly-through videos</a>.<br><strong>Deadline: 25 November 2022.</strong></p>



<h3 class="wp-block-heading"><strong>2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp;New Bikehangars for Glasgow</h4>



<p><strong>Council:</strong> Glasgow City.<br><strong>Area:</strong> The following postcode districts: G3, G4, G11, G12, G14, G20, G31, G40, G41, G42, G44 and G50.<br><strong>Subject:</strong> The latest expansion to Glasgow&#8217;s on-street secure bike parking. A <a href="https://www.gobike.org/wp-content/uploads/2022/11/GGC_Bikehangars-letter-Nov2022_5884.jpeg" target="_blank" rel="noreferrer noopener">letter from Glasgow City Council</a> was put through doors in the areas near the new locations. As with previous rounds in the last few years, these are Bikehangar units by Cyclehoop (who run the service to rent out spaces). They&#8217;re usually positioned on the road or pavement build-outs. Installations at 70 sites are due to be done by mid-December 2022. <br><strong>Website links: </strong><a href="https://cyclehoop.com/new-glasgow-bikehangar-locations/" target="_blank" rel="noreferrer noopener">Cyclehoop&#8217;s Glasgow announcement page</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2: Glasgow Active Travel Forum</h4>



<p><strong>Council:</strong> Glasgow City.<br><strong>Subject:</strong> GCC give with one hand but take with the other. A GoBike member&#8217;s enquiry about the ATF got a response about its role helping develop the <a href="http://www.glasgow.gov.uk/activetravel" target="_blank" rel="noreferrer noopener">Active Travel Strategy</a> and other projects but then this: <br><em><em>“</em>All of our ongoing projects involve engagement and consultation at specific stages. There is also now an Inclusive and Accessible Design Forum, which provides certain user groups with the opportunity to feed back on inclusive design issues in projects.</em><br><em>We therefore do not propose to continue with the Active Travel Forum, and will update the website accordingly.” </em><br>This is disappointing for all the groups who were involved with the ATF during Anna Richardson&#8217;s time at the council. GCC do offer a small olive branch: <br><em>“We are giving consideration however to occasional information-sharing and feedback events with communities and stakeholders on our overall progress on active travel, and will consider resources for this in 2023. We recommend you continue to engage with the Council’s active travel project development via engagement exercises and consultations, and we thank you for your continued support of active travel policy and project development in the city.<em>”</em></em><br>However, this doesn&#8217;t allow for the networking and planning that voluntary groups and other organisations could do through the ATF. </p>



<h4 class="wp-block-heading" id="two-three">2.3: South Lanarkshire Cycling Partnership</h4>



<p><strong>Council:</strong> South Lanarkshire.<br><strong>Subject:</strong> Happily, while Glasgow stops its forum, South Lanarkshire Council is restarting its cycling partnership later this month. There&#8217;s a change of chair (following a retirement) and South Lanarkshire&#8217;s first Green councillor, Kirsten Robb, will join.</p>



<h3 class="wp-block-heading"><strong>3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: East Dunbartonhire TROs</h4>



<figure class="wp-block-image is-resized"><img decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=474%2C76&amp;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" width="437" height="70" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="(max-width: 437px) 100vw, 437px" /></figure>



<p><strong>Areas:&nbsp;</strong>Bearsden, Bishopbriggs, Milton of Campsie, Kirkintilloch and Torrance.<br><strong>Subject:</strong>&nbsp;Orders to redetermine footways and parking restrictions (including near the Bearsway).<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-and-pavements/road-works#traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs (at foot of Roadworks page)</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Traffic Calming/TROs</h4>


<div class="wp-block-image">
<figure class="alignright size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?ssl=1"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="329" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=329%2C600&#038;ssl=1" alt="Cambridge St TRO plans (City Centre Order Variation 28)" class="wp-image-18873" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=329%2C600&amp;ssl=1 329w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=165%2C300&amp;ssl=1 165w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=843%2C1536&amp;ssl=1 843w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=1124%2C2048&amp;ssl=1 1124w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?w=1125&amp;ssl=1 1125w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 329px) 100vw, 329px" /></a><figcaption><em>Plans for Cambridge St (click to enlarge or see council’s PDF)</em></figcaption></figure>
</div>


<p><strong>Areas: </strong>City-wide.<br><strong>Subject:</strong> <em>TROs</em> – <strong>Cambridge Street</strong> links Sauchiehall St to Cowcaddens Subway station (via the Cowcaddens Rd underpass) and beyond to Garscube Rd. The TRO sets up a move from the current Spaces for People layout towards a permanent Avenues layout (a.k.a. Underline Phase 1). Last seen in <a href="https://www.gobike.org/consultation-digest-local-issue-101-9-december-2021-16159#two-two" target="_blank" rel="noreferrer noopener">Digest 101, Item 2.2</a>, it seems there have been changes in the TRO (but the previous ‘CA’ plan is still linked on the <a href="https://www.glasgow.gov.uk/avenues" target="_blank" rel="noreferrer noopener">Avenues webpage</a>?). The southern end seems to keep the bike-only lights across Renfrew St. Also, the lane is continuous across Hill St. However, it still breaks at the pedestrian crossing and has the big ‘shared space’ gap at the northern corner with Cowcaddens Rd (which doesn&#8217;t show crossing from Avenues Plus plans, above). These may be due to accessibility concerns raised by blind people at the council&#8217;s Inclusive and Accessible Design Forum. It has only met a few times but GoBike hasn&#8217;t made it to all of the meetings.<br><strong>Pitt Street</strong> (a.k.a. ‘Holland St Avenue’) links protected cycle lanes on Sauchiehall St (Avenue) and Waterloo St (West City Way/Connect2). This TRO only sets restrictions but the <a href="https://www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-City-Centre-TM-Amendment-No.34-REV-A.pdf" target="_blank" rel="noreferrer noopener">council’s plans for Pitt St (PDF)</a> are shown too. Also, we got a <a href="https://www.gobike.org/wp-content/uploads/2022/11/Pitt-St-response-from-GCC.pdf" target="_blank" rel="noreferrer noopener">detailed response from the council’s Sustainable Transport team</a> justifying their decisions. <em>Deadline: Friday 25 November 2022.</em><br><strong>Raeberry St</strong> – Mount St/Simpson St junction with local one-ways and a cycling only restriction (part of Connecting Woodside). <em>Deadline: Friday 25 November 2022.</em><br><strong>Royston Road </strong>– another Spaces for People route, which links Royston and Blackhill (including the proposed new prison site). <em>Deadline: 14 December 2022.</em><br><strong>London Rd</strong> – East City Way phases 6 &amp; 7, past the velodrome (as seen in <a href="https://www.gobike.org/consultation-digest-local-issue-113-23-june-2022-17591#one-four" target="_blank" rel="noreferrer noopener">Digest 113, Item 1.4</a>). Hopefully in time for the UCI Cycling World Championships in August 2023. <em>Deadline: 16 December 2022.</em><br>The 20mph Zone (<strong>Carmunnnock Rd</strong>) and Barras North (<strong>Calton Village Development</strong>) TROs were made on 3 November (to come into effect on 16 December).<br><em>Traffic Calming</em> –<strong> </strong>Linkwood Dr, Drumchapel; Wardie Rd, Easterhouse.<strong> </strong><br><strong>Website links: </strong><a href="https://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>, <a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3: North Lanarkshire TROs</h4>


<div class="wp-block-image">
<figure class="alignright"><img decoding="async" width="600" height="400" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=231%2C154&amp;ssl=1" alt="North Lanarkshire Council logo" class="wp-image-18420" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=300%2C200&amp;ssl=1 300w" sizes="(max-width: 525px) 100vw, 525px" /></figure>
</div>


<p><strong>Areas: </strong>Throughout North Lanarkshire.<br><strong>Subject:</strong> Order to introduce timed or total parking restrictions on streets in over a dozen towns and villages.<br><em>Deadline: 14 December 2022.<br></em><strong>Website links:</strong> <a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations" target="_blank" rel="noreferrer noopener">North Lanarkshire Live Consultations</a> (also links to Boundary Commission Scotland review of UK Parliament constituencies).</p>



<h4 class="wp-block-heading" id="three-four">3.4: Renfrewshire Traffic Calming</h4>


<div class="wp-block-image">
<figure class="alignright size-thumbnail is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=210%2C210&#038;ssl=1" alt="Renfrewshire Council logo" class="wp-image-18867" width="210" height="210" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?zoom=2&amp;resize=210%2C210&amp;ssl=1 420w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?zoom=3&amp;resize=210%2C210&amp;ssl=1 630w" sizes="auto, (max-width: 210px) 100vw, 210px" /></figure>
</div>


<p><strong>Areas:&nbsp;</strong>Kilbarchan, Houston, Howwood and Kilbarchan Road, Bridge of Weir.<br><strong>Subject:</strong>&nbsp;<em>“We are looking for feedback on the potential traffic calming measures prior to a final report being prepared.”</em> Also, there is a consultation on guardrails at a junction in Howwood.<br><strong>Website links:</strong>&nbsp;<a href="https://www.renfrewshire.gov.uk/village-traffic-surveys" target="_blank" rel="noreferrer noopener">Renfrewshire village traffic calming proposals</a> and <a href="https://www.renfrewshire.gov.uk/article/13002/Have-your-say-on-the-Bowfield-RoadMidton-Road-junction-in-Howwood" target="_blank" rel="noreferrer noopener">Bowfield Road/Midton Road junction, Howwood</a> (<a href="https://www.renfrewshire.gov.uk/haveyoursay" target="_blank" rel="noreferrer noopener">‘Have your say’ page</a> also links to Boundary Commission Scotland review of UK Parliament constituencies).</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18829</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 92, 3 August 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 03 Aug 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Auldhouse]]></category>
		<category><![CDATA[Bellshill]]></category>
		<category><![CDATA[Bishopbriggs]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[City Deal]]></category>
		<category><![CDATA[Claypits]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[Garscube Rd]]></category>
		<category><![CDATA[GHA]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[Kirkintilloch]]></category>
		<category><![CDATA[LEZ]]></category>
		<category><![CDATA[motherwell]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Sauchiehall St]]></category>
		<category><![CDATA[Sighthill]]></category>
		<category><![CDATA[south city way]]></category>
		<category><![CDATA[St Paul&#039;s Youth Forum]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=14734</guid>

					<description><![CDATA[Consultations dropping in from around Glasgow. This Digest comes after Great Britain &#38; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 92, 3 August 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Consultations dropping in from around Glasgow.</h2>



<p>This Digest comes after Great Britain &amp; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have dropped the cycleway to Motherwell train station). There are also several consultations for East Dunbartonshire and Glasgow plus one for East Renfrewshire.</p>



<p>The ban on pavement parking was made law in the Scottish Parliament in 2019. Last year, GoBike wondered when it would come into force (<a href="https://www.gobike.org/consultation-digest-issue-65-21-july-2020-whats-happened-to-pavement-parking-proposals-approved-but-not-enacted-plus-a-request-to-contribute-to-the-streets-for-all-glasgow-commonplace-map-and-m-11719" target="_blank" rel="noreferrer noopener">Digest 65, Item 3.4</a>) – it seems it&#8217;s due to be 2023. <a href="https://e-activist.com/page/87240/action/1?utm_medium=email&amp;utm_source=engagingnetworks&amp;utm_campaign=pp&amp;utm_content=Pavement+Parking+Scotland+ban+MSP+prev+PP+actn&amp;ea.url.id=5427510&amp;forwarded=true" target="_blank" rel="noreferrer noopener">Living Streets want you to write to your MSPs about bringing it forward</a>. </p>



<p>People of all abilities can cycle at facilities run by <a href="https://twitter.com/freewheel_north/status/1417846827991195648?s=20" target="_blank" rel="noreferrer noopener">Freewheel North – who are trying to fundraise just now</a>, in case you want to contribute. </p>



<span id="more-14734"></span>



<h3 class="wp-block-heading">Infrastructure Update</h3>



<ul class="wp-block-list"><li><a href="https://twitter.com/EyeintheskyGla/status/1421811255279603713?s=20" target="_blank" rel="noreferrer noopener">Sighthill&#8217;s new pedestrian/cycle bridge has been installed over the M8</a><span style="font-size: 1rem;"> (but won&#8217;t be open for a while yet).</span> <a href="https://twitter.com/UrbanistTOC/status/1422272043060547586?s=20" target="_blank" rel="noreferrer noopener">GoBike convenor, Thomas, spoke about it on STV!</a></li><li>At the canal, the Claypits nature reserve officially opened at the weekend, including the <a href="https://twitter.com/KineticsGlasgow/status/1421391556129574916?s=20" target="_blank" rel="noreferrer noopener">zigzag ramp from Garscube Rd</a>.</li><li>The <a href="https://twitter.com/Invest_Glasgow/status/1420749763310350347?s=20" target="_blank" rel="noreferrer noopener">Stockingfield Bridge at the canal is being assembled</a> but won&#8217;t be up and running until next year. </li><li><a href="https://twitter.com/reglasgow_web/status/1417460267936534531?s=20" target="_blank" rel="noreferrer noopener">North Canal Bank St – work is getting there</a> but it missed its July re-opening date.</li><li>At Kelvin Hall, <a href="https://twitter.com/YorkhillT/status/1419778370989084673?s=20" target="_blank" rel="noreferrer noopener">Argyle St/Bunhouse Rd has bike lights installed, but not yet operational</a>.</li><li>Thomas visited <a href="https://twitter.com/UrbanistTOC/status/1420724476996734980" target="_blank" rel="noreferrer noopener">Corkerhill Rd&#8217;s soft segregated lanes</a>. </li><li>He also let us know <a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener"></a><a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener">South City Way&#8217;s new cycle counters are up-and-running</a>.</li><li><span style="font-size: 1rem;">Outdoor seating in the sun was popular along </span><a style="font-size: 1rem;" href="https://twitter.com/LinesDashed/status/1419022365971959809?s=20" target="_blank" rel="noreferrer noopener">Sauchiehall St&#8217;s permanent lanes and the pop-ups at Candleriggs/George Square</a><span style="font-size: 1rem;"> and </span><a style="font-size: 1rem;" href="https://www.gobike.org/wp-content/uploads/2021/07/Cambridge-St-seating_1233.jpeg" target="_blank" rel="noreferrer noopener">Cambridge St</a><span style="font-size: 1rem;">.</span> </li><li>In East Kilbride, University Hospital <a href="https://eastkilbride.cyclestreets.net/location/172687/" target="_blank" rel="noreferrer noopener">Hairmyres has a new path into south of site</a> (from Strathtay Ave).</li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-94ad3f9e-5c10-4412-bc03-d3df722422ba"><li><a href="#one-one">Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</a> (ends 3 Aug – <strong>today!</strong>)</li><li><a href="#one-two">St. Paul&#8217;s Youth Forum – Flourishing Molendinar second consultation</a> (ends 6 Aug)</li><li><a href="#one-three">Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</a> (ends 13 Aug)</li><li><a href="#one-four">East Dunbartonshire Council – Bishopbriggs Town Centre Regeneration</a> (ends 15 Aug)</li><li><strong><a href="#one-five">East Dunbartonshire Council – Schools waiting and loading orders</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-six">East Dunbartonshire Council – Lenzie Rd, Kirkintilloch waiting and loading order</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-seven" target="_blank" rel="noreferrer noopener">East Dunbartonshire Council – Civic Way/Lenzie Rd, traffic management</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-eight">Glasgow City Council – Auldhouse Area Traffic Management Order</a> (ends 20 Aug)</strong></li><li><strong><a href="#one-nine">North Lanarkshire Council – Bellshill Entrance/Velo Park Project</a> (until end of Aug)</strong></li><li><a href="#one-ten">East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</a></li><li><a href="#one-eleven">Glasgow City Council – Low Emission Zone consultation</a> (ends 2 Sep)</li><li><a href="#one-twelve">Glasgow City Council – Inner East Strategic Development Framework</a> (ends 3 Sep)</li><li><a href="#one-thirteen">East Dunbartonshire Council – Active Travel Discussion</a> (ends 28 Sep)</li><li><a href="#one-fourteen">Glasgow Urban Sports – GUSM74 Urban Sports Sculpture Park</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#three-one">North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</a></strong></li></ol>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</h4>



<p>Glasgow Housing Association&#8217;s parking areas are in Townhead, east of Buchanan Bus Station, behind the high flats.&nbsp;Resident’s parking spaces around Kennedy St and St Mungo Avenue have been used as free parking by shoppers/commuters. This order introduces parking restrictions (as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-one" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.1</a>). </p>



<p>GoBike agreed with these measures in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-Parking-Stage-One-response-010421.pdf" target="_blank" rel="noreferrer noopener">Stage 1 GHA response</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-parking-response-280721.pdf" target="_blank" rel="noreferrer noopener">latest GHA response</a>. </p>



<p>There are the usual documents for a TRO:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/002-GCC-City-Centre-Traffic-Management-Order-2010-Variation-No.29....pdf" target="_blank" rel="noreferrer noopener">plan of GHA parking areas</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">GHA areas draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-11.01-Publication-of-Proposals-Press-Notice-Draft-Variation-29.pdf" target="_blank" rel="noreferrer noopener">GHA areas press notice</a>&nbsp;and the usual&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a>. Respond by e-mail to&nbsp;<a href="mailto:lestraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">lestraffic@glasgow.gov.uk</a>&nbsp; by<strong>&nbsp;3 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: St. Paul’s Youth Forum –&nbsp;Flourishing Molendinar second consultation</h4>



<p>The Flourishing Molendinar project covers an area around Blackhill in the north east of Glasgow. As seen in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-two" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.2</a>, the next stage of the&nbsp;<a href="https://twitter.com/_OnBikes/status/1413513153124737026?s=20" target="_blank" rel="noreferrer noopener">Flourishing Molendinar project has produced new plans</a> for consultation. Proposals include a pedestrianised section on Langdale St, segregated cycleways on Cumbernauld Rd and Royston Rd.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="372" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=525%2C372&#038;ssl=1" alt="Proposal for Royston Rd at Langdale St/Robroyston Rd" class="wp-image-14745" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=600%2C425&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plans for a permanent cycletrack along Royston Rd at junction with Langdale St and Robroyston Rd</figcaption></figure>



<p>Permanent segregated lanes on Royston Rd would continue east of Provanmill Rd, where the current pop-up lanes peter out, past the Langdale St/Robroyston Rd junction. This wouldn&#8217;t just connect Blackhill towards the city centre, it&#8217;s also just across the M80 footbridge from Barmulloch. The junction is also a route to a school,&nbsp;<a href="https://twitter.com/_OnBikes/status/1401112056217030661?s=20" target="_blank" rel="noreferrer noopener">St Philomena&#8217;s RC Primary School, where pupils have been doing their own plans in Minecraft</a> software. </p>



<p>For more on the above, see the&nbsp;<a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DQSIkWdsW0yxEjajBLZtrQAAAAAAAAAAAAMAADcjbltUNUg0SldZR0JBR1VPTEhOVDJLNTdCN0QwUC4u" target="_blank" rel="noreferrer noopener">FloMo survey</a>&nbsp;(ends&nbsp;<strong>6 August</strong>). </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</h4>



<p>Garnethill is perched above Sauchiehall St and Cambridge St, up some of the steepest streets in the city centre. As we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-three" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.3</a>, it&#8217;s due to get parking controls, which stem from a&nbsp;<a href="https://www.gobike.org/garnethill-car-parking-but-no-cycle-contraflow-public-exhibition-on-parking-controls-thursday-22-and-saturday-24-march-2018-4503" target="_blank" rel="noreferrer noopener">consultation event in 2018</a>. </p>



<p>Garnethill also has a lot of existing one way streets, which don&#8217;t allow for contraflow cycling. In our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-Stage1-response-090120.pdf" target="_blank" rel="noreferrer noopener">Garnethill Stage 1 response</a>, GoBike objected to this and other measures. Very little had changed since, apart from a few parking spaces, so we re-iterated our objections in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-response-300721.pdf" target="_blank" rel="noreferrer noopener">response to the published Garnethill order</a>.</p>



<p>See the restrictions in the TRO documents:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/05-Garnethill-Proposed-CPZ-Plan.pdf" target="_blank" rel="noreferrer noopener">Garnethill plan</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">Garnethill draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">Garnethill press notice</a>&nbsp;and the standard&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>. Email:&nbsp;<a href="mailto:garnethillparking@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">garnethillparking@glasgow.gov.uk</a>&nbsp;by&nbsp;<strong>13 August</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</h4>



<p>This consultation is about not just Bishopbriggs town centre, but also&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/delivery-brr5-and-westerhill-masterplan" target="_blank" rel="noreferrer noopener">phase 5 of Bishopbriggs Relief Road (BRR5)</a>&nbsp;and the&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/a803-corridor-improvements" target="_blank" rel="noreferrer noopener">A803 corridor</a>. Cycling doesn&#8217;t get much of a mention, as we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-four" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.4</a>. That&#8217;s despite Bishopbriggs being so close to the Forth &amp; Clyde canal and to Glasgow (where the A803 changes from Kirkintilloch Rd to Springburn Rd). If you want to put a word in for cycling, see the&nbsp;<a href="https://www.eastdunbarton.gov.uk/bishopbriggs-town-centre-regeneration-consultation" target="_blank" rel="noreferrer noopener">Bishopbriggs consultation webpage</a>&nbsp;and&nbsp;<a href="https://storymaps.arcgis.com/stories/7f0516541d9e45cc8d00ac151ae67143" target="_blank" rel="noreferrer noopener">Bishopbriggs Public Realm Plan survey</a> by&nbsp;<strong>15 August</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: East Dunbartonshire Council –&nbsp;Schools waiting and loading orders</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="208" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=525%2C208&#038;ssl=1" alt="Map of St Matthews and Wester Cleddens primary schools, Bishopbriggs" class="wp-image-14771" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=600%2C238&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=300%2C119&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Schools include St Matthew&#8217;s and Wester Cleddens primary schools, Bishopbriggs</figcaption></figure>



<p>A series of orders from East Dunbartonshire bring in parking restrictions around the following nine primary schools: </p>



<ul class="wp-block-list"><li>Clober Primary School, Milngavie </li><li>Westerton Primary School, Bearsden </li><li>Meadowburn Primary School, Bishopbriggs </li><li>St Matthew’s Primary School, Bishopbriggs </li><li>Wester Cleddens Primary School, Bishopbriggs </li><li>Gartconner Primary School, Kirkintilloch </li><li>Holy Family Primary School, Kirkintilloch </li><li>Craighead Primary School, Milton of Campsie </li><li>Torrance Primary School, Torrance</li></ul>



<p>All include &#8216;no waiting&#8217; restrictions between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. The Clober, Westerton, Craighead and Torrance school plans have sections with no waiting at any time (mostly on corners/school entry roads).</p>



<p>See the plans and other PDF documents for details: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-Statement-of-reasons-west-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;west&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-East-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs/Kirkintilloch/Milton of Campsie/Torrance schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-order-Bishopbriggs-Kirkintilloch-Milton-of-Campsie-Torrance-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-statement-of-reasons-east-schools-waiting-Loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Kirkintilloch-Bishopbriggs-Milton-of-Campie-Torrance-schools.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Bishopbriggs-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs consolidated order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-MoC-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Milton of Campsie consolidated order</a>. </p>



<p>Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-six">1.6: East Dunbartonshire Council –&nbsp;Linnhe Ave/Thums Ave/Ochil Rd waiting and loading order</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="235" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02.jpg?resize=525%2C235&#038;ssl=1" alt="Map of Linnhe Ave/Thums Ave/Ochil Rd, Bishopbriggs
" class="wp-image-14773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=600%2C269&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=300%2C134&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=1536%2C688&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=2048%2C917&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Linnhe Ave/Thums Ave are either side of Woodhill Rd, south of Woodhill Primary School</figcaption></figure>



<p>Immediately east of the above map are Linnhe Ave, Thums Ave and the Ochil Rd cul-de-sac (near Wester Cleddens Rd). Linnhe Ave is due to have no waiting or loading at any time, across from the shops on Woodhill Rd. Thums Ave and Ochil Rd are due to have restrictions only between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. Presumably, the times relate to the nearby Thomas Muir Primary School and Bishopbriggs Academy, which have a gate on Ochil Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Ochil-Rd-Thrums-Ave-Linnhe-Ave-plan.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Linnhe-Ave-Thrums-Ave-Ochil-Rd-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Linnhe-Ave-Thums-Ave-Ochil-rd.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd notice</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: East Dunbartonshire Council –&nbsp;Civic Way/Lenzie Rd, traffic management</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" height="295" width="525" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC_TJ-House_1000px-600x337.jpg?resize=525%2C295&#038;ssl=1" alt="F
ormer EDC headquarters building" class="wp-image-14838"/><figcaption><em>Tom Johnston House, the former EDC headquarters on Civic Way, Kirkintilloch</em></figcaption></figure>



<p>Civic Way, Kirkintinlloch was the site of the former East Dunbartonshire Council headquarters (<a href="https://www.kirkintilloch-herald.co.uk/news/bulldozers-move-demolish-landmark-2561377" target="_blank" rel="noreferrer noopener">the building was demolished in 2015</a>). <a href="https://www.urbanrealm.com/news/7951/Opinions_sought_on_Kirkintilloch_social_housing.html" target="_blank" rel="noreferrer noopener">New, affordable housing is being built</a> on the site, south of Civic Way. On the road itself, EDC plan to add a speed bump with parking restrictions round the corner on Lenzie Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Lenzie-Road-Plan.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Lenzie-Road-waiting-loading-restrictions.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Lenzie-Road-no-waiting-and-no-loading.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Notice-for-Civic-Way-road-hump.pdf" target="_blank" rel="noreferrer noopener">Civic Way notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener"></a><a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener">Kirkintilloch consolidated order</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Glasgow City Council –&nbsp;Auldhouse Area Traffic Management Order</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=298%2C356&#038;ssl=1" alt="Auldhouse area map" class="wp-image-14813" width="298" height="356" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=502%2C600&amp;ssl=1 502w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=251%2C300&amp;ssl=1 251w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?w=694&amp;ssl=1 694w" sizes="auto, (max-width: 298px) 100vw, 298px" /></figure></div>



<p>The Auldhouse area in this order is just south of Pollokshaws East train station and the White Cart Water. It&#8217;s a triangle bounded by Kilmarnock Rd, Auldhouse Rd and Nether Auldhouse Rd. </p>



<p>It&#8217;s mostly along similar lines to other parking controls elsewhere. However, there are a few back lanes between Riverford Rd and Ellisland Rd which will be signed as &#8216;access only&#8217; for motor vehicles. If those are followed, they should allow bikes to have a slightly quieter north-south route. However, the road surfaces are either rough tarmac or cobbles so they might not be that quiet! </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Traffic-Management-Order-plan.pdf" target="_blank" rel="noreferrer noopener">Auldhouse plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Report.pdf" target="_blank" rel="noreferrer noopener">Auldhouse report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/NoticeOfProposals-AuldhouseRoad-230x85mm.pdf" target="_blank" rel="noreferrer noopener">Auldhouse notice</a> and the catch-all <a href="https://www.gobike.org/wp-content/uploads/2021/08/Statement_of_Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>.</p>



<h4 class="wp-block-heading" id="one-nine">1.9: North Lanarkshire Council –&nbsp;Bellshill Entrance/Velo Park Project</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="375" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=525%2C375&#038;ssl=1" alt="Map highlighting the northern part of Strathclyde Country Park around the South Calder Water" class="wp-image-14794" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=600%2C428&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=300%2C214&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1231&amp;ssl=1 1231w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map shows the South Calder Water (blue dashed line). Pink dashed line shows bus route between Bellshill and Motherwell train stations. Will people be able to take their BMX on the bus?</figcaption></figure>



<p>The &#8216;entrance&#8217; is a bit confusing as most people don&#8217;t realise Strathclyde Country Park goes past Bothwellhaugh Rd and the railway, up to Bellshill Rd (A721). The area north of the loch includes the South Calder Water, Bothwellhaugh Cemetery, Bellshill Golf Club and the South Calder Walkway off-road path network. NLC propose to thread mountain bike trails around these, as shown in image, below.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="479" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=525%2C479&#038;ssl=1" alt="Map of proposed mountain bike trails around South Calder Water" class="wp-image-14795" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=600%2C547&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=300%2C273&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?w=800&amp;ssl=1 800w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of proposed mountain bike trails. The note about partially sharing one trail with pedestrians doesn&#8217;t sound like a good idea. The &#8216;green link to Ravenscraig&#8217; peters out around the Aquatec leisure centre</figcaption></figure>



<p>NLC have a patchy record with similar projects like mountain bike trails in Forgewood and skate ramps in Motherwell and Wishaw. However, there is a successful skatepark in Airdrie and a BMX race track in Cumbernauld. The council have taken some input from <a href="https://socialtrack.co.uk/" target="_blank" rel="noreferrer noopener">Socialtrack</a>, who created and run the excellent <a href="https://socialtrack.co.uk/pages/wishawhill-wood-pumptrack" target="_blank" rel="noreferrer noopener">Wishawhill Wood pump track</a> in Craigneuk. These plans include a pump track but it&#8217;s not designed yet (there&#8217;s just an example track photo). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="360" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=525%2C360&#038;ssl=1" alt="Plan of proposed 'Hub and Skills area' including pump track" class="wp-image-14796" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=600%2C411&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=300%2C206&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?w=826&amp;ssl=1 826w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of proposed &#8216;Hub and Skills area&#8217; on the eastern edge of Bellshill</figcaption></figure>



<p>The &#8216;Hub/Skills area&#8217; of the new velo park would be at the edge of Bellshill (next to the roundabout on Motherwell Rd/A721). It could be a great facility for young people around the Bellshill area. The existing Greenlink path makes it more accessible from North Motherwell too (but it doesn&#8217;t link to Ravenscraig, as claimed). </p>



<p>The new route into Strathclyde Country Park should broaden active travel access from Bellshill and Motherwell. This project doesn&#8217;t include any paths near the Raith Interchange bridges (as <a href="https://www.facebook.com/nlccountryparks/photos/a.833729946687529/4330993900294432/" target="_blank" rel="noreferrer noopener">suggested on Facebook</a>). The new routes are indirect and sloping, so are less likely to help cycle commuters around Bellshill. </p>



<p>If you cycle in the area, see the <a href="https://sway.office.com/RsgVUssczf0waxaJ?ref=Link" target="_blank" rel="noreferrer noopener">Bellshill Entrance &amp; Velo Park info page</a>. You can email comments to GreenspaceProjects@northlan.gov.uk. The page says the process should lead to a Sport Scotland application this month so email <strong>before the end of August</strong>.</p>



<h4 class="wp-block-heading" id="one-ten">1.10: East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</h4>



<p>As covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-five" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.5</a>, Ayr Rd through Newton Mearns is a main active travel route into Glasgow. This phase 2 consultation is about replacing the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-pop-up-bike-roll-corridor" target="_blank" rel="noreferrer noopener">phase 1 cones</a> with light segregation, removing some segregation and adding parking bays (one with the bike lane outside it and trialing a parking-protected bike lane for the other). </p>



<p>Light segregation options include &#8216;flexible delineator posts&#8217; or &#8216;wand orca&#8217; units. For examples, maps and more details, see the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-phase-2" target="_blank" rel="noreferrer noopener">Ayr Road Phase 2 Commonplace page</a>. No obvious deadline on this one.</p>



<h4 class="wp-block-heading" id="one-eleven">1.11: Glasgow City Council –&nbsp;Low Emission Zone consultation</h4>



<p>As in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-three" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.3</a> this consultation is about phase 2 of the Low Emission Zone in Glasgow city centre (between the M8, river and High St). Phase 1 only applied to local buses. Phase 2&nbsp;will include all vehicles entering the zone area (unless exempt) but&nbsp;enforcement is only due to start in June 2023.</p>



<p>The short survey asks you about issues like the size of the LEZ area and the grace periods. See the&nbsp;<a href="https://glasgow.gov.uk/27143" target="_blank" rel="noreferrer noopener">Glasgow LEZ consultation page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_LEZ2021/" target="_blank" rel="noreferrer noopener">LEZ online survey</a>. Closes on <strong>2 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-twelve">1.12: Glasgow City Council – Inner East Strategic Development Framework</h4>



<p>The other side of High St out to Carntyne and Tollcross is the &#8216;Inner East&#8217; area, covered in the latest SDF (as in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-four" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.4</a>). The &#8216;Connected&#8217; section mentions quite a few cycling infrastructure projects but the focus is still on public transport and roads, including the so-called East End Regeneration Route (EERR) dual carriageway.</p>



<p>See the&nbsp;<a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener">Inner East consultation page</a>&nbsp;for link to the&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_SDF_InnerEast/">SDF survey</a> –&nbsp;ends <strong>3 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-thirteen">1.13: East Dunbartonshire Council –&nbsp;Active Travel Discussion</h4>



<p>This has been featured since&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927#one-two" target="_blank" rel="noreferrer noopener">Digest 86, Item 1.2</a>, including its ‘<a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">Ideas Map</a>‘ for the area. It&#8217;s an opportunity to focus on active travel (walking, cycling and wheeling). EDC were pioneers when they built phase 1 of the Bearsway cycletrack in Milngavie. However, <a href="https://www.scotsman.com/news/transport/hundreds-join-mass-cycle-back-scrapped-bears-way-bike-lane-extension-1463105" target="_blank" rel="noreferrer noopener">since phase 2 was scrapped</a>, they&#8217;ve fallen behind other local authorities; not even bidding for Spaces for People funding. </p>



<p>Further online discussion events are due later in August. See a full list of events and background info on the&nbsp;<a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. Closing date – <strong>28 Sep 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-fourteen">1.14: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=301%2C301&#038;ssl=1" alt="" class="wp-image-14836" width="301" height="301" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=600%2C600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=300%2C300&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?w=929&amp;ssl=1 929w" sizes="auto, (max-width: 301px) 100vw, 301px" /><figcaption>A cut away view of the skate park plan</figcaption></figure></div>



<p>Charlotte Worthington&#8217;s gold medal at Tokyo 2020 in the BMX Freestyle Park event seems like a good reminder about <a href="https://glasgowurbansports.co.uk/" target="_blank" rel="noreferrer noopener">Glasgow Urban Sports</a>&#8216;&nbsp;skate park project. GUS want to bring land under the M74 extension into productive use as a park for ‘urban sports’ – BMX, skateboarding, inline skating, parkour, etc. Their site is between the back of West St Subway station and Eglinton St. The sculptures would enhance the area even when they didn&#8217;t have skaters jumping off them!</p>



<p>See <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUS&#8217;s survey</a>&nbsp;to try and find out what skaters, or their families, want from the park. Or see the <a href="https://www.facebook.com/groups/177902472310943/" target="_blank" rel="noreferrer noopener">GUS Facebook</a> or <a href="https://twitter.com/GlasUrbSpo" target="_blank" rel="noreferrer noopener">GUS Twitter</a> accounts.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="302" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=525%2C302&#038;ssl=1" alt="Visualisation of the new station" class="wp-image-14829" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=600%2C345&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=300%2C173&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=1536%2C884&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1768&amp;ssl=1 1768w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Visualisation of the new station –&nbsp;the access road would come from behind the view in this image</em></figcaption></figure>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="294" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&#038;ssl=1" alt="Plan of new access to west of Muir St" class="wp-image-14831" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&amp;ssl=1 294w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=147%2C300&amp;ssl=1 147w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?w=590&amp;ssl=1 590w" sizes="auto, (max-width: 294px) 100vw, 294px" /><figcaption>Plan of new access to west of Muir St</figcaption></figure></div>



<p>The planning application for this City Deal project first came up back in <a href="https://www.gobike.org/consultation-digest-issue-61-26-may-2020-11310" target="_blank" rel="noreferrer noopener">Digest 61, Item 1.1</a>. It was to create a new access to the station from the roundabout at the junction of Hamilton Rd (A723), West Hamilton Rd (A721) and Merry St. Running along derelict land behind the row of shops on Muir St, it would join the current road at the station. It would include a bus lane, taxi rank, disabled parking and short cycleway. </p>



<p>However, the cycleway seems to have been dropped from the latest drawings (29 Jun 2021) –see <a href="https://eplanning.northlanarkshire.gov.uk/online-applications/applicationDetails.do?activeTab=summary&amp;keyVal=Q7HWDIBAGXS00" target="_blank" rel="noreferrer noopener">planning application 20/00345/FUL</a>. It would&#8217;ve been pretty short and isolated but would at least have helped cycle to the station from the south. Another example of NLC&#8217;s inconsistent approach –&nbsp;a few steps forward (like the <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-two" target="_blank" rel="noreferrer noopener">RATL path</a>) then a few steps back (like the <a href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-two" target="_blank" rel="noreferrer noopener">RAI dual carriageway</a>).</p>



<p><a href="https://eplanning.northlanarkshire.gov.uk/online-applications/files/BBF1588F0DEB7D45D2D230D860D5010B/pdf/20_00345_FUL-DECISION_NOTICE-1321427.pdf" target="_blank" rel="noreferrer noopener">North Lanarkshire Council have now granted planning permission</a> for this access road to go ahead. Redevelopment has already taken place at nearby Park &amp; Ride car parks. <a href="https://www.scotrail.co.uk/about-scotrail/news/work-continues-motherwell-station-redevelopment" target="_blank" rel="noreferrer noopener">Work is now underway on the station building</a> (using the service road to get passengers down to the middle platforms while stairs are replaced). The Muir St works are expected to start late 2021 and finish summer 2022.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14734</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 86, 11 May 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 11 May 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Benalder St]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[Canniesburn Toll]]></category>
		<category><![CDATA[Connecting Woodside]]></category>
		<category><![CDATA[East City Way]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Kilbride]]></category>
		<category><![CDATA[Garscube Rd]]></category>
		<category><![CDATA[George Square]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[Maryhill]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Royston Rd]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13927</guid>

					<description><![CDATA[Junctions squinty and scary plus permanent and pop-up lanes. Around the north of the city, plans for Maryhill Road&#8217;s squinty crossing are dwarfed by proposals for Canniesburn Toll roundabout in East Dumbartonshire. In the city centre, another Bank Holiday building fire means the road is fenced off on High St at the junction of George &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 86, 11 May 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Junctions squinty and scary plus permanent and pop-up lanes.</h2>



<p>Around the north of the city, plans for Maryhill Road&#8217;s squinty crossing are dwarfed by proposals for Canniesburn Toll roundabout in East Dumbartonshire. </p>



<p>In the city centre, another Bank Holiday building fire means the road is fenced off on High St at the junction of George St/Duke St. </p>



<p>The Scottish Parliament election has passed but it&#8217;s still a bit quiet on the consultations front. However, there are plenty of temporary and permanent projects going on so we have another Infrastructure Update. Most of them are in the city but East Kilbride is also getting in on the Spaces for People action. </p>



<span id="more-13927"></span>



<h3 class="wp-block-heading" id="infra-update">Infrastructure Update </h3>



<ul class="wp-block-list"><li><a rel="noreferrer noopener" href="https://twitter.com/BrunsMoore/status/1391691966442708999?s=20" target="_blank">Benalder St, Glasgow is having a cycleway installed</a> over the River Kelvin after works on nearby Bunhouse Rd and Old Dumbarton Rd (for Yorkhill &amp; Kelvingrove Cycling Village).</li><li><a rel="noreferrer noopener" href="https://twitter.com/RiderGlasgow/status/1389972124824186885?s=20" target="_blank">Cambridge St, Glasgow – Spaces for People cycle lanes</a> are up and running (including <a rel="noreferrer noopener" href="https://twitter.com/GoBikeGlasgow/status/1388427198252691456?s=20" target="_blank">bike traffic lights at Renfrew St</a>)<span style="font-size: 1rem">. </span></li><li><a rel="noreferrer noopener" href="https://twitter.com/tofolo_1/status/1389980942039666690?s=20" target="_blank">East City Way phase 1</a> at London Rd/Mount Vernon may be nearly there – see 3.1, below.</li><li><a rel="noreferrer noopener" href="https://twitter.com/JoolzPedals/status/1388598294109114371?s=20" target="_blank">East Kilbride has Spaces for People lanes installed</a> between EK train station and shopping centre (via Brouster Hill) including <a rel="noreferrer noopener" href="https://twitter.com/JoolzPedals/status/1387860403372298240?s=20" target="_blank">double decker planters on Cornwall St</a>.</li><li><a style="font-size: 1rem" rel="noreferrer noopener" href="https://twitter.com/parcelorogues/status/1390755744853762050?s=20" target="_blank">Garscube Rd segregated lanes</a><span style="font-size: 1rem">, for the Connecting Woodside project, have almost reached </span><a style="font-size: 1rem" rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/05/Garscube-Rd-Firhill-lights_9982_1200px.jpg" target="_blank">new bike traffic lights at Firhill St</a><span style="font-size: 1rem"> </span>(installed but<span style="font-size: 1rem"> not put into service yet).</span></li><li><a rel="noreferrer noopener" href="https://twitter.com/isersmalone/status/1382657762648330242?s=20" target="_blank">George Square gets planter boxes</a> and <a rel="noreferrer noopener" href="https://twitter.com/iaindocherty/status/1388451557361000451?s=20" target="_blank">outdoor seating</a> (mostly for The Counting House).</li><li><a rel="noreferrer noopener" href="https://twitter.com/_OnBikes/status/1387711127665221632?s=20" target="_blank">Royston Rd, Glasgow – work started on Spaces for People lanes</a>. </li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong> – link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-bd8c9723-0178-460b-91f7-5728c4c50773"><li><strong><a href="#one-one">Glasgow City Council – Maryhill Road/North Woodside Road/Hopehill Road (Traffic Regulation) Order 2021</a>, (ends 18 June)</strong></li><li><a href="#one-two"><strong>East Dunbartonshire Council –&nbsp;Active Travel Discussion</strong></a></li><li><strong><a href="#one-three">East Dunbartonshire Council – Canniesburn Toll Signalisation Study</a></strong></li><li><a href="#one-four">North Lanarkshire Council –&nbsp;Town Hubs location surveys</a></li><li><a href="#one-five">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p><strong><a href="#two-one">Glasgow City Council –&nbsp;Pollok pop-up lanes consultation (Spaces for People)</a></strong></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Glasgow City Council –&nbsp;East City Way Phase 1 (London Dr to Daldowie Rd) Order 2021</a></li><li><a href="#three-two">Glasgow City Council –&nbsp;London Road and Hamilton Road (30mph Speed Limit) Order 2021</a></li><li><a href="#three-three">Multiplex –&nbsp;Glasgow Uni campus, May newsletter</a></li><li><a href="#three-four">Urban Roots –&nbsp;Malls Mire,&nbsp;April Newsletter</a></li></ol>



<h3 class="wp-block-heading" id="block-ad6eda16-21e7-4a1f-984d-21f675cbe2c1"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – Maryhill Road/North Woodside Road/Hopehill Road (Traffic Regulation) Order 2021</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="317" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Plan-TRO_1200px.png?resize=525%2C317&#038;ssl=1" alt="" class="wp-image-13944" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Plan-TRO_1200px.png?resize=600%2C362&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Plan-TRO_1200px.png?resize=300%2C181&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Plan-TRO_1200px.png?w=1011&amp;ssl=1 1011w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This traffic order has a long title for a short stretch of junction. It creates a diagonal cycle crossing on Maryhill Rd between the two filtered sections of N Woodside Rd. This is part of the wider <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/article/21802/Connecting-Woodside" target="_blank">Connecting Woodside</a> project (which is installing other squinty crossings on Garscube Rd). </p>



<p>The accompanying report says it includes <em>&#8220;the installation of a signalised pedestrian and cycle crossing at the junction of Maryhill Road, North Woodside Road and Hopehill Road&#8221;</em>. It also restricts people cycling on the crossing from turning onto Maryhill Rd midway across. Presumably, in an effort to protect pedestrians who may be crossing alongside bikes. </p>



<p>The eastern side will have a 2-way cycle carriageway (according to the very small annotation, above). The order also prohibits motor vehicles from using the new cycle carriageway (the current road has been used for car parking). </p>



<p>There are the usual documents: <a href="https://www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Plan-TRO.pdf" target="_blank" rel="noreferrer noopener">TRO plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Draft_Report.pdf" target="_blank" rel="noreferrer noopener">TRO report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_TRO-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">TRO press notice</a> and (short) <a href="https://www.gobike.org/wp-content/uploads/2021/05/Maryhill-Rd-N-Woodside-Rd_Statement_of_Reasons.pdf" target="_blank" rel="noreferrer noopener">TRO statement of reasons</a>. The deadline for responses is Friday, 18 June 2021.</p>



<h4 class="wp-block-heading" id="one-two">1.2:&nbsp;East Dunbartonshire Council – Active Travel Discussion (11 May –&nbsp;28 Sept)</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?resize=525%2C263&#038;ssl=1" alt="" class="wp-image-13973" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?resize=600%2C300&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?resize=1536%2C768&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?w=2000&amp;ssl=1 2000w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/EDC-AT-webbanner.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>EDC&#8217;s Active Travel Discussion has just started</figcaption></figure>



<p>This item came up just before publication and we&#8217;ll no doubt have more to say about it. However, for now, we&#8217;ll just highlight the online events starting on 18 May (for the Lennoxtown, Milton of Campsie, Haughhead and Clachan of Campsie areas). There are about a dozen online events in the next few months for different areas (using MS Teams). Paper forms are also available from local libraries.</p>



<p>See a full list of events and background info on the <a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. EDC have set up an <a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">online map</a> to gather suggestions, with links to highlight paths, etc. in the area. This consultation will feed into a new Active Travel Strategy later in the year.  </p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;East Dunbartonshire Council – Canniesburn Toll Signalisation Study</h4>



<p>Canniesburn Toll is a main junction between Bearsden and Glasgow, which links Switchback Rd and Drymen Rd to the A81 (Maryhill Rd/Milgavie Rd). East Dunbartonshire Council is going to add traffic lights and pedestrian crossings around the roundabout itself. At the same time EDC are proposing to add a cycle lane (using space gained by removing pavement around the centre of roundabout). </p>



<p>There are two options being put forward for the bike lane –&nbsp;one on the carriageway and one on the footway. While it&#8217;s good that EDC is looking at cycling infrastructure again (after ignoring Spaces for People), there are some obvious issues with both options. </p>



<p>Option 1, on the carriageway, seems to give priority for people cycling round the edge of the roundabout. However, there&#8217;s an obvious <a href="https://twitter.com/OConnorOisin/status/1391700806907334656?s=20" target="_blank" rel="noreferrer noopener">risk of a &#8216;left hook&#8217; collision, when cycling ahead from cars turning left across your path</a>. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-image15lq_1620058231952.png?resize=525%2C296&#038;ssl=1" alt="Canniesburn Toll, Option 1" class="wp-image-13936" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-image15lq_1620058231952.png?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-image15lq_1620058231952.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-image15lq_1620058231952.png?w=960&amp;ssl=1 960w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Canniesburn Toll, Option 1 –&nbsp;carriageway lane with priority but also &#8216;left hook&#8217; risk</figcaption></figure>



<p>Option 2, on the footway, should be safer but slower with multiple waits at traffic lights to cross each arm of the roundabout. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-looking_to_macfarlane_roadlq_1620125217927.png?resize=525%2C296&#038;ssl=1" alt="Canniesburn Toll, Option 2" class="wp-image-13937" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-looking_to_macfarlane_roadlq_1620125217927.png?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-looking_to_macfarlane_roadlq_1620125217927.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/05/Canniesburn-looking_to_macfarlane_roadlq_1620125217927.png?w=960&amp;ssl=1 960w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Canniesburn Toll, Option</em> 2 –&nbsp;footway lane is out of traffic but would mean waiting at crossings</figcaption></figure>



<p>It&#8217;s not clear if either option is trying to recreate a <a rel="noreferrer noopener" href="https://bicycledutch.wordpress.com/2015/10/13/explaining-the-dutch-roundabout-abroad/" target="_blank">Dutch roundabout</a>, which tend to be smaller, single-lane roundabouts with a cycle lane in a separate ring outside it (leaving a gap for cars to stop on each arm). There may not be enough space all the way around the roundabout to add bike lanes further out. However, there is a huge area in the middle of it.</p>



<p>The <a href="https://storymaps.arcgis.com/stories/01510c7eb11b474eb1bff3f62dfcf0cf" target="_blank" rel="noreferrer noopener">Canniesburn Toll consultation website</a> has background info and a link to the <a href="https://survey123.arcgis.com/share/?open=web&amp;embed=fullScreen&amp;id=63ec6e8609af4ff0a484991db4ff5f36&amp;hide=navbar,footer,theme" target="_blank" rel="noreferrer noopener">survey</a>, which takes general feedback and for each option. It&#8217;s apparently had a few technical issues which the consultants (Stantec) say are being resolved. If you have any issues with it you could try emailing <a href="mailto:canniesburntoll@stantec.com">canniesburntoll@stantec.com</a>. There&#8217;s no obvious closing date for this one. However, a &#8216;<a href="https://www.gobike.org/wp-content/uploads/2021/05/EDC-Technical-Notes-2021_Issue-22-Canniesburn-Toll-Improvement-Project-Tech-Note.pdf" target="_blank" rel="noreferrer noopener">Technical Note</a>&#8216; by EDC for their councillors says detailed design will start in June 2021.</p>



<h4 class="wp-block-heading" id="one-four">1.4:&nbsp;North Lanarkshire Council –&nbsp;Town Hubs location surveys</h4>



<p>As covered in <a href="https://www.gobike.org/consultation-digest-local-issue-85-27-april-2021-13844#one-two" target="_blank" rel="noreferrer noopener">Digest 85, Item 1.2</a>. The Hubs are about creating community facilities through school refurbishments (or other redevelopment). While not strictly about cycling, the new hubs should be accessible by bike/active travel. The areas involved are: Airdrie, Bellshill, Coatbridge, Cumbernauld, Kilsyth, Motherwell, ‘Northern Corridor’ (Chryston), Shotts and Wishaw. </p>



<p>Each area is covered in one of the&nbsp;<a href="https://www.northlanarkshire.gov.uk/regeneration-and-investment/towns-and-communities/place-vision/town-and-community-hubs/town-hub-location-survey" target="_blank" rel="noreferrer noopener">videos on the consultation webpage</a>. You can watch them on the page or by clicking the red link to open them in a new tab/window. There are also videos at the foot of the page explaining the thinking behind the project. Each area has a link to a survey to give your views. There’s no obvious closing date for this one.</p>



<h4 class="wp-block-heading" id="one-five">1.5: GUS –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>First covered in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank" rel="noreferrer noopener">Digest 81, Item 1.9</a>, the GUSM74 skate park would transform an area under the motorway near West St underground station. The&nbsp;<a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a>&nbsp;is still open for BMX riders, skaters, or their families, to have their say.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow City Council –&nbsp;Pollok pop-up lanes consultation (Spaces for People)</h4>



<p>The city council added pop-up cycle lanes in Pollok on Braidcraft Rd and Brockburn Rd (as mentioned in the Spaces for People Update in <a href="https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767" target="_blank" rel="noreferrer noopener">Digest 84</a>). As in other areas, the new lanes used &#8216;soft segregation&#8217; (black &amp; white &#8216;zebras&#8217;). They generated a lot of discussion on social media, especially Facebook. A <a href="https://www.facebook.com/CllrDavidMcDonald/posts/3777568095675219" target="_blank" rel="noreferrer noopener">Facebook post by Cllr David McDonald</a> talked about a future GCC consultation. It was apparently due to start on 7 May but there doesn&#8217;t seem to be any further information so far. </p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council –&nbsp;East City Way Phase 1 (London Dr to Daldowie Rd) Order 2021</h4>



<p>This was covered in <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-five" target="_blank" rel="noreferrer noopener">Digest 80, Item 1.5</a> with further responses in <a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#three-one" target="_blank" rel="noreferrer noopener">Digest 82, 3.1</a>. GCC have emailed to confirm it&#8217;s going ahead as proposed. Hopefully, this and the image in the Infrastructure Update, mean the first phase is just about complete. </p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Council –&nbsp;London Road and Hamilton Road (30mph Speed Limit) Order 2021</h4>



<p>This order has gone hand-in-hand with the above since <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-six" target="_blank" rel="noreferrer noopener">Digest 80, Item 1.6</a>. It&#8217;s also been approved. Both orders were made on 30th April 2021 with adverts in the Evening Times on 6th May 2021.</p>



<h4 class="wp-block-heading" id="three-three">3.3: Multiplex –&nbsp;Glasgow Uni campus, May newsletter</h4>



<p>Quick off the mark this month are Multiplex with their <a href="https://www.gobike.org/wp-content/uploads/2021/05/Glasgow-Uni-May-2021.pdf" target="_blank" rel="noreferrer noopener">May newsletter</a> about the Glasgow Uni campus redevelopment. </p>



<h4 class="wp-block-heading" id="three-four">3.4: Urban Roots –&nbsp;Malls Mire,&nbsp;April Newsletter</h4>



<p>First covered in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#three-four" target="_blank" rel="noreferrer noopener">Digest 74, Item 3.4</a>, we&#8217;re a wee bit late with the <a href="https://www.gobike.org/wp-content/uploads/2021/05/Malls-Mire-Newsletter-April-2021.pdf" target="_blank" rel="noreferrer noopener">April newsletter</a>. Apparently some paths may be rerouted to allow work to take place. On the plus side, the bike pump track is looking good!</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13927</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 84, 13 April 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 13 Apr 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Ardrossan]]></category>
		<category><![CDATA[barriers]]></category>
		<category><![CDATA[Braidcraft Rd]]></category>
		<category><![CDATA[Brockburn Rd]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[Dawsholm Park]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[Maryhill]]></category>
		<category><![CDATA[Merchant City]]></category>
		<category><![CDATA[planters]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13767</guid>

					<description><![CDATA[A handful of consultations and the latest on Spaces for People. This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire. Again, this Digest features an update about recent infrastructure developments. This time &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 84, 13 April 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A handful of consultations and the latest on Spaces for People. </h2>



<p>This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire.</p>



<p>Again, this Digest features an update about recent infrastructure developments. This time focusing on Glasgow&#8217;s latest Spaces for People measures (following on from Howard St last time). A few new lanes are going in Pollok and some in the north east of the city. The city centre has some new planter boxes and should get another new lane (eventually).</p>



<span id="more-13767"></span>



<h3 class="wp-block-heading" id="infra-update">Glasgow Spaces for People Update</h3>



<ul class="wp-block-list"><li><a href="https://www.glasgow.gov.uk/26693" target="_blank" rel="noreferrer noopener">Braidcraft Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26692" target="_blank" rel="noreferrer noopener">Brockburn Rd plans</a> and <a href="https://www.glasgowtimes.co.uk/news/19226857.cycling-group-hits-back-petition-lanes/" target="_blank" rel="noreferrer noopener">GoBike&#8217;s response to &#8216;bikelash&#8217; in Glasgow Times</a> making front page news!</li><li><a href="https://www.glasgow.gov.uk/26735" target="_blank" rel="noreferrer noopener">Cambridge St plans</a> which may not have started yet due to <a href="https://www.gobike.org/wp-content/uploads/2021/04/Cambridge-St-roadworks_9450_1000px.jpg" target="_blank" rel="noreferrer noopener">water main works</a> (and the usual considerate parking). </li><li><a href="https://twitter.com/RiderGlasgow/status/1377290772832206857?s=20" target="_blank" rel="noreferrer noopener">Planter boxes installed on Candleriggs, Merchant City</a> (to make way for outdoor seating?). More on Bell Street, Wilson Street and Trongate.</li><li><a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Fielden-St_9441_1000px.jpg" target="_blank" rel="noreferrer noopener">London Rd roadworks near Fielden St</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Clyde-Gateway_9439_1000px.jpg" target="_blank" rel="noreferrer noopener">more near Celtic Park</a> (possibly to lay cable?). Missing zebras/armadillos have been replaced outside Celtic Park/Emirates and lane cleaned.</li><li><a href="https://www.glasgow.gov.uk/26852" target="_blank" rel="noreferrer noopener">Royston Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26851" target="_blank" rel="noreferrer noopener">Wallacewell Rd plans</a>.</li></ul>



<h3 class="wp-block-heading">Barriers Overload Update</h3>



<p><a href="https://twitter.com/langoo/status/1379473673044824070?ref_src=twsrc%5Etfw%7Ctwcamp%5Eembeddedtimeline%7Ctwterm%5Eprofile%3Agobikeglasgow%7Ctwgr%5EeyJ0ZndfZXhwZXJpbWVudHNfY29va2llX2V4cGlyYXRpb24iOnsiYnVja2V0IjoxMjA5NjAwLCJ2ZXJzaW9uIjpudWxsfSwidGZ3X2hvcml6b25fdHdlZXRfZW1iZWRfOTU1NSI6eyJidWNrZXQiOiJodGUiLCJ2ZXJzaW9uIjpudWxsfX0%3D&amp;ref_url=https%3A%2F%2Fwww.gobike.org%2Fconsultation-digest-local-issue-83-30-march-2021-13568" target="_blank" rel="noreferrer noopener">Dawsholm Park barriers</a> –&nbsp;three(!) sets added to new path.</p>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Ardrossan Connections –&nbsp;Design Festival</a> (workshops 14/21 April)</strong></li><li><a href="#one-two">Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops</a> (22/26 April)</li><li><a href="#one-three">East Dunbartonshire Council – Climate Conversation</a><span style="font-size: 1rem;">&nbsp;(online event 22 April)</span></li><li><a href="#one-four">Maryhill North Transformational Regeneration Area – Masterplan consultation</a>&nbsp;(ends 23 April)</li><li><a href="#one-five">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Malls Mire newsletter – March 2021</a></li></ol>



<h3 class="wp-block-heading" id="block-ad6eda16-21e7-4a1f-984d-21f675cbe2c1"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Ardrossan Connections –&nbsp;Design Festival</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="249" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=525%2C249&#038;ssl=1" alt="Illustration of key areas of Ardrossan (looking south)" class="wp-image-13791" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=600%2C285&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=300%2C143&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1521&amp;ssl=1 1521w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>First covered in <a href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#one-two" target="_blank" rel="noreferrer noopener">Digest 78 (1.2)</a>, Ardrossan Connections is about improving links and public spaces in the Ayrshire coastal town. See the <a href="https://ardrossanconnections.commonplace.is/about" target="_blank" rel="noreferrer noopener">webpage about the project</a> or <a href="https://s3-eu-west-2.amazonaws.com/commonplace-customer-assets/ardrossandesignfestival/Information%20boards%20Ardrossan%20Connections%20March%202021.pdf" target="_blank" rel="noreferrer noopener">information boards</a> for more background or view comments on the <a href="https://ardrossanconnections.commonplace.is/comments" target="_blank" rel="noreferrer noopener">Ardrossan Commonplace map</a>.</p>



<p>The latest phase of the project is a &#8216;Design Festival&#8217; from 7–27 April.  In other words, some design workshops (announced just after the last Digest). GoBike members will probably be more interested in the &#8216;Connections&#8217; design workshops on 14 and 21 April. There are also &#8216;Placemaking&#8217; workshops on 20 and 26 April. Each workshop is shown on the <a href="https://ardrossandesignfestival.commonplace.is/overview" target="_blank" rel="noreferrer noopener">Design Festival page</a> –&nbsp;click the one you want to go to its sign-up link. </p>



<p>Alternatively, if you can&#8217;t make any of the workshops, you might be able to use the <a href="https://en-gb.padlet.com/eilidhsustrans/Ardrossan" target="_blank" rel="noreferrer noopener">Ardrossan &#8216;padlet&#8217;</a> to add a design idea as a pin on the map (zoom in –&nbsp;a lot!).</p>



<h4 class="wp-block-heading" id="one-two">1.2: Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops </h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="396" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=525%2C396&#038;ssl=1" alt="Map of (Y)our City Centre Districts with current phase highlighted (Cowcaddens, Townhead, 'Learning Quarter and Merchant City)" class="wp-image-13773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?w=530&amp;ssl=1 530w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=300%2C226&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of (Y)our City Centre Districts with current phase highlighted</figcaption></figure>



<p>The city centre districts projects have been featured several times, including <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-two" target="_blank" rel="noreferrer noopener">Digest 74, 1.2</a>. These are about major regeneration, with an emphasis on transport and community. The four districts being consulted on in this phase are Cowcaddens, Townhead, Merchant City and &#8216;Learning Quarter&#8217; (Cathedral St, etc.). The <a href="https://yourcitycentre2020.commonplace.is/comments" target="_blank" rel="noreferrer noopener">districts Commonplace map</a> is still open but the focus will be on the outcome of the latest workshops.</p>



<p>Proposals Workshops are coming up for&nbsp;Merchant City on 22 April and &#8216;Learning Quarter&#8217; on 26 April. Timetables for each online event are on the <a href="https://www.glasgowcitycentrestrategy.com/city-centre-workshops" target="_blank" rel="noreferrer noopener">City Centre Strategy workshops page</a>. </p>



<p>Cowcaddens and Townhead have already had their workshops. The same webpage showcases the themes which came out of those. &#8216;(Y)our Ideas&#8217;, are numbered –&nbsp;clicking each takes you to a PDF summary about it. Underneath the themes is a button to a survey –&nbsp;it asks which ideas you see as highest priority. </p>



<p>In due course, a similar setup will probably appear for Merchant City/&#8217;Learning Quarter&#8217; after their workshops. </p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;East Dunbartonshire Council – Climate Conversation&nbsp;</h4>



<p>This initiative was first covered in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#one-seven" target="_blank" rel="noreferrer noopener">Digest 82, Item 1.7</a>. East Dunbartonshire Council didn&#8217;t apply for Spaces for People funding but sustainable transport is part of their <a href="https://www.eastdunbarton.gov.uk/climate-conversation">Climate Conversation webpage</a>. Subsequently, this will feed into three future consultations on the&nbsp;environment, including a new Active Travel Strategy.</p>



<p>The last of their&nbsp;<a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/east-dunbartonshire-climate-conversation-tickets-143700675589" target="_blank">Climate Conversation events</a> is on&nbsp;22 April (online, using MS Teams). The overall Climate Conversation itself will run until 2 May 2021.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Maryhill North Transformational Regeneration Area – Masterplan consultation&nbsp;</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="321" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min.jpeg?resize=525%2C321&#038;ssl=1" alt="Maryhill TRA – Kilmun St visual" class="wp-image-13784" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=600%2C367&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=300%2C183&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=1536%2C939&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=2048%2C1252&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Kimun St visual –</em> new housing and landscaping but no new pavements?</figcaption></figure>



<p>As mentioned in <a href="https://www.gobike.org/consultation-digest-local-issue-83-30-march-2021-13568#one-four" target="_blank" rel="noreferrer noopener">Digest 83, Item 1.4</a>, this regeneration project is looking at housing and public spaces in Gilshochill, south of Summerston train station. </p>



<p>There are many visualisations on the&nbsp;<a href="https://www.maryhillnorthtra.com/consultations/1" target="_blank" rel="noreferrer noopener">Maryhill North consultation page</a>, most of which look promising. However, there are some very sharp angles in the zigzag paths, which don&#8217;t look very bike-friendly (as seen in the feature photo at the top of this Digest). Also, some of the realigned streets appear to be &#8216;shared space&#8217;, without any pavements. The theory behind shared space is that drivers pay more attention if pavements and markings are removed. However, the reality is often pedestrians get startled by cars and have to dart out the way (or in this case, dive into a hedge!). </p>



<p>If you want to comment on the TRA plans, you have to register first on the above page. Consultation&nbsp;closes on 23 April.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>A few comments in the city centre districts Commonplace map ask about more space for skaters. GUS&#8217;s M74 skatepark project would provide that under a flyover near West St subway station. First covered in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank">Digest 81, Item 1.9</a>, the&nbsp;<a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a>&nbsp;is still open for BMX riders, skaters, or their families, to have their say about the park. </p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Malls Mire newsletter – March 2021</h4>



<p>The first issue of this newsletter featured in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#three-four" target="_blank" rel="noreferrer noopener">Digest 74, Item 3.4</a>. The Malls Mire project is creating play areas and woodland paths between Toryglen and Rutherglen. </p>



<p>The <a href="https://www.gobike.org/wp-content/uploads/2021/04/Malls-Mire-Newsletter-March-2021.pdf" target="_blank" rel="noreferrer noopener">March 2021 newsletter</a> covers the latest construction news about the bike pump track, playgrounds, landscaping and more. See further background about the project on <a href="http://www.clydegateway.com/clyde-gateway-gives-malls-mire-a-new-lease-of-life-as-it-is-transformed-into-a-woodland-retreat/" target="_blank" rel="noreferrer noopener">Clyde Gateway&#8217;s Malls Mire webpage</a>.</p>



<p>&nbsp;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13767</post-id>	</item>
	</channel>
</rss>
