<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>scw &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/scw/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Fri, 27 Aug 2021 17:22:20 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest Issue 54, 18 February 2020: An event today for Battlefield, one tomorrow for Yorkhill &#038; Kelvingrove, and yet more on &#8220;traffic calming&#8221;.</title>
		<link>https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 18 Feb 2020 10:53:16 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car club]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[EV Charging]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[Housing]]></category>
		<category><![CDATA[Low Emission Zone]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Public Hearing]]></category>
		<category><![CDATA[regeneration]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=10097</guid>

					<description><![CDATA[This is, primarily, the feedback issue, with 16 updates on items that have been covered before. These include 10 consultation submissions: 4 for Traffic Calming (speed cushions proposed for all), 3 for Byres Road, 1 for proposed one-way with no contraflow (but see our final item for what we hope is a change for the &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 54, 18 February 2020: An event today for Battlefield, one tomorrow for Yorkhill &#038; Kelvingrove, and yet more on &#8220;traffic calming&#8221;."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>This is, primarily, the feedback issue, with 16 updates on items that have been covered before. These include 10 consultation submissions: 4 for Traffic Calming (speed cushions proposed for all), 3 for Byres Road, 1 for proposed one-way with no contraflow (but see our final item for what we hope is a change for the better) 1 for Car Club Electric Vehicle  Charging Points (the location of which cause some concern, but we include a different approach from North Lanarkshire) and 1 high-level District Regeneration Framework &#8211; thanks to all the people who contributed to the letters submitted, but do please read on for the detail and stushies at 2 big football clubs.</p>



<span id="more-10097"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scotland&#8217;s Low Emission Zones: Consultation on Regulations and Guidance, closes 24 February</li><li>Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li><li> **NEW-ish** Glasgow, Connecting Woodside, commonplace map for comments closes 09 March </li><li>**NEW** East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, additional South City Way event for Battlefield extension, TODAY, 18 February, 4-6pm, Langside Library, Sinclair Drive</li><li>Glasgow, Yorkhill &amp; Kelvingrove Community Council Cycling Village consultation, TOMORROW, 19 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>North Lanarkshire Council tell us about the new Scottish Transforming Planning Website </li><li>Glasgow, Central District Regeneration Framework, submission and  acknowledgement </li><li>Glasgow, Ardencraig Road, Traffic Calming, submission </li><li>Glasgow, Bankfoot Road and Wedderlea Drive, Traffic Calming, submission</li><li>Glasgow, Castlemilk Drive, Traffic Calming Submission</li><li>Glasgow, Mosspark Drive Traffic Calming, submission </li><li>Glasgow, Carmunnock Road Service Road, One-Way with no contraflow, submission</li><li>Glasgow, South Side Car Club TRO, submission</li><li>North Lanarkshire, £5 million electric vehicle charging network</li><li>Glasgow, Byres Road Traffic Management &amp; Parking (for cycle lanes),submission</li><li>Glasgow, Byres Road 20mph TRO, submission</li><li>Glasgow, Hillhead Traffic Management and Parking Controls TRO,  submission </li><li>East Dunbartonshire, Bearsden Town Centre, Waiting &amp; Loading Restrictions confirmed.</li><li>Glasgow, Celtic Park &amp; Emirates Arena, Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 10 March</li><li>Glasgow, Ibrox Stadium,  Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 11 March </li><li>Glasgow University Campus Development February update </li><li>Glasgow, Good News with some Progress on Contraflow Cycling</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations in date order for response</h4>



<h6 class="wp-block-heading">1.1  **NEW** Scotland&#8217;s Low Emission Zones: Consultation on Regulations and Guidance, closes 24 February </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="(max-width: 517px) 100vw, 517px" /></figure>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/LEZ.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10238"/></figure></div>



<p>GoBike member, Steph, has alerted us to the Scottish Government&#8217;s <a rel="noreferrer noopener" aria-label="consultation on Low Emission Zones (opens in a new tab)" href="https://www.transport.gov.scot/consultation/scotlands-low-emission-zones-consultation-on-regulations-and-guidance/" target="_blank">consultation on Low Emission Zones</a>. As with the next item on Housing, it&#8217;s a bit confusing at first, but do give it a try if you are concerned about all the pollution in our urban centres. There does seem to be a presumption that contravening an LEZ is a bit like a parking infringement, ie an inconvenience, rather than something that is causing ill-health and death, particularly for the disadvantaged in our society. No doubt cycle uptake would increase if our streets were cleaner, too.</p>



<h6 class="wp-block-heading">1.2 Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<div class="wp-block-image"><figure class="alignleft size-full"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/affordable-housing.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10055"/></figure></div>



<p><br><br></p>



<p></p>



<p>This consultation featured as Item 1.12 in <a rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank">Digest 53</a> and here&#8217;s the link again:  <a rel="noreferrer noopener" aria-label="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/  (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/ </a></p>



<p>This is the link to the start of your response: <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://consult.gov.scot/housing-services-policy-unit/housing-to-2040/consultation/intro/" target="_blank">https://consult.gov.scot/housing-services-policy-unit/housing-to-2040/consultation/intro/</a></p>



<p>I found it all a bit confusing but did manage to mention active travel and my preference for terraced and tenement-style housing linked with good cycleways. Give it a try and let&#8217;s get active travel ranked above the private car.</p>



<h6 class="wp-block-heading">1.3 **NEW-ish** Glasgow, Connecting Woodside, commonplace map for comments closes 09 March</h6>



<p>We&#8217;ve had lots of news about Woodside but the latest <a rel="noreferrer noopener" aria-label="update (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/02/12/just-keep-pinning-until-9th-march!" target="_blank">update</a> signals the closure of the  commonplace map on 09 March. It&#8217;s good to read that 22 dropped kerbs and 80 bike parking stands have been installed in the project area to date, so do have a look and see what else is needed.</p>



<h6 class="wp-block-heading">1.4 **NEW** East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-10216" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=300%2C137&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=600%2C273&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This proposal, to remove on-street parking from a short section of Westerhill Road just off Kirkintilloch Road in Bishopbriggs and the junction areas with Dalkeith Avenue and Wellington Road, arrived by email on 11 February from East Dunbartonshire Council:</p>



<p>&#8220;<em>PROPOSED:  THE EAST DUNBARTONSHIRE COUNCIL (DALKEITH AVENUE, WELLINGTON ROAD AND WESTERHILL ROAD, BISHOPBRIGGS) ( NO WAITING AND NO LOADING AT ANY TIME RESTRICTIONS) ORDER     <br><br>The  Council  is  promoting  a  Traffic  Regulation  Order  which would introduce no waiting and no loading at any time restrictions.  <br>Enclosed is <a rel="noreferrer noopener" aria-label=" a  copy of the draft Order, plan and Statement of Reasons, together with  a copy of the Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/200211Dalkeith-Ave-Wellington-Rd-Westerhill-Rd-Order.pdf" target="_blank"> a  copy of the draft Order, plan and Statement of Reasons, together with  a copy of the Notice</a> that is to appear in the Bishopbriggs Herald which is published on 12 February 2020<br>Should you wish to comment on the proposal you must do so in writing by Monday,  16 March 2020. <br>Your comments should be sent to Chief Solicitor &amp;   Monitoring   Officer,   Legal   Services,  12  Strathkelvin  Place,     Kirkintilloch, G66 1TJ.   <br>(See  attached  file:  200211Dalkeith  Ave- Wellington Rd &#8211; Westerhill Rd   Order.pdf)   </em><br><br><em>Regards   <br>Fiona Stirling   <br>Legal Services   <br>12 Strathkelvin Place   <br>Kirkintilloch   G66 1TJ</em>&#8220;</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-10218" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Given the commercial properties in the vicinity and the tendency of people to leave their cars/vans at or near junctions inconveniencing others, particularly people walking or cycling, this proposal seems very sensible. Unless you out there tell us otherwise, this is one that GoBike will be supporting.</p>



<p>Back in June last year, in <a rel="noreferrer noopener" aria-label="Digest 37 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank">Digest 37</a>, Item 3.4 were details of an earlier TRO that we had supported, removing on-road parking from further along Westerhill Road, outside commercial units.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, additional South City Way event for Battlefield extension, TODAY, 18 February, 4-6pm, Langside Library, Sinclair Drive</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="287" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=525%2C287&#038;ssl=1" alt="" class="wp-image-10114" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=300%2C164&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=600%2C328&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As per our <a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" target="_blank" rel="noreferrer noopener" aria-label="Consultation Extra of 07 February (opens in a new tab)">Consultation Extra of 07 February</a>, there is a further consultation event this afternoon for the Queen&#8217;s Drive residents who missed all the earlier publicity and meetings. It&#8217;s open to all, takes place TODAY, 18 February at <a rel="noreferrer noopener" aria-label="Langside Library (opens in a new tab)" href="https://www.glasgowlife.org.uk/libraries/venues/langside-library" target="_blank">Langside Library</a> on Sinclair Drive. Do get along if you can.</p>



<h6 class="wp-block-heading">2.2  Glasgow, Yorkhill &amp; Kelvingrove Community Council Cycling Village consultation, TOMORROW, 19 February </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="743" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=525%2C743&#038;ssl=1" alt="" class="wp-image-10208" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?w=678&amp;ssl=1 678w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=424%2C600&amp;ssl=1 424w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p> Do get along to the  cycle village consultation on Wed 19 Feb at the Kelvingrove tennis pavilion 5-7.30pm. Get along and have your say, if you live, work, play or cycle in the area.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 North Lanarkshire Council tell us about the new Scottish Transforming Planning Website</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="444" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=525%2C444&#038;ssl=1" alt="" class="wp-image-10185" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?w=716&amp;ssl=1 716w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=300%2C254&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=600%2C508&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<h6 class="wp-block-heading">3.2  Glasgow, Central District Regeneration Framework, submission and  acknowledgement </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Central-DRF-response-060220.pdf" target="_blank">response</a>, submitted on 06 February, written by GoBike committee member, Brenda, to this consultation, featured in previous Digests, most recently, <a rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank">Digest 53</a>, Item 1.6. In a nutshell, the framework is good but needs sharpening up if we are to transform our city centre.</p>



<p>Here&#8217;s the acknowledgement, received later that day:</p>



<p>&#8220;<em>Hi Tricia,<br>Thanks  very much for your email and the attached documents. I will include  this representation within the wider responses received  as part of the Central DRF public consultation exercise.<br>Please let me know if you require anything further.<br>Best regards,&#8221;</em> etc</p>



<h6 class="wp-block-heading">3.3 Glasgow, Ardencraig Road, Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation, which was introduced in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.5, closed on 11 February. The proposal, to slow motor traffic down on this straight road past houses and schools, was by using the City Council&#8217;s only solution, the installation of speed cushions. We think much more could be done &#8211; here&#8217;s our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Ardencraig-Road-traffic-calming-response-060220.pdf" target="_blank">letter</a> in response to the proposals.</p>



<h6 class="wp-block-heading">3.4 Glasgow, Bankfoot Road and Wedderlea Drive, Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The consultation to install traffic calming speed cushions in these two roads was Item 1.6 in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>. GoBike fully supports lower traffic speeds but objects to the standard policy of installing speed cushions in every location. Here&#8217;s our <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Bankfoot-Road-and-Wedderlea-traffic-calming-response-100220.pdf" target="_blank">response</a> to the consultation.</p>



<h6 class="wp-block-heading">3.5 Glasgow, Castlemilk Drive, Traffic Calming Submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Castlemilk Drive forms part of the route from the city centre, past King&#8217;s Park and Croftfoot railway stations to the Cathkin Braes Country Park and Mountain Bike Centre. The proposal to install speed cushions to reduce motor traffic speeds in this residential area featured in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.7. A half-hearted attempt was made prior to the 2014 Commonwealth Games to provide a cycle route from the city to the Braes, but a significant part was on the footways etc; it certainly wasn&#8217;t a route that children could use. Glasgow has relatively low car ownership and Castlemilk is one of its less affluent suburbs, yet the road is to be maintained as one for cars. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Castlemilk-Drive-traffic-calming-response-100220.pdf" target="_blank">letter</a> objecting to the standard policy of speed cushions and looking for something more appropriate. </p>



<h6 class="wp-block-heading">3.6 Glasgow, Mosspark Drive Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="241" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=525%2C241&#038;ssl=1" alt="" class="wp-image-10053" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=600%2C275&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The traffic calming proposal for Mosspark Drive featured as Item 1.5 in <a href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank" rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)">Digest 53</a>. The standard speed cushion proposal takes no account of the possibilities of blocking through motor traffic,  of installing zebra crossings to allow people to cross safely to the park area or to tightening the radius of the turn from Mosspark Boulevard to 90 degrees. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Mosspark-Drive-traffic-calming-response-100220.pdf" target="_blank">letter of response</a>.</p>



<h6 class="wp-block-heading">3.7 Glasgow, Carmunnock Road Service Road, One-Way with no contraflow, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The details of this consultation were first given in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.10 but we had previously been invited to comment at Stage One. Our <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a> at that Stage went in on 10 January and we have received no response to the concerns we expressed. In a nutshell, the City Council responded to residents&#8217; concerns about &#8220;traffic&#8221; on the road by proposing that it be made one-way. There was no mention, as far as we can see, about cycles; are they included in the one-way or not? Are people cycling going to be pushed to use the main road, or not? Here&#8217;s the <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Carmunnock-Road-response-100220.pdf" target="_blank">reply</a> we sent in on 10 February, very similar to our response at Stage One.</p>



<h6 class="wp-block-heading">3.8 Glasgow, South Side Car Club TRO, submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/carclub-1.jpg?w=525&#038;ssl=1" alt="" class="wp-image-9837"/></figure></div>



<p>Details of this TRO were first given in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.9. With the assistance of GoBike member, Brenda, we had responded to the Stage One consultation with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">letter</a>, to which we received a fairly general response. We have sharpened up our concerns to objections in this <a href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-South-Side-Car-Club-response-100220.pdf">response</a>. The objections are to:  charging points/car club spaces on arterial routes such as Paisley Road West, where there should be a cycle lane, on streets with shops at ground floor level and where long-term parking is inappropriate.</p>



<p>Soon after submission, on 12 February, we received this detailed email in response:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</strong>, <strong>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Ms Fort<br><br><strong>THE GLASGOW CITY COUNCIL, (SOUTH SIDE CAR CLUB), ORDER 202_</strong><br><br>Thank you for your correspondence regarding the above named Traffic Regulation Order on behalf of Go Bike.<br>In answer to the points Go Bike have raised:</em></p>



<ul class="wp-block-list"><li> <em>The electric charging bays will be free for use  only while the vehicle is charging. It is intended to replace current  internal combustion engine car club with electric in future and the  standard electric charging bays will be  converted to car club only as the fleet is updated.</em></li><li><em> There is low take up of electric cars at present  and as you state this will change in future and it is the Council’s  intention to encourage electric use for the environmental benefits. The  Council is committed to expanding and  encouraging sustainable transport but a balance is required to promote  development in line with our policies and aspirations and further  details are available at <a href="https://www.google.com/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=11&amp;ved=2ahUKEwj0sbSRrLrmAhVbhlwKHQ3ODFMQFjAKegQIAhAC&amp;url=http%3A%2F%2Fwww.glasgow.gov.uk%2FCouncillorsandCommittees%2FviewSelectedDocument.asp%3Fc%3DP62AFQDN2UUTT10GZ3&amp;usg=AOvVaw0CZz-SRa1YjvwCHkoPJBmt" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)"> link to EV strategy development info</a>.</em></li><li> <em>The Council’s intention is for all car club  vehicles to be electric in future and the order as presented allows for  this growth while providing improved charging facilities for existing  electric vehicles.</em></li><li><em> Car Club bays on arterial routes have been located  to provide suitable locations which can be easily located and accessed  for users. Cycle infrastructure is being developed on major routes and  the existing infrastructure will  be considered and developed when each route is designed. Each route is  likely to require a Traffic Regulation Order to implement and the car  club and electric charging will be considered an amended as appropriate  at this time.</em></li><li><em> The Council are providing car club and electric  charging to help address the environmental issues facing us. The future  of mass charging and faster charging will be considered as development  and policies change.</em></li><li><em> The locations close to shops will provide potential  charging for delivery vehicles and each site has significant  residential premises which are an ideal target to encourage residents to  change private cars for car club vehicles.</em></li><li><em> If space permits consideration will be given to  perpendicular parking, the sites currently promoted are not suitable for  this measure.</em></li></ul>



<p><em>It is unclear from your response if you are  supporting or objecting to this order, I will classify it as an  objection unless otherwise advised.</em><br><br><em>Having considered the above, should you wish to withdraw your objection I would be pleased if you would inform me by 6<sup>th</sup> March by writing to Group Manager, Neighbourhoods and Sustainability, exchange House, 231 George Street,  Glasgow, G1 1RX or e-mailing <a href="mailto:SustainableTransport@glasgow.gov.uk"> SustainableTransport@glasgow.gov.uk</a>.<br><br>If you do not wish to withdraw your objection then there is no requirement for you to write to us again.<br><br>Your objection will be  considered and included within the final report which will inform the  decision. Once a decision has been taken in regards to these proposals I  shall write to you again and advise of the  outcome.<br><br>Yours sincerely</em>&#8220;</p>



<p>A telephone conversation with the writer of the above email has clarified that Paisley Road West is not yet listed as a candidate for cycle lanes, which is disappointing, but as per the email above, the City Council&#8217;s policy on electric cars and charging is clearer. Our comments and objection to parts of the proposals is seen as an objection to the TRO.</p>



<h6 class="wp-block-heading">3.9 North Lanarkshire, £5 million electric vehicle charging network</h6>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/North-Lanarkshire-EV-points.jpg?resize=525%2C235&#038;ssl=1" alt="" class="wp-image-10239" width="525" height="235"/><figcaption>Vector Eco electric car. Electric car charging at refueling power station on the background of the big city. Flat style vector illustration. Photo provided by North Lanarkshire on the email alert of 13 February,</figcaption></figure>



<p>The approach from North Lanarkshire seems to be quite different from that of Glasgow. We haven&#8217;t been told about any consultation yet, but here&#8217;s an email alert issued on 13 February:</p>



<p>&#8220;<em>Our  Environment and Transportation Committee has backed a project which  could see up to £5m investment in Electric Vehicle (EV) charging and  electricity network infrastructure across Lanarkshire.<br><br>The  public use hubs will be created in car parks owned and operated by both  North and South Lanarkshire Councils, in a bid to meet ambitious plans  by the Scottish Government to phase out the need for new petrol and  diesel cars and vans by 2032.<br><br>Members  of the committee were told that preparatory work with Transport  Scotland and SP Energy Networks is underway, as part of Project PACE,  which aims to determine optimum EV charge point locations and the  electricity network infrastructure required to support them.</em><br><br><em>Locations  being considered align with areas of potential demand, taking into  account existing electricity infrastructure location and capacity,  available land and the need to provide public access.<br><br>Councillor  Michael McPake, Convener of the Environment and Transportation  Committee, welcomed the decision to support the project, saying: “This  is an innovative, ambitious plan for Lanarkshire that will see a real  increase in the electric vehicle charging infrastructure on the  ChargePlace Scotland network in North Lanarkshire, by the end of this  year.</em><br><br>“<em>The  Scottish Government targets aim to phase out the need for new petrol  and diesel cars and vans by 2032, and these plans are designed to pave  the way for that to become a reality. The new network will contribute to  reducing air pollution and providing access to clean energy for our  residents, and the project fits with this council’s ambition to be the  place to live, learn, work, invest and visit.”<br><br>The  Strategic Partnership between the Scottish Government, including  Transport Scotland, SP Energy Networks and Scottish and Southern  Electricity Networks was announced by the First Minister on 29 August  2019.</em><br><br><em>Since  the launch of the partnership, SP Energy Networks and Transport  Scotland have established Project PACE with North Lanarkshire Council  and South Lanarkshire Council, as beneficiaries to trial opportunities  to improve the delivery and co-ordination of investment in electric  vehicle charging infrastructure.</em></p>



<p>It&#8217;s looking like on-street (and, of more concern, with the actual charging points being on footways) in Glasgow and in public car parks in North and South Lanarkshire.</p>



<h6 class="wp-block-heading">3.10 Glasgow, Byres Road Traffic Management &amp; Parking (for cycle lanes),submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Byres-Road.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10061"/></figure></div>



<p>We have now responded to Glasgow City Council&#8217;s proposals for changes on Byres Road to allow construction of a cycle lane on each side with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Byres-Road-Traffic-Management-Parking-Controls-110220.pdf" target="_blank">letter</a>, written by GoBike members Iona and Thomas. Detailed design details for the cycle lanes were not part of the TRO but you will see that we have concerns about the continuity and thus priority, of the cycling, and walking, routes at side road junctions. It is critical that ALL traffic on Byres Road has priority over traffic entering, or leaving, a side road.</p>



<p>Full details of the TRO were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.11</p>



<h6 class="wp-block-heading">3.11  Glasgow, Byres Road 20mph TRO, submission</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="152" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=300%2C152&#038;ssl=1" alt="" class="wp-image-8677" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=300%2C152&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=600%2C303&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1772&amp;ssl=1 1772w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p>Here&#8217;s part of the Byres Road proposals that we fully support! Again, full details of the proposed reduction in speed limit to 20mph were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.12 and here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Byres-Road-20mph-response-110220.pdf" target="_blank">letter of support</a>, written by GoBike members Thomas and Iona.</p>



<h6 class="wp-block-heading">3.12 Glasgow, Hillhead Traffic Management and Parking Controls TRO,  submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="157" height="159" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?resize=157%2C159&#038;ssl=1" alt="" class="wp-image-10182" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?w=157&amp;ssl=1 157w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?resize=100%2C100&amp;ssl=1 100w" sizes="auto, (max-width: 157px) 100vw, 157px" /></figure></div>



<p>We have submitted this <a href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Hillhead-Parking-response-110220.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter (opens in a new tab)">letter</a>, again written by Iona and Thomas, in general support of moving parked vehicles from Byres Road into vacant spaces in the surrounding streets, but we do have 2 concerns:</p>



<ol class="wp-block-list"><li>Why are parking charges so low in Glasgow? Why is it cheaper to park a car on a street for an hour than it is to get a return ticket for the bus or subway?</li><li>Why should households be given the option of storing not one, but two, private cars on the public street?</li></ol>



<p>Full details of the proposals were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.13</p>



<h6 class="wp-block-heading">3.13 East Dunbartonshire, Bearsden Town Centre, Waiting &amp; Loading Restrictions confirmed.</h6>



<p>Here&#8217;s the email confirming this order that we received on 10 February.</p>



<p>&#8220;<em>The  above-mentioned Traffic Regulation Orders has now been made and will   become  effective  on  Monday,  13 April 2020. Enclosed are copies of the   Order and plan, together with copy of the Notice that is to appear in the   edition  of  the  Milngavie  and Bearsden Herald which is published on 14   February 2020</em>.&#8221;</p>



<p>Here are the <a rel="noreferrer noopener" aria-label="details (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/200120-Bearsden-Town-Centre-Order.pdf" target="_blank">details</a> that were enclosed with the email. GoBike supported this proposal and details were given in Digest </p>



<h6 class="wp-block-heading">3.14 Glasgow, Celtic Park &amp; Emirates Arena, Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 10 March</h6>



<div class="wp-block-image"><figure class="alignleft size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/05/Celtic-Park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5000"/></figure></div>



<p>In 2018 consultation was issued on Event Day Emergency Routes and Parking, which GoBike supported with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/05/GoBike-Celtic-Park-Event-parking-letter-290518.pdf" target="_blank">letter</a>. We last reported on this in <a rel="noreferrer noopener" aria-label="Digest 25 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-25-10-january-2019-happy-new-year-with-more-progress-on-the-south-city-way-good-news-about-byres-road-and-feedback-from-argyll-and-bute-and-north-lanarkshire-7286" target="_blank">Digest 25</a> in January 2019 after we were told there was to be a hearing. It seemed clear then that supporters had been mobilised to object to the proposals, although there are valid concerns about the lack or inadequacy of public transport to the football stadium and the arena and parking moving to areas further away from the stadium.<br>On 07 February, we received this extremely long email from the City Council:</p>



<p>&#8220;<em><strong>THE GLASGOW CITY COUNCIL (CELTIC PARK AND EMIRATES ARENA) (EVENT DAY EMERGENCY ROUTES AND PARKING ZONE) ORDER 20__</strong><br><br><strong>PUBLIC HEARING</strong><br><br>We refer to the above proposed order,  the representation you have made about the proposed order, and the  letter dated 20 December 2018 which was sent to you from the Director of  Operations, Neighbourhoods and Sustainability in this regard.<br><br>Glasgow City Council has now appointed  Ms Sinéad Lynch and Mr Lance R Guilford, reporters from the Scottish  Government, to conduct a public hearing and submit a report to the  council. The council has also established a dedicated Programme Officer  Team to assist with the organisation of the hearing.</em><br><br><em>Participation in the hearing<br><br>The reporters have decided that since  it is now over a year since the above letter was sent to you, we should  write again in order to confirm those who wish to participate in the  hearing. We are providing more information to help you decide.<br><br>If you decide <strong>not</strong> to  participate in the hearing, your representation will be considered on  the basis of your original written submission, although you may submit a  further written submission in support of your representation within the  next 28 days if you wish to do so. It is also important to note that  all representations proceeding by written submission will have the same  weight as those examined at the hearing.<br><br>Therefore, whether or not you responded to the above letter, <strong>please advise us within the next 14 days</strong> if you wish to participate in the hearing.</em><br><br><em>Pre-hearing meeting<br><br>Given the complex nature of this order  and the significant number of representations that have been made, the  reporters have decided that a pre-hearing meeting for hearing  participants is necessary. <a>This meeting will be held in public and will discuss the procedures relating to the hearing.</a> However, there will be no discussion about the merits or otherwise of the order at this meeting.<br><br><strong>The meeting will take place as follows:</strong><br><br>7pm on Tuesday 10<sup>th</sup> March 2020 in the Glasgow Royal Concert Hall (Exhibition Hall), 19 Killermont Street, Glasgow, G2 3NX<br><br>The reporters hope that most hearing  participants will attend the pre-hearing meeting, in order to ensure as  far as possible that the arrangements for the hearing take everyone’s  interest into account.</em><br><br><em>We <strong><a href="https://www.gobike.org/wp-content/uploads/2020/02/PHM-Agenda-Celtic-Park-3.pdf" target="_blank" rel="noreferrer noopener" aria-label="enclose an agenda (opens in a new tab)">enclose an agenda</a></strong>, together with an explanatory note which provides detailed information about the matters to be discussed. <strong>Please read this information to help you prepare for the meeting.</strong></em><br><br><em>However, the reporters recognise that  some people may have prior engagements or other reasons why they cannot  attend the pre-hearing meeting, and being unable to attend the  pre-hearing meeting does not preclude participation in the hearing. It  is suggested that people who cannot attend the meeting may wish to  contact another person (or organisation) who will be attending in order  to represent their interests. There is more on this contained in the  explanatory note attached to the agenda.<br><br>In any event, anyone who cannot attend the meeting may comment on the matters contained in theagenda  before the date of the pre-hearing meeting. Furthermore, a note of  matters agreed at the pre-hearing meeting will be uploaded to the  website after the meeting, and comments on what is contained in the note  of matters may be made within 14 days of that note being uploaded to  the web. All such comments will be taken into account in making the  arrangements for the hearing.<strong>           Please advise us within the next 14  days if you wish to attend the pre-hearing meeting in addition to  participating in the hearing. Please also inform us if you intend to be  represented (providing the details of any such representation) and  advise whether any special access or other arrangements are required to  enable attendance at the meeting.</strong>if you wish to attend the  pre-hearing meeting in addition to participating in the hearing. Please  also inform us if you intend to be represented (providing the details of  any such representation) and advise whether any special access or other  arrangements are required to enable attendance at the meeting.   <br><br> Owing to the limited capacity within  the venue (200 places) an entrance ticket will be provided to those who  have made representations about the order and wish to attend the  pre-hearing meeting.</em><br><br><em>You can register for a ticket using the following link:-<a href="https://www.eventbrite.co.uk/e/celtic-park-and-emirates-arena-traffic-regulation-order-pre-hearing-meeting-tickets-90947196513">https://www.eventbrite.co.uk/e/celtic-park-and-emirates-arena-traffic-regulation-order-pre-hearing-meeting-tickets-90947196513</a><strong>Tickets will be available to download from 4pm On Friday 7<sup>th</sup> February 2020</strong><br><br>In the event that there is any  difficulty relating to the capacity of the venue and the number of  people who wish to attend, you will be advised of any action being taken  before the date of the meeting.<br><br>All representations will be in the public domain<br><br>Please note that your representation, if  maintained, will not be treated as confidential, and that it will be  published unless you provide details of exceptional circumstances as</em> <em>to  why you consider that the substance of your representation should not be  in the public domain. Exceptional circumstances might apply where  publication of the substance of the representation might be considered  to breach the provisions of the General Data Protection Regulations  (GDPR) because it cannot be sufficiently separated from identifying  personal information which should not be in the public domain.<br><br>Alternatively, there might be sensitive  information (for example on mental or physical health), the publication  of which might be considered to breach the right to privacy under the  European Convention on Human Rights (ECHR). In either case you would be  advised whether or not such details are sufficient to justify the  further redaction of certain information or non-publication of the  representation.<br><br>However, please note that as a matter of  course under GDPR all identifying personal information will be redacted  from the representations before they are placed in the public domain.  This will include all names, postal addresses, email addresses,  telephone numbers, job descriptions and details of business premises<strong>.</strong></em><br><br><em>If we have not heard from you within the  next 14 days on this matter, we will assume that you are content that  your representation should be in the public domain.<br><br>Following this period, the maintained  representations (unless excepted under the terms stated above) and  related documents will be published on the council’s website. There will  also be a brief summary of the matters raised in the representations,  and an associated schedule which separates them into basic categories  including the type and whether it is an objection or letter of support.  This may assist you in preparing for the meeting, particularly with  respect to the possible grouping of parties with a similar interest, and  which is referred to in more detail in the explanatory note attached to  the agenda.<br><br>Webcasting<br><br>We would advise that the pre-hearing  meeting will be recorded and webcast, and therefore in the event that  you are unable to attend the meeting, the proceedings may</em> <em>be observed  (after the meeting) online at:<br><br><a href="https://www.glasgow.gov.uk/article/20480/Celtic-ParkEmirates-Arena">https://www.glasgow.gov.uk/article/20480/Celtic-ParkEmirates-Arena</a><br><br>Webcasting is part of a strategy to  enhance public access to this process, and will make it easier for  individuals to keep up to date with proceedings.<br><br>If you require any further  information, please contact the programme officer team at the below  telephone number or email address.<br><br>Yours faithfully,<br>Programme Officer Team<br>Email: &nbsp;<a href="mailto:TROCelticParkandEmiratesArena@glasgow.gov.uk">TROCelticParkandEmiratesArena@glasgow.gov.uk</a><br>Phone: 0141 287 5820 (Please note this phone line is a messaging service only</em>&#8220;</p>



<p> Thus there is a massive expense because people wish to leave their cars near the ground on match days, because other people do not want these cars to move to outside their house, because the second loop of the Subway, mooted in 2007, has never been built and we have not yet got the political and social climate in which people will cycle or walk to such events.</p>



<p>GoBike will not be attending the hearing, although we understand our sister group, Get Glasgow Moving, will be there to push the public transport case, but we will confirm our support for the parking restrictions.</p>



<h6 class="wp-block-heading">3.15  Glasgow, Ibrox Stadium,  Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 11 March  </h6>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Ibrox-Stadium.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7343"/></figure></div>



<p>On the same day, 07 February and just a few minutes later a very similar, almost identical  email arrived for  Event Day Emergency Routes and Parking around Ibrox Stadium. Although there is a Subway station near the stadium, there are concerns here about the lack of public transport and private car parking being moved further away from the stadium. That said, there is no doubt the football club has mobilised its supporters to object. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/05/GoBike-Ibrox-Stadium-Event-parking-letter-150518.pdf" target="_blank">letter of support</a> for the proposals that GoBike submitted in May 2018.</p>



<p>Apologies to anyone who hoped to see the Rangers email in full here, but if you do wish to have a copy either contact the club or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank">consultations@gobike.org</a> and a copy will be sent to you. The hearing is the day after the Celtic hearing and the details are the same.</p>



<p>GoBike won&#8217;t be attending either this or the Parkhead hearing but will confirm our support for parking restrictions on the grounds that all on-street car parking reduces the road space available for cycling and makes it more difficult for people walking to cross the road.</p>



<h6 class="wp-block-heading">3.16  Glasgow University Campus Development February update</h6>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Glasgow-University.jpg?resize=315%2C196&#038;ssl=1" alt="" class="wp-image-8796" width="315" height="196"/></figure></div>



<p> <br>Multiplex, who are carrying out the construction work at Glasgow University, have provided us with details of their <a rel="noreferrer noopener" href="https://campusdevelopment.co.uk/" target="_blank">website</a> and the <a rel="noreferrer noopener" href="https://campusdevelopment.co.uk/wp-content/uploads/2020/01/February-2020.pdf" target="_blank">link to their February Newsletter</a> </p>



<h6 class="wp-block-heading">3.17 Glasgow, Good News with some Progress on Contraflow Cycling</h6>



<div class="wp-block-image"><figure class="alignleft size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="225" height="225" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=225%2C225&#038;ssl=1" alt="" class="wp-image-3788" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?w=225&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=36%2C36&amp;ssl=1 36w" sizes="auto, (max-width: 225px) 100vw, 225px" /></figure></div>



<p>For our final item we have some good news. We have objected time and time again to Glasgow City Council&#8217;s policy of reducing the city&#8217;s residential streets from 2-way to 1-way to allow for more residential parking, with no exemption for cycling. The City Council&#8217;s design guide, <a rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)" href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank">Cycling by Design</a>, quotes, at Section 5.1.5, page  &#8220;<em>The default position should be to permit two-way cycling on one-way streets.</em>&#8221;  The Council&#8217;s policy of ignoring, or finding an excuse not to apply, this default has caused great inconvenience to people trying to cycle in Dowanhill, Partick and elsewhere, as well as seeming contrary to everything the City Council says in terms of active travel, reducing car use etc. When Ali, Brenda and Tricia met with City Council staff on 12 December, this issue was raised and on 10 February this email arrived:</p>



<p>&#8220;<em>I  can advise that, following the meeting you attended in December, I have  taken a look at the literature you referenced and linked on the GoBike  webpage. &nbsp; I have  now drafted a <a rel="noreferrer noopener" aria-label="specific appendix (attached) (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/Appendix-31-Consideration-of-Pedestrians-Cyclists-and-Public-Transport-Provision.pdf" target="_blank">specific appendix (attached)</a> to be added to the Council&#8217;s  procedures and guidance when promoting Traffic Regulation Orders and  Traffic Calming Schemes. This ensures officers take specific consideration of pedestrians, cyclists and public  transport provision. This should be distributed to all officers by the  end of the month. &nbsp;   In  regards to contra-flow cycling specifically, I agree that this should be  considered where it can be done safely. I understand that within the  Sustrans Design Manual Handbook for cycle-friendly design it states that 3.3m can accommodate contra-flow cycling, however  it is our intention that a minimum free road width should be 3.5m before  any consideration can take place (this is consistent with Edinburgh&#8217;s  Street Design Guidance). &nbsp; In  addition to the above, each situation should be assessed on its own  merits and further consideration will be given where vehicles are parked  on both sides of the road for short and long lengths, taking into account the gradient of the road and ensuring there is a  consistency when proposing changes over a wider area. &nbsp; I trust  this has provided further clarification on the Council&#8217;s position and  can assure you that the current parking control scheme proposals are  being revised to investigate what addition measures can be included to assist cyclists</em>.&#8221; </p>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2016/07/contraflow-cycling.jpg?w=525&#038;ssl=1" alt="" class="wp-image-1737"/><figcaption><br></figcaption></figure></div>



<p><br><br>This has yet to be tested but we are told that we will see a difference in approach in forthcoming schemes. Let&#8217;s hope so!</p>



<p><br><br><br>__________________________________________</p>



<p><br>That was a mixed bag &#8211; let&#8217;s see what the post brings in over the next 2 weeks.</p>



<p>_____________________________________________________________________</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10097</post-id>	</item>
		<item>
		<title>Consultation Extra: 18 February, additional South City Way event for Battlefield extension.</title>
		<link>https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Fri, 07 Feb 2020 15:00:10 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[Sustrans]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=10113</guid>

					<description><![CDATA[GoBike members and supporters will be very aware of the proposals for the South City Way to extend to Battlefield. Consultation events and proposals last year were well reported in our Digests and GoBike was involved in the consultation process with Sustrans and the City Council. However, it seems that residents on nearby Queen&#8217;s Drive &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Extra: 18 February, additional South City Way event for Battlefield extension."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>GoBike members and supporters will be very aware of the proposals for the South City Way to extend to Battlefield. Consultation events and proposals last year were well reported in our Digests and GoBike was involved in the consultation process with Sustrans and the City Council. However, it seems that residents on nearby Queen&#8217;s Drive claim to have been unaware that changes were afoot! Read on for a reprint of today&#8217;s article in the Glasgow Times by Catriona Stewart:</p>



<span id="more-10113"></span>



<h1 class="wp-block-heading">&#8220;<em>Southside community blasts consultation for potential Battlefield plans</em>&#8220;</h1>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="287" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=525%2C287&#038;ssl=1" alt="" class="wp-image-10114" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=300%2C164&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=600%2C328&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>   &#8220;<em>RESIDENTS have complained they were not involved in a community  consultation on ambitious proposals to redesign a South Side area. <br><br>   Battlefield Street Design is an ongoing project to make the centre of  Battlefield and Battlefield Road more pedestrian and cycle friendly. <br><br>   Community engagement on the scheme, developed by Sustrans </em><a href="https://www.glasgowtimes.co.uk/news/scottish-news/"><em>Scotland</em></a><em>, took place last year. <br><br>   But locals in Queen’s Drive, which is attached to Battlefield Road, said they were left out of the consultation process. <br><br>   Now Glasgow City </em><a href="https://www.glasgowtimes.co.uk/news/councilandpoliics/"><em>Council</em></a><em> bosses have said they will hold another event &#8211; and Queen’s Drive residents will be contacted directly to invite them. </em><br><br>  <em> Local councillor Soryia Siddique said: “Queen’s Drive residents  contacted me regarding not been included in the Sustrans consultation. <br><br>   “I raised this with Glasgow City Council and they have now arranged  another session allowing residents to discuss the concept design  drawings produced by Sustrans. <br><br>  “This is an opportunity for the local community’s views to be taken on board.” <br><br>   Although it is not part of the nearby South City Way, a cycle route  being developed to run from Queen’s Park, down Victoria Road to the  Merchant City, the potential new cycle route would form a connection to  it. </em><br><br>   <em>This would run along Battlefield Road to the Battlefield Rest and on to Mount Florida.<br><br>   Last year design ideas were on display from March 19 for three weeks  to give locals the chance to see the street design project plans. <br><br>   They are being delivered jointly by Sustrans Scotland and Glasgow City Council. <br><br>   The hope behind the scheme would be to make it easier for people of  all ages and abilities to walk and cycle through the area and to improve  the quality of the public spaces. <br><br>   In 2019 13 events were held locally with more than 700 attendees to  gather information and develop design ideas, including in Langside  Library and Langside Parish Church. </em><br><br>   <em>A meeting for Queen’s Drive residents should have been held in  December following a number of complaints to the council that the  consultation had not be geographically broad enough. <br><br>   But this meeting was delayed due to the </em><a href="https://www.glasgowtimes.co.uk/news/general-election/"><em>General Election</em></a><em>. <br><br>   An new meeting has now been arranged for February 18 between 4pm and 6pm in Langside Library on Sinclair Drive. <br><br>   Letters have been sent out to addresses on Queen’s Drive to ensure all residents know the event is taking place. <br><br>   It will give the chance to give feedback on plans, which have now been handed over to Glasgow City Council. </em><br><br>   <em>It is hoped the scheme will be funded by the Sustrans Places for Everyone fund. <br><br>   A spokesman for the council said: “There has been a very positive  response to the proposals to improve the streets and public spaces  connected to Battlefield Rest. <br><br>   “The plans extend out from Battlefield Rest in either direction to  Mount Florida and Govanhill and one of the main aims is to help make  these streets more attractive for active travel. </em>&#8220;</p>



<p>If you live, work or travel southside do please get along and support the proposals.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10113</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders</title>
		<link>https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 07 Jan 2020 11:50:20 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[SWCW]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9679</guid>

					<description><![CDATA[As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so we campaign for it. We receive no public funding, have no paid employees, and are run entirely by volunteers, but we do have enthusiastic members who are pleased to get involved and/or pay our minimum fee of £5 per year (and many pay more). <a rel="noreferrer noopener" aria-label="Do please join us (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank">Do please join us</a> but also read on for the news, including the long-awaited Byres Road TROs, we have for you.</p>



<span id="more-9679"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultation</h6>



<ol class="wp-block-list"><li>Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </li><li>Glasgow, City Centre Strategic Development Framework, closes 17 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>  **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>GoBike ride 05 January, to see what has been done and how much more is needed.</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C98&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="98" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is important, setting the tone for what comes next. If you haven&#8217;t responded to this on-line consultation yet, please do so by 5pm on Friday afternoon. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">link</a> to the survey and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-STPR2-response-060120.pdf" target="_blank">letter</a> that GoBike has also submitted. The survey is easy to do, but do remember to be ambitious; Scotland needs transport systems to match its scenery, ie superb.</p>



<h6 class="wp-block-heading">1.2 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>This consultation finally closes next Thursday; we&#8217;ve been publicising it since <a href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284">Digest 46</a>, Item 1.9 back at the end of October. Here&#8217;s the <a href="https://www.lawcom.gov.uk/project/automated-vehicles/">link to the consultation</a> and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter</a> we have written in to voice concern.  It&#8217;s almost a fantasy world to expect automated vehicles to improve conditions on our roads but do have a look at the consultation for yourself.</p>



<h6 class="wp-block-heading">1.3 Glasgow, City Centre Strategic Development Framework, closes 17 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This high-level document was first featured in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.11 and here is the <a rel="noreferrer noopener" aria-label="link to the City Council's consultation page (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the City Council&#8217;s consultation page</a>. Scroll down to the bottom of the page to find this one.<br>GoBike has submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Draft-City-Centre-SDF-response-060120.pdf" target="_blank">letter</a> outlining our views. Do please add your voice to the consultation.</p>



<h6 class="wp-block-heading">1.4 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This on-line consultation first featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.13 and, as you can see from the screenshot above, there is plenty of room for cycle lanes for a route running from the city centre to Pollok Park. Do please get your views in &#8211; the link to the City Council&#8217;s consultation page is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a> (scroll down to find this one) &#8211; although you might wish to wait until after the consultation event on Wednesday 22nd Jan (see Item 2.1 below) to respond.</p>



<h6 class="wp-block-heading">1.5 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This is a consultation that was confused with Item 1.3, sorry about that, but we featured it in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council&#8217;s consultation page. This consultation is the second item on page 1.</p>



<p>Previously we responded to the Broomielaw  District Regeneration Framework with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Broomielaw-DRF-response-050419.pdf" target="_blank">letter</a> in April 2019 and the St Enoch  District Regeneration Framework in September 2019 with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/08/GoBike-St-Enoch-DRF-response-020919.pdf" target="_blank">letter</a>. The response to this latest consultation will be along similar lines.</p>



<h6 class="wp-block-heading">1.6 **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February</h6>



<div class="wp-block-image"><figure class="alignright is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/cropped-Byres-Road-1-e1517677604466.jpg?resize=357%2C236&#038;ssl=1" alt="" class="wp-image-4151" width="357" height="236"/></figure></div>



<p>We&#8217;ve just found out that the TROs for Byres Road, proposed parking changes, cycle lanes and 20mph are now all on the City Council&#8217;s website, see:  <a href="https://www.glasgow.gov.uk/proposedtro">https://www.glasgow.gov.uk/proposedtro</a> <br>We&#8217;ll be having a close look at these over the next couple of weeks.</p>



<h4 class="wp-block-heading"> Section 2: Forthcoming Consultations </h4>



<h6 class="wp-block-heading">2.1 Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="245" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>As mentioned in Item 1.4 above and in our <a rel="noreferrer noopener" aria-label="Consultation Extra of 29 November (opens in a new tab)" href="https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495" target="_blank">Consultation Extra of 29 November</a>, there will be a consultation event at St Albert&#8217;s Primary School, 36 Maxwell Drive on Wednesday 22 January from 3:30 to 7pm. You may see details of the proposals at this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 GoBike ride 05 January, to see what has been done and how much more is needed.</h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?fit=525%2C295&amp;ssl=1" alt="" class="wp-image-9739" width="642" height="361" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is the route of the 15 miles or so of the GoBike ride on Sunday plus a wee bit from Glasgow Green to the start at the SEC.</p>



<p>Much of the infrastructure that we travelled on has been the topic of consultation and that is shown in bold &#8211; search on our website at <a rel="noreferrer noopener" aria-label="www.gobike.org (opens in a new tab)" href="https://www.gobike.org/" target="_blank">www.gobike.org</a> to find details. From the SEC and travelling clockwise our journey covered:</p>



<ul class="wp-block-list"><li>West City Way (consulted on and constructed before GoBike records were kept on our website)</li><li><strong>Woodside </strong>&#8211; recent and ongoing consultation</li><li><strong>Garscube Road </strong>&#8211; included in the Woodside consultation</li><li>The <strong>Underline </strong>project &#8211; one of the Avenues projects connecting New City Road under the M8</li><li><strong>St George&#8217;s Road </strong>&#8211; to connect Woodside to Sauchiehall Street</li><li><strong>Sauchiehall Street </strong>&#8211; the first of the Avenues projects to be constructed, from Charing Cross to Rose Street</li><li><strong>Renfrew Street, Killermont Street and North Hanover Street </strong>&#8211; a further Avenues project to connect the Sauchiehall Street Avenue to the east of Queen Street Station</li><li><strong>South City Way from King Street via Bridgegate and Gorbals Street to Victoria Road and Queen&#8217;s Park</strong> &#8211; under construction</li><li>Muirend to Queen&#8217;s Park Quiet Way &#8211; advisory cycle lanes</li><li><strong>South West City Way </strong>&#8211; constructed from Commerce Street to St Andrew&#8217;s Drive and currently under consultation for continuation to Pollok Park</li><li>National Cycle Route 756</li></ul>



<p>Well, that was shorter than usual but do try to respond to the consultations listed &#8211; the more voices the authorities hear, the more they will listen. No doubt there will be more in Digest 52 in two weeks time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9679</post-id>	</item>
		<item>
		<title>Looking forward to a Brexit New Year? NO? Then cycle out with GoBike on 05 January and see what we should be campaigning on in 2020.</title>
		<link>https://www.gobike.org/looking-forward-to-a-brexit-new-year-no-then-cycle-out-with-gobike-on-05-january-and-see-what-we-should-be-campaigning-on-in-2020-9666</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 31 Dec 2019 16:00:07 +0000</pubDate>
				<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9666</guid>

					<description><![CDATA[Join us on the monthly GoBike ride on Sunday 05 January, look at what we&#8217;ve got and see how much more we need. Here are the details: Sunday 5 January 2020&#160;– 2020 VisionFor our annual tour of cycle infrastructure, we will be taking a trip around various works both north and south of the river. &#8230; <p class="link-more"><a href="https://www.gobike.org/looking-forward-to-a-brexit-new-year-no-then-cycle-out-with-gobike-on-05-january-and-see-what-we-should-be-campaigning-on-in-2020-9666" class="more-link">Continue reading<span class="screen-reader-text"> "Looking forward to a Brexit New Year? NO? Then cycle out with GoBike on 05 January and see what we should be campaigning on in 2020."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p><br>Join us on the monthly GoBike ride on Sunday 05 January, look at what we&#8217;ve got and see how much more we need. Here are the details:</p>



<span id="more-9666"></span>



<p><strong>Sunday 5 January 2020&nbsp;– 2020 Vision<br></strong>For our annual tour of cycle infrastructure, we will be taking a trip around various works both north and south of the river. We’ll start by heading to Woodside to see the latest on the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/article/21802/Connecting-Woodside" target="_blank">Connecting Woodside</a>&nbsp;project, then cross the city centre by way of&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/city-centre-avenues" target="_blank">Sauchiehall Street</a>, to the Merchant City from where we’ll follow the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/scw" target="_blank">South City Way</a>. We’ll continue south through Battlefield, then turn at Muirend to head for Queen’s Park, the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=31865&amp;p=0" target="_blank">South West City Way</a>, and the Stobcross Bridge.<br>16 miles, ending back at Kelvingrove in time for lunch.<br><em>Meet 10am Bell’s Bridge, Congress Road, Glasgow.</em></p>



<p>See <a href="https://www.gobike.org/about-us/cycle-rides" target="_blank" rel="noreferrer noopener" aria-label="here on our website (opens in a new tab)">here on our website</a> for further details.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9666</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 40, 06 August 2019</title>
		<link>https://www.gobike.org/consultation-digest-issue-40-06-august-2019-8861</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 06 Aug 2019 11:05:55 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[City Deal]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[NCN75]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[Sustrans]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Transport Scotland]]></category>
		<category><![CDATA[walk cycle vote]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=8861</guid>

					<description><![CDATA[This Digest contains only one new consultation but it&#8217;s a big one, from Transport Scotland and there is a surprising amount of feedback, finishing with the excellent news that Yorkhill and Kelvingrove Community Council have been successful in gaining funding for their cycling village. The picture heading this Digest shows the proposed new bridge over &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-40-06-august-2019-8861" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 40, 06 August 2019"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>This Digest contains only one new consultation but it&#8217;s a big one, from Transport Scotland and there is a surprising amount of feedback, finishing with the excellent news that Yorkhill and Kelvingrove Community Council have been successful in gaining funding for their cycling village. The picture heading this Digest shows the proposed new bridge over the Clyde, see Item 3.11.</p>



<span id="more-8861"></span>



<h4 class="wp-block-heading">Contents</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, &#8216;Avenues&#8217; preview events for Renfrew, Killermont &amp; North Hanover Streets, TODAY, Tuesday 06 August, 1pm or 2:30pm, with on-line comments closing on 18 August.</li><li>Glasgow, South City Way Traffic Management Order, 2-way cycle lane on Bridgegate and King Street, closes 09 August</li><li>Glasgow, St Enoch District Regeneration Framework Public Consultation, closes 06 September</li><li> **NEW** Consultation on Scotland&#8217;s National Transport Strategy, closes 23 October </li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consuitations</h4>



<ol class="wp-block-list"><li>Glasgow, Pollok Country Park &#8211; Project Update and Public Consultation Event, 22 August.</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Pollok Country Park &#8211; Project Update</li><li> WalkCycleVote/RNIB workshops </li><li>Glasgow City Council (Garscube Road)(Traffic Regulation and Parking Controls) Order 201</li><li>THE GLASGOW CITY COUNCIL, Consultation on future policy development of taxi and private hire car licensing </li><li>Glasgow, Dennistoun &amp; Royston &#8211; Traffic Management &amp; Parking Controls Order 201 drop-in events 24, 25 and 27 July</li><li>Battlefield Proposals (Streets for All) update</li><li>The Glasgow City Council (Broomfield Road) Traffic calming scheme 20__</li><li>The Glasgow City Council (Sunnybank Street) Traffic Calming Scheme 20__</li><li><strong> </strong>Proposals for Upgrading of Elmbank Street, Pitt Street and Holland Street </li><li>World Pipe Band Championships, use of the National Cycle Route through Glasgow Green</li><li>International interest to build first opening bridge over the River Clyde</li><li>Yokecoco win funding for Yorkhill and Kelvingrove Cycling Village</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for action or responses</h4>



<h6 class="wp-block-heading">1.1 Glasgow, &#8216;Avenues&#8217; preview events for Renfrew, Killermont &amp; North Hanover Streets, TODAY, Tuesday 06 August, 1pm or 2:30pm, with on-line comments closing 18 August.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Renfrew-Street.jpg?resize=525%2C263&#038;ssl=1" alt="" class="wp-image-8825" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Renfrew-Street.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Renfrew-Street.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Renfrew-Street.jpg?resize=600%2C300&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>We gave all the information for these 2 events, which take place TODAY, in <a rel="noreferrer noopener" aria-label="Digest 39 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest 39</a>, Item 2.2.<br>If you wish to attend either of the sessions then you should book; here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.eventbrite.co.uk/e/glasgow-city-centre-avenues-initial-design-ideas-for-renfrew-st-killermont-st-and-north-hanover-st-tickets-65415450373?ref=enivte001&amp;invite=MTY4ODQ0MzUvY29uc3VsdGF0aW9uc0Bnb2Jpa2Uub3JnLzE%3D%0A&amp;utm_source=eb_email&amp;utm_medium=email&amp;utm_campaign=invitemodernv2&amp;utm_term=eventpage" target="_blank">link</a>. <br>In a further email, dated 23 August, there was this information:</p>



<figure class="wp-block-table"><table><tbody><tr><td>&#8220;<strong><em>THE PACE IS PICKING UP ON GLASGOW CITY CENTRE&#8217;S &#8220;AVENUES&#8221;!</em></strong><em><br> <br> The pilot&nbsp;project to make&nbsp;Sauchiehall Street more accessible and  people-friendly&nbsp;is <br>now in place,&nbsp;and design and consultations have been  progressing on Argyle Street, <br>Trongate, Sauchiehall Street precinct,  Cambridge Street&nbsp;and the &#8216;Underline&#8217; over the <br>last year.&nbsp; You can see  the initial drawings for all those at </em><a rel="noreferrer noopener" href="https://glasgow.us18.list-manage.com/track/click?u=f64c6e619b95c4d50963fec5d&amp;id=dc24c593be&amp;e=a5211b0e2a" target="_blank"><em>www.glasgow.gov.uk/avenues</em></a><em>.<br> <br> </em><strong><em>Next up are initial designs for Renfrew Street, Killermont  Street and North Hanover Street &#8211; the next exciting stage in an  east-west cycle and pedestrian route across </em></strong><em><br></em><strong><em>from Cathedral to Great  Western Road.&nbsp; Designs for the final section,&nbsp;Cathedral </em></strong><em><br></em><strong><em>Street, will  follow in August&#8230; we&#8217;ll keep you posted on that.</em></strong><em><br> <br> </em><strong><em>Initial plans and visualisations for Renfrew Street, Killermont  Street and North </em></strong><em><br></em><strong><em>Hanover Street are all online for public comment at </em><a rel="noreferrer noopener" href="https://glasgow.us18.list-manage.com/track/click?u=f64c6e619b95c4d50963fec5d&amp;id=04e234bc5f&amp;e=a5211b0e2a" target="_blank"><em>glasgow.gov.uk/avenues</em></a><em>. The </em></strong><em><br></em><strong><em>deadline for comment is Sunday 18 August 2019.</em></strong>                                                                 </td></tr></tbody></table></figure>



<figure class="wp-block-table"><table><tbody><tr><td> <strong><em>WHAT&#8217;S THIS ALL ABOUT?</em></strong><em><br> <br> The £115million </em><a rel="noreferrer noopener" href="https://glasgow.us18.list-manage.com/track/click?u=f64c6e619b95c4d50963fec5d&amp;id=7cde4b796d&amp;e=a5211b0e2a" target="_blank"><em>Avenues project</em></a><em>&nbsp;is funded by </em><a rel="noreferrer noopener" href="https://glasgow.us18.list-manage.com/track/click?u=f64c6e619b95c4d50963fec5d&amp;id=b7113f1c2d&amp;e=a5211b0e2a" target="_blank"><em>Glasgow City Region City Deal</em></a><em>.&nbsp;Between  now and 2025, it will&nbsp;change&nbsp;the face of Glasgow city centre&nbsp;for  everyone&nbsp;who lives, <br>works or studies here, as well as all those who  visit this great location to shop, eat and drink or enjoy a concert or  theatre show.&nbsp;<br> <br> Key streets in the city centre will be redesigned to protect and  prioritise space for <br>cyclists and pedestrians, improve connectivity,  introduce sustainable green <br>infrastructure through attractive  streetscapes, and improve the way public transport is accommodated. &#8221;                                                                          </em></td></tr></tbody></table></figure>



<h6 class="wp-block-heading">1.2 Glasgow, South City Way Traffic Management Order, 2-way cycle lane on Bridgegate and King Street, closes 09 August</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?resize=525%2C295&#038;ssl=1" alt="" class="wp-image-7667" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?w=2934&amp;ssl=1 2934w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/Bridgegate_looking_North_Artist_Impression.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The details for this latest extension of the South City Way were given in <a rel="noreferrer noopener" aria-label="Digest 38 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-38-10-july-2019-the-south-city-way-approaches-the-city-centre-8763" target="_blank">Digest 38</a>, Item 1.5 and we are looking forward to there being a continuous cycle route from Queen&#8217;s Park to the Merchant City.<br>We are concerned, though, at the lack of clarity in the TRO documents about the junction between Bridgegate and King Street. Our <a href="https://www.gobike.org/wp-content/uploads/2019/08/GoBike-SCW-Bridgegate-King-Street-response-060819.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter of response is here (opens in a new tab)">letter of response is here</a>.</p>



<h6 class="wp-block-heading">1.3 Glasgow, St Enoch District Regeneration Framework Public Consultation, closes 06 September</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Draft-St-Enoch-District-Regenration-Framework-Full-Report-2.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-8738" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Draft-St-Enoch-District-Regenration-Framework-Full-Report-2.jpg?w=1000&amp;ssl=1 1000w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Draft-St-Enoch-District-Regenration-Framework-Full-Report-2.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Draft-St-Enoch-District-Regenration-Framework-Full-Report-2.jpg?resize=600%2C424&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation period is quite long; the full details were in <a rel="noreferrer noopener" aria-label="Digest 37 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank">Digest 37</a>, Item 1.7 and our response is being prepared. It will be published before the closing date.<br>If you have perused the document and have any views, please do send them in to consultations@gobike.org</p>



<h6 class="wp-block-heading">1.4 **NEW** Consultation on Scotland&#8217;s National Transport Strategy, closes 23 October</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p>Published just a few days ago on 31 July, here&#8217;s the <a rel="noreferrer noopener" aria-label="latest big consultation (opens in a new tab)" href="https://consult.gov.scot/transport-scotland/national-transport-strategy/" target="_blank">latest big consultation</a> from the Scottish Government and Transport Scotland. This is one we all need to consider and submit our views.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, Pollok Country Park &#8211; Project Update and Public Consultation Event, 22 August.</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" height="99" width="300" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/burrell-collection-pollok-park-300x99.jpg?resize=300%2C99&#038;ssl=1" alt="" class="wp-image-7330"/></figure></div>



<p>We published the details of this event in our last <a rel="noreferrer noopener" aria-label="Digest, No 39 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest, No 39</a>, Item 2.3 and it will be held at <a rel="noreferrer noopener" aria-label="Pollokshaws Library (opens in a new tab)" href="https://www.glasgowlife.org.uk/libraries/venues/pollokshaws-library" target="_blank">Pollokshaws Library</a> from 12 noon &#8211; 8pm. Do get along there if you can.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Pollok Country Park &#8211; Project Update</h6>



<p>Before you go to the Consultation Event on the 22nd, do read this <a rel="noreferrer noopener" aria-label="briefing note (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/08/Pollok-Country-Park-Update-July-2019-Briefing-Note.pdf" target="_blank">briefing note</a> produced by Glasgow Life, outlining progress to date.</p>



<h6 class="wp-block-heading">3.2  WalkCycleVote/RNIB workshops </h6>



<p>Sally and Suzanne from Walk/Cycle/Vote have been working this year with people from the <a href="https://www.rnib.org.uk/scotland">RNIB</a> and have held workshops around the country, in Glasgow,  Inverness and Edinburgh. Brenda, Iain and Tricia from GoBike attended the Glasgow event and discussed pertinent issues with people from RNIB.  Walk/Cycle/Vote hope to follow up these recent sessions with a larger event in October,  focusing on a combined response to the National Transport Strategy  consultation has just been launched, see Item 1.4 above.<br>Here are the agreed outcomes of the Glasgow workshop:</p>



<ul class="wp-block-list"><li> <em>We&#8217;re still missing some users from this discussion who&#8217;ll have valuable input.</em></li><li><em> Our cities would be safer for everyone if there were fewer private cars. </em></li><li><em> We need to reduce car dominance of our streets if we are all to get the space we need. </em></li><li><em> Kerbs are important with appropriate modifications for wheelchairs.</em></li><li><em> Cycling infrastructure needs to be designed in a way that&#8217;s inclusive for everybody and doesn&#8217;t create barriers.</em></li><li><em> Street clutter is a hazard.</em></li><li><em> Cycle paths should be clearly distinguishable from pavement and roads by appropriate means. </em></li><li><em> We want a clear delineation between cyclists and pedestrians.</em></li><li><em> Side turnings should be squared off to make drivers slow down.</em></li><li><em> Control boxes (on signal-controlled crossings) could vibrate as an alternative to the rotating cone which can be broken easily or simply not included on the box.</em></li><li><em> We  acknowledge that different groups of people will have different  priorities based on their different needs. We should not allow people to  divide and rule us. </em></li></ul>



<p>So a good start was made in understanding and recognising that we have different needs but we all have a right to use our streets.</p>



<h6 class="wp-block-heading">3.3 Glasgow City Council (Garscube Road)(Traffic Regulation and Parking Controls) Order 201</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="230" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=525%2C230&#038;ssl=1" alt="" class="wp-image-8684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=600%2C263&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On 23 July we received this acknowledgement to our <a href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Garscube-Road-response-010719.pdf" target="_blank" rel="noreferrer noopener" aria-label="submission (opens in a new tab)">submission</a> to the consultation on the proposals preparing for the construction of a 2-way cycle route on Garscube Road:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL (GARSCUBE ROAD) </em></strong><em> </em><strong><em>(TRAFFIC REGULATION AND PARKING CONTROL) ORDER 201_</em></strong><em><br>Thank you for your correspondence regarding the above named Traffic Regulation Order.<br>Your  support will be considered and included within the final report which  will inform the decision. Once a decision has been taken in regards to  these proposals I shall write to you again and advise  of the outcome.<br>Yours sincerely<br></em><strong><em>Steve Gray</em></strong><em><br></em><strong><em>Assistant Group Manager (Sustainable Transport)</em></strong><em><br></em><strong><em>Neighbourhoods and Sustainability</em></strong><em>&#8220;</em></p>



<h6 class="wp-block-heading">3.4 THE GLASGOW CITY COUNCIL, Consultation on future policy development of taxi and private hire car licensing </h6>



<p>On 23 July we received this brief acknowledgement of our <a href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Taxi-and-Private-HIre-response-220719.pdf" target="_blank" rel="noreferrer noopener" aria-label="submission (opens in a new tab)">submission</a> on this consultation:</p>



<p>&#8220;<em>Thank you for your consultation response, which will be considered by the Licensing and Regulatory Committee in due course. <br>Kind regards</em>&#8220;</p>



<h6 class="wp-block-heading">3.5 Glasgow, Dennistoun &amp; Royston &#8211; Traffic Management &amp; Parking Controls Order 201 drop-in events 24, 25 and 27 July</h6>



<p>These events, which were detailed in <a rel="noreferrer noopener" aria-label="Digest 38 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-38-10-july-2019-the-south-city-way-approaches-the-city-centre-8763" target="_blank">Digest 38</a>, Item 2.5 with further information on opposition to the proposals in <a rel="noreferrer noopener" aria-label="Digest 39 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest 39</a>, Item 2.1, were held to gauge public views prior to the Traffic Regulation Order being finalised and issued.<br>City Council staff at one of the Dennistoun events reported that views were mixed, but there was certainly interest from members of the public.<br>Again, though, parking controls mean, to the City Council, changing streets from 2-way to 1-way to allow for the introduction of diagonal parking and ensure adequate clearance to the parked cars. Exemption for cycles is apparently generally vetoed by Police Scotland and the City Council continue to provide storage space for private vehicles on our streets rather than providing sufficient space for people to walk and cycle.<br>One would hope that by the introduction of parking permits demand for parking would reduce?</p>



<p>We look forward to the publication of the TRO with some interest.</p>



<h6 class="wp-block-heading">3.6 Battlefield Proposals (Streets for All) update</h6>



<p><br><br>Sustrans issued this <a rel="noreferrer noopener" aria-label="update (opens in a new tab)" href="https://battlefieldproposals.commonplace.is/news/2019/07/25/battlefield-street-design-showcase-event" target="_blank">update</a> on 25 July and, once you are past all the pictures, there&#8217;s a wee survey for you to complete by 16 August &#8211; and there&#8217;s a prize draw! <br></p>



<h6 class="wp-block-heading">3.7 The Glasgow City Council (Broomfield Road) Traffic calming scheme 20__</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="228" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?resize=525%2C228&#038;ssl=1" alt="" class="wp-image-8746" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?resize=300%2C130&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?resize=600%2C261&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Broomfield-Road-2.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On 29 July we received this response to our<a href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Broomfield-Road-Traffic-Calming-response-010719.pdf" target="_blank" rel="noreferrer noopener" aria-label=" submission (opens in a new tab)"> submission</a> on the proposal for traffic calming on Broomfield Road:</p>



<p>&#8220;<em>Thank you for your undernoted email regarding the traffic calming proposals on Broomfield Road.<br><br>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200 mm, with 1000 mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” <br></em><br><em>Due  to the width of the carriageway on Broomfield Road and the minimum  width of the speed cushions being increased to facilitate buses, a 1m  gap from either side of the kerbline was determined. A larger gap  between the speed cushion and the kerb may encourage drivers to park  partly in the gap and partly on the cushion, causing an obstruction for  cyclists.<br><br>Regarding  your request for a cycle lane to be introduced at this location,  I can advise that the funding we have received for this location is  from a traffic calming budget, therefore the introduction of cycle lanes  at this location is not something that we would consider at this time. </em><br><br><em>Finally, it is anticipated the introduction of speed cushions will reduce vehicular speeds, which in turn lead to better road safety conditions for all road users including, pedestrians, cyclists and motorists.<br>I trust the above information is of assistance, however, should you require any further information please contact (name and contact details removed by GoBike)<br><br>Michael Brady<br>Group Manager – Traffic and Road Safety<br>Neighbourhoods and Sustainability&#8221;</em></p>



<p>So there we have it: the budgets, and not just the staff, are in silos within the City Council. Why on earth don&#8217;t they think holistically and consider the best overall solution?</p>



<h6 class="wp-block-heading">3.8 The Glasgow City Council (Sunnybank Street) Traffic Calming Scheme 20__</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="142" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?resize=300%2C142&#038;ssl=1" alt="" class="wp-image-8707" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?resize=300%2C142&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?resize=600%2C284&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Sunnybank-Street-2.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p>Correspondence continues on Sunnybank Street. You may remember that in <a rel="noreferrer noopener" aria-label="Digest 38 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-38-10-july-2019-the-south-city-way-approaches-the-city-centre-8763" target="_blank">Digest 38</a>, Item 3.7 we published an exchange of emails where Glasgow City Council had confused the GoBike response on Sunnybank Street with that of either Ladyloan Avenue or Broomfield Road?</p>



<p>A further reply was received on 29 July:</p>



<p>&#8220;<em>Dear Ms Fort <br><br>Thank you for your undernoted email regarding the traffic calming proposals for Sunnybank Street.</em><br><br><em>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming measures,  states that “Distances between cushions, or cushions and the kerb,  should not generally exceed 1200mm, with 1000mm as an ideal maximum.  These dimensions are designed to deter drivers of small vehicles from  attempting to drive in the gap.” <br><br>The gap between cushions and the kerb may differ at each location depending on factors  such as the width of the carriageway, the width, length and design of  the cushions, any potential build outs or the location being a bus  route.<br><br>I  trust the above information is of assistance, however, should you  require any further information please contact (contact details removed by GoBike).<br><br>Michael Brady<br>Group Manager – Traffic and Road Safety<br>Neighbourhoods and Sustainability&#8221;</em></p>



<p> When in a hole, it&#8217;s best not to dig any deeper! The distance between the speed cushion and the kerb is shown as 1.2m for Sunnybank Street, but only 1.0m for Broomloan Road above.</p>



<h6 class="wp-block-heading">3.9  Proposals for Upgrading of Elmbank Street, Pitt Street and Holland Street</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Elmbank-Street-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-8865" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Elmbank-Street-map.png?w=1264&amp;ssl=1 1264w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Elmbank-Street-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Elmbank-Street-map.png?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Elmbank-Street-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> A consultation event was held on 24 July, of which we became aware at very short notice, but we now have some details.  We  have requested ongoing notification  but here is what Holland Street might look like in the future!<br><br>There is more information on the <a rel="noreferrer noopener" aria-label="consultant's website (opens in a new tab)" href="http://www.ironsidefarrar.com/avenues/avenues.html" target="_blank">consultant&#8217;s website</a>.<br><br>We aim to keep you informed of progress.</p>



<h6 class="wp-block-heading">3.10 World Pipe Band Championships, use of the National Cycle Route through Glasgow Green</h6>



<p>The World Pipe Band Championships take place on Glasgow Green on 16 and 17 July and Glasgow Life have informed local residents, including your Digest author, of closures to roads around the Green and restrictions on access to the Green itself.</p>



<p>Unfortunately, the information provided was inadequate when it came to cycling and thus the following email was sent:</p>



<p>&#8220;<em>Sent: 26 July 2019 14:02<br>To: GL Culture <br>Cc: GoBike! Convenor <br>Subject: World Pipe Band Championships, use of the National Cycle Route through Glasgow Green <br><br>Hello, <br>As a local resident I have today received the neighbour notification for the forthcoming World Pipe Band Championships to be held on Glasgow Green on 16 and 17 July. <br><br>Your letter, ref WPBC2019/HC informs me of motor vehicle restrictions but does not mention the National Cycle Network Route (NCN) that passes through the Green. You do, of course, refer to the riverside &#8220;path&#8221;, which is where the NCN runs but you do not give any alternate route for people who are cycling to work, to their place of study, on business or for leisure. This is one of the busiest cycle routes in Glasgow, used by people of all ages and all cycling abilities and it is critical, not just for this event, but for all events on the Green, that clear alternatives are posted well in advance. <br></em><br><em>Thus, could you, by return, send me the alternative route that you propose for the NCN so that I may make all our GoBike members and supporters aware of the change in their journey well in advance of the 2 days? It is not good enough for people to arrive at a point where their route is blocked and to be told by a steward that they must retrace their route and take a diversion. <br><br>I hope that by doing this, we will be able to reduce the frustration felt by people cycling through the Green and thus reduce the number of complaints that are received by yourselves; complaints that may be avoided by good planning. <br><br>It is disappointing that world class events on the Green are marred by lack of attention to detail. I look forward to your prompt response. <br><br>Yours, <br>Tricia Fort <br>for Consultations, GoBike, Strathclyde Cycle Campaign, </em><a href="http://www.gobike.org"><em>www.gobike.org</em></a></p>



<p>A response was received a few days later, and here it is for you to judge its content!</p>



<figure class="wp-block-table"><table><tbody><tr><th>&#8220;<em>Subject: </em></th><td><em>RE: World Pipe Band Championships, use of the National Cycle Route </em><br><em>through Glasgow Green</em></td></tr><tr><th><em>Date</em>: </th><td><em>Tue, 30 Jul 2019 08:49:13 +0000</em></td></tr><tr><th><em>From: </em></th><td><em>GL WPBC &lt;theWorlds@glasgowlife.org.uk&gt;</em></td></tr><tr><th><em>To: </em></th><td><em>consultations@gobike.org &lt;consultations@gobike.org&gt;</em></td></tr></tbody></table></figure>



<p> <em>Dear Tricia,<br><br>Thank you for your email.<br><br>As per every event  at Glasgow Green &#8211; both ran by Glasgow Life and private companies &#8211;  diversion routes will be in place and well signed in advance.<br><br>On the Friday it is a minor diversion within the park.<br><br>On  the Saturday there is a diversion (example cycling from West to East)  from Saltmarket (at Albert Bridge), across the bridge and left on to  Ballater Street. Continue straight onto King&#8217;s Bridge and right back  onto the current Cycle Network 75.<br><br>If you require any further information please do not hesitate to get back in touch.<br><br>Kind regards,<br>WPBC Team &#8220;</em></p>



<p>Needless to say, a further message has been sent to Glasgow LIfe, but if you are trying to cycle in or near Glasgow Green on 16 and 17 July, perhaps even trying to get to the &#8220;Worlds&#8221;, we can only apologise for not being able to get you clear information.</p>



<h6 class="wp-block-heading">3.11 International interest to build first opening bridge over the River Clyde</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="148" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/Glasgow-City-Deal.jpg?resize=300%2C148&#038;ssl=1" alt="" class="wp-image-6163" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/Glasgow-City-Deal.jpg?resize=300%2C148&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/Glasgow-City-Deal.jpg?w=392&amp;ssl=1 392w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p><br>We received this email from City Deal Renfrewshire on 31 July, giving us progress news on the proposed new bridge over the Clyde:</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge.jpg?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-8868" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge.jpg?resize=300%2C137&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge.jpg?resize=600%2C273&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<figure class="wp-block-table"><table><tbody><tr><td></td></tr><tr><td>&#8220;<strong><em>International interest to build first opening bridge over the River Clyde</em></strong><em>.<br>Three international engineering teams are in the running to build the first opening road bridge over the River Clyde.T he crossing connecting Renfrew to Clydebank and Yoker <br>forms the centre-piece of the&nbsp;</em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://www.renfrewshire.gov.uk/cwrr" target="_blank"><em>Clyde Waterfront and Renfrew Riverside project</em></a><em>&nbsp;&#8211; a <br>major infrastructure project to transform the Clyde waterfront. Jointly funded by the <br>UK and Scottish Governments through the Glasgow City Region City Deal, the <br>£90.7million Clyde Waterfront and Renfrew Riverside project includes a 184 <br>metre-long, twin-leaf cable-stayed swing bridge accommodating vehicles, cyclists and pedestrians and opening horizontally for passing ships. Following an initial selection <br>stage earlier this year, Renfrewshire Council has now invited three bidders to <br>participate in the detailed tendering stage of the procurement process.</em><br><br><em>Who is bidding for the contract?&nbsp;</em><br><em><br>ARC &#8211; a joint venture of Roadbridge and American Bridge supported by COWI as <br>design partner, whose previous projects include the construction of the iconic <br>Queensferry Crossing and the Tappan Zee Bridge over New York&#8217;s Hudson River</em><br><br><em>A Balfour Beatty team, comprising Cleveland Bridge, Qualter Hall and consultants <br>Atkins. They have delivered the Media City Swing Bridge in Salford and are currently <br>replacing the Surf City Swing Bridge in North Carolina.<br><br>Construction and civil engineering company GRAHAM, working with Hollandia and <br>Ramboll &#8211; GRAHAM and Hollandia were both involved in the construction of the <br>Samuel Beckett Bridge in Dublin whilst Ramboll led the Design Joint Venture of the <br>Queensferry Crossing.</em></td></tr><tr><td><em>More on the project: Leading engineering firm Sweco worked with Kettle Collective &#8211; <br>the architects behind the Falkirk Wheel &#8211; to draw up initial designs for the bridge which<br>draw on the area&#8217;s rich shipbuilding heritage. Also included in the project is more than <br>2km of new and improved roads and shared cycle and pedestrian routes, including <br>connections into the Advanced Manufacturing Innovation District Scotland being <br>developed next to Glasgow Airport. Each team has received the full tendering pack <br>which comprises more than 750 documents and 300 drawings. It is anticipated the <br>successful team will be appointed in early 2020 and construction is scheduled to start <br>later that year and be completed in 2022. Local businesses are being encouraged to <br>ensure they are registered on&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.publiccontractsscotland.gov.uk/" target="_blank">Public Contracts Scotland</a>&nbsp;where sub-contractor <br>opportunities will be published.<br><br>For more information including reaction to this news, visit our website at&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://www.renfrewshire.gov.uk/article/9263/International-interest-to-build-first-opening-bridge-over-the-River-Clyde" target="_blank">www.renfrewshire.gov.uk/citydeal</a>.</em>&#8220;</td></tr></tbody></table></figure>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="255" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge-2.jpg?resize=525%2C255&#038;ssl=1" alt="" class="wp-image-8869" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge-2.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge-2.jpg?resize=300%2C146&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Renfrew-bridge-2.jpg?resize=600%2C292&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h6 class="wp-block-heading">3.12 Yokecoco win funding for Yorkhill and Kelvingrove Cycling Village</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="176" height="176" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Yokecoco-win.jpg?resize=176%2C176&#038;ssl=1" alt="" class="wp-image-8870" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Yokecoco-win.jpg?w=176&amp;ssl=1 176w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Yokecoco-win.jpg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Yokecoco-win.jpg?resize=100%2C100&amp;ssl=1 100w" sizes="auto, (max-width: 176px) 100vw, 176px" /></figure></div>



<p>Saving the best until last; here&#8217;s the excellent news that Yorkhill and Kelvingrove Community Council, working in collaboration with Sustrans, have gained funding to progress their plans for transforming the area, see:  <a href="https://www.facebook.com/yokecoco/">https://www.facebook.com/yokecoco/</a> for all the details.<br>This is a wonderful achievement by the Community Council and local residents.</p>



<p>We first published details of the Traffic Regulation Order last year in <a rel="noreferrer noopener" aria-label="Digest 12  (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-12-the-full-version-26-june-2018-community-activity-around-kelvinhall-and-proposed-buildouts-and-speed-cushions-impeding-cycling-near-glasgow-green-5467" target="_blank">Digest 12 </a>and news of the initial public consultation events were given in <a rel="noreferrer noopener" aria-label="Digest 9 (opens in a new tab)" href="https://www.gobike.org/consultations-digest-issue-9-15-may-cycle-lanes-and-hazardous-access-to-glasgow-city-centre-plus-dangerous-roundabouts-in-east-renfrewshire-4993" target="_blank">Digest 9</a>, Item 1.7 back in May last year, so people have been busy on this for a long time and the success is well deserved.</p>



<p>Your next Digest will be out with you in 2 weeks &#8211; who knows what news there will be?</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">8861</post-id>	</item>
		<item>
		<title>** UPDATE 2 ** Side Streets</title>
		<link>https://www.gobike.org/update-2-side-streets-8077</link>
		
		<dc:creator><![CDATA[Iona Shepherd]]></dc:creator>
		<pubDate>Fri, 22 Mar 2019 13:45:56 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Comment]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[design guide]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[side streets]]></category>
		<category><![CDATA[south city way]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=8077</guid>

					<description><![CDATA[We have previously let you know about concerns arising around side street design in new schemes within Glasgow, and as detailed in our previous blogs, have been in touch with Sustrans and Glasgow City Council about the safety issues we feel are important to urgently address. If you haven&#8217;t caught our discussions so far you &#8230; <p class="link-more"><a href="https://www.gobike.org/update-2-side-streets-8077" class="more-link">Continue reading<span class="screen-reader-text"> "** UPDATE 2 ** Side Streets"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>We have previously let you know about concerns arising around side street design in new schemes within Glasgow, and as detailed in our previous blogs, have been in touch with Sustrans and Glasgow City Council about the safety issues we feel are important to urgently address.</p>



<p>If you haven&#8217;t caught our discussions so far you can catch up here:</p>



<span id="more-8077"></span>



<figure class="wp-block-embed is-type-rich is-provider-gobike"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="2pru4m1LV7"><a href="https://www.gobike.org/side-streets-7626">Side Streets</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Side Streets&#8221; &#8212; GoBike" src="https://www.gobike.org/side-streets-7626/embed#?secret=ZZhavHK5rj#?secret=2pru4m1LV7" data-secret="2pru4m1LV7" width="525" height="296" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure>



<p>and here:</p>



<figure class="wp-block-embed is-type-rich is-provider-gobike"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="oB2Gx34m8j"><a href="https://www.gobike.org/update-side-streets-7916">**UPDATE** Side Streets</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;**UPDATE** Side Streets&#8221; &#8212; GoBike" src="https://www.gobike.org/update-side-streets-7916/embed#?secret=MBkRxHc5vl#?secret=oB2Gx34m8j" data-secret="oB2Gx34m8j" width="525" height="296" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure>



<p>We have now also had some discussions with Sustrans staff who have assured us that there will soon be a clear piece of published guidance on side streets, and now, just this week (six weeks after we emailed), we have had a response in from the council.</p>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p>Further to your email dated 2<sup>nd</sup> February, which I believe was subsequently discussed with Cllr Richardson, please find attached  our response.<br> The  Council’s primary design reference guide is Cycling by Design.&nbsp;  However, we are aware that this requires  a refresh as it was introduced before we had many segregated cycle  routes in Scotland.&nbsp; Glasgow has been the pioneer in the installation of  segregated cycle routes and also considers other design guidelines  produced by TfL and Sustrans.&nbsp; The concept designs  for South City Way have been widely consulted on and a pilot was  undertaken to show how the first section would look.&nbsp; The current  section is still under construction and all the lining and signing has  not been completed for this section.<br> For our major cycle schemes we undertake a series of &nbsp;Safety Audits where the designs are looked at by  external safety auditors.&nbsp; These are reviewed at:<br> ·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stage 1 – After preliminary design is complete<br> ·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stage 2 – After the detailed design is complete<br> ·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Stage  3 – After Construction.&nbsp; This is undertaken on site, where an external  auditor, Police Scotland and members of the design team attend. The  Audit Team  will examine the scheme site during daylight and during the hours of  darkness, so hazards particular to night operation can also be  identified and the comments raised will also be highlighted to the audit  team.&nbsp; Any issues that have also been raised are also  highlighted.<br> We  will ensure that your comments are also highlighted as part of the  Safety Audit review process and will consider your observations in  a part of the design process in future schemes.<br> &nbsp;<br> I trust this is of assistance.<br> &nbsp;<br> Yours sincerely <br> &nbsp;<br> Communication &amp; Support Services <br> Neighbourhoods and Sustainability </p></blockquote>



<p>We don&#8217;t feel that there is an awareness of the urgency we believe is required within this response and so have reiterated why.</p>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p><strong>       Dear Communication and Support Services<br>       <br>Thank you for your response dated 18th March. There was no attachment to your email but we trust that the text below was the response you referred to.<br>       <br>We need to press on the urgency of a safety audit for the latest side street junctions on the South City Way, including those currently under construction. Presumably your procedures for major cycling schemes audits are new, and being that you admit that guidance in safely designing segregated cycling routes is lacking, we feel it is pressing that should safety be flagged up as an issue, as we and many of our members have done, that an urgent and intermediary safety audit is performed. It is clear that as it stands, there is going to be a collision at this junction soon, and we should be doing all that we can to prevent that. Not only that, but were this treated with the urgency we think it needs, a swift redesign that takes safety into account would prevent further danger being built into the rest of this major cycling scheme. We have after all, been promised that the SCW &#8220;will ensure safe cycling every inch of the way&#8221;. We also don’t believe that it is enough to leave the danger built in to SCW and only consider different designs for future schemes. If the audit outcomes are deemed as dangerous, could we suggest that the side streets have a lot of potential to be filtered from traffic.<br>       <br>       We appreciate the limitations that come with the current Cycling by Design guide and believe that Sustrans are working on updated guidance for side streets. GoBike would encourage you to look further afield in the meantime though and would point out that while Glasgow certainly are indeed pioneering with regards to segregated cycle routes in Scotland, segregated cycling routes are most definitely not anything new in other nearby countries. Thank you also for considering our observations and links to other guides as a part of the future design process.<br>       <br>       Can we please press again on the urgency of the need for an immediate safety audit and redesign. We are desperately aware that the safety of people on bikes is currently at risk on the South City Way and feel that a timely response that reflects the imminent danger is required.     </strong>     </p></blockquote>



<p>It is clear that design guidance is desperately in need of a refresh. Not just from a safety perspective but also for the sake of other projects going into the ground. We are also finding other great new schemes are falling down in other areas such as the pedestrian crossing at the Avenues end at Charing Cross that we detailed in our <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-30-19-march-2019-get-your-views-in-now-to-the-spt-regional-survey-and-the-get-glasgow-moving-petition-and-is-transformation-possible-8038" target="_blank">last digest (section 3.3</a>).</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="600" height="450" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2019/03/Photo-1-1.jpg?fit=525%2C394&amp;ssl=1" alt="" class="wp-image-8081" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/03/Photo-1-1.jpg?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/03/Photo-1-1.jpg?resize=300%2C225&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>And it is also clear to us that if something dangerous is put into the ground, the danger needs to be rectified as a matter of priority. We hope that the council will hear our plea to look at this soon &#8211; we believe that the South City Way can create a wonderful space for cycling and want to ensure that it is fully safe and usable from the outset.</p>



<p>If you have any comments or issues with the side streets, please let the council know on <a href="mailto:sustainable.transport@glasgow.gov.uk">sustainable.transport@glasgow.gov.uk</a> . Our collective voice can help to add credence to the issue within the council. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">8077</post-id>	</item>
		<item>
		<title>How the other 50% gets around</title>
		<link>https://www.gobike.org/how-the-other-50-gets-around-7586</link>
		
		<dc:creator><![CDATA[John Donnelly]]></dc:creator>
		<pubDate>Sun, 03 Feb 2019 08:30:41 +0000</pubDate>
				<category><![CDATA[GoBike]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[maintenance]]></category>
		<category><![CDATA[NCN7]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Transport Poverty]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=7586</guid>

					<description><![CDATA[GoBike calls for a drastic overhaul on gritting priorities from Glasgow City Council. Almost 50% of Glaswegians don&#8217;t have access to a private car. For them walking and cycling is not active travel, but is how they get around. Transport Poverty is a real factor to a number of people in this city. Last week &#8230; <p class="link-more"><a href="https://www.gobike.org/how-the-other-50-gets-around-7586" class="more-link">Continue reading<span class="screen-reader-text"> "How the other 50% gets around"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>GoBike calls for a drastic overhaul on gritting priorities from Glasgow City Council.  Almost 50% of Glaswegians don&#8217;t have access to a private car.  For them  walking and cycling is not active travel, but is how they get around.  Transport Poverty is a real factor to a number of people in this city.</p>



<p>Last week saw ice return to Glasgow.  At the same time the focus of getting Glaswgians to participate in active travel seemed to go out of the window. Footpath and cycle lanes were ice rinks.  In the light of lots of disquiet from our members about the unjust priorities the council have set for gritting, we have decided it is time for action.</p>



<span id="more-7586"></span>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="416" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/IMG_20190124_083656.jpg?resize=525%2C416&#038;ssl=1" alt="" class="wp-image-7639"/><figcaption>Glasgow&#8217;s 2nd busiest cycle route on Thursday 24th January at 8.36am</figcaption></figure>



<h2 class="wp-block-heading">Priorities</h2>



<p>Glasgow City Council are actively encouraging people to move from private cars to active travel.  This would appear to be only for those days where ice is not forecast.  On those days it would appear that the priority is to get the cars moving around Glasgow.</p>



<p>Many of our members tweeted the dire conditions they faced while trying to undertake their daily commute.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
https://twitter.com/JohnChivall/status/1088371505484959744
</div></figure>



<p>Leaving the bike and walking wasn&#8217;t really an option either.  Those on foot were not fairing much better.  Many had to resort to walking on the gritted roads as the foot ways were unsafe.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Treacherous pavements everywhere this morning so people were forced to walk on the carriageway (where gritting kept cars mobile, obvs).  <br><br>Pavement and cycle track were beyond use.  Does <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> forget that half the city&#39;s households don&#39;t have access to a car? <a href="https://t.co/JNUgEFZwhB">pic.twitter.com/JNUgEFZwhB</a></p>&mdash; Ernie Marples <img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f1ea-1f1fa.png" alt="🇪🇺" class="wp-smiley" style="height: 1em; max-height: 1em;" /><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3f4-e0067-e0062-e0073-e0063-e0074-e007f.png" alt="🏴󠁧󠁢󠁳󠁣󠁴󠁿" class="wp-smiley" style="height: 1em; max-height: 1em;" /><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f1ee-1f1ea.png" alt="🇮🇪" class="wp-smiley" style="height: 1em; max-height: 1em;" /> (@ErnieMarples) <a href="https://twitter.com/ErnieMarples/status/1088361192366710784?ref_src=twsrc%5Etfw">January 24, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p>It seems unfair to encourage people to move from their car to walking or cycling, then abandon them as soon as the ice comes to town. For those whose New Year resolution was to leave the car and walk or cycle, I am sure they are having second thoughts now. To enable people to commit to walking or cycling to work, school or the shops, this needs to be an option all year round. </p>



<h2 class="wp-block-heading">Deja Vu</h2>



<p>It was a similar situation during the cold snap in December.  There were multiple crashes on key cycle routes, including the South West City Way and the NCR 7 beside the transport museum.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">So the predicted ice came to fruition and the expected skating rink on SWCW also raised it&#39;s ugly head, also as predicted. <a href="https://twitter.com/GoBikeGlasgow?ref_src=twsrc%5Etfw">@GoBikeGlasgow</a> <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> <a href="https://twitter.com/AnnaLangside?ref_src=twsrc%5Etfw">@AnnaLangside</a> GCC it&#39;s not good enough. This route was treacherous with ice and unrideable. Despite riding slow, I fell on the ice.</p>&mdash; Graeme C (@gjcookie69) <a href="https://twitter.com/gjcookie69/status/1069874637478219776?ref_src=twsrc%5Etfw">December 4, 2018</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Gutted to see this. Sending well wishes to the injured person. <a href="https://t.co/DSVhc99qP5">https://t.co/DSVhc99qP5</a></p>&mdash; GoBike (@GoBikeGlasgow) <a href="https://twitter.com/GoBikeGlasgow/status/1069910834728570881?ref_src=twsrc%5Etfw">December 4, 2018</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<h2 class="wp-block-heading">Financial Impacts</h2>



<p>Slips, trips and falls are the most common types of accident in life generally, but snow and ice increase this. For most falls on snow or ice result in minor bumps and bruises.  If you are cycling usually the first thought is &#8220;how is the bike?&#8221;.</p>



<p>However, hundreds each year are less fortunate. They are admitted to hospital after suffering more serious injuries after falls during wintry weather.The cost of these admissions is considerable. Falls that result in a hospital admission cost an average of £5,000 each time. For older people this rises to £8,600. While a hip fracture costs the whole care system almost £40,000. </p>



<p>There needs to be a balancing of the cost of public health measures like gritting, with the healthcare costs associated with falls. The economic burden of falls on ice is substantial.  Keeping footpaths and cycle lanes free from ice should be a public health priority.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="307" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/MVIMG_20190130_085151.jpg?resize=525%2C307&#038;ssl=1" alt="" class="wp-image-7638"/><figcaption>Glasgow&#8217;s busiest cycle route at 8.50am on Wednesday 30th January.</figcaption></figure>



<h2 class="wp-block-heading">Transport Poverty</h2>



<p>Glasgow has always had a low car ownership level.  Within those areas of Glasgow with traditionally lower incomes the number of people with access to a private car drops even further. For them  walking and cycling is not active travel, but is how they get around.  </p>



<p>Transport Poverty is a real factor to a number of people who have limited options.  They don&#8217;t get duvet or snow days.  They need to get to their work or they will not get paid.  However, if trying to get to their work results in a fall and injury they often don&#8217;t get sick pay either.</p>



<p>Areas like Parkhead and Dalmarnock have 50% of children living in poverty.  Access to work is a key factor in getting people out of poverty. Removing the ability for them to get to work safely is morally reprehensible.<br></p>



<h2 class="wp-block-heading">Harder on Pedestrians than Drivers</h2>



<p>Alastair Dalton&#8217;s piece from last year is still relevant today.  He highlighted how pedestrians and cyclists are hit hardest when it snows.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">A timely reminder to <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> <a href="https://twitter.com/AnnaLangside?ref_src=twsrc%5Etfw">@AnnaLangside</a> from <a href="https://twitter.com/GoBikeGlasgow?ref_src=twsrc%5Etfw">@GoBikeGlasgow</a>. My take on it last year in <a href="https://twitter.com/TheScotsman?ref_src=twsrc%5Etfw">@TheScotsman</a>: <a href="https://t.co/j7qUkLBI1f">https://t.co/j7qUkLBI1f</a> <a href="https://t.co/EOqNea5Zjp">https://t.co/EOqNea5Zjp</a></p>&mdash; Alastair Dalton (@AlastairDalton) <a href="https://twitter.com/AlastairDalton/status/1088396672269537280?ref_src=twsrc%5Etfw">January 24, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p>We strongly agree with what Alastair wrote back then, in particular this:</p>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p><em>There is never going to be enough money to clear every road and pavement, but there seems to be a clear inequity in how they are tackled.</em></p></blockquote>



<h2 class="wp-block-heading">Call For Action </h2>



<p>Glasgow City Council, as a matter of urgency can not neglect their moral responsibility to reduce Transport Poverty and provide safe routes for people to walk and cycle.</p>



<p>We echo Chris Boardman’s request, that basic maintenance is provided on our foot paths and cycle lanes. We call for action from Glasgow City Council for a drastic reprioritisation of the winter maintenance policy that more fairly reflects the right for all people to get around, not just those who have access to a car.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Another topic for the list: basic servicing and maintenance,, in line with what we do for Motor traffic as a minimum seems reasonable. <a href="https://t.co/RSq0AGQFA3">https://t.co/RSq0AGQFA3</a></p>&mdash; Chris Boardman (@Chris_Boardman) <a href="https://twitter.com/Chris_Boardman/status/1090603836975312896?ref_src=twsrc%5Etfw">January 30, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7586</post-id>	</item>
		<item>
		<title>Side Streets</title>
		<link>https://www.gobike.org/side-streets-7626</link>
		
		<dc:creator><![CDATA[Iona Shepherd]]></dc:creator>
		<pubDate>Sat, 02 Feb 2019 16:14:20 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Comment]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[side streets]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=7626</guid>

					<description><![CDATA[We&#8217;ve had a lot of disquiet from our members this week about a side street that has been unveiled on the South City Way. While we do know and understand that our council is making great steps forward with schemes such as the SCW, and that UK design guidance on side street treatments has a &#8230; <p class="link-more"><a href="https://www.gobike.org/side-streets-7626" class="more-link">Continue reading<span class="screen-reader-text"> "Side Streets"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>We&#8217;ve had a lot of disquiet from our members this week about a side street that has been unveiled on the South City Way. While we do know and understand that our council is making great steps forward with schemes such as the SCW, and that UK design guidance on side street treatments has a long way to come, the safety of people cycling is at the heart of what we campaign for. We are so aware that side streets are a common source of collisions and so for the sake of safety, we want to work to get this right.</p>



<p>We&#8217;ve been in touch with GCC and Sustrans as follows, and will keep you updated on any progress.</p>



<p><em>Hi to our contacts in LES, Sustrans, and Cllr Richardson,</em></p>



<p><em>First of all thank you for the work you are doing to create safe places to cycle in Glasgow. We can see how hard everyone is working on getting this right, however we at GoBike wanted to get in touch to express our concerns about the designs on side streets that we are seeing emerging on the ground, particularly in reference to the most recently completed junction on the SCW at Turriff Street, but also in the wider context of other schemes in the planning stages.</em></p>



<span id="more-7626"></span>



<p><em>Where segregated cycling lanes are installed, it is essential that the design of the side streets that meet them is well thought out, to protect the safety of the people using them. In practice, we believe that this means making the cycle lanes continuous where the road is continuous, and making the priority of the people using the cycle lanes across these side streets absolutely clear and unambiguous. Where this doesn&#8217;t happen, the safety of people on bikes is deeply at risk.<br></em></p>



<p><em>We would suggest that the following points are key to side street design considerations around cycle lanes:</em><br></p>



<p><strong><em>Clear and unambiguous continuous priority for the cycle lane.</em></strong><em> If the cycle lane follows the road, the same priority afforded to vehicles on that road should also be given to people on bikes if the Transport Scotland active travel hierarchy is to be followed. If priority for the cycle lane is not made clear to people in vehicles, those turning will be far more likely to cross the lane before checking it&#8217;s clear, and before making their maneuver.</em><br></p>



<p><strong><em>Surface material and colour. </em></strong><em>To be unambiguous, this</em><strong><em> </em></strong><em>must remain consistent and unbroken across the full length of the cycle lane. Consistently brightly coloured. Consistent safe and non-slippy surfacing.</em><br></p>



<p><strong><em>Raised tables.</em></strong><em> Crossings for the cycle lane must be raised to footway height to slow vehicles speed and to reduce ambiguity over which users have priority.</em><br></p>



<p><strong><em>Sharp corners.</em></strong><em> There should be no indentations or wide radius at corners that might encourage people in cars to take a sweeping line. Tight corners will encourage slower cornering.</em><br></p>



<p><em>We would be really keen to have the continuous priority of cycle lanes and the design of side streets on upcoming projects checked and re-assessed against these points. We are seeing potential side street issues within future plans for Connecting Woodside, and have concerns that the side streets will also remain ambiguous on Byres Road. We also understand that side streets are an issue within other projects outwith Glasgow and would be keen to add our campaign backing for the points outlined above. This is a safety issue &#8211; if side streets are not designed safely, we cannot proclaim our new cycling infrastructure to be safe.</em><br></p>



<p><em>We look forward to hearing from you all on how this issue can be improved &#8211; if there is anyway that we can assist, please do let us know.</em><br></p>



<p><em>Thanks and best wishes<br></em></p>



<p><em>References:</em><br></p>



<p><em>UK design guides have yet to detail side street treatment well but we understand that the CROW manual provides good examples. </em></p>



<p><em>This article is extremely helpful: </em><a href="https://robertweetman.wordpress.com/2018/11/13/design-details-1/"><em>https://robertweetman.wordpress.com/2018/11/13/design-details-1/</em></a><br></p>



<p><em>‘Designing for Cycle Traffic: International principles and practice’ John Parkin (pgs 105-108) lends support to the need for continuous cycle tracks in order for them to retain value, and details good design practice.</em><br></p>



<p><em>This study provides reference to highway code rules of engagement supporting priority for cycling and walking at side streets (pg 42):</em><a href="http://content.tfl.gov.uk/international-cycling-infrastructure-best-practice-study.pdf">http://content.tfl.gov.uk/international-cycling-infrastructure-best-practice-study.pdf</a></p>



<p>There are also a few good points made in the London Cycling Design Standards (pg 150):  <a href="https://consultations.tfl.gov.uk/cycling/draft-london-cycling-design-standards/user_uploads/draft-lcds---all-chapters.pdf">https://consultations.tfl.gov.uk/cycling/draft-london-cycling-design-standards/user_uploads/draft-lcds&#8212;all-chapters.pdf</a></p>



<p>I’ve also attached an example from Edinburgh, Leith Walk that works well.</p>



<p> </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7626</post-id>	</item>
	</channel>
</rss>
