<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>fastlink &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/fastlink/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Thu, 14 Dec 2023 22:02:06 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 150, 14 December 2023</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-150-14-december-2023-20965</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 14 Dec 2023 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Ayrshire Roads Alliance]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[ldf]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[sdf]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=20965</guid>

					<description><![CDATA[Paisley landmarks plans. Glasgow guidance on green belt, delivery and place – plus a few Development Frameworks. East Dunbartonshire LDP3, East Kilbride neighbourhood plans and East Ayrshire School Streets.]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Stitching it together…</h2>



<p>Plans for a few Paisley landmarks to connect with more green space. Glasgow has guidance on green belt, delivery, place and a few Development Frameworks. East Dunbartonshire gathers evidence at events for its Local Development Plan 3. Also, neighbourhood plans in East Kilbride and school streets in East Ayrshire. </p>



<p>The new look Digest is still coming together as well –&nbsp;hopefully in the New Year. </p>



<span id="more-20965"></span>



<p class="has-small-font-size">Image: &#8216;Paisley Abbey from the south east&#8217;, taken from Cotton Street where there are plans to remove slip roads. <br>© <a href="https://commons.wikimedia.org/wiki/User:Colin">User:Colin</a> / <a href="https://commons.wikimedia.org/wiki/Main_Page">Wikimedia Commons</a> / <a href="https://creativecommons.org/licenses/by-sa/3.0/">CC BY-SA 3.0</a></p>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Paisley town centre junction improvements</h4>



<p><strong>Council:&nbsp;</strong>Renfrewshire.<br><strong>Subject:&nbsp;</strong>Changes to remove filter lanes at junctions at either end of Gauze St, Paisley. One by Paisley Abbey and the other on Glasgow Rd (A726) by St Mirin’s RC Cathedral. Both plans would add crossings, increase space for walking and, to an extent, cycling. They’re within the&nbsp;<a href="https://paisleyfirst.com/bid-area/" target="_blank" rel="noreferrer noopener">area of Paisley First</a>, the town centre Business Improvement District (BID) who shot down plans for segregated cycleways on nearby Causeyside St. So, these slight improvements may still need support.<br><strong>Website links:</strong>&nbsp;<a href="https://www.renfrewshire.gov.uk/article/13651/Paisley-town-centre-junction-improvements" target="_blank" rel="noreferrer noopener">Paisley town centre junction improvements page</a>,&nbsp;<a href="https://www.renfrewshire.gov.uk/media/16007/Glasgow-Rd-Mill-St-Gauze-St-Incle-St/pdf/Glasgow_Road__Mill_Street__Gauze_Street_and_Incle_Street_Junction.pdf?m=1701079330227" target="_blank" rel="noreferrer noopener">Glasgow Rd junction plan</a>&nbsp;and&nbsp;<a href="https://www.renfrewshire.gov.uk/media/16008/Gauze-Street---Cotton-Street---Lawn-Street/pdf/Gauze_Street__Cotton_Street_and_Lawn_Street_Junction.pdf?m=1701079456407" target="_blank" rel="noreferrer noopener">Gauze St/Cotton St junction plan</a>. Respond by email:&nbsp;<a href="mailto:ei@renfrewshire.gov.uk?subject=Paisley%20junctions%20feedback">ei@renfrewshire.gov.uk</a>.<br><strong>Deadline: 22 December 2023.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: East Kilbride South Neighbourhood Planning 2023</h4>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:&nbsp;</strong>Local planning project about a wide range of issues including transport and public spaces. Intended for residents of the southern part of East Kilbride –&nbsp;doesn’t mention neighbourhoods but presumably Greenhills, Whitehills, Mossneuk, etc.<br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshire.gov.uk/directory_record/664684/east_kilbride_south_neighbourhood_planning_2023" target="_blank" rel="noreferrer noopener">EK South Neighbourhood Planning webpage</a>&nbsp;and&nbsp;<a href="https://online1.snapsurveys.com/interview/33d8cb4f-9c08-48a8-8d68-9f3b1b4ddf83" target="_blank" rel="noreferrer noopener">EK South Neighbourhood Planning survey</a>.<br><strong>Deadline: 30 December 2023.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: Supplementary Guidance SG6: Green Belt and Green Network</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;A side salad served with the City Development Plan. Detailed guidance on…&nbsp;<em>“development in the Green Belt, the enhancement of the green network, the protection of open space… provision of open space to support new development, …the role of contributions from new development in delivering… different types of open space.”</em>&nbsp;Includes scoring tables and maps of city greenspace provision.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2023/11/SG6-Green-Belt-and-Green-Network-Consultation-Draft-Supplementary-Guidance.pdf" target="_blank" rel="noreferrer noopener">SG6 consultation draft</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCCSG6/" target="_blank" rel="noreferrer noopener">SG6 survey</a>.<br><strong>Deadline: 18 January 2024.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: Supplementary Guidance SG12: Delivering Development</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;A side dish served with the City Development Plan (probably chips).&nbsp;<em>“Further detailed guidance, including the mechanisms the Council will use to secure contributions to deliver the Clyde Fastlink project, a public transport scheme intended to enhance public transport access along the Clyde Waterfront.”</em>&nbsp;Includes tables categorising different sizes of development and financial contributions for each type. There are no maps but it’s probably the same&nbsp;<a href="https://www.gobike.org/fastlink-156" target="_blank" rel="noreferrer noopener">route via the Squinty Bridge</a>&nbsp;to Govan as in TROs from several years ago. There are currently developments proposed and being built along the route around Central Quay and Yorkhill.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2023/11/SG12-Delivering-Development-Consultation-Draft-Supplementary-Guidance.pdf" target="_blank" rel="noreferrer noopener">SG12 consultation draft</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCCSG12/" target="_blank" rel="noreferrer noopener">SG12 survey</a>.<br><strong>Deadline: 18 January 2024.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5: Local Development Plan 3 Evidence and Data Gathering (EDC)</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:</strong>&nbsp;EDC is consulting about an Evidence Report for LDP3. They need <em>“the views of residents, businesses, groups and organisations. The report will focus on the broad concepts that will shape the plan and not, at this stage, the merits of individual sites. Key issues include… Sustainable transport.”</em> <a href="https://www.eastdunbarton.gov.uk/news/chance-get-involved-and-help-guide-vital-plan-future-development" target="_blank" rel="noreferrer noopener">Public drop-in sessions</a> have already started in various locations –&nbsp;these run between late November and mid-January.<br><strong>Website links:&nbsp;</strong><a href="https://www.eastdunbarton.gov.uk/local-development-plan-3-%E2%80%93-evidence-gathering-%E2%80%93-consultation-0" target="_blank" rel="noreferrer noopener">LDP3 Evidence Report consultation webpage</a> and <a href="https://survey123.arcgis.com/share/d4f0a9ceb5ac42c48b8fbeeb537b1de9" target="_blank" rel="noreferrer noopener">LDP3 online survey</a>.<br><strong>Deadline: 31 January 2024<strong>&nbsp;(5pm)</strong>.</strong></p>



<h4 class="wp-block-heading" id="one-six">1.6: My Neighbourhood, My City – Place Standard Survey</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;Survey for the new City Development Plan (Glasgow’s land-use plan), which will decide where new homes, schools, businesses and open spaces should be located. The Place Standard tool gathers rates different factors about a neighbourhood to identify issues. Responses will inform the Evidence Report for the plan.<br><strong>Website links:&nbsp;</strong><a href="https://survey123.arcgis.com/share/2667eef714894e5fb9a42a612399cff4" target="_blank" rel="noreferrer noopener">MNMC Place Standard survey</a>&nbsp;(and&nbsp;<a href="https://cdp2-glasgowgis.hub.arcgis.com/" target="_blank" rel="noreferrer noopener">City Development Plan 2 web hub</a>).<br><strong>Deadline: 1 February 2024.</strong></p>



<h4 class="wp-block-heading" id="one-seven">1.7: Greater Easterhouse Strategic Development Framework</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:&nbsp;</strong><em>“The SDF for Greater Easterhouse identifies key issues and opportunities in the area, and sets the vision and framework for future development in line with the spatial policies of the City Development Plan and the National Planning Framework 4.”</em><br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/greatereasterhousesdf" target="_blank" rel="noreferrer noopener">Greater Easterhouse SDF page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GreaterEasterhouseSDF/" target="_blank" rel="noreferrer noopener">Greater Easterhouse SDF survey</a>.<br><strong>Deadline: 5 February 2024.</strong></p>



<h4 class="wp-block-heading" id="one-eight">1.8: Greater Pollok Local Development Framework</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:&nbsp;</strong><em>“The Vision for Greater Pollok includes… movement and travel infrastructure, town centres, local shopping, facilities, housing, and economic development areas</em>…<em>&nbsp;green spaces and initiatives which tackle climate change. Following extensive community engagement, which ended in September 2022, the Draft Greater Pollok LDF document is now complete.”</em><br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/greaterpollokldf" target="_blank" rel="noreferrer noopener">Greater Pollok LDF page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GreaterPollokLDF/" target="_blank" rel="noreferrer noopener">Greater Pollok LDF survey</a>.<br><strong>Deadline: 5 February 2024.</strong></p>



<h4 class="wp-block-heading" id="one-nine">1.9: School Street Trial, Hurlford</h4>



<p><strong>Organisation:&nbsp;</strong>Ayrshire Roads Alliance (ARA).<br><strong>Subject:&nbsp;</strong>School Streets trial in Academy Street and Union Street, Hurlford (East Ayrshire). Temporary bollards and reduction in parking spaces directly in front of&nbsp;Hurlford Primary School.<br><strong>Website links:</strong>&nbsp;<a href="https://www.ayrshireroadsalliance.org/Information-On/Consultations/Current-consultations/East-Ayrshire-Council-School-Street-Trial-Hurlford.aspx" target="_blank" rel="noreferrer noopener">Hurlford School Streets</a>&nbsp;webpage and (very short)&nbsp;<a href="https://www.smartsurvey.co.uk/s/TIBIJO/" target="_blank" rel="noreferrer noopener">School Streets survey</a>.<br><strong>Deadline:&nbsp;</strong>No obvious deadline.</p>



<h3 class="wp-block-heading"><strong>Section 2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp;Pavement parking and enforcement</h4>



<p><strong>Subject: </strong>Without wanting to step on the toes of our National Consultation Digest, new powers over pavement parking are due to come into force by early 2024. <a href="https://www.edinburgh.gov.uk/parking/new-parking-rules/2" target="_blank" rel="noreferrer noopener">City of Edinburgh Council announced they&#8217;d use new pavement parking powers</a> from January 2024. In Glasgow, councillor Angus Millar responded to a question about pavement parking: <em>“Glasgow intends to begin limited enforcement of dropped kerbs and double parking upon completion of the necessary update to our back office system, which is currently targeted for March 2024.”</em> <br>Most councils in Strathclyde have already got Decriminalised Parking Enforcement (DPE) powers, where they&#8217;ve taken over parking enforcement from police. According to <a href="https://www.transport.gov.scot/our-approach/industry-guidance/parking/#45735" target="_blank" rel="noreferrer noopener">Transport Scotland&#8217;s DPE map</a>, only North Ayrshire and West Dunbartonshire don&#8217;t have DPE already.<br><strong>Website links:</strong> <a href="https://www.glasgowtimes.co.uk/news/scottish-news/23978156.illegal-pavement-parking-introduced-glasgow-month/" target="_blank" rel="noreferrer noopener">GCC question on pavement parking (Glasgow Times)</a> and <a href="https://digitalpublications.parliament.scot/ResearchBriefings/Report/2018/10/30/Transport--Scotland--Bill--Pavement-Parking-and-Double-Parking#Introduction" target="_blank" rel="noreferrer noopener">report on measures in Transport Bill (2018 – SPICe)</a>.</p>



<h3 class="wp-block-heading"><strong>Section 3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1:&nbsp;Glasgow City TROs &amp; Traffic Calming</h4>



<p><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18127" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>&nbsp;and&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.&nbsp;TRO for Wallacewell Road and NEATR (deadline: 15 December 2023). Parking restrictions for Yorkhill and Toryglen St. Temporary TRO for South City Way, Victoria Bridge to Trongate works (ongoing at Clutha junction).</p>



<h4 class="wp-block-heading" id="three-two">3.2:&nbsp;North Lanarkshire TROs</h4>



<p><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations">North Lanarkshire Live Consultations</a>.&nbsp;A752/Townhead Road speed limits and penalties for abuse of off-street car parking.</p>



<hr class="wp-block-separator has-alpha-channel-opacity"/>



<p>GoBike got onto a better footing in 2023 but, like many others, still isn&#8217;t back to where it was pre-pandemic. A few more people are stepping back so we still need volunteers. Thanks to everyone who&#8217;s contributed in 2023 – let&#8217;s hope things improve further in 2024. </p>



<p>Merry Christmas and a Guid Hogmanay – see you in the New Year.</p>


<div class="wp-block-image">
<figure class="aligncenter"><img decoding="async" width="204" height="131" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/12/holly-bike-icon.png?resize=204%2C131&amp;ssl=1" alt="Holly-bike icon" class="wp-image-16385"/></figure>
</div>]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20965</post-id>	</item>
		<item>
		<title>Cycling in Glasgow &#8211; a major update, apologies for the hiccup yesterday</title>
		<link>https://www.gobike.org/cycling-in-glasgow-a-major-update-apologies-for-the-hiccup-yesterday-11276</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Fri, 15 May 2020 19:14:30 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[covid]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[permeability]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=11276</guid>

					<description><![CDATA[Yesterday, 14 May, GoBike was fortunate enough to get an update from Councillor Anna Richardson, Chair of Sustainability and Carbon Reduction with Glasgow City Council on the action the Council is taking to manage social distancing and other issues arising from the Covid 19 pandemic. She confirmed that the new Clyde Street / Broomielaw cycle &#8230; <p class="link-more"><a href="https://www.gobike.org/cycling-in-glasgow-a-major-update-apologies-for-the-hiccup-yesterday-11276" class="more-link">Continue reading<span class="screen-reader-text"> "Cycling in Glasgow &#8211; a major update, apologies for the hiccup yesterday"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p> Yesterday, 14 May, GoBike was fortunate enough to get an update from  Councillor Anna Richardson, Chair of Sustainability and Carbon Reduction with Glasgow City Council on the action the Council is taking to manage social distancing and other issues arising from the Covid 19 pandemic. She confirmed that the new Clyde Street / Broomielaw cycle lane is one way, westbound, and gave other significant news. </p>



<span id="more-11276"></span>



<div class="wp-block-image"><figure class="alignright size-medium"><img data-recalc-dims="1" height="300" width="225" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/05/anna-richardson-bike-225x300.jpg?resize=225%2C300&#038;ssl=1" alt="" class="wp-image-11272"/></figure></div>



<p>Anna told us that the City Council are working on a Local Transport Strategy, a Neighbourhood Strategy and preparing a bid for part of the £10m Covid 19 fund currently available from the Scottish Government</p>



<p> They are focusing on 3 things: </p>



<ul class="wp-block-list"><li> City Centre, creating social distancing space for businesses </li><li> Arterial route cycle infrastructure, to allow people to cycle into the city </li><li> Neighbourhoods work, including space on high streets for businesses. </li></ul>



<p> The City Council will also be looking to extend the number of car-free zones around schools from the current 6.<br>Anna talked about filtered permeability for cycling, demand management and looking to the less affluent north and east of the city for improving cycle provision. </p>



<p>GoBike asked her 2 questions about the new cycle lane on Clyde Street and Broomielaw and she answered:<br>“<em>Yes, the new cycle lane is just westbound – it could be done quickly and shows the Council’s determination to act. People travelling east may either use the road or stick to the riverside shared use path.<br>Yes, the cones will stay, &#8220;We will keep the cones there for as long as they are needed to keep people safe. </em>” </p>



<p> So that’s good news, a wee bit disappointing about there being no new cycle lane for eastbound cycle traffic on the Broomielaw and Clyde Street, but it does give us more space and cycling on the Fastlink bus lanes has been formalised. </p>



<p> GoBike has been calling for cycle lanes on arterial routes into the city and for cycling permeability in areas of one-way streets for a long time, with contraflow cycling and cycle filters, so delighted with that news. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11276</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!</title>
		<link>https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 21 Jan 2020 16:00:32 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[side streets]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9795</guid>

					<description><![CDATA[Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across a side road, a child in Glasgow should be able to too. Secondly, contraflow cycling &#8211; when cars are going too fast or more on-road parking is needed the first line of response is to make a street one-way, even for bikes. What have we done wrong? Why should we have to make big detours? Do read on for the details of all the current issues.</p>



<span id="more-9795"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</li><li>**NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</li><li>**NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li> **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February </li><li> **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>**NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>**NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </li><li> Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February </li><li> Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li> **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</li><li>Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 February</li><li> Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</li><li>Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns. </li><li>Glasgow, Duror Street, Traffic Calming, GCC response to our concerns </li><li>Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month </li><li>Glasgow, Connecting Woodside Update, with news of new Facebook page</li><li>Glasgow Avenues project, George Square and Blythswood Square. </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<h6 class="wp-block-heading">1.1 **NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" fetchpriority="high" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=525%2C274&#038;ssl=1" alt="" class="wp-image-9833" width="525" height="274" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?w=540&amp;ssl=1 540w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=300%2C156&amp;ssl=1 300w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s a message that has been put out by Alison Johnstone, MSP (Green Party), which is pretty clear and self-explanatory. New road construction means less money to build cycle lanes. Please respond.</p>



<p>&#8220;T<em>he  Government look set to spend £120 million on a new spaghetti junction  on              Edinburgh’s bypass. We can stop them though. Government are  consulting on the new junction now. </em><a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Please take a second to object</em></a><em>  and ask them to invest these funds into   public transport and bike lanes  instead. We can’t just keep on pouring public money      into building new  roads like there is no climate emergency.</em><br><br> <a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><strong><em>Take action now</em></strong></a><em><br> &nbsp;<br> By their own admission, the Government expects this scheme to  increase traffic by 5%. Across the world we’ve learnt that if you build  more road capacity it just fills with more cars and causes more  pollution.</em> <br><br> <em>But the same is true with the alternatives. Invest in public  transport, and the buses,       trains and trams fill up. Build cycle lanes,  and people get on their bikes.</em> <br><br> <em>Business as usual is killing the planet, and it’s time for change.  The Government             declared a climate emergency. Sheriffhall spagetthi  junction is the first test of               whether they mean it.</em> <br><br> <em>Lets make this clear and flood them with objections. </em><a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><em>Please take action and share the campaign now</em></a><em>.</em> <br><br> <em>Yours<br> &nbsp;<br> Alison Johnstone, Scottish Green MSP for Lothian </em> <br><br> <a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Take Action Now&nbsp;</em></a> &#8220;</p>



<h6 class="wp-block-heading">1.2 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This has been mentioned once or twice already,  Item 1.13 in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>&nbsp;gave the details for this on-line consultation, do please respond before it closes. Here’s the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>&nbsp;to the City Council’s consultation page where you have to scroll down to find this one. </p>



<p>The survey is quite short, so won&#8217;t take you long to do &#8211; and do try to ignore all the &#8220;typos&#8221; in the information in the Council&#8217;s consultation information!</p>



<p>While this isn&#8217;t one of the city&#8217;s radial routes, which are so important, a good cycle route out to Pollok Park from the city centre should get people to take to their bikes. You might wish to question why the route is two-way on one side of the road rather than 2 lanes, one each side? Another concern is cycle priority at side roads &#8211; including all the driveways!</p>



<h6 class="wp-block-heading">1.3 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>There&#8217;s no reason given as to why this consultation is being extended but here&#8217;s the email that we got on 07 January:</p>



<p>&#8220;<em>Dear All,<br><br>Firstly, we would like to thank all of you who have already provided responses to the consultation. <br><br>Many  of you have also been in contact to request more time to complete your  responses. We are happy to announce an extension to the consultation  period. &nbsp;<br><br></em><strong><em>We now invite you to respond to the paper by 3 February 2020</em></strong><em>. </em><br><br><em>Our  online portal for submitting responses will remain open until midnight  on this date but we also welcome input in any format. Attached is a word  version of the online  portal &#8211; please feel free to use this form if you prefer. &nbsp;<br><br>The consultation paper, summary and more details on how to respond are available on our project page at </em><a href="https://www.lawcom.gov.uk/project/automated-vehicles/"><em>https://www.lawcom.gov.uk/project/automated-vehicles/</em></a><em>&nbsp;<br><br>Yours sincerely,<br><br>Automated Vehicles Team – Law Commissions</em>&#8220;</p>



<p>Note that the word version of the online portal is not given here. GoBike uses WordPress for its website and this does not permit the uploading of word documents. If you wish to have the word version please request one direct or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter of response</a> that GoBike sent in on 06 January. Be afraid, very afraid!</p>



<h6 class="wp-block-heading">1.4  **NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9834" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Glassford Street</figcaption></figure>



<p>The Avenues programme has been quiet for a while but here&#8217;s a recent email that we received last week, headed &#8220;Glasgow Avenues: Glassford Street and Stockwell Street Online and On Street Consultations&#8221;:</p>



<p> &#8220;<em>On 16 Jan 2020, at 19:56, Avenues &lt;</em><a rel="noreferrer noopener" href="mailto:avenues@ironsidefarrar.com" target="_blank"><em>avenues@ironsidefarrar.com</em></a><em>&gt; wrote: <br><br></em><strong><em>Glasgow Avenues – Your Avenues Consultation</em></strong><em><br></em><br><em>A multi-disciplinary design team led by Ironside  Farrar Ltd has been appointed to deliver the second phase (“Block B”) of  the Glasgow Avenues programme which will invest £115m in the public  realm of the City Centre in the next few years,  introducing a network of connected ‘green’ routes across Glasgow’s city  centre.&nbsp; <br><br>Block B includes </em><strong><em>Stockwell Street</em></strong><em>&nbsp;and </em><strong><em>Glassford Street</em></strong><em> Avenues.<br><br>The Design Team are seeking to consult with you &#8211;  local residents, businesses and stakeholders &#8211;&nbsp; on the draft proposals  for these two streets in the following 3 ways:<br><br>1. You are invited to view and comment on the concept designs online at: </em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a><br><br><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>,  helping us understand your perception of the street as it is today. <br><br>3. Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.<br><br>Please feel free to forward this email to other  parties who may be interested in getting involved.&nbsp; The online  consultation is open until 9</em><sup><em>th</em></sup><em> February 2020.<br><br>Thanks in advance for your assistance. <br><br>Kind Regards,<br><br></em><strong><em>Charlie Griffiths</em></strong><em>&#8220;</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9835" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Stockwell Street</figcaption></figure>



<p>From point 1, clicking on the link will get you to the City Council&#8217;s Avenues page. Click on the down arrow at Consultations and then on &#8220;here&#8221; under &#8220;Current Consultation&#8221;.</p>



<p>Or you can  try this quick link:  <a rel="noreferrer noopener" aria-label="link:https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959 (opens in a new tab)" href="https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959" target="_blank">https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959</a></p>



<p>The questionnaire for point 2 is quite curious &#8211; very generic, but you will be able to comment on the dominance of the motor vehicle, particularly with respect to the large areas on Stockwell Street given over to car parking. Why aren&#8217;t they proper parks, with trees and grass and somewhere to sit?</p>



<p>We&#8217;ve been told that the consultants have 2 rickshaws that will be moving about but do look for them at the Argyle Street precinct or further south at the car park area. If you go, do please have your bike with you, or your children, or ageing aunt in a wheelchair &#8211; anything to demonstrate that we should have priority over all the cars in the area.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>The northern part of Ardencraig Road , near Miller Primary School, is proposed for traffic calming</figcaption></figure>



<p>Glasgow City Council now seem to have an alphabetical approach to traffic calming with this and the next 2 schemes that have arrived in the Consultations mailbox this very morning, 21 January. Here is the email and attachments for the first, Ardencraig Road in Castlemilk:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br></em><br><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Ardencraig Road)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong> <br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. </em><br><br><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-<br></em><br><strong>Ardencraig Road</strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>3 sets of 3, 1.9m, 75mm high, speed cushions, </em></li><li><em> 3 sets of 2, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions</em>.</li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>.  <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the attached documents: <a rel="noreferrer noopener" aria-label="Proposals (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals.pdf" target="_blank">Proposals</a>, <a rel="noreferrer noopener" aria-label="Proposals Section 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-1-From-number-76-to-number-38.pdf" target="_blank">Proposals Section 1</a> and <a rel="noreferrer noopener" aria-label="Proposals Section 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-2.pdf" target="_blank">Proposals Section 2</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s the standard approach to high traffic speeds, yet again, by the City Council, which is now proclaiming itself as &#8220;<strong>Glasgow &#8211; proud host of the 26th&nbsp;UN Climate Change Conference (COP26) &#8211; UK2020</strong>&#8221; but where are the cycle lanes to the school?</p>



<h6 class="wp-block-heading">1.6  **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February  </h6>



<p>Moving on to &#8220;B&#8221; and north-west to Cardonald, here&#8217;s the email from earlier today, 21 January, for these 2 residential roads:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Bankfoot Road and Wedderlea Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Bankfoot Road</em></strong></li><li><em> </em><strong><em>Wedderlea Drive</em></strong></li></ul>



<p> <em>Details of the proposed Scheme<br> The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>6 sets of 3, 1.8m, 75mm high, speed cushions, </em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br>Please reply directly to <a href="mailto:LandServices.Mailroom@glasgow.gov.uk">LandServices.Mailroom@glasgow.gov.uk</a>.<br><br><em>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant Jordan  Tracey on 0141 287 9173.<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Bankfoot Road, looking north from Paisley Road West</figcaption></figure>



<p>Here&#8217;s one of the feeder roads on to the cycle lanes we so desperately need on Paisley Road West if we are to achieve the modal split required to save the world. Not many, sorry, not any, apologies for not reaching the target, the aim, no sorry, just an aspiration of 10% of journeys by bike this year, were there? Let&#8217;s look to doing better this decade.</p>



<h6 class="wp-block-heading">1.7   **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9912" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On that long Castlemilk Drive (singing along to <a rel="noreferrer noopener" aria-label="Devil Gate Drive (opens in a new tab)" href="https://www.youtube.com/watch?v=9vFTksaposs" target="_blank">Devil Gate Drive</a>, a classic from Suzy Q!), struggling up to, or coasting down from, the top of the hill and the countryside of South Lanarkshire, motorists are going too fast and so we must suffer yet more speed cushions. Why can&#8217;t such concerns be declared as public realm schemes and then we might get cycle lanes, giving us enough room to wobble up the hill without danger of being clipped by a close-passing motor vehicle? However, money is tight and the COP26 delegates won&#8217;t be encouraged to visit Castlemilk, so we will be stuck with another rash of speed cushions. Here&#8217;s the email received from the City Council today, 21 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Castlemilk Drive)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme</em><br><em>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Castlemilk Drive</em></strong></li></ul>



<p><em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>4 sets of 3, 1.9m, 75mm high speed cushions. </em></li><li><em> The installation of bollards beside the proposed speed cushions</em></li></ul>



<p><em> Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br><em>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;, </em>etc</p>



<p>Here&#8217;s the plan showing the proposed speed cushions: <a href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.79-Castlemilk-Drive-TC-proposals-Full-view-of-proposals.pdf" target="_blank" rel="noreferrer noopener" aria-label="Castlemilk Drive plan (opens in a new tab)">Castlemilk Drive plan</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Note the active-travel friendly parking! GoBike will applaud the aim, but not the method, of reducing traffic speeds here.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> This consultation featured in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council’s consultation page. This consultation is the second item on page 1. We hope to have the GoBike response in our next Digest.</p>



<p>Note that the area it covers is bounded on the south-east by Glassford Street and Stockwell Street.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><br>Here&#8217;s a consultation that GoBike responded to at Stage One &#8211; details further on &#8211; but this is the email for the public consultation that we received on 16 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(SOUTH SIDE CAR CLUB) ORDER 202_</em></strong><em><br><br>Further to my consultation email of 3</em><sup><em>rd</em></sup><em> December 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose  a copy of the press notice of the proposed Order, relevant drawings, statement of reasons and detailed report.<br><br>The  location proposed for Queen Elizabeth Gardens has been removed from  this order and will be included in a future parking control order for  the area.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><strong><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a></strong><em> <br><br>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing  to Group Manager, Sustainable Transport, Neighbourhoods and  Sustainability, Exchange House, 231 George Street, Glasgow, G! 1RX or by  e-mail to </em><strong><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a></strong><em> by Friday 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully,</em>&#8221; etc</p>



<p>Here are the documents referred to in the email above: <a rel="noreferrer noopener" aria-label="Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-CarClub-Consultation-advert-160120.pdf" target="_blank">Advert</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-Car-Club-TRO-Report-Jan-2020.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-CarClub-TRO-SOR_Jan2020.pdf" target="_blank">Statement of Reasons</a>, <a rel="noreferrer noopener" aria-label="Allison Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-001_Allison-St.pdf" target="_blank">Allison Street plan</a>, <a rel="noreferrer noopener" aria-label="Paisley Road West plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-003_PRW.pdf" target="_blank">Paisley Road West plan</a>, <a rel="noreferrer noopener" aria-label="Torrisdale Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-004_Torrisdale.pdf" target="_blank">Torrisdale Street plan</a>, <a rel="noreferrer noopener" aria-label="Kenmure Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-005_Kenmuir.pdf" target="_blank">Kenmure Street plan</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-006-Albert-1.pdf" target="_blank" rel="noreferrer noopener" aria-label="Albert Drive plan (opens in a new tab)">Albert Drive plan</a>.</p>



<p>At Stage One we were given this information by email:</p>



<p>&#8220;<em>Background to the proposed Order<br> This  order is proposed to provide car club and electric parking on the south  side at the locations below in line with the Council’s policy for  sustainable transport and emission reductions.<br><br>Area affected by the proposed Order<br>The area is the south side of the city.<br><br>Details of the proposed Order<br>The order proposes the following restrictions as shown on the attached drawings:</em></p>



<ul class="wp-block-list"><li> <em>Electric charging and car club bays on Alison Street east of Langside Road.</em></li><li><em> Electric charging and car club bays on Queen Elizabeth Gardens north of Old Rutherglen Road.</em></li><li><em> Electric charging and car club bays on Paisley Road West at Cessnock Street.</em></li><li><em> Electric charging and car club bays on Torrisdale Street west of Victoria Road.</em></li><li><em> Electric charging and car club bays on Kenmuir Street north of Albert Drive.</em></li><li><em> Electric charging and car club bays on Albert Avenue north of Queens Drive.</em>&#8220;</li></ul>



<p>You will see that Queen Elizabeth Gardens in the Gorbals has been removed at the Public Consultation stage, presumably because of local lobbying but GoBike objected, see <a rel="noreferrer noopener" aria-label="this letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">this letter</a>, to the inclusion of Paisley Road West. Paisley Road West is a major arterial road connecting the city centre to the outskirts and one of the most heavily cycled roads into the city; kerbside parking obstructs the construction of the cycle lanes we desperately need on this route if we are to meet climate change targets. We have had no response from the City Council to this well-argued letter written by one of our members.</p>



<p>GoBike will be responding to this public consultation but if you support our views do please write in to comment or object to the proposals.</p>



<h6 class="wp-block-heading">1.10 **NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no, or perhaps with, contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The service road is a residential and shopping side road to the busy Carmunnock Road and at the Stage One consultation GoBike was told that &#8220;<em>The Council have been made aware of road safety issues with the existing two-way traffic flow on Carmunnock Road  (Service Road).&nbsp; Therefore, a  questionnaire was posted to the nearby residents to find out if they  supported the introduction of a proposed one way system.&nbsp; The results of  the returned survey were 23 in favour of the  proposals and 6 against.&#8221; </em><br>In its <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a>, GoBike argued strongly that cycling must be exempt from the one-way order. Since receiving the Public Consultation email below, GoBike has emailed the City Council for an answer to the one-way question. However, we now note, from the Detailed Report issued with this public consultation that improved safety may be achieved by &#8221; <em>Providing a single directional route for vehicular travel</em>.&#8221; Note the use of the word &#8220;vehicular&#8221;, which would not normally include cycles?</p>



<p>Here&#8217;s the Public Consultation email received on 17 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (CARMUNNOCK ROAD (SERVICE ROAD))</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 20__ </em></strong><em><br><br>Further to my consultation email of 6</em><sup><em>th</em></sup><em>  December 2019 regarding the above named Traffic Regulation Order, and  in accordance with statutory procedures, I now enclose a copy of the  press  notice of the proposed Order, relevant map, statement of reasons,  detailed report.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person  wishing to object to the proposed Order should send details of the  grounds for objection in writing to Kevin Hamilton, Head of Roads  Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/NoticeOfProposals-CarmunnockRoad-ServiceRoad-190x114mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Carmunnock_Road_-_Plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/08.01-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label="Detailed Report (opens in a new tab)">Detailed Report</a>.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </h6>



<p>You may be aware that we responded last autumn to the Stage One consultation concerning the proposed cycle lanes on Byres Road and submitted detailed questions related to the design of the cycle lanes. A major concern is about side road junctions where, to us, it&#8217;s obvious that all traffic (motor, cycle, pedestrian) has priority over traffic into and out of side roads. Unfortunately, the City Council appears to take a different view. <br><br><br>We informed you in Digest 51 that the 3 TROs for Byres Road had just been published but full details from the City Council arrived just too late for inclusion in that Digest. </p>



<p>Here&#8217;s the email that we received on 06 January, with almost no detail of the cycle lane design:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(BYRES ROAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Road-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P-5114-0000-Byres-Road-TRO.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Draft-Report.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-TRO.pdf" target="_blank">FAQs</a></p>



<p>Some of our members are busy writing our response and our concern at the lack of information on the cycle lane design has been voiced to the City Council.</p>



<h6 class="wp-block-heading">1.12  Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February  </h6>



<p><br>GoBike supports 20mph speed limits in our towns and cities and Byres Road is no exception. We supported this proposal at the Stage One consultation in the autumn and no doubt we will support it now.</p>



<p>Here&#8217;s the email we received on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (BYRES ROAD)</em></strong><em> </em><strong><em>(20MPH SPEED LIMIT ZONE) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs</em>.<br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:ByresRoad20MPH@glasgow.gov.uk"><em>ByresRoad20MPH@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-20Mph-Zone-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P5114-101-Byres-Road-20MPH.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Draft-Report-Byres20MPH.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Byres20MPH.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-20MPH.pdf" target="_blank">FAQs</a>.</p>



<p>The FAQs are certainly not directed at those of us keen on active travel; here&#8217;s one Q and A:<br>&#8220;<em>Can I park / load in the cycle lanes?<br>  Parking / Loading from the cycle lanes is not permitted</em>&#8220;<br>Yes, the motor driver is still seen as the main customer &#8211; the the FAQs are the same for all 3 TROs.</p>



<h6 class="wp-block-heading">1.13  Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February </h6>



<p>Car parking on the streets around Byres Road is not normally a major concern for most of us in GoBike, but if you live in Hillhead you might have a different view or particular concern about this proposal? If so, do email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a> and we can include it in our response. <br>Points we have noted so far include the introduction of a second car parking permit per household (why should that be introduced in a city that&#8217;s trying to reduce car ownership, reduce pollution and will be hosting COP26 in November?) and the ridiculously cheap parking charges (even if they are the same across the city). Surely parking charges should be at least the cost of a return ticket on the Subway or bus and not just 80p per hour? <br>Here&#8217;s the email received from the City Council on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL (HILLHEAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><br><br><em>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp;<br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:HillheadTRO@glasgow.gov.uk"><em>HillheadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>The attached documents are here: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Advert-Hillhead-TRO.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Hillhead-TRO-Publication-plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Report-Hillhead-TRO.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Hillhead-TRO.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Hillhead-TRO.pdf" target="_blank" rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)">FAQs</a>.</p>



<p>This information was included in the Stage One email, but there is far more information within the Report: <br><br>&#8220;<em>Background to the proposed Order<br>The  proposal is to amend the existing Hillhead parking controls from a  Controlled Parking Zone (CPZ) to a Restricted Parking Zone (RPZ).<br>RPZs  are indicated by zone entry signs which have a no waiting roundel to  inform that no waiting is permitted at any time outwith the bays. The  zone entry signs tell you to “park only in signed bays” with a no  waiting roundel which means no waiting at any time. This is the  restriction which applies outwith all the marked bays.<br>This  order will propose the conversion of “residents only” parking bays to  “shared use” bays in order to bring the parking regime in Hillhead into  line with other residential areas within the west-end.&nbsp;Whilst all bays  will become “shared use”, residents will be able to acquire a second  personal permit and visitor permits, fees will be in line with other  zones. Permits will also be usable in adjacent zones. The order will  also include proposals to pedestrianise Ashton Lane / Great George Lane  with service access limited to specific times and controlled by  drop-bollards. Residential access to the rear of Ashton Road will be  maintained. Cresswell Lane will remain pedestrianised.</em>&#8220;</p>



<p>The private car is still at the top of the transport tree, it seems.</p>



<h6 class="wp-block-heading">1.14  **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike member, Emily, alerted us to this consultation, which has a question on &#8220;Do you have any proposals that would improve the <strong>space around our homes</strong> and promote connected places and vibrant communities?&#8221; and the &#8216;vision&#8217; and background refer to lots of relevant stuff about connectivity, walking and cycling, vibrant local areas, climate emergency, air pollution, etc.</p>



<p>Here&#8217;s the link:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a> </p>



<p>Do have a look and let&#8217;s get lots of responses in that mention cycling and active travel.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" width="525" height="245" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Going hand in hand with Item 1.2 above, the on-line consultation on the SWCW extension along St Andrew&#8217;s Drive, is this public consultation event tomorrow, Wednesday 22 January at  St Albert’s Primary School, 36 Maxwell Drive from 3:30 to 7pm. You may see details of the proposals at this&nbsp;<a rel="noreferrer noopener" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>. Do try and get to the event if you can; there will be the opportunity to speak to the staff involved about the proposals.</p>



<h6 class="wp-block-heading">2.2 Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 January</h6>



<p>Mentioned in Item 1.4 above, is this on-street, meet the people event:</p>



<p>&#8220;<em>Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.</em>&#8220;</p>



<p>We don&#8217;t have any more information but it should be quite easy to spot one or other of the 2 rickshaws that the consultants will have. If you are in the town, do look out for the displays; check out the area at the end of the Argyle Street precinct or the car park areas on Stockwell Street.</p>



<h6 class="wp-block-heading">2.3  Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/burrell-collection-pollok-park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7330"/></figure>



<p>On 17 January GoBike received this email from The Transforming Pollok Country Park Project Team within Glasgow Life:</p>



<p>&#8220;<em>Hello, <br><br>Following  previous consultation events, Glasgow City Council and Glasgow Life  would like to invite you to a public meeting on the access proposals  being developed for Pollok Country Park, as  part of the Transforming Pollok Country Park project. <br><br>The  purpose of this meeting is to share the proposals, summarise recent  changes in response to feedback from previous consultations, and outline  current progress ahead of a formal planning submission  later in February 2020. <br><br></em><strong><em>Transforming Pollok Country Park</em></strong><br><br><strong><em>Public Meeting </em></strong><em><br><br></em><strong><em>Tuesday 4 February, 6.30–7.45pm </em></strong><em><br><br></em><strong><em>at Pollokshaws Burgh Hall,</em></strong><em> </em><strong><em>Pollokshaws Road, G43 1NE</em></strong><em><br><br>The meeting will include a presentation lasting up to 45 minutes followed by up to 30 minutes for questions.<br><br>We hope you can join us. If you’re unable to attend but would like to find out more, please email us at </em><a href="mailto:PollokCountryParkTransformation@glasgowlife.org.uk"><em>PollokCountryParkTransformation@glasgowlife.org.uk</em></a><em>. <br><br>Kind regards,  <br>The Transforming Pollok Country Park Project Team&#8221;</em></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p><br><br>Our objection to the proposal to allow taxis and authorised vehicles to use the bus and cycle lanes on this bridge was published in <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)">Digest 50</a>, Item 1.2 We received this acknowledgement on 07 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Tricia Fort<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>I  am writing to confirm receipt of your correspondence regarding the  above named Traffic Regulation Order. Following the publication period,  officers  shall commence an analysis of all correspondence received and issue you  with a considered response in due course. <br><br>Please  note that timescales for preparing and distributing a considered  response can be influenced by the quantity and nature of correspondence  received.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Let&#8217;s hope they are rethinking the proposal, especially since it is so close to the site of the COP26 Conference in November.</p>



<h6 class="wp-block-heading">3.2 Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9628" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 3.10 Our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a>, sent in on 18 December, raised concerns that the GCC response to speeding on this wide road in the north of the city was to yet again install speed cushions with no thought to narrowing the road with cycle lanes etc. Note that no Traffic Regulation Order is required for the installation of speed cushions. The City Council response to our letter, with this email of 08 January, is illuminating as to how the Council currently operates:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY, GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort<br><br>Thank you for your undernoted enquiry.<br><br>Whilst  I appreciate your concerns regarding Ashgill Road not being included as  part of the city’s cycle  network, I can advise that this section is focused on reducing injury  accidents throughout the city. The council has limited funding and  resources available to implement traffic calming schemes and in order to  make sure these resources are directed at the  locations with the greatest potential for casualty reduction, a site  risk assessment is undertaken for each request. This process assesses  the location against criteria including the history of injury accidents,  measured vehicle speeds and the presence of  any local amenities such as being close to a nearby school or nursery</em><br><br><em>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions, however, in this instance we would  consider that the road bends at this location also act as traffic  calming features.<br><br>Whilst  I appreciate that drivers may accelerate and brake between each set of  cushions, the Council are currently seeking to implement mandatory 20mph  city-wide  speed limit restrictions on appropriate roads. Should the restrictions  be introduced, a reduction in the permitted speed limit would encourage  drivers to maintain a reduced speed whilst negotiating speed cushions or  any other form of traffic calming feature.</em><br><br><em>I trust the above information is of assistance, however, should you require any further information please contact (name and phone number removed by GoBike).</em></p>



<h6 class="wp-block-heading">3.3 Glasgow, Duror Street, Traffic Calming, GCC response to our concerns</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9637" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Again, this consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, item 3.13 and we submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> on 18 December. To reduce speeding by motor vehicles on this wide road in the east of the city it seems to be a reasonable suggestion to stop most through motor traffic with a filter to allow only buses (and emergency vehicles) and bikes through but here&#8217;s the reply that we received on 10 January. Note that the installation of speed cushions does not require a traffic regulation order and that a filter, of the type we propose, ie one with rising bollards or similar, would not prevent residents accessing either side of that filter:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY</em></strong><em>, </em><strong><em>GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br>Thank you for your undernoted enquiry.<br><br>I can advise that the introduction of a bus/cycle gate would require the Council to successfully promote a Traffic Regulation Order (TRO). The  legal  process of promoting a TRO is subject to formal consultation and public  advertisement, is open to objection and can take in excess of 12 months  to complete. The promotion of such an order also requires the support  of emergency services and various other road  user groups. It is highly likely that the introduction of a bus/cycle  gate on Duror Street would lead to objections from local residents as  they would be unable to park near to their properties. In view of the  foregoing, there are no plans at present for a  bus/cycle gate to be introduced at this location.<br><br>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions and this recommendation has been  adhered to in the design of this traffic calming proposal.<br><br>I trust the above information is of assistance, however, should you require any further information please contact</em>&#8221; (name and phone number removed by GoBike)</p>



<h6 class="wp-block-heading">3.4 Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=525%2C340&#038;ssl=1" alt="" class="wp-image-9825" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=600%2C389&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike has responded to several consultations about the regeneration of Sighthill, and some might remember that this was a favourite project of the one-time Cycling Czar Councillor Frank McAveety? Who&#8217;s he? Some newer GoBike members might ask. However, the Glasgow (Evening) Times reported on 11 January that construction of the bridge should start in February, be completed in August 2021 and cost £19m. See: <a rel="noreferrer noopener" aria-label="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln (opens in a new tab)" href="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln" target="_blank">https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln</a></p>



<h6 class="wp-block-heading">3.5 Glasgow, Connecting Woodside Update, with news of the  Woodside ‘Making Places’ project </h6>



<p>If you don&#8217;t subscribe direct to the Connecting Woodside updates then you will have missed the free family fun event on Saturday but there is a new Facebook page about the Making Places project that is working in tandem with the active travel team. See <a rel="noreferrer noopener" aria-label="this link (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/01/15/free-family-fun-event-this-saturday!" target="_blank">this link</a> and if you live in the area do get involved. If you would like to ask a question to the project team about this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Free family fun event this Saturday!" target="_blank">sustainabletransport@glasgow.gov.uk</a>. </p>



<h6 class="wp-block-heading">3.6 Glasgow Avenues project, George Square and Blythswood Square.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="352" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=525%2C352&#038;ssl=1" alt="" class="wp-image-9899" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=300%2C201&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=600%2C402&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption> A vision of what Blythswood Square could look like in the future (Herald photo)</figcaption></figure>



<p>News of the Avenues and these 2 squares and yet more consultation in today&#8217;s Herald newspaper; follow this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.heraldscotland.com/news/18174117.plans-hobbit-house-visitor-centre-cafe-25m-project/" target="_blank">link</a> for the details. Let&#8217;s hope for the best that it happens.</p>



<h6 class="wp-block-heading">3.7 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9112" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The Traffic Regulation Order, which we supported, see <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.2, to limit parking in this area near the car showroom, has now been approved, and here&#8217;s the confirmation from East Dunbartonshire Council, received today, 21 January:</p>



<p>&#8220;<em>Dear Sir/Madam   <br><br>The  Traffic Regulation Orders mentioned below has now been made and will become  effective  on  Monday,  23 March 2020. <br><br>Attached are copies of the Order and plan, together with copy of the Notice that is to appear in the edition of the  Milngavie and Bearsden Herald which is published on 24   January 2020.   <br><br>Yours faithfully   </em><br><em>Fiona Stirling   <br>Legal Services, 12 Strathkelvin Place,  Kirkintilloch, G66 1TJ  <br>Telephone 0300 12345 10 (Ext 8012)   <br><br>Note Referred to:-    1. The East Dunbartonshire Council (Killermont Avenue, Rannoch Drive And Woodvale  Avenue,  Bearsden) (No Waiting And No Loading At Any Time       Restrictions) Order 2020.    <br>(See  attached  file:  <a rel="noreferrer noopener" aria-label="200121  Killermont,  etc  - Waiting Time Order 2020.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/200121-Killermont-etc-Waiting-Time-Order-2020.pdf" target="_blank">200121  Killermont,  etc  &#8211; Waiting Time Order 2020.pdf</a>)</em>&#8220;</p>



<p>Good to get something in from outwith the city, but we do hope to get more positive news in before COP26, which will be upon us before we know it. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9795</post-id>	</item>
	</channel>
</rss>
