<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Flourishing Molendinar &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/flourishing-molendinar/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Wed, 01 May 2024 01:48:10 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 156, 04 April 2024</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-156-04-april-2024-21572</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 04 Apr 2024 08:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[anderston]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[kelvingrove]]></category>
		<category><![CDATA[NCN7]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[South Ayrshire]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[yorkhill]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=21572</guid>

					<description><![CDATA[In the centre… Town centres dominate this issue –&#160;one in South Lanarkshire (visualisation in featured image, above)&#160;and no less than eight in East Renfrewshire! Elsewhere, North Lanarkshire&#8217;s consultations continue and South Ayrshire looks at car parking. Glasgow has a few projects in both the West End and in the north of the city – one &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-156-04-april-2024-21572" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 156, 04 April 2024"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">In the centre…</h2>



<p>Town centres dominate this issue –&nbsp;one in South Lanarkshire (visualisation in featured image, above)&nbsp;and no less than eight in East Renfrewshire! Elsewhere, North Lanarkshire&#8217;s consultations continue and South Ayrshire looks at car parking. Glasgow has a few projects in both the West End and in the north of the city – one of the latter links with East Dunbartonshire.</p>



<span id="more-21572"></span>



<p>On 26 March <a href="https://x.com/Glasgow_Live/status/1772618956861231176?s=20">a vigil was held for Una Brandreth</a>, who was killed while cycling in Bearsden a week before. The <a href="https://www.change.org/p/immediate-action-to-improve-traffic-safety-in-bearsden">petition to improve road safety in the area</a> now has over 2,000 signatures.</p>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;North Woodside Road (Outdoor Public Space)</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Subject:&nbsp;</strong>This started as an idea from Websters Theatre for a temporary public events space in the cul-de-sac outside their building. It was put forward for a council programme called Animating Spaces but has since become part of the wider Connecting Woodside project. The latest plans feature a path, dropped kerb, cycle hire station and rain garden. The street is a useful link between the Kelvin Way and Great Western Road (and doesn’t currently have a drop kerb). While the plan might seem modest, removing two car parking spaces to fit it in might still get a negative reaction from some in the West End.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-one">Digest 75, 1.1</a>&nbsp;(originally as “Websters Theatre –&nbsp;A New Public Space at Kelvinbridge”).<br><strong>Website links:</strong>&nbsp;<a href="https://storymaps.arcgis.com/stories/431192821b4145abb3b17756cbc24a6a">N Woodside Rd storymap</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/NorthWoodsidePhase2/">N Woodside Rd survey</a><br><strong>Deadline: 12 April 2024.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Conservation Area Consultations (Coatbridge/Cumbernauld)</h4>



<p><strong>Council:</strong>&nbsp;North Lanarkshire.<br><strong>Subject:&nbsp;</strong>Two consultations about lesser known Conservation Areas. The Coatbridge one is either side of Blairhill train station and the other is in Cumbernauld Village (the original settlement north of the town centre). While not directly related to cycling, the last few survey questions mention traffic and development.<br><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations/coatbridge-blairhill-and-dunbeth-conservation-area-consultation">Coatbridge: Blairhill and Dunbeth Conservation Area Consultation</a>&nbsp;and&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations/cumbernauld-village-conservation-area-consultation">Cumbernauld Village Conservation Area Consultation</a>.<br><strong>Deadline: 12 April 2024.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: A803 Stage 2</h4>



<p><strong>Council:</strong>&nbsp;East Dunbartonshire (and Glasgow CC/City Deal).<br><strong>Subject:&nbsp;</strong>The A803 includes Springburn Rd and Kirkintilloch Rd between North Glasgow and Bishopbriggs. Consultation in 2022 (with Atkins) led to three route options (by Arcadia).<br>Option 1 –&nbsp;bus lanes (mostly southbound) with nothing for cycling.<br>Option 2 –&nbsp;some southbound bus lanes and a shared path for walking/cycling. Except near Bishopbriggs town centre it zigzags off into a ‘quietway’ cycle route. Then back to a shared path before it gives up at Hawthorn St.<br>Option 3 –&nbsp;some sections of 2-way cycleway in north Bishopbriggs then shared path/quietway again until Hawthorn St (where it&nbsp;<em>“will tie into a proposed cycle route that Glasgow City Council is developing”</em>). However, what would happen in the meantime? Alternatives would include using grass verges/upgrading existing paths or actually taking road space from the A803 dual carriageway. However, EDC doesn’t offer those options.<br>A drop-in event has already taken place.<br><strong>Website links:</strong>&nbsp;<a href="https://storymaps.arcgis.com/stories/4ea36650720f40c28e236cca8980e892">A803 Stage 2 storymap</a>&nbsp;and&nbsp;<a href="https://www.eastdunbarton.gov.uk/a803-stage-2-%E2%80%93-public-consultation">A803 public consultation page</a>&nbsp;(with downloads of plans for&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Option-1_A803-Maps.pdf">Option 1</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Option-2_A803-Maps.pdf">Option 2</a>&nbsp;and&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Option-3_A803-Maps.pdf">Option 3</a>).<br><strong>Deadline: 21 April 2024.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: Hamilton Town Centre Masterplan</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Hamilton_View02-Castle-St_001_edited.jpeg?resize=525%2C296&#038;ssl=1" alt="Visualisation of repurposed public space off Castle St, Hamilton" class="wp-image-21576" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Hamilton_View02-Castle-St_001_edited.jpeg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Hamilton_View02-Castle-St_001_edited.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Hamilton_View02-Castle-St_001_edited.jpeg?w=1499&amp;ssl=1 1499w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Hamilton_View02-Castle-St_001_edited.jpeg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Visualisation of changes to public space off <a href="https://maps.app.goo.gl/Fg9SKA1SyJFqPAZt9">Castle St, Hamilton</a> (view to Princes Gate)</figcaption></figure>



<p><strong>Council:</strong>&nbsp;South Lanarkshire.<br><strong>Subject:&nbsp;</strong>One of <a href="https://en.wikipedia.org/wiki/List_of_towns_and_cities_in_Scotland_by_population#Localities">Scotland&#8217;s biggest towns</a> gets a radical rethink to reduce retail and reintroduce residences. The same team who did <a href="https://www.gobike.org/consultation-digest-local-issue-144-21-september-2023-20344">East Kilbride&#8217;s plans</a> are looking at potential demolition of both the New Cross and Regent shopping centres (and maybe the former Baird&#8217;s and M&amp;S buildings). However, initial plans keep the 4/5-lane A723 around the south-eastern edge of the town centre, which severs it from neighbouring areas (Barncluith and Silvertonhill). The Masterplan material mentions active travel but very few images have cycle lanes. There are some inventive ideas but many cluttered shared spaces, which could do with some kind of segregation (like rows of trees, to take inspiration from the historic <a href="https://en.wikipedia.org/wiki/Hamilton_Palace#The_site_today">‘Great Avenue’</a>). The only current cycle route in the town centre (between Hamilton Central station and Strathclyde Park) is mostly paint, except a <a href="https://maps.app.goo.gl/HtBnTkoprnDDSsoy5">short stretch of shared path on Leechlee Rd protected by a hedge</a>. The masterplan process is a golden opportunity to push for cycleways like recent ones in Glasgow or <a href="https://www.gobike.org/consultation-digest-local-issue-110-14-april-2022-17193">East Kilbride town centre</a>.<br>Drop-in events (remaining): <br>4 April, 10am–4pm –&nbsp;Former Quiz shop unit, Regent Shopping Centre (Regent Way).<br>5 April, 10am–4pm –&nbsp;Asda, Palace Grounds. <br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshireview.scot/news/article/2136/tell_us_your_thoughts_on_town_centre_proposals">South Lanarkshire View article</a>, <a href="https://www.hamiltonfuture.co.uk/">Hamilton Masterplan website</a> and <a href="https://www.hamiltonfuture.co.uk/feedback-form">Hamilton Masterplan survey</a>.<br><strong>Deadline: 28 Apr 2024.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5: Connecting Yorkhill and Kelvingrove</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Subject:&nbsp;</strong>Former&nbsp;<a href="https://yokecoco.files.wordpress.com/2019/07/yokecoco_cyclingvillageproposal_135ppa4_apr19.emailfinal.pdf">‘Cycling Village’ bid</a>&nbsp;by&nbsp;<a href="https://yokecoco.wordpress.com/">YoKeCoCo</a>&nbsp;(big Sustrans funding winner back in 2019). Since the pandemic it’s been rebranded as a GCC ‘Connecting…’ project.<br>Phase 1 –&nbsp;Yorkhill North includes previous plans for Radnor St, Haugh Rd, Gilbert St and Sandyford St (between Kelvin Way and SWG3). Another 2-way cycleway up Yorkhill St would link to infrastructure on Old Dumbarton Rd (behind the Kelvin Hall).<br>Phase 2 – widen footways along Kelvinhaugh St and add 1-way cycleways at the wide Argyle St junction.<br>Phase 3 – add bidirectional cycleways on Derby St to link from Kelvinhaugh St, across Argyle St and Sauchiehall St, to Kelvingrove Park.<br>Phase 4 – look at Corunna Street and Minerva Street (near Exhibition Centre train station). Also, there will be changes to car parking provision to better match the number of spaces and permit holders (currently two of the latter on Kelvinhaugh St for 203 spaces!).<br><em>Drop-in event:&nbsp;</em>Thursday 18 April 2024 at 3.30–7pm in The Pyramid at Anderston, 759&nbsp;Argyle Street, Glasgow G3 8DS.<br>See below for related Liveable Neighbourhoods projects and Traffic Regulation Order.<br><strong>Website links:</strong>&nbsp;<a href="https://storymaps.arcgis.com/stories/38b3e94303f44ebd8257be3da86a4ac1">Connecting Y&amp;K storymap</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/ConnectingYorkhillAndKelvingrove/">Connecting Y&amp;K survey</a>.<br><strong>Deadline: 28 Apr 2024.</strong></p>



<h4 class="wp-block-heading" id="one-six">1.6: Yorkhill to Anderston: Liveable Neighbourhoods</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Subject:&nbsp;</strong>The above Connecting Yorkhill and Kelvingrove work means the Liveable Neighbourhoods projects focus on Anderston (and part of Sandyford). These include adding some cycleways to the West City Way and tweaks to other sections. So, there’s a new cycleway for the quieter bit of Argyle St between the Buttery and Pyramid, near St Patrick’s Primary School. Some raised tables removed and the Elderslie St/Argyle St corner is remodelled. New 1-way cycleways go north of St Vincent St with a revised crossing on Elderslie St. Also, Kent Rd would get a 1-way section and some greenery. However, there are no upgrades for Berkeley St –&nbsp;the bus boarder and junctions at Elderslie St and Claremont St (near the Gaelic School) are untouched. North Claremont St is still disrupted by building work but it’s hard to follow the logic of the rest. Hopefully, the joint consultation event will provide some answers (18 April, as above). Also, these works raise questions about the level of provision in other LN areas.<br><strong>Website links:</strong>&nbsp;<a href="https://storymaps.arcgis.com/stories/550d359a92964421818e4891663f2981">Yorkhill–Anderston LN storymap</a>,&nbsp;<a href="https://www.smartsurvey.co.uk/s/LiveableNeighbourhoodsAnderston/">Anderston LN survey</a>&nbsp;and&nbsp;<a href="https://www.glasgow.gov.uk/liveableneighbourhoods">Yorkhill to Anderston consultation (on GCC’s LN webpage</a>).<br><strong>Deadline: 28 Apr 2024.</strong></p>



<h4 class="wp-block-heading" id="one-seven">1.7: Prestwick parking consultation 2024</h4>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?ssl=1"><img data-recalc-dims="1" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?resize=525%2C371&#038;ssl=1" alt="Prestwick Residents Parking Scheme map" class="wp-image-21590" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?resize=1536%2C1086&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?resize=2048%2C1448&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Prestwick-Residents-Parking-Scheme.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></a><figcaption class="wp-element-caption">Map of proposal for Prestwick car parking permit scheme (click to enlarge)</figcaption></figure>



<p><strong>Organisation:</strong>&nbsp;Ayrshire Roads Alliance (on behalf of South Ayrshire Council).<br><strong>Subject:&nbsp;</strong>Proposals to add further streets to an existing residents car parking permit scheme around Main Street, Prestwick. The new town centre streets added at the northern end of the area include Berelands Road, Mieklewood Avenue and Links Road. The latter is part of NCN7, along with Station Rd and Kirk St.<br><strong>Website links:</strong> <a href="https://www.ayrshireroadsalliance.org/Information-On/Consultations/Current-consultations/Prestwick-Parking-Consultation/Prestwick-parking-consultation.aspx">Prestwick parking consultation webpage</a>.<br><strong>Deadline: 03 May 2024.</strong></p>



<h4 class="wp-block-heading" id="one-eight">1.8: East Renfrewshire Town Centres</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Eastwood-Toll-gates_3320_1200px.jpeg?resize=525%2C296&#038;ssl=1" alt="Eastwood Park gates looking onto Eastwood Toll, Giffnock, East Ren" class="wp-image-21593" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Eastwood-Toll-gates_3320_1200px.jpeg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Eastwood-Toll-gates_3320_1200px.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Eastwood-Toll-gates_3320_1200px.jpeg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/Eastwood-Toll-gates_3320_1200px.jpeg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Park gates at Eastwood Toll – measures for Ayr Rd and Fenwick Rd are in consultation</figcaption></figure>



<p><strong>Council:</strong>&nbsp;East Renfrewshire.<br><strong>Subject:&nbsp;</strong>Further consultation about eight East Ren town centres: Clarkston, Eaglesham, Giffnock, Barrhead, Busby, Neilston, Newton Mearns and Thornliebank. The last phase collected suggestions about changes to each place. Some of the most popular options are now available to choose in ‘Final verification surveys’. Questions are grouped under headings: ‘Roads, transportation and active travel’, ‘Buildings, retail and meeting spaces’ and ‘Green space and path networks’. <br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-fourteen">Digest 121, 1.14</a> (and 112).<br><strong>Website links:</strong> <a href="https://eastrenfrewshireprogramme.commonplace.is/">East Renfrewshire Town Centres Commonplace site</a>.<br><strong>Deadline: 05 May 2024.</strong></p>



<h4 class="wp-block-heading" id="one-nine">1.9: Flourishing Molendinar</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Subject:&nbsp;</strong>A project started by St Paul’s Youth Forum and their On Bikes team. Their original base is on Langdale St, Blackhill which had one of the first Spaces for People streets created during lockdown. More SfP streets followed on Royston Rd, Provanmill Rd and Cumbernauld Rd before the wider project was taken over by Glasgow City Council. These (very) detailed draft plans would make those protected lanes permanent and add a new public space in the middle of Langdale St (on a block with no houses facing onto it). Also, they’d add crucial connections to places like Smithycroft High School, taming junction 12 of the M8 motorway in the process.<br><em>Public Drop in Events:</em>&nbsp;Wednesday 24 / Thursday 25 April 2024, 3pm – 7pm.<br>Molendinar Community Centre, 1210 Royston Road, Glasgow G33 1HE<br><strong>Website links:</strong>&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/A3-poster_flourishing-molendinar_V1_printready.pdf">FloMo poster</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Flourishing_Molendinar_GA1_March_2024.pdf">FloMo plans sheet 1</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Flourishing_Molendinar_GA2_March_2024.pdf">FloMo plans sheet 2</a>&nbsp;and&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2024/03/Flourishing_Molendinar_GA3_March_2024.pdf">FloMo plans sheet 3</a>.<br><strong>Deadline: 13 May 2024.</strong></p>



<h3 class="wp-block-heading"><strong>Section 2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp;South Lanarkshire Cycling Partnership meeting – 25 March 2024</h4>



<p><strong>Subject:</strong> SLCP members include councillors, officers and external groups like Sustrans, Camglen Bike Town and GoBike. The main presentation was about the finished active travel studies for Clydesdale (split into three areas). The council now has <a href="https://www.southlanarkshire.gov.uk/downloads/download/982/">active travel studies</a> covering the whole of South Lanarkshire. <br>The other main presentation was about funding changes – Strathclyde Partnership for Transport (SPT) has had its capital budget cut to zero. Also, funding that used to come via Sustrans is changing to direct funding from Transport Scotland. This has affected some ongoing projects but it looks like TS funding may go towards work around the new Hairmyres station (which goes to planning soon). <br>Updates included Bike Town planning expansion into East Kilbride, following their work there on bikes for refugees (with <a href="https://www.dailyrecord.co.uk/in-your-area/lanarkshire/new-east-kilbride-integration-network-31909588">EK Integration Network</a>) and tours of the new cycling infrastructure. <br>Also, some success for GoBike – following consultation, SLC are looking at an alternative route up from the Raith Interchange on Laighlands Rd/Bothwellpark Rd (instead of the steeper Langside Rd).</p>



<h3 class="wp-block-heading"><strong>Section 3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1:&nbsp;East Dunbartonshire TROs</h4>



<p><strong>Subject:</strong>&nbsp;Order about disabled car parking spaces.<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-pavements-and-parking/traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City TROs and Traffic Calming</h4>


<div class="wp-block-image">
<figure class="alignright size-thumbnail"><img data-recalc-dims="1" loading="lazy" decoding="async" width="150" height="150" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_p2-excerpt-150x150.png?resize=150%2C150&#038;ssl=1" alt="" class="wp-image-21602" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_p2-excerpt.png?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_p2-excerpt.png?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_p2-excerpt.png?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_p2-excerpt.png?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w" sizes="auto, (max-width: 150px) 100vw, 150px" /><figcaption class="wp-element-caption">N Hanover St TRO plans (click to enlarge)</figcaption></figure>
</div>


<p><strong>Subject:</strong>&nbsp;Traffic order&nbsp;for North Hanover St and Kyle St – in advance of works for the Avenues project. <a href="https://www.gobike.org/wp-content/uploads/2024/03/North_Hanover_Street_and_Kyle_Street_-_Plan.pdf">TRO plans</a> show 2-way lanes are due to go on the eastern side of N Hanover St then a diagonal crossing will take them to the northern side of Kyle St (to connect with the new Sighthill bridge). A <a href="https://www.gobike.org/wp-content/uploads/2024/03/GoBike-N-Hanover-St-Kyle-St-TRO-response-Feb2024.pdf">GoBike response</a> raised several issues, especially about junctions/future connections including George Sq, Cathedral St, Cowcaddens Rd and Dobbies Loan. The <a href="https://www.gobike.org/wp-content/uploads/2024/03/GCC-N-Hanover-St-Kyle-St-TRO-response-Feb2024.pdf">GCC response</a> answered some of our points but seemed to misinterpret others. Unfortunately, as GoBike are still quite stretched, we didn&#8217;t manage to get back to them before the public TRO went out. <em>Deadline: 19 April 2024</em>.<br>Other ongoing TRO consultations include Yorkhill Area/Radnor St and Duke St/John Knox St. The page also lists recent ‘made’ orders for St George&#8217;s St/Clarendon Place and the North East Active Travel Routes (NEATR).<br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18127">GCC Proposed Traffic Regulation Orders</a>&nbsp;and&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878">GCC Proposed Traffic Calming Schemes</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3: North Lanarkshire TROs</h4>



<p><strong>Subject:</strong>&nbsp;Changes to restrictions in Airdrie at the pedestrianised part of Graham St and on Wellwynd (next to New Wellwynd Parish Church).&nbsp;<em>Deadline: 19 April 2024</em>.<br><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations/graham-street-and-wellwynd-airdrie-proposed-traffic-regulation-consolidation-variation-order">Graham Street and Wellwynd, Airdrie – Traffic Regulation (Consolidation) Variation Order</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">21572</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 92, 3 August 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 03 Aug 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Auldhouse]]></category>
		<category><![CDATA[Bellshill]]></category>
		<category><![CDATA[Bishopbriggs]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[City Deal]]></category>
		<category><![CDATA[Claypits]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[Garscube Rd]]></category>
		<category><![CDATA[GHA]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[Kirkintilloch]]></category>
		<category><![CDATA[LEZ]]></category>
		<category><![CDATA[motherwell]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Sauchiehall St]]></category>
		<category><![CDATA[Sighthill]]></category>
		<category><![CDATA[south city way]]></category>
		<category><![CDATA[St Paul&#039;s Youth Forum]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=14734</guid>

					<description><![CDATA[Consultations dropping in from around Glasgow. This Digest comes after Great Britain &#38; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 92, 3 August 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Consultations dropping in from around Glasgow.</h2>



<p>This Digest comes after Great Britain &amp; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have dropped the cycleway to Motherwell train station). There are also several consultations for East Dunbartonshire and Glasgow plus one for East Renfrewshire.</p>



<p>The ban on pavement parking was made law in the Scottish Parliament in 2019. Last year, GoBike wondered when it would come into force (<a href="https://www.gobike.org/consultation-digest-issue-65-21-july-2020-whats-happened-to-pavement-parking-proposals-approved-but-not-enacted-plus-a-request-to-contribute-to-the-streets-for-all-glasgow-commonplace-map-and-m-11719" target="_blank" rel="noreferrer noopener">Digest 65, Item 3.4</a>) – it seems it&#8217;s due to be 2023. <a href="https://e-activist.com/page/87240/action/1?utm_medium=email&amp;utm_source=engagingnetworks&amp;utm_campaign=pp&amp;utm_content=Pavement+Parking+Scotland+ban+MSP+prev+PP+actn&amp;ea.url.id=5427510&amp;forwarded=true" target="_blank" rel="noreferrer noopener">Living Streets want you to write to your MSPs about bringing it forward</a>. </p>



<p>People of all abilities can cycle at facilities run by <a href="https://twitter.com/freewheel_north/status/1417846827991195648?s=20" target="_blank" rel="noreferrer noopener">Freewheel North – who are trying to fundraise just now</a>, in case you want to contribute. </p>



<span id="more-14734"></span>



<h3 class="wp-block-heading">Infrastructure Update</h3>



<ul class="wp-block-list"><li><a href="https://twitter.com/EyeintheskyGla/status/1421811255279603713?s=20" target="_blank" rel="noreferrer noopener">Sighthill&#8217;s new pedestrian/cycle bridge has been installed over the M8</a><span style="font-size: 1rem;"> (but won&#8217;t be open for a while yet).</span> <a href="https://twitter.com/UrbanistTOC/status/1422272043060547586?s=20" target="_blank" rel="noreferrer noopener">GoBike convenor, Thomas, spoke about it on STV!</a></li><li>At the canal, the Claypits nature reserve officially opened at the weekend, including the <a href="https://twitter.com/KineticsGlasgow/status/1421391556129574916?s=20" target="_blank" rel="noreferrer noopener">zigzag ramp from Garscube Rd</a>.</li><li>The <a href="https://twitter.com/Invest_Glasgow/status/1420749763310350347?s=20" target="_blank" rel="noreferrer noopener">Stockingfield Bridge at the canal is being assembled</a> but won&#8217;t be up and running until next year. </li><li><a href="https://twitter.com/reglasgow_web/status/1417460267936534531?s=20" target="_blank" rel="noreferrer noopener">North Canal Bank St – work is getting there</a> but it missed its July re-opening date.</li><li>At Kelvin Hall, <a href="https://twitter.com/YorkhillT/status/1419778370989084673?s=20" target="_blank" rel="noreferrer noopener">Argyle St/Bunhouse Rd has bike lights installed, but not yet operational</a>.</li><li>Thomas visited <a href="https://twitter.com/UrbanistTOC/status/1420724476996734980" target="_blank" rel="noreferrer noopener">Corkerhill Rd&#8217;s soft segregated lanes</a>. </li><li>He also let us know <a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener"></a><a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener">South City Way&#8217;s new cycle counters are up-and-running</a>.</li><li><span style="font-size: 1rem;">Outdoor seating in the sun was popular along </span><a style="font-size: 1rem;" href="https://twitter.com/LinesDashed/status/1419022365971959809?s=20" target="_blank" rel="noreferrer noopener">Sauchiehall St&#8217;s permanent lanes and the pop-ups at Candleriggs/George Square</a><span style="font-size: 1rem;"> and </span><a style="font-size: 1rem;" href="https://www.gobike.org/wp-content/uploads/2021/07/Cambridge-St-seating_1233.jpeg" target="_blank" rel="noreferrer noopener">Cambridge St</a><span style="font-size: 1rem;">.</span> </li><li>In East Kilbride, University Hospital <a href="https://eastkilbride.cyclestreets.net/location/172687/" target="_blank" rel="noreferrer noopener">Hairmyres has a new path into south of site</a> (from Strathtay Ave).</li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-94ad3f9e-5c10-4412-bc03-d3df722422ba"><li><a href="#one-one">Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</a> (ends 3 Aug – <strong>today!</strong>)</li><li><a href="#one-two">St. Paul&#8217;s Youth Forum – Flourishing Molendinar second consultation</a> (ends 6 Aug)</li><li><a href="#one-three">Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</a> (ends 13 Aug)</li><li><a href="#one-four">East Dunbartonshire Council – Bishopbriggs Town Centre Regeneration</a> (ends 15 Aug)</li><li><strong><a href="#one-five">East Dunbartonshire Council – Schools waiting and loading orders</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-six">East Dunbartonshire Council – Lenzie Rd, Kirkintilloch waiting and loading order</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-seven" target="_blank" rel="noreferrer noopener">East Dunbartonshire Council – Civic Way/Lenzie Rd, traffic management</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-eight">Glasgow City Council – Auldhouse Area Traffic Management Order</a> (ends 20 Aug)</strong></li><li><strong><a href="#one-nine">North Lanarkshire Council – Bellshill Entrance/Velo Park Project</a> (until end of Aug)</strong></li><li><a href="#one-ten">East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</a></li><li><a href="#one-eleven">Glasgow City Council – Low Emission Zone consultation</a> (ends 2 Sep)</li><li><a href="#one-twelve">Glasgow City Council – Inner East Strategic Development Framework</a> (ends 3 Sep)</li><li><a href="#one-thirteen">East Dunbartonshire Council – Active Travel Discussion</a> (ends 28 Sep)</li><li><a href="#one-fourteen">Glasgow Urban Sports – GUSM74 Urban Sports Sculpture Park</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#three-one">North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</a></strong></li></ol>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</h4>



<p>Glasgow Housing Association&#8217;s parking areas are in Townhead, east of Buchanan Bus Station, behind the high flats.&nbsp;Resident’s parking spaces around Kennedy St and St Mungo Avenue have been used as free parking by shoppers/commuters. This order introduces parking restrictions (as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-one" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.1</a>). </p>



<p>GoBike agreed with these measures in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-Parking-Stage-One-response-010421.pdf" target="_blank" rel="noreferrer noopener">Stage 1 GHA response</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-parking-response-280721.pdf" target="_blank" rel="noreferrer noopener">latest GHA response</a>. </p>



<p>There are the usual documents for a TRO:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/002-GCC-City-Centre-Traffic-Management-Order-2010-Variation-No.29....pdf" target="_blank" rel="noreferrer noopener">plan of GHA parking areas</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">GHA areas draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-11.01-Publication-of-Proposals-Press-Notice-Draft-Variation-29.pdf" target="_blank" rel="noreferrer noopener">GHA areas press notice</a>&nbsp;and the usual&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a>. Respond by e-mail to&nbsp;<a href="mailto:lestraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">lestraffic@glasgow.gov.uk</a>&nbsp; by<strong>&nbsp;3 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: St. Paul’s Youth Forum –&nbsp;Flourishing Molendinar second consultation</h4>



<p>The Flourishing Molendinar project covers an area around Blackhill in the north east of Glasgow. As seen in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-two" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.2</a>, the next stage of the&nbsp;<a href="https://twitter.com/_OnBikes/status/1413513153124737026?s=20" target="_blank" rel="noreferrer noopener">Flourishing Molendinar project has produced new plans</a> for consultation. Proposals include a pedestrianised section on Langdale St, segregated cycleways on Cumbernauld Rd and Royston Rd.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="372" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=525%2C372&#038;ssl=1" alt="Proposal for Royston Rd at Langdale St/Robroyston Rd" class="wp-image-14745" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=600%2C425&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plans for a permanent cycletrack along Royston Rd at junction with Langdale St and Robroyston Rd</figcaption></figure>



<p>Permanent segregated lanes on Royston Rd would continue east of Provanmill Rd, where the current pop-up lanes peter out, past the Langdale St/Robroyston Rd junction. This wouldn&#8217;t just connect Blackhill towards the city centre, it&#8217;s also just across the M80 footbridge from Barmulloch. The junction is also a route to a school,&nbsp;<a href="https://twitter.com/_OnBikes/status/1401112056217030661?s=20" target="_blank" rel="noreferrer noopener">St Philomena&#8217;s RC Primary School, where pupils have been doing their own plans in Minecraft</a> software. </p>



<p>For more on the above, see the&nbsp;<a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DQSIkWdsW0yxEjajBLZtrQAAAAAAAAAAAAMAADcjbltUNUg0SldZR0JBR1VPTEhOVDJLNTdCN0QwUC4u" target="_blank" rel="noreferrer noopener">FloMo survey</a>&nbsp;(ends&nbsp;<strong>6 August</strong>). </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</h4>



<p>Garnethill is perched above Sauchiehall St and Cambridge St, up some of the steepest streets in the city centre. As we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-three" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.3</a>, it&#8217;s due to get parking controls, which stem from a&nbsp;<a href="https://www.gobike.org/garnethill-car-parking-but-no-cycle-contraflow-public-exhibition-on-parking-controls-thursday-22-and-saturday-24-march-2018-4503" target="_blank" rel="noreferrer noopener">consultation event in 2018</a>. </p>



<p>Garnethill also has a lot of existing one way streets, which don&#8217;t allow for contraflow cycling. In our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-Stage1-response-090120.pdf" target="_blank" rel="noreferrer noopener">Garnethill Stage 1 response</a>, GoBike objected to this and other measures. Very little had changed since, apart from a few parking spaces, so we re-iterated our objections in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-response-300721.pdf" target="_blank" rel="noreferrer noopener">response to the published Garnethill order</a>.</p>



<p>See the restrictions in the TRO documents:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/05-Garnethill-Proposed-CPZ-Plan.pdf" target="_blank" rel="noreferrer noopener">Garnethill plan</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">Garnethill draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">Garnethill press notice</a>&nbsp;and the standard&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>. Email:&nbsp;<a href="mailto:garnethillparking@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">garnethillparking@glasgow.gov.uk</a>&nbsp;by&nbsp;<strong>13 August</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</h4>



<p>This consultation is about not just Bishopbriggs town centre, but also&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/delivery-brr5-and-westerhill-masterplan" target="_blank" rel="noreferrer noopener">phase 5 of Bishopbriggs Relief Road (BRR5)</a>&nbsp;and the&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/a803-corridor-improvements" target="_blank" rel="noreferrer noopener">A803 corridor</a>. Cycling doesn&#8217;t get much of a mention, as we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-four" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.4</a>. That&#8217;s despite Bishopbriggs being so close to the Forth &amp; Clyde canal and to Glasgow (where the A803 changes from Kirkintilloch Rd to Springburn Rd). If you want to put a word in for cycling, see the&nbsp;<a href="https://www.eastdunbarton.gov.uk/bishopbriggs-town-centre-regeneration-consultation" target="_blank" rel="noreferrer noopener">Bishopbriggs consultation webpage</a>&nbsp;and&nbsp;<a href="https://storymaps.arcgis.com/stories/7f0516541d9e45cc8d00ac151ae67143" target="_blank" rel="noreferrer noopener">Bishopbriggs Public Realm Plan survey</a> by&nbsp;<strong>15 August</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: East Dunbartonshire Council –&nbsp;Schools waiting and loading orders</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="208" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=525%2C208&#038;ssl=1" alt="Map of St Matthews and Wester Cleddens primary schools, Bishopbriggs" class="wp-image-14771" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=600%2C238&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=300%2C119&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Schools include St Matthew&#8217;s and Wester Cleddens primary schools, Bishopbriggs</figcaption></figure>



<p>A series of orders from East Dunbartonshire bring in parking restrictions around the following nine primary schools: </p>



<ul class="wp-block-list"><li>Clober Primary School, Milngavie </li><li>Westerton Primary School, Bearsden </li><li>Meadowburn Primary School, Bishopbriggs </li><li>St Matthew’s Primary School, Bishopbriggs </li><li>Wester Cleddens Primary School, Bishopbriggs </li><li>Gartconner Primary School, Kirkintilloch </li><li>Holy Family Primary School, Kirkintilloch </li><li>Craighead Primary School, Milton of Campsie </li><li>Torrance Primary School, Torrance</li></ul>



<p>All include &#8216;no waiting&#8217; restrictions between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. The Clober, Westerton, Craighead and Torrance school plans have sections with no waiting at any time (mostly on corners/school entry roads).</p>



<p>See the plans and other PDF documents for details: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-Statement-of-reasons-west-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;west&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-East-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs/Kirkintilloch/Milton of Campsie/Torrance schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-order-Bishopbriggs-Kirkintilloch-Milton-of-Campsie-Torrance-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-statement-of-reasons-east-schools-waiting-Loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Kirkintilloch-Bishopbriggs-Milton-of-Campie-Torrance-schools.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Bishopbriggs-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs consolidated order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-MoC-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Milton of Campsie consolidated order</a>. </p>



<p>Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-six">1.6: East Dunbartonshire Council –&nbsp;Linnhe Ave/Thums Ave/Ochil Rd waiting and loading order</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="235" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02.jpg?resize=525%2C235&#038;ssl=1" alt="Map of Linnhe Ave/Thums Ave/Ochil Rd, Bishopbriggs
" class="wp-image-14773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=600%2C269&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=300%2C134&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=1536%2C688&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=2048%2C917&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Linnhe Ave/Thums Ave are either side of Woodhill Rd, south of Woodhill Primary School</figcaption></figure>



<p>Immediately east of the above map are Linnhe Ave, Thums Ave and the Ochil Rd cul-de-sac (near Wester Cleddens Rd). Linnhe Ave is due to have no waiting or loading at any time, across from the shops on Woodhill Rd. Thums Ave and Ochil Rd are due to have restrictions only between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. Presumably, the times relate to the nearby Thomas Muir Primary School and Bishopbriggs Academy, which have a gate on Ochil Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Ochil-Rd-Thrums-Ave-Linnhe-Ave-plan.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Linnhe-Ave-Thrums-Ave-Ochil-Rd-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Linnhe-Ave-Thums-Ave-Ochil-rd.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd notice</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: East Dunbartonshire Council –&nbsp;Civic Way/Lenzie Rd, traffic management</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" height="295" width="525" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC_TJ-House_1000px-600x337.jpg?resize=525%2C295&#038;ssl=1" alt="F
ormer EDC headquarters building" class="wp-image-14838"/><figcaption><em>Tom Johnston House, the former EDC headquarters on Civic Way, Kirkintilloch</em></figcaption></figure>



<p>Civic Way, Kirkintinlloch was the site of the former East Dunbartonshire Council headquarters (<a href="https://www.kirkintilloch-herald.co.uk/news/bulldozers-move-demolish-landmark-2561377" target="_blank" rel="noreferrer noopener">the building was demolished in 2015</a>). <a href="https://www.urbanrealm.com/news/7951/Opinions_sought_on_Kirkintilloch_social_housing.html" target="_blank" rel="noreferrer noopener">New, affordable housing is being built</a> on the site, south of Civic Way. On the road itself, EDC plan to add a speed bump with parking restrictions round the corner on Lenzie Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Lenzie-Road-Plan.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Lenzie-Road-waiting-loading-restrictions.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Lenzie-Road-no-waiting-and-no-loading.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Notice-for-Civic-Way-road-hump.pdf" target="_blank" rel="noreferrer noopener">Civic Way notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener"></a><a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener">Kirkintilloch consolidated order</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Glasgow City Council –&nbsp;Auldhouse Area Traffic Management Order</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=298%2C356&#038;ssl=1" alt="Auldhouse area map" class="wp-image-14813" width="298" height="356" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=502%2C600&amp;ssl=1 502w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=251%2C300&amp;ssl=1 251w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?w=694&amp;ssl=1 694w" sizes="auto, (max-width: 298px) 100vw, 298px" /></figure></div>



<p>The Auldhouse area in this order is just south of Pollokshaws East train station and the White Cart Water. It&#8217;s a triangle bounded by Kilmarnock Rd, Auldhouse Rd and Nether Auldhouse Rd. </p>



<p>It&#8217;s mostly along similar lines to other parking controls elsewhere. However, there are a few back lanes between Riverford Rd and Ellisland Rd which will be signed as &#8216;access only&#8217; for motor vehicles. If those are followed, they should allow bikes to have a slightly quieter north-south route. However, the road surfaces are either rough tarmac or cobbles so they might not be that quiet! </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Traffic-Management-Order-plan.pdf" target="_blank" rel="noreferrer noopener">Auldhouse plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Report.pdf" target="_blank" rel="noreferrer noopener">Auldhouse report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/NoticeOfProposals-AuldhouseRoad-230x85mm.pdf" target="_blank" rel="noreferrer noopener">Auldhouse notice</a> and the catch-all <a href="https://www.gobike.org/wp-content/uploads/2021/08/Statement_of_Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>.</p>



<h4 class="wp-block-heading" id="one-nine">1.9: North Lanarkshire Council –&nbsp;Bellshill Entrance/Velo Park Project</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="375" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=525%2C375&#038;ssl=1" alt="Map highlighting the northern part of Strathclyde Country Park around the South Calder Water" class="wp-image-14794" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=600%2C428&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=300%2C214&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1231&amp;ssl=1 1231w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map shows the South Calder Water (blue dashed line). Pink dashed line shows bus route between Bellshill and Motherwell train stations. Will people be able to take their BMX on the bus?</figcaption></figure>



<p>The &#8216;entrance&#8217; is a bit confusing as most people don&#8217;t realise Strathclyde Country Park goes past Bothwellhaugh Rd and the railway, up to Bellshill Rd (A721). The area north of the loch includes the South Calder Water, Bothwellhaugh Cemetery, Bellshill Golf Club and the South Calder Walkway off-road path network. NLC propose to thread mountain bike trails around these, as shown in image, below.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="479" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=525%2C479&#038;ssl=1" alt="Map of proposed mountain bike trails around South Calder Water" class="wp-image-14795" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=600%2C547&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=300%2C273&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?w=800&amp;ssl=1 800w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of proposed mountain bike trails. The note about partially sharing one trail with pedestrians doesn&#8217;t sound like a good idea. The &#8216;green link to Ravenscraig&#8217; peters out around the Aquatec leisure centre</figcaption></figure>



<p>NLC have a patchy record with similar projects like mountain bike trails in Forgewood and skate ramps in Motherwell and Wishaw. However, there is a successful skatepark in Airdrie and a BMX race track in Cumbernauld. The council have taken some input from <a href="https://socialtrack.co.uk/" target="_blank" rel="noreferrer noopener">Socialtrack</a>, who created and run the excellent <a href="https://socialtrack.co.uk/pages/wishawhill-wood-pumptrack" target="_blank" rel="noreferrer noopener">Wishawhill Wood pump track</a> in Craigneuk. These plans include a pump track but it&#8217;s not designed yet (there&#8217;s just an example track photo). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="360" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=525%2C360&#038;ssl=1" alt="Plan of proposed 'Hub and Skills area' including pump track" class="wp-image-14796" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=600%2C411&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=300%2C206&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?w=826&amp;ssl=1 826w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of proposed &#8216;Hub and Skills area&#8217; on the eastern edge of Bellshill</figcaption></figure>



<p>The &#8216;Hub/Skills area&#8217; of the new velo park would be at the edge of Bellshill (next to the roundabout on Motherwell Rd/A721). It could be a great facility for young people around the Bellshill area. The existing Greenlink path makes it more accessible from North Motherwell too (but it doesn&#8217;t link to Ravenscraig, as claimed). </p>



<p>The new route into Strathclyde Country Park should broaden active travel access from Bellshill and Motherwell. This project doesn&#8217;t include any paths near the Raith Interchange bridges (as <a href="https://www.facebook.com/nlccountryparks/photos/a.833729946687529/4330993900294432/" target="_blank" rel="noreferrer noopener">suggested on Facebook</a>). The new routes are indirect and sloping, so are less likely to help cycle commuters around Bellshill. </p>



<p>If you cycle in the area, see the <a href="https://sway.office.com/RsgVUssczf0waxaJ?ref=Link" target="_blank" rel="noreferrer noopener">Bellshill Entrance &amp; Velo Park info page</a>. You can email comments to GreenspaceProjects@northlan.gov.uk. The page says the process should lead to a Sport Scotland application this month so email <strong>before the end of August</strong>.</p>



<h4 class="wp-block-heading" id="one-ten">1.10: East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</h4>



<p>As covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-five" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.5</a>, Ayr Rd through Newton Mearns is a main active travel route into Glasgow. This phase 2 consultation is about replacing the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-pop-up-bike-roll-corridor" target="_blank" rel="noreferrer noopener">phase 1 cones</a> with light segregation, removing some segregation and adding parking bays (one with the bike lane outside it and trialing a parking-protected bike lane for the other). </p>



<p>Light segregation options include &#8216;flexible delineator posts&#8217; or &#8216;wand orca&#8217; units. For examples, maps and more details, see the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-phase-2" target="_blank" rel="noreferrer noopener">Ayr Road Phase 2 Commonplace page</a>. No obvious deadline on this one.</p>



<h4 class="wp-block-heading" id="one-eleven">1.11: Glasgow City Council –&nbsp;Low Emission Zone consultation</h4>



<p>As in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-three" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.3</a> this consultation is about phase 2 of the Low Emission Zone in Glasgow city centre (between the M8, river and High St). Phase 1 only applied to local buses. Phase 2&nbsp;will include all vehicles entering the zone area (unless exempt) but&nbsp;enforcement is only due to start in June 2023.</p>



<p>The short survey asks you about issues like the size of the LEZ area and the grace periods. See the&nbsp;<a href="https://glasgow.gov.uk/27143" target="_blank" rel="noreferrer noopener">Glasgow LEZ consultation page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_LEZ2021/" target="_blank" rel="noreferrer noopener">LEZ online survey</a>. Closes on <strong>2 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-twelve">1.12: Glasgow City Council – Inner East Strategic Development Framework</h4>



<p>The other side of High St out to Carntyne and Tollcross is the &#8216;Inner East&#8217; area, covered in the latest SDF (as in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-four" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.4</a>). The &#8216;Connected&#8217; section mentions quite a few cycling infrastructure projects but the focus is still on public transport and roads, including the so-called East End Regeneration Route (EERR) dual carriageway.</p>



<p>See the&nbsp;<a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener">Inner East consultation page</a>&nbsp;for link to the&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_SDF_InnerEast/">SDF survey</a> –&nbsp;ends <strong>3 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-thirteen">1.13: East Dunbartonshire Council –&nbsp;Active Travel Discussion</h4>



<p>This has been featured since&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927#one-two" target="_blank" rel="noreferrer noopener">Digest 86, Item 1.2</a>, including its ‘<a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">Ideas Map</a>‘ for the area. It&#8217;s an opportunity to focus on active travel (walking, cycling and wheeling). EDC were pioneers when they built phase 1 of the Bearsway cycletrack in Milngavie. However, <a href="https://www.scotsman.com/news/transport/hundreds-join-mass-cycle-back-scrapped-bears-way-bike-lane-extension-1463105" target="_blank" rel="noreferrer noopener">since phase 2 was scrapped</a>, they&#8217;ve fallen behind other local authorities; not even bidding for Spaces for People funding. </p>



<p>Further online discussion events are due later in August. See a full list of events and background info on the&nbsp;<a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. Closing date – <strong>28 Sep 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-fourteen">1.14: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=301%2C301&#038;ssl=1" alt="" class="wp-image-14836" width="301" height="301" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=600%2C600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=300%2C300&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?w=929&amp;ssl=1 929w" sizes="auto, (max-width: 301px) 100vw, 301px" /><figcaption>A cut away view of the skate park plan</figcaption></figure></div>



<p>Charlotte Worthington&#8217;s gold medal at Tokyo 2020 in the BMX Freestyle Park event seems like a good reminder about <a href="https://glasgowurbansports.co.uk/" target="_blank" rel="noreferrer noopener">Glasgow Urban Sports</a>&#8216;&nbsp;skate park project. GUS want to bring land under the M74 extension into productive use as a park for ‘urban sports’ – BMX, skateboarding, inline skating, parkour, etc. Their site is between the back of West St Subway station and Eglinton St. The sculptures would enhance the area even when they didn&#8217;t have skaters jumping off them!</p>



<p>See <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUS&#8217;s survey</a>&nbsp;to try and find out what skaters, or their families, want from the park. Or see the <a href="https://www.facebook.com/groups/177902472310943/" target="_blank" rel="noreferrer noopener">GUS Facebook</a> or <a href="https://twitter.com/GlasUrbSpo" target="_blank" rel="noreferrer noopener">GUS Twitter</a> accounts.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="302" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=525%2C302&#038;ssl=1" alt="Visualisation of the new station" class="wp-image-14829" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=600%2C345&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=300%2C173&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=1536%2C884&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1768&amp;ssl=1 1768w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Visualisation of the new station –&nbsp;the access road would come from behind the view in this image</em></figcaption></figure>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="294" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&#038;ssl=1" alt="Plan of new access to west of Muir St" class="wp-image-14831" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&amp;ssl=1 294w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=147%2C300&amp;ssl=1 147w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?w=590&amp;ssl=1 590w" sizes="auto, (max-width: 294px) 100vw, 294px" /><figcaption>Plan of new access to west of Muir St</figcaption></figure></div>



<p>The planning application for this City Deal project first came up back in <a href="https://www.gobike.org/consultation-digest-issue-61-26-may-2020-11310" target="_blank" rel="noreferrer noopener">Digest 61, Item 1.1</a>. It was to create a new access to the station from the roundabout at the junction of Hamilton Rd (A723), West Hamilton Rd (A721) and Merry St. Running along derelict land behind the row of shops on Muir St, it would join the current road at the station. It would include a bus lane, taxi rank, disabled parking and short cycleway. </p>



<p>However, the cycleway seems to have been dropped from the latest drawings (29 Jun 2021) –see <a href="https://eplanning.northlanarkshire.gov.uk/online-applications/applicationDetails.do?activeTab=summary&amp;keyVal=Q7HWDIBAGXS00" target="_blank" rel="noreferrer noopener">planning application 20/00345/FUL</a>. It would&#8217;ve been pretty short and isolated but would at least have helped cycle to the station from the south. Another example of NLC&#8217;s inconsistent approach –&nbsp;a few steps forward (like the <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-two" target="_blank" rel="noreferrer noopener">RATL path</a>) then a few steps back (like the <a href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-two" target="_blank" rel="noreferrer noopener">RAI dual carriageway</a>).</p>



<p><a href="https://eplanning.northlanarkshire.gov.uk/online-applications/files/BBF1588F0DEB7D45D2D230D860D5010B/pdf/20_00345_FUL-DECISION_NOTICE-1321427.pdf" target="_blank" rel="noreferrer noopener">North Lanarkshire Council have now granted planning permission</a> for this access road to go ahead. Redevelopment has already taken place at nearby Park &amp; Ride car parks. <a href="https://www.scotrail.co.uk/about-scotrail/news/work-continues-motherwell-station-redevelopment" target="_blank" rel="noreferrer noopener">Work is now underway on the station building</a> (using the service road to get passengers down to the middle platforms while stairs are replaced). The Muir St works are expected to start late 2021 and finish summer 2022.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14734</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 91, 20 July 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 20 Jul 2021 18:49:21 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[active travel]]></category>
		<category><![CDATA[Ayr Road]]></category>
		<category><![CDATA[Beith St]]></category>
		<category><![CDATA[East City Way]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[GHA]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Inner East]]></category>
		<category><![CDATA[LEZ]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Mount Vernon]]></category>
		<category><![CDATA[Sighthill]]></category>
		<category><![CDATA[St Paul&#039;s Youth Forum]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=14629</guid>

					<description><![CDATA[Consultations around the edge of Glasgow (and city centre parking). There&#8217;s plenty in this Digest despite it being holiday time, with weather to match for a change (in Glasgow Fair!). This issue is mostly about the fringes – both inside and outside the city boundary; in more and less deprived areas. It&#8217;s also about city &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 91, 20 July 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Consultations around the edge of Glasgow (and city centre parking).</h2>



<p>There&#8217;s plenty in this Digest despite it being holiday time, with weather to match for a change (in Glasgow Fair!). </p>



<p>This issue is mostly about the fringes – both inside and outside the city boundary; in more and less deprived areas. It&#8217;s also about city centre parking and emissions, which is often linked to people driving in from areas around the edge of Glasgow. </p>



<p>The Infrastructure Update has a bit more from north and east but also a project from the West End, just in case anyone&#8217;s getting withdrawal symptoms…</p>



<span id="more-14629"></span>



<h3 class="wp-block-heading">Infrastructure Update</h3>



<ul class="wp-block-list"><li><a href="https://twitter.com/mark_mcintyre/status/1417147339861602309" target="_blank" rel="noreferrer noopener">A thread about recent route developments in Glasgow,</a> looking great in sunshine.</li><li><a href="https://twitter.com/UrbanistTOC/status/1415259968035557380" target="_blank" rel="noreferrer noopener">Beith St has new access and drop kerbs added</a>.</li><li><a href="https://www.glasgowlive.co.uk/news/removal-cycle-lane-bumps-celtic-21009807" target="_blank" rel="noreferrer noopener">London Rd has had soft segregation removed at Celtic Park (but chalk added)</a>.</li><li><a href="https://twitter.com/UrbanistTOC/status/1417040730242048004" target="_blank" rel="noreferrer noopener">At the other end of London Rd, photos of Mount Vernon junction</a>. It&#8217;s good this phase of the East City Way is complete but there are <a href="https://twitter.com/UrbanistTOC/status/1417071202238140416" target="_blank" rel="noreferrer noopener">issues going eastbound</a>, as <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-five" target="_blank" rel="noreferrer noopener">GoBike warned previously</a>.</li><li><a href="https://www.reglasgow.com/in-pictures-transformation-in-progress-at-sighthill/" target="_blank" rel="noreferrer noopener">A bird&#8217;s eye view of the new Sighthill</a> and a few close-ups of its new, but rusty, <a href="https://twitter.com/GlasgowCC/status/1414868471188533249?s=20" target="_blank" rel="noreferrer noopener">pedestrian/cycle bridge</a> before it&#8217;s installed.</li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</a> (ends 3 Aug)</strong></li><li><strong><a href="#one-two">St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar second consultation</a> (ends 6 Aug)</strong></li><li><strong><a href="#one-three">Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</a> (ends 13 Aug)</strong></li><li><strong><a href="#one-four">East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</a> (ends 15 Aug)</strong></li><li><strong><a href="#one-five">East Renfrewshire Council –&nbsp;Ayr Road (A77): Spaces for People, Phase 2</a></strong></li><li><a href="#one-six">Glasgow City Council – Low Emission Zone consultation</a> (ends 2 Sep)</li><li><a href="#one-seven">Glasgow City Council –&nbsp;Inner East Strategic Development Framework</a> (ends 3 Sep)</li><li><a href="#one-eight">East Dunbartonshire Council – Active Travel Discussion</a>&nbsp;(ends 28 Sep)</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#three-one">Mount Florida Community Council – Letherby Triangle planning decision</a></strong></li><li><strong><a href="#three-two">St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar first consultation feedback</a></strong></li></ol>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="251" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=525%2C251&#038;ssl=1" alt="Townhead area around Kennedy St and St Mungo Ave" class="wp-image-14652" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=600%2C287&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=300%2C144&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Townhead –&nbsp;GHA parking areas are mostly side streets off Kennedy St and St Mungo Ave</figcaption></figure>



<p>&#8216;GHA Parking Areas&#8217; refers to land in Townhead owned by Glasgow Housing Association. The area is east of Buchanan Bus Station and Glasgow Caledonian University, behind the high flats. Resident&#8217;s parking spaces around Kennedy St and St Mungo Avenue have been used as free parking by shoppers/commuters. This order introduces parking restrictions which can be enforced. </p>



<p>There are the usual documents for a TRO: <a href="https://www.gobike.org/wp-content/uploads/2021/07/002-GCC-City-Centre-Traffic-Management-Order-2010-Variation-No.29....pdf" target="_blank" rel="noreferrer noopener">plan of GHA parking areas</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">GHA areas draft report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-11.01-Publication-of-Proposals-Press-Notice-Draft-Variation-29.pdf" target="_blank" rel="noreferrer noopener">GHA areas press notice</a> and the usual <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a>. Respond by e-mail to&nbsp;<a href="mailto:lestraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">lestraffic@glasgow.gov.uk</a>&nbsp; by<strong> 3 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar second consultation </h4>



<p>The last mention of the Flourishing Molendinar project was in <a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#one-eight" target="_blank" rel="noreferrer noopener">Digest 82, Item 1.8</a> (when it changed to its current name). The main image on this Digest shows the area covered by the project in the north east of Glasgow. </p>



<p>The next stage of the <a href="https://twitter.com/_OnBikes/status/1413513153124737026?s=20" target="_blank" rel="noreferrer noopener">Flourishing Molendinar project has produced some eye-catching plans</a>. In particular, the pedestrianised area proposed for Langdale St, which could be an example for other so-called &#8216;liveable&#8217; neighbourhoods. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="349" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=525%2C349&#038;ssl=1" alt="Flourishing Molendinar plan for Langdale St" class="wp-image-14655" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=600%2C399&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=300%2C199&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Illustration of proposal for Langdale St, Blackhill (where St Paul&#8217;s Youth Forum are based –&nbsp;at bottom right of image)</figcaption></figure>



<p>However, there was also big news for anyone who cycles on Cumbernauld Rd (A80) across the M8 motorway. The bridge is a four/five lane dual carriageway, which many pupils have to cross to get to Smithycroft Secondary School. FloMo&#8217;s plan would reduce the (wide) lanes and add segregated cycleways. If it goes ahead, this would transform that stretch of road into a far more people-friendly place.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="406" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=525%2C406&#038;ssl=1" alt="Flourishing Molendinar plan for Cumbernauld Rd (A80)" class="wp-image-14654" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=600%2C464&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=300%2C232&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Illustration of proposal for</em> Cumbernauld Rd (A80) with amended on/off-ramps to <em>M8 junction 12</em> (on right of image –&nbsp;blue car is going the wrong way!)</figcaption></figure>



<p>For more on the above (and Royston Rd) go to the <a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DQSIkWdsW0yxEjajBLZtrQAAAAAAAAAAAAMAADcjbltUNUg0SldZR0JBR1VPTEhOVDJLNTdCN0QwUC4u" target="_blank" rel="noreferrer noopener">FloMo survey</a> (ends <strong>6 August</strong>). We look forward to seeing what comes out of it. </p>



<p>For more about the phase 1 consultation, see Item 3.2.</p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</h4>



<p>Garnethill, north of Sauchiehall St, is known for (what&#8217;s left of) Glasgow School of Art. It&#8217;s also home to a few schools, places of worship, hotels and several thousand residents. The area has steep, tight streets and existing one-ways, as well as the usual parking issues. </p>



<p>GoBike posted about the <a href="https://www.gobike.org/garnethill-car-parking-but-no-cycle-contraflow-public-exhibition-on-parking-controls-thursday-22-and-saturday-24-march-2018-4503" target="_blank" rel="noreferrer noopener">consultation events for Garnethill back in March 2018</a>. The plans involve a lot of yellow lines, parking restrictions on back lanes and the creation of car parking bays. One thing that isn&#8217;t included in the plan is the <a href="https://www.gobike.org/consultation-digest-local-issue-85-27-april-2021-13844#three-one" target="_blank" rel="noreferrer noopener">two-way section of Hill St, at St Aloysius College, created by TTRO in April</a> (Digest 85, 3.1). However, the parking bays are still included, which reduce the road to one car width. </p>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?ssl=1" target="_blank" rel="noopener"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="311" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=525%2C311&#038;ssl=1" alt="Detail of Garnethill parking plans" class="wp-image-14680" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=600%2C355&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=300%2C177&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=1536%2C908&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=2048%2C1211&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption>Detail of Garnethill parking plans showing St Aloysius College, GSA, etc. <strong>Click image to enlarge</strong></figcaption></figure>



<p>Any neighbourhood plan is of most interest to people who live in the area. However, issues in Garnethill could have a knock-on effect on Sauchiehall St and Cambridge St so it&#8217;s in our wider interest that it works. </p>



<p>Again, there are the usual TRO documents: <a href="https://www.gobike.org/wp-content/uploads/2021/07/05-Garnethill-Proposed-CPZ-Plan.pdf" target="_blank" rel="noreferrer noopener">Garnethill plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">Garnethill draft report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">Garnethill press notice</a> and the standard <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>. Respond by email:&nbsp;<a href="mailto:garnethillparking@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">garnethillparking@glasgow.gov.uk</a> by <strong>13 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</h4>



<p>This consultation covers Bishopbriggs town centre and two City Deal projects – <a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/delivery-brr5-and-westerhill-masterplan" target="_blank" rel="noreferrer noopener">phase 5 of Bishopbriggs Relief Road (BRR5)</a> and the <a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/a803-corridor-improvements" target="_blank" rel="noreferrer noopener">A803 corridor</a> (Springburn Rd/Kirkintilloch Rd). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="254" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=525%2C254&#038;ssl=1" alt="" class="wp-image-14661" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=600%2C290&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Bishopbriggs map showing NCN754 (in red) and &#8216;Wester Way&#8217; (blue dashed line on right of image)</figcaption></figure>



<p>Bishopbriggs town centre is marooned between NCN754 (Forth &amp; Clyde canal) and the &#8216;Wester Way&#8217; shared path, without good active travel links to either. The Wester Way was built alongside the BRR on Westerhill Rd, where <a href="https://www.kirkintilloch-herald.co.uk/news/what-went-wrong-bishopbriggs-relief-road-project-284659" target="_blank" rel="noreferrer noopener">BRR phase 4 caused years of disruption</a>. Both road and path peter out opposite the Aviva offices, north of the rail line to Lenzie. BRR5 doesn&#8217;t have a route decided yet but could affect some paths in the area. </p>



<p>The striking thing about the town centre &#8216;Future&#8217; images is how little the infrastructure changes apart from slightly wider footways and planting more trees. There are a few cyclists in the images but no segregated cycle lanes. The town centre work is part of a City Deal project worth nearly £35m, so they&#8217;re not skint. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="233" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=525%2C233&#038;ssl=1" alt="Kirkintilloch Rd – before/after image" class="wp-image-14686" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=600%2C266&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=300%2C133&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?w=1247&amp;ssl=1 1247w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Kirkintilloch Rd –&nbsp;before/after visualisation showing very little change</figcaption></figure>



<p>If you&#8217;ve ridden any routes in the area, it&#8217;s worth putting a word in for cycling. See the <a href="https://www.eastdunbarton.gov.uk/bishopbriggs-town-centre-regeneration-consultation" target="_blank" rel="noreferrer noopener">Bishopbriggs consultation webpage</a> and <a href="https://storymaps.arcgis.com/stories/7f0516541d9e45cc8d00ac151ae67143" target="_blank" rel="noreferrer noopener">Bishopbriggs Public Realm Plan survey</a>. Consultation closes <strong>15 August</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-15110" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?w=1078&amp;ssl=1 1078w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Ayr Road (A77) showing cones on painted cycle lane</em></figcaption></figure>



<p>The Ayr Rd section of the A77 route at Newton Mearns is south of the <a href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#one-four" target="_blank" rel="noreferrer noopener">Fenwick Rd Spaces for People lanes, which we covered back in January 2021</a> (Digest 78, 1.4). GoBike staged a <a href="https://www.gobike.org/pedal-on-parliament-pop-up-protests-throughout-next-weekend-8308" target="_blank" rel="noreferrer noopener">local Pedal on Parliament event about parking on Ayr Rd&#8217;s bike lanes</a> back in 2019.  </p>



<p>The phase 2 consultation is partly about replacing the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-pop-up-bike-roll-corridor" target="_blank" rel="noreferrer noopener">phase 1 cones</a> with light segregation. However, it also removes the segregation in some sections (like at Mearns Cross). It includes adding parking bays with the bike lane outside it in one location but trialing a parking-protected bike lane at Ashtree Grove (as in image, below). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="293" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=525%2C293&#038;ssl=1" alt="" class="wp-image-14681" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=600%2C335&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=300%2C168&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?w=1528&amp;ssl=1 1528w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of bike lane protected <em>from carriageway</em> by car parking near Ashtree Grove</figcaption></figure>



<p>The mixed approach probably reflects that on-road, segregated cycleways are still very new in East Renfrewshire (or anywhere outside a city). Issues in other towns, like <a href="https://www.gobike.org/sunday-06-november-gobike-ride-and-bears-way-advocacy-ride-2008" target="_blank" rel="noreferrer noopener">the Bearsway extension being scrapped</a> and the <a href="https://www.gobike.org/time-to-get-councillors-who-support-active-travel-holmston-road-cycle-lane-in-ayr-to-be-ripped-up-1938" target="_blank" rel="noreferrer noopener">removal of lanes on Holmston Rd</a>, cast a long shadow. Newton Mearns is just as affluent and <a href="https://www.gov.scot/publications/scottish-household-survey-2019-supplementary-analysis/pages/6/" target="_blank" rel="noreferrer noopener">around 90% of people in East Ren have access to a car</a>. However, it has younger demographics than either Milngavie or Ayr. </p>



<p>East Ren differ from Glasgow by only asking how to improve the scheme, not whether people want rid of it. If ERC wait to get feedback before making changes then that would be an improvement on London Rd too. A few comments in the Commonplace survey allude to Glasgow ripping out segregation so that seems to have had an effect beyond the city boundary. </p>



<p>Light segregation options include &#8216;flexible delineator posts&#8217; or &#8216;wand orca&#8217; units. For examples, maps and more details, see the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-phase-2" target="_blank" rel="noreferrer noopener">Ayr Road Phase 2 consultation page</a>. No obvious deadline on this one. </p>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow City Council – Low Emission Zone consultation </h4>



<p>Glasgow&#8217;s city centre Low Emission Zone (LEZ) has only applied to some buses so far. GCC are consulting before it changes to include cars and other motor vehicles. It covers most of the city centre –&nbsp;north of the river, conveniently inside the M8 and eastwards to High St/Saltmarket. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=525%2C340&#038;ssl=1" alt="Plan of boundary of Glasgow Low Emission Zone" class="wp-image-14684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=600%2C388&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan showing boundary of Glasgow Low Emission Zone</figcaption></figure>



<p>However, the LEZ won&#8217;t include cars any time soon as there are some &#8216;grace periods&#8217; built into the plan at the moment. One year until it comes in, so summer 2022. Then another year until it becomes enforceable –&nbsp;1 June 2023. There will be a further year&#8217;s grace for folk who live in the city centre (until 1 June 2024). Some exemptions apply to people with disabilities, emergency vehicles, etc. </p>



<p>One good thing about the short survey is it does ask you about the above. So, if you think the LEZ area is too small or the grace periods are too long, you can tick those boxes and add a comment too. </p>



<p>See the&nbsp;<a href="https://glasgow.gov.uk/27143" target="_blank" rel="noreferrer noopener">Glasgow LEZ consultation page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_LEZ2021/" target="_blank" rel="noreferrer noopener">LEZ online survey</a>. Closes on <strong>2 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: Glasgow City Council –&nbsp;Inner East Strategic Development Framework</h4>



<p>The ‘Inner East’ goes from High St out to Carntyne and Tollcross, between the River Clyde and the M8 (just short of FloMo&#8217;s patch).&nbsp;Like previous SDFs for other areas, it has themes about connections and sustainability but is mostly about identifying development opportunities. Some planned cycle routes and the Avenues Plus active travel scheme are included on a map with &#8216;missing links&#8217;. There are some issues with the map, like the red line between Barrowfield and Parkhead, counting the bus lane on one side as &#8220;off road/segregated&#8221;. Although it&#8217;s patchy, it puts more focus on active travel than previous strategies about the East End.</p>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?ssl=1" target="_blank" rel="noopener"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="350" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=525%2C350&#038;ssl=1" alt="Map: Connected Inner East" class="wp-image-14691" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=600%2C400&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=300%2C200&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?w=1500&amp;ssl=1 1500w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption><em>Draft map of &#8220;Seemless&#8221; Active Travel Routes –&nbsp;Freudian slip? </em><strong>Click image to enlarg</strong><em><strong>e</strong></em></figcaption></figure>



<p>A few of the rail improvements in the document have been talked about for over ten years, such as the Parkhead rail halt. However, it&#8217;s the East End Regeneration Route (EERR phase 3) that seems to be back on the agenda due to new funding. It&#8217;s&nbsp;a dual carriageway that would run through Hogarth Park and under Edinburgh Rd and Cumbernauld Rd to the M8. </p>



<p>See the&nbsp;<a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener">Inner East consultation page</a>&nbsp;for link to the PDF document and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_SDF_InnerEast/">SDF survey</a>. Ends <strong>3 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: East Dunbartonshire Council – Active Travel Discussion</h4>



<p>This was first in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927#one-three" target="_blank" rel="noreferrer noopener">Digest 86, Item 1.2</a>, with its ‘<a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">Ideas Map</a>‘ for the area. Recently, East Dunbartonshire Council has brought in new <a href="https://www.kirkintilloch-herald.co.uk/news/people/bearsden-more-misery-at-new-allander-junction-traffic-lights-system-3302472" target="_blank" rel="noreferrer noopener">parking restrictions on Milngavie Rd</a>, opposite the remodeled junction to Allanton Sports Centre. It&#8217;s small but possibly the first parking restriction since the Bearsway was built? </p>



<p>The Bearsway was due to extend to Kessington on the way to Glasgow. While researching this Digest, it emerged it has one of the oldest populations in Scotland. <a href="https://www.nrscotland.gov.uk/files//statistics/population-estimates/sape-19/sape-19-publication.pdf" target="_blank" rel="noreferrer noopener">52% of people of Kessington West are over 65 years old</a> (page 19). Will the Bearsway ever get there? </p>



<p>There are no more consultation events until August/September. See a full list of events and background info on the&nbsp;<a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. Closing date – <strong>28 September 2021</strong>.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Mount Florida Community Council – Letherby Triangle planning decision</h4>



<p>This project was first in <a href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66, 1.3</a> when Mount Florida Community Council (MoFloCoCo) were consulting about it. It&#8217;s good to see it progressing towards being built. </p>



<p>The plan is to close the end of Carmunnock Road at Cathcart Rd to link a triangular traffic island to nearby shops. It will have a viewing platform added and be used for leisure and cultural events. There&#8217;s a handy <a href="https://www.reglasgow.com/mount-florida-civic-space-plan-gets-go-ahead/" target="_blank" rel="noreferrer noopener">overview of the proposal on the ReGlasgow website</a>. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="403" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=525%2C403&#038;ssl=1" alt="" class="wp-image-11816" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=600%2C460&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=300%2C230&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=1536%2C1177&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1600&amp;ssl=1 1600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Artist&#8217;s impression of how Letherby Triangle could look </figcaption></figure>



<p>It&#8217;s <a href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=documents&amp;keyVal=QK1LJ1EXJDM00" target="_blank" rel="noreferrer noopener">planning application 20/03067/FUL</a> if you want to look at it on GCC&#8217;s planning portal. Good luck to MoFloCoCo and their partners for the next stage. </p>



<h4 class="wp-block-heading" id="three-two">3.2: St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar first consultation feedback</h4>



<p>In addition to the new plans in Item 1.2, above, Flourishing Molendinar published data from their earlier consultation (Jan–May 2021). There are plenty of interesting results on the website homepage and in their <a href="https://b6c3af05-b5ec-46fa-897c-166bcced266b.filesusr.com/ugd/428ac6_61e36f4281be4e75899a9a852cf8037e.pdf" target="_blank" rel="noreferrer noopener">Summary Report (PDF)</a>. </p>



<p>In particular, the data shows <a href="https://www.flourishingmolendinar.com/?pgid=kpi7qu3r-a2668058-130b-498a-b41e-7bb616a8b9a6" target="_blank" rel="noreferrer noopener">strong support for keeping Spaces for People measures, as long as they can be adjusted/improved</a>. Overall, 89% wanted to keep the SfP measures in some form while only 11% wanted them removed (out of 152 responses). While FloMo is focussed on one local area, it&#8217;s hopefully a good sign for the results of Glasgow City Council&#8217;s wider SfP consultation (whenever those are published).</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14629</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 82, 16 March 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 16 Mar 2021 20:27:12 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[Inchinnan]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[yorkhill]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13425</guid>

					<description><![CDATA[A rush of closing consultations from inside and outside the city. In this Digest there&#8217;s a mix of consultations from Glasgow and from all directions outside the city. Most are over before late March, which will mark six weeks until the Scottish Parliament election. This is the Public Sector&#8217;s &#8216;purdah&#8217; pre-election period when projects tend &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 82, 16 March 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A rush of closing consultations from inside and outside the city.</h2>



<p>In this Digest there&#8217;s a mix of consultations from Glasgow and from all directions outside the city. Most are over before late March, which will mark six weeks until the Scottish Parliament election. This is the Public Sector&#8217;s &#8216;purdah&#8217; pre-election period when projects tend to avoid new announcements (which could get caught up in electioneering). </p>



<p>That may be why there&#8217;s been a flurry of news about the <a rel="noreferrer noopener" href="https://www.reglasgow.com/further-spaces-for-people-measures-include-more-low-traffic-neighbourhoods-and-extra-10-kilometres-of-bike-lanes/" target="_blank">next lot of Glasgow&#8217;s Spaces for People projects</a> –&nbsp;including <a rel="noreferrer noopener" href="https://www.reglasgow.com/work-to-improve-further-city-centre-bike-lane-announced/" target="_blank">Howard St</a>, <a rel="noreferrer noopener" href="https://www.reglasgow.com/city-centre-street-getting-better-bike-route/" target="_blank">Cambridge St</a> and <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/26852" target="_blank">Royston Rd</a>. GoBike first heard about these at the revived Glasgow Active Travel Forum, which met for the first time online earlier this month (previous meeting was Sept 2019!). </p>



<span id="more-13425"></span>



<p>Ahead of the election in May, see the&nbsp;<a rel="noreferrer noopener" href="https://action.cyclinguk.org/page/75816/petition/1" target="_blank">Cycling for everyone election petition</a> by Cycling UK in Scotland (closes 26 March) and <a rel="noreferrer noopener" href="https://pedalonparliament.org/" target="_blank">Pedal on Parliament&#8217;s &#8216;Light the Way&#8217; campaign</a> on 24 April.</p>



<p>If you&#8217;re in the city, see <a rel="noreferrer noopener" href="https://www.gobike.org/not-1-but-3-infrastructure-rides-for-january-12877" target="_blank">Andy&#8217;s three infrastructure routes</a> around Glasgow to take in Spaces for People infrastructure. Andy has also started to inform GoBike about closures and diversions; if you hear of any please do let us know.</p>



<p>This Digest includes links in the Contents page so you can jump straight to a topic if you want to.</p>



<h3 class="wp-block-heading" id="block-85aea166-a937-4431-9c26-67f7a1578d90"><strong>Contents</strong><br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-d9dde381-de55-44b2-8cd5-c99e5f8a6057"><li><strong><a href="#one-one">Renfrewshire Council –&nbsp;Inchinnan cycling and walking route</a> –&nbsp;closes 17 March</strong></li><li><a href="#one-two">North Lanarkshire Council – Town hub community engagement events</a> – events 16–18 March</li><li><a href="#one-three">Scottish Canals –&nbsp;Stockingfield Junction art survey &amp; public meeting</a> – 18 March</li><li><strong><a href="#one-four">Glasgow City Council –&nbsp;(Y)our Townhead Proposals Workshops</a> – 18 March</strong></li><li><a href="#one-five">Glasgow Harbour Ltd – Yorkhill </a><a href="#one-six">Quay Phase 2</a> –&nbsp;closes Friday 19 March</li><li><a href="#one-six">North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall</a> – closes Sunday 21 March</li><li><strong><a href="#one-seven">East Dunbartonshire Council –&nbsp;Climate Conversation</a> –&nbsp;online events 22 &amp; 30 March/22 April</strong></li><li><strong><a href="#one-eight">Flourishing Molendinar (North East Glasgow) – Public workshops</a> 23–25 March</strong></li><li><a href="#one-nine">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li><a href="#two-one">Glasgow City Council –&nbsp;(Y)our Cowcaddens, &#8216;Learning Quarter&#8217; and Merchant City Proposals Workshops</a></li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</a></li><li><a href="#three-two">Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</a></li><li><a href="#three-three">Multiplex – Glasgow University Newsletter March 2021</a></li></ol>



<h3 class="wp-block-heading" id="block-4347ee24-314e-4146-bc8a-6da0cd17f192"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Renfrewshire Council –&nbsp;Inchinnan cycling and walking route</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="166" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=525%2C166&#038;ssl=1" alt="" class="wp-image-13474" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=600%2C190&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=300%2C95&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=1536%2C485&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?w=2038&amp;ssl=1 2038w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Renfrewshire Council supply Exhibits 1–4 about current &#8220;provision&#8221; on the northern footway on Greenock Rd. At least they might scrape back the grass verge&#8230;</figcaption></figure>



<p><a rel="noreferrer noopener" href="https://goo.gl/maps/BKNujw97QdDfcVCJ6" target="_blank">Greenock Rd</a> (A8) runs between Inchinnan Business Park and Renfrew. This proposed route will be on the north side of the road, apparently starting as a shared path before becoming a segregated cycleway. It will pass McGills bus depot and a few scraps of current infrastructure before going south to Glasgow Airport. It will lead to the new pedestrian/cycle bridge over the Black Cart Water, one of the projects in <a rel="noreferrer noopener" href="http://www.renfrewshire.gov.uk/gaia" target="_blank">Glasgow Airport Investment Area (GAIA)</a>, as mentioned in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest 39, Item 3.3</a>.  </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="480" height="360" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?resize=480%2C360&#038;ssl=1" alt="" class="wp-image-13476" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?w=480&amp;ssl=1 480w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?resize=300%2C225&amp;ssl=1 300w" sizes="auto, (max-width: 480px) 100vw, 480px" /><figcaption>A still from Renfrewshire Council&#8217;s fly-through video from August 2019 shows the Greenock Rd cycle route <em>from the new Black Cart bridge</em> on the south/west side of the road.</figcaption></figure>



<p>The new bridge sits on the southern side of the road (after enhancing its active travel credentials when it <a rel="noreferrer noopener" href="https://www.dailyrecord.co.uk/authors/paisley-daily-express/blunder-bridge-chaos-near-glasgow-23054261" target="_blank">fell off a loader and crushed a white van</a>!). <a href="http://www.renfrewshire.gov.uk/Greenock-Road-Inchinnan-walking-cycling-route" target="_blank" rel="noreferrer noopener">Renfrewshire Council&#8217;s Inchinnan webpage</a> says a toucan crossing will be installed near the bridge. However, it doesn&#8217;t say why the route has now switched to the northern side, especially as the Business Park is also south of the road. Perhaps to avoid the airport&#8217;s approach lights (or someone else&#8217;s land)? Or for future connections into Inchinnan itself? If you want to comment you&#8217;ll need to be quick –&nbsp;the <a href="https://survey123.arcgis.com/share/82d1da254142402298a5f83b8f2265a8" target="_blank" rel="noreferrer noopener">Greenock Rd survey</a> closes on Wednesday 17 March.</p>



<h4 class="wp-block-heading" id="one-two">1.2: North Lanarkshire Council –&nbsp;Town hub community engagement events</h4>



<p>These events first featured in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-two" target="_blank" rel="noreferrer noopener">Digest 81, 1.2</a>. North Lanarkshire Council have <em>&#8220;ambition to replace every school not replaced or remodelled since 1996, our vision is to make these places for the whole community rather than only the school community</em>.<em>&#8220;</em> So, that should include active travel.</p>



<p>Most of the events have already passed but it you get your skates on you can catch the last two for Wishaw and Shotts. The link for each town goes to an Eventbrite sign-up page to register for the event:</p>



<ul class="wp-block-list"><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-wishaw-tickets-141447652737" target="_blank" rel="noreferrer noopener">Wishaw</a>&nbsp;– Wednesday 17th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-shotts-tickets-141448322741" target="_blank" rel="noreferrer noopener">Shotts</a>&nbsp;– Thursday 18th March – 6:30pm</li></ul>



<h4 class="wp-block-heading" id="one-three"> 1.3: Scottish Canals – Stockingfield Junction art survey &amp; public meeting</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="306" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/08/Bridge-picture-Stockingfield.jpg?resize=525%2C306&#038;ssl=1" alt="Stockingfield Bridge" class="wp-image-6147"/><figcaption>Visualisation of new bridge at Stockingfield Junction on Forth &amp; Clyde canal.</figcaption></figure>



<p>Details about the Stockingfield Junction public meeting on 18 March were in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-five" target="_blank" rel="noreferrer noopener">Digest 81, Item 1.5</a>. Since then a <a href="https://www.surveymonkey.co.uk/r/R95QQ5M" target="_blank" rel="noreferrer noopener">survey about Stockingfield</a> has opened asking what kind of artwork people want around the new bridge. There are different views about what form the bridge should have taken so there are sure to be plenty about what (if any) artworks should surround it. Many of us will probably pass through the area once it&#8217;s finished so we might as well chip in our 2p&#8217;s worth. </p>



<p>Scottish Canals want to hear what represents the local communities of Gilshochill, Maryhill and Ruchill (be kind!). Just don&#8217;t say <a href="https://www.glasgowtimes.co.uk/news/13234544.45m-plan-for-bigman-bridge-cut-down-to-size/" target="_blank" rel="noreferrer noopener">The Big Man</a>! </p>



<h4 class="wp-block-heading" id="one-four">1.4: Glasgow City Council –&nbsp;(Y)our Townhead Proposals Workshops</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=525%2C263&#038;ssl=1" alt="Townhead Proposals Workshops – Thursday 18 March. Online – sign-up via Eventbrite" class="wp-image-13464" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=600%2C300&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?w=1024&amp;ssl=1 1024w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Also on Thursday is the next lot of meetings about the District regeneration projects. GoBike received an email about Townhead: </p>



<p><em>&#8220;An Action Plan and Framework for the regeneration of Townhead is currently being prepared by a consultant team appointed by Glasgow City Council. We want your input to help shape and influence the priority projects to improve Townhead.&#8221;</em></p>



<p>There is a series of workshops throughout a &#8216;Co-Design Day&#8217; on Thursday 18 March:</p>



<ul class="wp-block-list"><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-co-design-day-launch-tickets-144243224367" target="_blank" rel="noreferrer noopener">Co-Design Day Launch</a> </strong>(1000 &#8211; 1030) </li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-getting-around-workshops-tickets-144248209277" target="_blank" rel="noreferrer noopener">Getting Around &#8211; Workshops</a>&nbsp;</strong>(1030 &#8211; 1230)</li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-city-centre-communities-workshops-tickets-144250076863" target="_blank" rel="noreferrer noopener">City Centre Communities – Workshops</a>&nbsp;</strong>(1300 &#8211; 1500)</li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-reimaging-your-townhead-tickets-144250447973" target="_blank" rel="noreferrer noopener">Reimagining (Y)our Townhead</a>&nbsp;</strong>(1530 &#8211; 1730)</li></ul>



<p>These suggest a much more collaborative approach than many of these events. Obviously, the most interesting one for us is the morning &#8216;Getting Around&#8217; workshop: </p>



<p><em>&#8220;A participatory workshop considering how to make Townhead more accessible and better connected. Potential projects include:</em></p>



<ul class="wp-block-list"><li><em>Connecting to ‘Townhead Island’</em></li><li><em>Active Travel : walking, wheeling, cycling</em></li><li><em>Junction 15 on M8</em></li><li><em>Cathedral Street</em></li><li><em>Stirling Road Triangle</em></li><li><em>Canal to Cathedral : Dobbies Loan to St James Road</em></li><li><em>…?&#8221;</em></li></ul>



<p>Plenty to get our teeth into there. Alternatively, the <a href="https://yourcitycentre2020.commonplace.is/" target="_blank" rel="noreferrer noopener">Districts Commonplace map</a> is still available if you want to see what suggestions have been made so far or add your own.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow Harbour Ltd – Yorkhill Quay Phase 2</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="291" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=525%2C291&#038;ssl=1" alt="Yorkhill Quay Phase 2 render" class="wp-image-13494" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=600%2C332&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=300%2C166&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=1536%2C851&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=2048%2C1134&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>The latest visualisation of the Phase 2 tower blocks (now on stilts above underground car park).</figcaption></figure>



<p>This development first sprung up in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" target="_blank">Digest 73, Item 1.1</a>. It&#8217;s now nearing the end of a pre-application period before actual plans are submitted to the council.</p>



<p>The <a rel="noreferrer noopener" href="http://yorkhillquay.com/next-steps-and-feedback" target="_blank">Next Steps and Feedback page</a> has a webform you can use to send comments. Or you can email: yorkhillquay@iceniprojects.com by Friday 19 March.</p>



<h4 class="wp-block-heading" id="one-six">1.6: North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall</h4>



<p>North Lanarkshire Council is consulting about traffic in the villages of Calderbank and Chapelhall, between Airdrie and the M8 (as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-seven" target="_blank" rel="noreferrer noopener">Digest 81, Item 1.7</a>). See the&nbsp;<a href="https://storymaps.arcgis.com/stories/1bcf196100854629b3b0d5fbc32a5d58" target="_blank" rel="noreferrer noopener">Chapelhall Traffic Study</a> and&nbsp;<a href="https://storymaps.arcgis.com/stories/fec286268a3c4ee0994aa71aecbd84e5" target="_blank" rel="noreferrer noopener">Calderbank Traffic Study</a>&nbsp;for a survey link at the end of each. If you know the areas you have until Sunday 21 March to respond.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: East Dunbartonshire Council –&nbsp;Climate Conversation</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=525%2C272&#038;ssl=1" alt="East Dunbartonshire's climate conversation" class="wp-image-13465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=1536%2C796&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?w=1628&amp;ssl=1 1628w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Actual roads in East Dunbartonshire may vary.</figcaption></figure>



<p>As many of us know, East Dunbartonshire Council was the only mainland Scottish council not to bid for Spaces for People funding. However, they do seem to be trying to engage their residents about climate change. It almost seems timed as a response to a nearby city having some sort of globally important climate event (which isn’t mentioned).</p>



<p>Their <a href="https://www.eastdunbarton.gov.uk/climate-conversation">Climate Conversation webpage</a> says: <em>&#8220;The Climate Conversation is the first stage in preparing an area-wide Climate Action Plan (CAP) for East Dunbartonshire&#8230; We are also commencing work during 2021 on new strategies that will support the objectives of the CAP: the Open Space Strategy; Circular Economy Strategy; and Active Travel Strategy.&#8221;</em> The last one will obviously be of most interest to GoBike (but the other two are also welcome). </p>



<p>EDC have various surveys to fill in –&nbsp;one general, one for businesses and one for young people (all want an email address upfront). There are also <a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/east-dunbartonshire-climate-conversation-tickets-143700675589" target="_blank">Climate Conversation events</a>, on 22 March,&nbsp;30 March&nbsp;and&nbsp;22 April. The events are all online (on MS Teams) so it&#8217;s likely to be more civil than <a rel="noreferrer noopener" href="https://www.milngavieherald.co.uk/news/police-called-last-thursdays-meeting-about-bears-way-2134078" target="_blank">previous public meetings where the police were called</a>. Perhaps EDC will have their own version of <a href="https://www.theguardian.com/uk-news/2021/feb/05/handforth-parish-council-jackie-weaver-internet-star" target="_blank" rel="noreferrer noopener">Jackie Weaver</a> to guide proceedings?</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Flourishing Molendinar (formerly North East City Ways) –&nbsp;Public workshops</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="329" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=525%2C329&#038;ssl=1" alt="" class="wp-image-13467" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=600%2C376&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=300%2C188&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?w=1052&amp;ssl=1 1052w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Blackhill might not quite look like this –&nbsp;yet!</figcaption></figure>



<p>This initiative, started by On Bikes and St Paul&#8217;s Youth Forum, was <a href="https://www.gobike.org/north-east-city-ways-needs-you-12345" target="_blank" rel="noreferrer noopener">first mentioned in a GoBike blog</a>. Their original name, North East City Ways, may have been inspired by a certain city council. The new name, <a href="https://www.flourishingmolendinar.com/" target="_blank" rel="noreferrer noopener">Flourishing Molendinar</a>, comes from the stream that runs from Hogganfield Loch past Blackhill (mostly in a culvert) towards the city centre. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=525%2C296&#038;ssl=1" alt="" class="wp-image-13479" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Not always blue skies in the North East –&nbsp;this park is also named after the Molendinar Burn</figcaption></figure>



<p>Along with the new name comes a change in focus from the wider area to Provanmill Rd and Langdale St. Both these streets had Spaces for People projects installed over the summer and showed potential for active travel routes. FloMo (it&#8217;s easier to spell!) are looking to build on that with <a href="https://www.eventbrite.co.uk/e/flourishing-molendinar-public-workshop-tickets-121601496349" target="_blank" rel="noreferrer noopener">public workshops on 22, 23 and 24 March</a>. They still have their <a href="https://docs.google.com/forms/d/e/1FAIpQLSdRjYngGGZTaojHa1NjhbIUn3lcuSxpj68IdsHuzrxEerZbtQ/viewform" target="_blank" rel="noreferrer noopener">survey about getting around the North East</a> of the city. Also, there&#8217;s the <a href="https://streetsforallglasgow.commonplace.is/" target="_blank" rel="noreferrer noopener">Streets for All Commonplace map</a> (which On Bikes share with GoBike and <a href="https://www.glasgowecotrust.org.uk/" target="_blank" rel="noreferrer noopener">Glasgow Eco Trust</a>). </p>



<h4 class="wp-block-heading" id="one-nine">1.9: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>A different kind of active travel project but also driven by young (and not so young) people. First covered in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank">Digest 81, Item 1.9</a>, it&#8217;s for a skate park under the M74 extension near West St underground station. The <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a> is still open for skaters, or their families, to have their say about what they want to see in the park.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow City Council –&nbsp;(Y)our Cowcaddens, &#8216;Learning Quarter&#8217; and Merchant City Proposals Workshops</h4>



<p>The email for item 1.4 also said: <em>&#8220;Townhead, alongside Cowcaddens, the Learning Quarter and the Merchant City, is the focus of the current phase of (Y)our City Centre District Regeneration Frameworks.&#8221;</em> So, workshops for the other three will no doubt follow sometime soon.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</h4>



<p>Some swift feedback from the city council about Tricia&#8217;s points in the <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-ECW-Phase-1-response-260221.pdf" target="_blank">GoBike response to the ECW order</a>. Let&#8217;s skip the &#8216;thank you&#8217; and &#8216;COVID-19 happened&#8217; bit and go to the following paragraph: </p>



<p><em>&#8220;The left turn from London Road to Hamilton Road has been banned for all traffic to allow the slip road to be closed and provide a large and safe pedestrian area for crossing.&nbsp;A segregate cycle route will be provided on the south side of London Road and Hamilton Road and will have signal controlled crossing facilities for pedestrians and cycles at Mount Vernon Junction which will link to all potential movements. This junction had no cycle or pedestrian facilities prior to these works. Cycle counts undertaken July 2017 recorded that 4 cycles per day made the left turn from London Road to Hamilton Road which included cyclists on the footway. A classified traffic count, counting all traffic categories, undertaken in October 2017 supported this.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=525%2C263&#038;ssl=1" alt="" class="wp-image-6416" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=600%2C301&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Image of the Mount Vernon junction from the original consultation in 2018.</figcaption></figure>



<p>It&#8217;s not clear if the first part really is talking about the turn from London Rd eastbound to Hamilton Rd westbound, as Tricia asked. However, the count gives us an idea of how many people it might have affected in 2017. Will last summer&#8217;s surge in cycling numbers make a difference to that? And will the new junction attract all eastbound cyclists across the road to the 2-way lane? I guess we&#8217;ll find out in the near future.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</h4>



<p>GoBike also received a shorter response from GCC about Tricia&#8217;s <a href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-Hamilton-Road-30mph-response-260221.pdf" target="_blank" rel="noreferrer noopener">GoBike response to the 30mph order</a>. Not a lot of detail in this one –&nbsp;it thanks us for our support then basically says East City Way will be done in stages and the police enforce speed limits. It&#8217;s just as well we&#8217;ve got GCC officers to keep us right on these things. </p>



<h4 class="wp-block-heading" id="three-three">3.3: Multiplex – Glasgow University campus newsletter</h4>



<p>Having just missed our publication time for the last Digest I&#8217;m sure everyone will be delighted to see the latest <a href="https://campusdevelopment.co.uk/wp-content/uploads/2021/03/March-2021.pdf" target="_blank" rel="noreferrer noopener">Glasgow Uni campus newsletter</a> this time. There are some nice pictures of large steel frames. However, it doesn&#8217;t include that <a href="https://campusdevelopment.co.uk/wp-content/uploads/2021/03/March-2021.pdf https://campusdevelopment.co.uk/news/university-place-pedestrian-diversion/" target="_blank" rel="noreferrer noopener">University Place has closed to pedestrians and cycling for three months</a>. Nor does it mention a change to the road layout on University Ave: </p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
https://twitter.com/kaisertia/status/1371466915781222400?s=20
</div></figure>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13425</post-id>	</item>
	</channel>
</rss>
