<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>traffic calming &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/traffic-calming/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Mon, 29 Sep 2025 10:56:35 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 73, 10 November 2020: Good news on a protected junction survey and sad news for Pollok Park</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 10 Nov 2020 18:00:43 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[covid]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[EV Charging]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[protected junctions]]></category>
		<category><![CDATA[Sustrans]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=12455</guid>

					<description><![CDATA[The Digests are changing! Hopefully, you saw the recent post by Jim Densham, who will now be writing a monthly article about national (Scotland and UK) consultations. These Digests, still to be fortnightly, will concentrate on issues from the Local Authorities where we have members. If you don&#8217;t get our blogs direct to your email &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 73, 10 November 2020: Good news on a protected junction survey and sad news for Pollok Park"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>The Digests are changing! Hopefully, you saw the recent <a href="https://www.gobike.org/gobikes-new-national-consultation-digest-and-a-guide-to-the-road-safety-framework-12450" target="_blank" rel="noreferrer noopener">post by Jim Densham</a>, who will now be writing a monthly article about national (Scotland and UK) consultations. These Digests, still to be fortnightly, will concentrate on issues from the Local Authorities where we have members. <br>If you don&#8217;t get our blogs direct to your email inbox you can subscribe on the <a rel="noreferrer noopener" href="https://www.gobike.org/" target="_blank">GoBike website home page</a>, joining over 4,000 others who already do so. <br><br><strong>Reminder:</strong> <a href="https://www.gobike.org/go-bike-agm-and-public-meeting-2020-12365">GoBike AGM online</a>: 19th November 2020 (Pedal on Parliament AGM: 17th Nov).</p>



<span id="more-12455"></span>



<h3 class="wp-block-heading"><strong>Contents</strong> </h3>



<h4 class="wp-block-heading">Section 1: Current Consultations </h4>



<ol class="wp-block-list"><li>*NEW* Glasgow City Council, &#8220;Yorkhill Quay masterplan to fulfil River Clyde blue corridor vision&#8221;</li><li><span style="font-size: 1rem;">Glasgow City Council – new City Development Plan, closes 11 December</span></li><li><span style="font-size: 1rem;">East Dunbartonshire Council – Proposed Local Development Plan 2 (LDP2), closes 15 January 2021</span></li><li>OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</li><li>*NEW* Glasgow City Council – Protected Junction Trial consultation</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>Traffic Regulation Orders to make Covid 19 pop-ups permanent </li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow City Council (City Centre) (Traffic Management) Order 2010 (Variation No 27) Order 202, waiting and loading, plus EV parking, GCC response to our submission</li><li>Glasgow City Council (Ruchazie Road) Traffic Calming Scheme (OFFICIAL) and a query as to the effectiveness of these measures, survey information from GCC</li><li>East Renfrewshire Council, update on Proposed Local Development Plan 2</li><li>Glasgow City Council, Pollok Park planning application approved</li></ol>



<h3 class="wp-block-heading"><strong>Section 1:</strong> <strong>Current Consultations </strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading">1.1: *NEW* Glasgow City Council, &#8220;Yorkhill Quay masterplan to fulfil River Clyde blue corridor vision&#8221;</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" fetchpriority="high" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Yorkhill-Quay.png?resize=525%2C394&#038;ssl=1" alt="Artist's impression of proposed development at Yorkhill Quay" class="wp-image-12534" width="525" height="394"/></figure>



<p>GoBike member Brenda tells us there&#8217;s an online consultation for a pre-planning application for the strip of land along the river between Riverside museum and the new distillery.&nbsp; Includes the offer of &#8216;live chat&#8217; on Thurs 12 Nov between 10am and 1pm.&nbsp; Looks like a row of massively tall blocks of flats surrounded by parking, with a relatively narrow, completely exposed strip along the riverside providing the advertised &#8216;complete permeability&#8217;. (I may be biased).<br>We think this is a requirement for major developments, and gets reported in the Design and Access Statement that forms part of the eventual planning application.&nbsp; Perhaps they even need to show that they&#8217;ve addressed concerns raised by respondents&#8230;<br>There&#8217;s a <strong><a target="_blank" href="https://www.urbanrealm.com/news/9080/Yorkhill_Quay_masterplan_to_fulfil_River_Clyde_blue_corridor_vision.html" rel="noreferrer noopener">summary of the possible proposal</a></strong> and a <a target="_blank" href="http://mcinally-associates.co.uk/yq/index.html#home" rel="noreferrer noopener">consultation</a>. <br>Available for viewing till 30 November.</p>



<p>Doesn&#8217;t look like Glasgow at all, does it?</p>



<h4 class="wp-block-heading">1.2: Glasgow City Council – new City Development Plan <br>(Closes 11 December)</h4>



<p>First covered in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342">Digest issue 72</a>, Item 1.7. GCC&#8217;s email said <em>&#8220;<em>We are working with our partners, The Future Fox to host an online engagement called Placebuilder. It is designed to help us understand the experiences and ideas of Glasgow’s different neighbourhood communities&nbsp;on what they think works, what could be better and what they would like to see change.</em>&#8220;</em> Plenty of scope there – <a href="https://placebuilder.io/glasgowplaces" target="_blank" rel="noreferrer noopener">link to Placebuilder online engagement</a>.</p>



<h4 class="wp-block-heading">1.3: East Dunbartonshire Council – <br>Proposed Local Development Plan 2 (LDP2) <br>(Closes 15 January 2021)</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="84" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=525%2C84&#038;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p>East Dunbartonshire were the only mainland council that didn&#8217;t bid for any funding from the Spaces for People programme by Sustrans. If you&#8217;d like to encourage EDC to improve on that record (and maybe finish the <a href="https://www.gobike.org/campaigns/mini-campaigns/friends-of-bearsway" target="_blank" rel="noreferrer noopener">Bearsway</a> or something) then you have a chance to mention it in this consultation. As covered in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342" target="_blank" rel="noreferrer noopener">Digest issue 72</a>, Item 1.8. See the Council website:&nbsp;<a href="http://www.eastdunbarton.gov.uk/LDP2" target="_blank" rel="noreferrer noopener">www.eastdunbarton.gov.uk/LDP2</a>. Apparently <em>&#8220;your representation should be submitted by e-mail to&#8221;</em>&nbsp;<a href="mailto:development.plan@eastdunbarton.gov.uk" target="_blank" rel="noreferrer noopener">development.plan@eastdunbarton.gov.uk</a>.&nbsp;</p>



<h4 class="wp-block-heading">1.4: OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</h4>



<p>This <a rel="noreferrer noopener" href="https://docs.google.com/forms/d/e/1FAIpQLSdRjYngGGZTaojHa1NjhbIUn3lcuSxpj68IdsHuzrxEerZbtQ/viewform" target="_blank">multiple choice survey</a> (as covered in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342">Digest issue 72</a>, Item 1.1) was originally looking for quick feedback but remains open. OnBikes and SPYF (St Paul’s Youth Forum) are working on a Places for Everyone project to improve active travel infrastructure in parts of North East Glasgow like Smithycroft, Riddrie and Blackhill. </p>



<h4 class="wp-block-heading">1.5: **NEW** Glasgow City Council – Protected Junction Trial consultation</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="378" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Turning_right_for_cyclists.jpg?resize=525%2C378&#038;ssl=1" alt="Turning right at a protected junction" class="wp-image-12492" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Turning_right_for_cyclists.jpg?resize=600%2C432&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Turning_right_for_cyclists.jpg?resize=300%2C216&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Turning_right_for_cyclists.jpg?w=640&amp;ssl=1 640w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p>Posters of a new junction on Victoria Road have been appearing on bus shelters around Glasgow (as seen by GoBike member Steph). The City Council&#8217;s website says: <br><em>&#8220;As part of the South City Way, we will be&nbsp;trialling protected junctions&nbsp;on Victoria Road at the Calder Street and Allison Street junctions. Protected junctions&nbsp;are widely and successfully used across Europe, however they are relatively new in the UK and these will be the&nbsp;first&nbsp;in the UK outside of London! </em><br><em>A &#8216;protected junction&#8217; is a road junction designed so that people travelling on foot, by cycle, and&nbsp;in vehicles are all separated as they pass through the junction. The aim is to make the junctions safer for all road users, and particularly for those on cycles. Unlike other junctions, which normally require right-turning cyclists to wait in the centre of the junction for a suitable gap in the traffic, the protected junction&nbsp;offers a safer alternative.&nbsp;Protected cycle tracks &#8211; like those on the South City Way &#8211; make it easier for people to make everyday journeys by cycle&nbsp;instead of by car.&nbsp;&#8221; </em></p>



<p>That last sentence may seem obvious but there will be plenty of people in the city who struggle to get their heads around it. The stately progress of the South City Way may be a source of frustration for many. However, it is innovative (for Scotland) and we do need to see more along similar lines. So, if you want to show support for the new junctions, or just find out more, see <a rel="noreferrer noopener" href="https://glasgow.gov.uk/protectedjunctions" target="_blank">GCC&#8217;s Protected Junctions webpage</a> for further images, a video, a PDF document and a contact link. The junction trial will last two years but there&#8217;s no deadline mentioned for feedback. </p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading">2.1: Traffic Regulation Orders to make Covid 19 pop-ups permanent</h4>



<p>Michael Matheson spoke at the <a rel="noreferrer noopener" href="https://www.cycling.scot/cycling-scotland-conference" target="_blank">Cycling Scotland online conference</a> on 05 November. He was very hopeful that local authorities would choose, and be able, to make many of the measures permanent. TROs, which will come through the normal consultation channels, will be required.</p>



<h3 class="wp-block-heading"><strong>Section 3: Consultation Feedback </strong></h3>



<h4 class="wp-block-heading">3.1: Glasgow City Council (City Centre) (Traffic Management) Order 2010 (Variation No 27) Order 202, waiting and loading, plus EV parking, GCC response to our submission</h4>



<p>In <a href="https://www.gobike.org/consultation-digest-issue-71-13-october-2020-how-do-we-talk-about-cycling-and-where-do-we-store-our-bikes-12249" target="_blank" rel="noreferrer noopener">Digest 71</a>, Item 1.5, we published this consultation and mentioned our concern that there was no mention of the proposed introduction of two-way cycling on Candleriggs. Here&#8217;s the letter we submitted on 26 October and on 29 October we received this response: </p>



<p>&#8220;<em>Thank you for your correspondence regarding the above named Traffic Regulation Order.</em></p>



<p><em>With regards to contraflow cycling on Candleriggs, I can advise that this aspect of the TRO has been withdrawn since the first consultation.&nbsp; This is as a result of an existing goods vehicle loading facility located on the west side of Candleriggs, approximately 15 metres south of Bell Street which will remain in place.&nbsp; It has been noted that the publicised drawing incorrectly shows existing double kerb markings at this location instead of single kerb markings and the removal of this proposal should have been included in the consultation email that stakeholders received. &nbsp;This was omitted in error after the implementation of this TRO was passed from our Project Services department to our Parking Services department.</em></p>



<p><em>In view of the above loading facility remaining in place, a decision was taken to remove contraflow cycling at this location in order to prevent the possibility of northbound cyclists having to cycle into the centre of the carriageway if a goods vehicle was situated at the above loading facility, with limited visibility of oncoming traffic and potentially come into conflict with an oncoming southbound vehicle.</em></p>



<p><em>I appreciate that you may feel frustrated at this decision, however, it has been taken with road safety in mind, particularly for cyclists.&nbsp; However, I would advise that the Council remain committed to introducing contraflow cycling where it is deemed safe and will keep this area under consideration for future proposed TRO’s.</em></p>



<p><em>I trust this is of assistance at this time.</em></p>



<p><em>Yours sincerely</em></p>



<p><em>Kevin Hamilton<br>Head of Roads<br>Neighbourhoods and Sustainability&#8221;</em></p>



<p>This is sad news and yet another blow for the permeability that cycles offer for getting around in Glasgow.</p>



<h4 class="wp-block-heading">3.2: Glasgow City Council, (Ruchazie Road) Traffic Calming Scheme (OFFICIAL) and a query as to the effectiveness of these measures, survey information from GCC</h4>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="337" height="150" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/06/speed-cushions.jpg?resize=337%2C150&#038;ssl=1" alt="Speed cushions with markings" class="wp-image-2693" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/06/speed-cushions.jpg?w=337&amp;ssl=1 337w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/06/speed-cushions.jpg?resize=300%2C134&amp;ssl=1 300w" sizes="auto, (max-width: 337px) 100vw, 337px" /></figure></div>



<p>In our last <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342" target="_blank" rel="noreferrer noopener">Digest, issue 72</a>, Item 3.4, we published Glasgow City Council&#8217;s confirmation that speed cushions will be installed on Ruchazie Road and in reply we asked the question as to before and after speed checks to confirm the effectiveness of speed cushions. Here&#8217;s the response we received on 02 November:</p>



<p>&#8220;<em>Thank you for your undernoted enquiry.<br><br>I can advise that due to the circumstances caused by Covid-19, we are still awaiting the results of the “after” surveys for the traffic calming schemes that were installed towards the end of the last financial year and this financial year.<br><br>I can however provide results for other locations at which we have installed speed cushions over the past 18 months. A survey was carried out prior to the implementation of traffic calming on Sunnybank Street, between 23/04/2019 and 29/04/2019, during which time the average speed of vehicles was found to be 22mph and the 85<sup>th</sup> percentile speed was 28mph. Although this may not seem excessive, it should be noted that there is a newly built primary school on this street and a bus gate adjacent to the school was to be removed as part of the works associated with the formation of school. After the traffic calming had been implemented, a survey was carried out between 25/11/2019 and 30/11/2019 and found the average speed had dropped to 17mph and the 85<sup>th</sup> percentile speed had significantly dropped to 21mph.</em><br><br><em>A survey was also carried out prior to the implementation of traffic calming on Kingsland Drive, between 11/02/2019 and 17/02/2019, during which time the average speed of vehicles was found to be 28mph and the 85<sup>th</sup> percentile speed was 33mph. After the traffic calming had been implemented, a survey was carried out between 19/02/2020 and 25/02/2020, during which the average speed had dropped to 21mph and the 85<sup>th</sup> percentile speed had significantly dropped to 25mph.<br><br>I can advise that, should you wish, once we receive the results of the most recent surveys and have comparable “before” and “after” data available for the latest schemes, I will forward these to you.<br><br>I trust the above information is of assistance, however, should you require any further information, please contact (details removed by GoBike).</em><br><br><em><strong>Kevin Hamilton</strong><br><strong>Head of Roads</strong>, <strong>Neighbourhoods And Sustainability</strong></em>&#8220;</p>



<p>GoBike has confirmed that we wish to see the results of any further before and after tests. The results look good but we have asked for details of how they are carried out.</p>



<h4 class="wp-block-heading">3.3: East Renfrewshire Council, update on Proposed Local Development Plan 2</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="400" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/east-ren-logo.png?resize=400%2C218&#038;ssl=1" alt="East Renfrewshire Council logo" class="wp-image-12502" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/east-ren-logo.png?w=400&amp;ssl=1 400w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/east-ren-logo.png?resize=300%2C164&amp;ssl=1 300w" sizes="auto, (max-width: 400px) 100vw, 400px" /></figure>



<p>GoBike responded to the Local Development Plan 2 as reported in <a href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank" rel="noreferrer noopener">Digest 49</a>, Item 1.3 and received an initial response that was included in <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener">Digest 50</a>, Item 3.9<br>East Renfrewshire Council have now informed us our <em>&#8220;representation has not been resolved&#8221;</em> about LDP2 and so Scottish Government reporters have been appointed to examine it: </p>



<p><em>&#8220;<strong>DPEA PLAN REF NO: LDP-220-3</strong></em></p>



<p><em>The above proposed plan was submitted to Scottish Ministers on&nbsp;18 August 2020&nbsp;for examination. &nbsp;The local development plan is a document that sets out which types of development should take place where, and which areas should be protected from development.&nbsp; It also contains policies that inform the planning authority’s decisions on planning applications.</em></p>



<p><em>You had previously made a representation regarding this plan when it was consulted upon from 21 October until 13 December 2019 and Scottish Ministers have been made aware that your representation has not been resolved.&nbsp;</em></p>



<p><em>The Scottish Ministers have appointed&nbsp;Mr Alasdair Edwards MA(Hons) and Mr Malcolm Mahony BA(Hons) MRTPI&nbsp;as the reporters who will carry out the examination of the above proposed plan.&nbsp; The administration of the examination will be carried out by the Scottish Government’s Planning and Environmental Appeals Division (DPEA).</em></p>



<p><em>We have provided the reporters with a summary of the issues that we consider should be assessed at the examination, and a copy of your full representation. &nbsp;Your representation will be considered by the reporters.&nbsp;</em></p>



<p><em>Please note that additional reporters may be appointed to support the speedy delivery of the report.</em></p>



<p><em>The reporters will now commence the examination of conformity with our participation statement as required by Section 19(4) of the Town and Country Planning Scotland Act 1997 (as amended).&nbsp; To comply with Section 19(7) of the Act, the examination of the above proposed plan under Section 19(3) of the Act will not commence until the examination of conformity with the participation statement has concluded, or until four weeks from the date of the appointment of the reporters, whichever is the latter.&nbsp; Therefore the earliest date upon which the examination of issues raised in representations will commence is 19 November 2020.&nbsp;</em></p>



<p><em>A notice regarding this examination has been published in the Evening Times and Barrhead News.</em></p>



<p><em>A copy of the proposed plan will be available for public viewing on our website: <a href="http://www.eastrenfrewshire.gov.uk/ldp2">http://www.eastrenfrewshire.gov.uk/ldp2</a></em></p>



<p><em>You do not need to take any action in response to this letter.&nbsp;&nbsp;The reporters are not expected to require further information from you, but if they do DPEA will write to you specifying what is needed and how and when you should submit it.</em></p>



<p><em>Information about the examination including a summary of the issues being addressed by the&nbsp;reporters&nbsp;(known as Schedule 4 Forms), Further Information Requests and Responses, Document Lists, any Hearing and Inquiry Statements, and in due course, the Recommendations by Issue Table and the Examination Report can be found at the DPEA’s website using the link below: <br></em><a href="http://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121161;"><em>http://www.dpea.scotland.gov.uk/CaseDetails.aspx?id=121161;</em></a></p>



<p><em>Further guidance on the examination process is available from the Scottish Government’s website using the weblink below: </em><br><a href="https://beta.gov.scot/policies/planning-architecture/development-plans/"><em>https://beta.gov.scot/policies/planning-architecture/development-plans/</em></a></p>



<p><em>A guidance note that explains development plan examinations for people who have submitted representations is available at the weblink below: </em><br><a href="https://beta.gov.scot/publications/development-plan-representations-guidance/"><em>https://beta.gov.scot/publications/development-plan-representations-guidance/</em></a></p>



<p><em>If you require further information about the progress of the examination please contact Jayne Anderson ,&nbsp;Planning and Environmental Appeals, 4 The Courtyard, Callendar Business Park , Falkirk , FK1 1XR,<strong>&nbsp;</strong>or telephone 0131 244 6934, or email&nbsp;<a href="mailto:Jayne.Anderson@gov.scot" target="_blank" rel="noreferrer noopener">Jayne.Anderson@gov.scot</a></em></p>



<p><em>Please note that DPEA will be moving office with effect from Monday 16 November.&nbsp;</em></p>



<p><em>The new address will be Planning and Environmental Appeals Division, Scottish Government, Ground Floor, Hadrian House, Callendar Business Park, Callendar Road, Falkirk FK1 1XR</em></p>



<p><em>All telephone numbers and e-mail addresses will remain the same.</em></p>



<p><em>DPEA collect information if you take part in the planning process, use DPEA websites, send correspondence to DPEA or attend a webcast.&nbsp; To find out more about what information is collected, how the information is used and managed please read the&nbsp;<a target="_blank" href="https://beta.gov.scot/publications/planning-and-environmental-appeals-division-privacy-notice/" rel="noreferrer noopener">DPEA&#8217;s privacy notice</a>&nbsp;&#8211;&nbsp;<a target="_blank" href="https://beta.gov.scot/publications/planning-and-environmental-appeals-division-privacy-notice/" rel="noreferrer noopener">https://beta.gov.scot/publications/planning-and-environmental-appeals-division-privacy-notice/</a></em></p>



<p><em>Yours faithfully</em></p>



<p><em>Gillian McCarney<br>Head of Environment (Chief Planning Officer)&#8221;</em></p>



<p>We&#8217;ll update you on any further news.</p>



<h4 class="wp-block-heading">3.4 Glasgow City Council, Pollok Park planning application approved</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=525%2C394&#038;ssl=1" alt="Road in Pollok Park, Glasgow" class="wp-image-11625" width="525" height="394" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?w=2016&amp;ssl=1 2016w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>You might have seen in the press that the planning application, 20/01352/FUL, to build a new access road into the Park has now been approved. See <a rel="noreferrer noopener" href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=documents&amp;keyVal=QAZZ49EXIKO00" target="_blank">details on the City Council&#8217;s Planning website</a>.<br>In confirmation we received this email from the City Council yesterday, 09 November :</p>



<p>&#8220;<em>We are writing to let you know that the Planning Application for an Active Travel Management Plan in Pollok Country Park was approved on the 6<sup>th</sup> November 2020. The full application is available to view here (Reference Number 20/01352/FUL): <a href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?keyVal=QAZZ49EXIKO00&amp;activeTab=summary">https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?keyVal=QAZZ49EXIKO00&amp;activeTab=summary</a></em><br><br><em>The status of the application will be updated shortly.<br>Kind Regards,<br>Glasgow City Council/Glasgow Life</em>&#8220;</p>



<p>This <a href="https://www.glasgowtimes.co.uk/news/18840858.council-set-back-car-cut-park/" target="_blank" rel="noreferrer noopener">Glasgow Times article</a> reports on the forthcoming Council meeting that confirmed the decision. GoBike and one of our members are both quoted. It&#8217;s bad news: trees being removed to make way for cars in a park, of all places. Yes, we know it&#8217;s to a world-renowned museum; we just hope the private, non-blue-badge, cars are controlled and kept to the new car park at the edge of the park.</p>



<p>__________________________________________________</p>



<p>This Digest is a joint effort  by the old and a new compiler. If you would like to join our consultations team just drop an email to <a href="mailto:consultations@gobike.org" target="_blank" rel="noreferrer noopener">consultations@gobike.org</a> giving some details of your interests and/or skills in the topic.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12455</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 68, 01 September 2020: Humps all the way in Glasgow and in North Lanarkshire it&#8217;s Roads, Roads and more Roads</title>
		<link>https://www.gobike.org/consultation-digest-issue-68-01-september-2020-humps-all-the-way-in-glasgow-and-in-north-lanarkshire-its-roads-roads-and-more-roads-11968</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 01 Sep 2020 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Liveable Neighbourhoods]]></category>
		<category><![CDATA[Living Streets]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[pavement parking]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[UK government]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=11968</guid>

					<description><![CDATA[Glasgow City Council have found 3 more areas that don&#8217;t yet have speed cushions &#8211; why can&#8217;t they wait for the Liveable Neighbourhoods Plan to be adopted? GoBike agrees that speeding motor traffic is a menace but our view is that the solution is bigger than speed cushions, as we explain in Section 1. North &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-68-01-september-2020-humps-all-the-way-in-glasgow-and-in-north-lanarkshire-its-roads-roads-and-more-roads-11968" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 68, 01 September 2020: Humps all the way in Glasgow and in North Lanarkshire it&#8217;s Roads, Roads and more Roads"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Glasgow City Council have found 3 more areas that don&#8217;t yet have speed cushions &#8211; why can&#8217;t they wait for the Liveable Neighbourhoods Plan to be adopted? GoBike agrees that speeding motor traffic is a menace but our view is that the solution is bigger than speed cushions, as we explain in Section 1. <br>North Lanarkshire have found millions of pounds to spend on roads to Ravenscraig but not a cycle lane to be seen, see Item 3.3.<br>Better news: there&#8217;s still time to support Living Streets for their excellent campaign to get parked cars off our pavements and do please respond to the online survey on the Town Centre Action Plan.</p>



<span id="more-11968"></span>



<h3 class="wp-block-heading"><strong>Contents</strong></h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list">
<li>**NEW** SCVO charity awards, vote for Living Streets Pavement Parking Campaign online, closes 04 September</li>



<li>Glasgow City Council, Hermiston Road (Shettleston) Traffic Calming Scheme, closes 08 September</li>



<li>Glasgow City Council, Muirhead Road (Baillieston) Traffic Calming Scheme, closes 09 September</li>



<li>Glasgow City Council, Newlands Park Area Traffic Calming Scheme, closes 09 September</li>



<li>South Lanarkshire Council, Hamilton, Abercorn Drive and Chestnut Crescent, Traffic Calming Scheme, closes 11 September</li>



<li>**NEW** Glasgow City Council, Auchinleck Avenue, Robroyston, Traffic Calming Scheme, closes 17 September</li>



<li>**NEW** Glasgow City Council, Maxwell Drive, Pollokshields, Traffic Calming Scheme, closes 17 September</li>



<li>**NEW** Glasgow City Council, Maxwell Park Traffic Calming Scheme, closes 22 September<br>**Additional Item: Glasgow City Council response on Traffic Calming**</li>



<li>Scottish Government, Town Centre Action Plan Expert Review Group, online survey, closes 30 September</li>



<li>UK Department of Transport, Review of the Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</li>
</ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list">
<li>South Lanarkshire Council, East Kilbride cycling routes </li>



<li>Glasgow City Council, Transport Strategy, City Centre Transformation Strategy and Liveable Neighbourhoods Plan consultation commences 21 September</li>



<li>North Lanarkshire Council, new roads to Ravenscraig</li>
</ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list">
<li>GoBike Digest Survey results</li>



<li>Glasgow City Council, Helensburgh Drive Traffic Calming, 1 year on</li>



<li>North Lanarkshire Council, New Road Plans on the Agenda!</li>



<li>East Dunbartonshire Council, Local Development Plan Newsletter No 58</li>



<li>Glasgow City Council, Renewal of Planning Consent, Glasgow Harbour, initial response</li>



<li>Scottish Government, Response to Town Centre Action Plan Review submission</li>



<li>Glasgow City Council, Govan Partick Strategic Development Framework consultation update</li>



<li>Glasgow City Council, Draft River Strategic Development Framework consultation update</li>
</ol>



<h3 class="wp-block-heading"><strong>Section 1: Current Consultations, in date order for responses</strong></h3>



<h4 class="wp-block-heading">1.1 **NEW** SCVO charity awards, vote for Living Streets Pavement Parking Campaign online, closes this Friday, 04 September</h4>


<div class="wp-block-image">
<figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="317" height="448" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Living-Streets_LOGO.png?resize=317%2C448&#038;ssl=1" alt="" class="wp-image-11974" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Living-Streets_LOGO.png?w=317&amp;ssl=1 317w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Living-Streets_LOGO.png?resize=212%2C300&amp;ssl=1 212w" sizes="auto, (max-width: 317px) 100vw, 317px" /></figure>
</div>


<p><br><br><br><br><br>GoBike supported moves to ban pavement parking and, as we reported in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-65-21-july-2020-whats-happened-to-pavement-parking-proposals-approved-but-not-enacted-plus-a-request-to-contribute-to-the-streets-for-all-glasgow-commonplace-map-and-m-11719" target="_blank" rel="noreferrer noopener">Digest 65</a>, Item 3.4, we are bitterly disappointed that the new legislation has not yet come into effect. Living Streets played a pivotal role in the campaign for the ban. Tricia is a personal member of Living Streets and here&#8217;s the email sent out to the organisation&#8217;s members on 17 August:</p>



<h1 class="wp-block-heading">&#8220;<em>Living Streets Scotland&#8217;s<br>pavement parking&nbsp;campaign has been nominated for the SCVO charity awards</em></h1>



<p><em>Dear member,<br><br>Living Streets is thrilled to have been nominated for the SCVO charity awards <a href="https://e-activist.com/page/email/click/1719/4864523?email=97c6GsmKVLuTjgSbKmYgG97cBTh3KwkR&amp;campid=2yLoymjt7hKZkArzVWMSmA==">for our work on pavement parking in Scotland</a>.<br><br>The ban in October 2019 was the culmination of over a decade of campaigning by Living Streets Scotland and disability charities,&nbsp;and&nbsp;<strong>we could not have done it without your&nbsp;support &#8211; thank you!</strong><br><br>The Scottish Charity Awards recognise the best of the voluntary sector in Scotland, and our nomination recognises the 10-year campaign led by Living Streets and the Responsible Parking Campaign.&nbsp;<br><br>Now we need your votes!<br><strong>Members of the public can have their say and vote for their favourite campaign.&nbsp;</strong></em></p>



<p><a href="https://scvo.org.uk/scottish-charity-awards/finalists-2020/cracking-campaign/pavement-parking-ban-living-streets-scotland" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">VOTE FOR LIVING STREETS</a></p>



<div class="wp-block-group"><div class="wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow">
<h4 class="wp-block-heading">items 1.2 &#8211; 1.8 Traffic Calming by the use of speed cushions</h4>



<p>The following 7 items, the first 3 from Glasgow City Council followed by 1 from South Lanarkshire Council were all featured in our last Digest, <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Issue 67</a>, Section 1. The last 3 are new this issue and are all from Glasgow City Council. With the 5 schemes that first appeared in Digest 66, we have now, in August, received 11 speed cushion schemes from Glasgow City Council.<br><br>GoBike has a proud record of supporting moves for 20mph speed limits in urban centres and residential areas and many of us have experienced scares and injuries caused by motor vehicle drivers exceeding speed limits and otherwise driving without due care and attention towards other road users.<br><br>However, the solution is not one that a single agency, such as the Neighbourhoods &amp; Sustainability section of Glasgow City Council can solve. What is needed is a nation-wide response that addresses:</p>



<ul class="wp-block-list">
<li>the physical layout of our streets</li>



<li>limits on access to our streets for motor vehicles, particularly for through journeys</li>



<li>modal filters that allow through access for people walking and cycling</li>



<li>filters that allow through access for buses, refuse lorries and emergency vehicles as appropriate to the location</li>



<li>detection and appraisal of motor drivers who exceed speed limits and/or who otherwise drive without due care and attention to traffic information and to other road users</li>



<li>penalties for motor drivers that are appropriate to the offence committed</li>



<li>retesting for any motor driver who loses their driving licence further to a road traffic offence</li>



<li>a change in public attitudes towards poor driving behaviour such as the change in attitude towards smoking in public buildings that occurred further to legal changes in 2006</li>
</ul>
</div></div>



<p>In the meantime, it is clear that speed cushions are not an effective measure:</p>



<ul class="wp-block-list">
<li>they either push bikes into the gutter or into the centre of the road rather than allowing riders to maintain a primary position on the road</li>



<li>many current vehicles are so wide that, even as larger and larger speed cushions are used, they can straddle the cushions necessitating only a minimal reduction in speed, if any</li>



<li>they do not prevent motor drivers using residential streets as rat runs</li>



<li>they deteriorate, as shown on the feature photo for this Digest and again in Item 3.2 below</li>



<li>we are not aware of any evidence that speed cushions reduce maximum speeds or make roads safer for people to cross them</li>
</ul>



<p>The points above plus the prospect of a Liveable Neighbourhoods Plan for Glasgow form the basis of <a href="https://www.gobike.org/wp-content/uploads/2020/09/GoBike-Hermiston-Muirhead-Newlands-Park-Auchinleck-Maxwell-Drive-and-Park-traffic-calming-response-010920.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">this letter</a> that GoBike has just sent to Glasgow City Council in respect of the 6 schemes and the letter sent to South Lanarkshire Council featured in Item 1.5 below.</p>



<h4 class="wp-block-heading">1.2 Glasgow City Council, Hermiston Road (Shettleston) Traffic Calming Scheme, closes 08 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="244" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-11886" style="width:673px;height:313px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?w=1257&amp;ssl=1 1257w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p> This was included as Item 1.10 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a> and given that Hermiston Road is just 2 streets to the west of Greenfield Road, also proposed for the speed cushion treatment, see Item 1.8 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a>, which, in turn runs parallel to the main road, Springboig Road, it seems sensible to address this area as  a &#8220;liveable neighbourhood&#8221;, see Item 2.2 below. Both roads are being used as alternatives to Springboig Road and we suggest that a series of modal filters be installed to prevent motor traffic using the area as a short cut.</p>



<h4 class="wp-block-heading">1.3 Glasgow City Council, Muirhead Road (Baillieston) Traffic Calming Scheme, closes 09 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11897" style="width:672px;height:349px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Muirhead Road featured as Item 1.11 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a> and this is not as obvious a rat run. However, if the road were closed to through motor traffic, apart from buses and emergency vehicles, at the railway station, then the road would be quieter. Motor traffic would still have the option of, north of the railway, access via Glasgow Road / Main Street to Glasgow and the motorway system and south of the railway, where there is a lot of residential development, access to Glasgow and the motorway system via Boghall Road. Significant amounts of public money have been spent on motorway construction in this area and motor traffic should be directed towards it.</p>



<h4 class="wp-block-heading">1.4 Glasgow City Council, Newlands Park Area Traffic Calming Scheme, closes 09 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="396" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=525%2C396&#038;ssl=1" alt="" class="wp-image-11904" style="width:673px;height:508px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=600%2C453&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=300%2C226&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?w=611&amp;ssl=1 611w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The Newlands Park scheme was Item 1.12 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a> and is presumably proposed to stop vehicles speeding as they try to cut through from Merrylee Road to Kilmarnock Road. The roads being proposed for speed cushion treatment are Beverley Road, Calderwood Road, Carlaverock Road and Lubnaig Road. This is an affluent area so probably many of the motors will be large enough to glide over the cushions with little, if any, discomfort to the passengers. Reducing traffic overall with a series of modal filters would be a far more fitting solution.</p>



<h4 class="wp-block-heading">1.5 South Lanarkshire Council, Hamilton, Abercorn Drive and Chestnut Crescent, Traffic Calming Scheme, closes 11 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11936" style="width:673px;height:350px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?w=650&amp;ssl=1 650w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a> featured this proposal as Item 1.13 and here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://www.southlanarkshireview.scot/news/article/687/Have_your_say_on_traffic_management_plan" target="_blank" rel="noreferrer noopener">link</a> to the details. Last October in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank" rel="noreferrer noopener">Digest 46</a> we publicised proposals for a modal filter on Silvertonhill Avenue, which we very much supported. However, it seems that the residents do not wish to lose their freedom for uncontrolled road use and the current proposals are for speed cushions and parking restrictions.<br>The <a aria-label="undefined (opens in a new tab)" href="https://wh1.snapsurveys.com/s.asp?k=159490783460" target="_blank" rel="noreferrer noopener">survey</a> is, apparently, limited to local residents, but if you do wish to comment just enter the street you live in and hope to proceed.</p>



<p>Here is the <a href="https://www.gobike.org/wp-content/uploads/2020/09/GoBike-Abercorn-Drive-Chestnut-Avenue-concerns-010920.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">letter of concerned objection</a> that GoBike has submitted today.</p>



<h4 class="wp-block-heading">1.6 **NEW** Glasgow City Council, Auchinleck Avenue Traffic Calming Scheme, closes 17 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="251" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Saughs-Robroyston-map.png?resize=525%2C251&#038;ssl=1" alt="" class="wp-image-11976" style="width:675px;height:323px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Saughs-Robroyston-map.png?resize=600%2C287&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Saughs-Robroyston-map.png?resize=300%2C144&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Saughs-Robroyston-map.png?w=1319&amp;ssl=1 1319w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Saughs-Robroyston-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This area of Robroyston is just to the north of the M80 and the shopping area, with carparks of course, which includes the Robroyston Asda. A vast amount of public money has been spent on the roads in this area, not just the M80, but all the connecting roads such as the new roundabout and all the roads to the south of the motorway, where many new houses are being built. There&#8217;s the new station too, but are there cycle lanes to it? Shared footways south of the motorway and nothing to the north of the motorway, which isn&#8217;t really the way to encourage active travel. It&#8217;s a bit scary on the bike round here.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="255" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-view.png?resize=525%2C255&#038;ssl=1" alt="" class="wp-image-11977" style="width:677px;height:328px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-view.png?resize=600%2C291&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-view.png?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-view.png?w=1315&amp;ssl=1 1315w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Auchinleck-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Even with all the new roads, drivers still want a short cut and are cutting through this residential area. Surely the obvious answer is to get them to use these expensive roads by putting modal filters on these 2 roads?</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="259" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Saughs-view.png?resize=525%2C259&#038;ssl=1" alt="" class="wp-image-11978" style="width:677px;height:334px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Saughs-view.png?resize=600%2C296&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Saughs-view.png?resize=300%2C148&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Saughs-view.png?w=1298&amp;ssl=1 1298w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Saughs-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>However, the City Council propose speed cushions and here&#8217;s the specific detail from their email of 20 August:</p>



<p>&#8220;<em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list">
<li><em>7 sets of 3 (differing width) speed cushions</em></li>



<li><em>9 sets of 2 (differing width) speed cushions</em></li>



<li><em>The supply and installation of 32 bollards</em></li>
</ul>



<p><em>Please provide any comments you wish to make on these proposals within <strong>28 days.</strong>&nbsp;<br>Please reply directly to <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a>.</em>&#8220;</p>



<p>The 6 plans attached are:<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Avenue-TC-Proposals-A1-Titlebox-P-P.pdf" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals</a><br><a aria-label="undefined (opens in a new tab)" href="http://Auchinleck-Avenue-TC-Proposals-Section-1-Btwn-roundabout-and-north-of-Cumnock-Rd" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals-Section-1-Btwn-roundabout-and-north-of-Cumnock-Rd</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Avenue-TC-Proposals-Section-2-Btwn-north-of-Cumnock-Rd-and-east-of-Pathead-Gardens.pdf" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals-Section-2-Btwn-north-of-Cumnock-Rd-and-east-of-Pathead-Gardens</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Avenue-TC-Proposals-Section-3-Btwn-west-of-Glenbuck-Drive-and-north-of-Saughs-Avenue.pdf" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals-Section-3-Btwn-west-of-Glenbuck-Drive-and-north-of-Saughs-Avenue</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Avenue-TC-Proposals-Section-4-Btwn-Saughs-Avenue-and-south-of-Auchinleck-Avenue.pdf" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals-Section-4-Btwn-Saughs-Avenue-and-south-of-Auchinleck-Avenue</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Auchinleck-Avenue-TC-Proposals-Section-5-Saughs-Avenue.pdf" target="_blank" rel="noreferrer noopener">Auchinleck-Avenue-TC-Proposals-Section-5-Saughs-Avenue</a></p>



<p>The cushion spacing varies from a kerbside gap of 0.5 to 1.0m, making it tricky to maintain a primary position of about 1.0m from the kerb without going over the cushions. 2 modal filters, one on the north and one on the south part of the Auchinleck Avenue loop would be much less expensive and time consuming to install and might even encourage residents to cycle to Asda!</p>



<h4 class="wp-block-heading">1.7 **NEW** Glasgow City Council, Maxwell Drive Traffic Calming Scheme, closes 17 September</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11985" style="width:675px;height:351px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-map.png?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-map.png?resize=600%2C312&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Maxwell Drive in Pollokshields, Glasgow, is a wide road and, if you look carefully at the photograph below, it&#8217;s just possible to see a cycle lane painted on the road &#8211; it&#8217;s under the parked cars, so no surprise there!</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-view.png?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-11986" style="width:677px;height:308px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-view.png?resize=600%2C273&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-view.png?resize=300%2C136&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-view.png?w=1283&amp;ssl=1 1283w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The email from the City Council, received on 20 August, contains this critical information:</p>



<p>&#8220;<em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list">
<li><em>2 sets of 3 x 2m wide cushions</em></li>



<li><em>2 sets of 4 x 2m wide cushions</em></li>



<li><em>4 sets of 3 x 1.9m wide cushions</em></li>



<li><em>1 set of 4 x 1.9m wide cushions</em></li>



<li><em>The supply and installation of 22 bollards</em></li>
</ul>



<p><em>Please provide any comments you wish to make on these proposals within <strong>28 days.</strong>&nbsp;&nbsp;&nbsp;&nbsp;<br>Please reply directly to <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a></em>.&#8221;</p>



<p>The plans attached to the email are:<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-TC-proposals-Section-1-Btwn-St-Andrews-Drive-and-Maxwell-Grove.pdf" target="_blank" rel="noreferrer noopener">Maxwell-Drive-TC-proposals-Section-1-Btwn-St-Andrews-Drive-and-Maxwell-Grove</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-TC-proposals-Section-2-Between-Maxwell-Gardens-and-east-of-Woodrow-Road.pdf" target="_blank" rel="noreferrer noopener">Maxwell-Drive-TC-proposals-Section-2-Between-Maxwell-Gardens-and-east-of-Woodrow-Road</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-TC-proposals-Section-3-Btwn-west-of-Woodrow-Rd-and-east-of-Woodrow-Pl.pdf" target="_blank" rel="noreferrer noopener">Maxwell-Drive-TC-proposals-Section-3-Btwn-west-of-Woodrow-Rd-and-east-of-Woodrow-Pl</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-TC-Proposals-Section-4-Btwn-number-106-and-number-136.pdf" target="_blank" rel="noreferrer noopener">Maxwell-Drive-TC-Proposals-Section-4-Btwn-number-106-and-number-136</a><br><a href="https://www.gobike.org/wp-content/uploads/2020/08/Maxwell-Drive-TC-proposals-Section-5-Btwn-number-152-and-Nithsdale-Rd.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">Maxwell-Drive-TC-proposals-Section-5-Btwn-number-152-and-Nithsdale-Rd</a></p>



<p>Reinstating the cycle lanes would be a start here and, at a decent width with any parking on the outside, the width of the road would be reduced such that traffic would move more slowly. With separated cycle lanes people walking or cycling would have some protection from the motor traffic thus making the area much safer.<br>Unfortunately, the plans fail to show that there have ever been cycle lanes here and the kerb to cushion dimensions vary between 0.6 and 1.0m width.</p>



<h4 class="wp-block-heading">1.8 **NEW** Glasgow City Council, Maxwell Park Traffic Calming Scheme, closes 22 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="229" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=525%2C229&#038;ssl=1" alt="" class="wp-image-11993" style="width:675px;height:295px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=600%2C262&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This proposal covers Fotheringay Road from Darnley Road west to Springkell Avenue, Springkell Avenue from the railway south to Titwood Road and Dolphin Road from Fotheringay Road to Titwood Road.</p>



<p>The City Council&#8217;s email arrived on 25 August and here is the critical section of it:</p>



<p>&#8220;<em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list">
<li><em>5 sets of 3 x 2m wide, 75mm high, speed cushions on Dolphin Road,</em></li>



<li><em>6 sets of 3 x 2m wide, 75mm high, speed cushions on Fotheringay Road,</em></li>



<li><em>11 sets of 3x 2m wide, 75mm high, speed cushions on Springkell Avenue</em></li>



<li><em>The installation of bollards beside the proposed speed cushions.</em></li>
</ul>



<p><em>Please provide any comments you wish to make on these proposals within <strong>28 days.</strong><br>Please reply directly to <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a></em>&#8220;</p>



<p>Here are the relevant plans:<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Dolphin-Road.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Dolphin-Road</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-1.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-2.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-2</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-3.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-3</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-4.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Fotheringay-Road-section-</a>4<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Springkell-Avenue-section-1.pdf" target="_blank" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Springkell-Avenue-section-1</a><br><a href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.96-Maxwell-Park-proposals-Springkell-Avenue-section-2.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">RS.19.96-Maxwell-Park-proposals-Springkell-Avenue-section-2</a></p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="255" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Fotheringay-Road-view.png?resize=525%2C255&#038;ssl=1" alt="" class="wp-image-12004" style="width:674px;height:327px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Fotheringay-Road-view.png?resize=600%2C291&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Fotheringay-Road-view.png?resize=300%2C146&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Fotheringay-Road-view.png?w=1207&amp;ssl=1 1207w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Fotheringay-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>From the plans it may be seen that the kerb to cushion gap varies from 0.7m to 1.0m, but this width, as may be seen from the view of Fotheringay Road above, is no use for cycling if you have to bump over setts. The alternatives are to either cycle 3m out from the kerb, or to cycle on the footway (tut, tut) to avoid the cushions.</p>



<p>GoBike member, John, who lives in the area and who has young children, would by far prefer to see traffic reduced by a series of modal filters and he refers to the speed cushions on nearby Terregles Avenue which are starting to break up. Some of you will know that Springkell Avenue was closed to motor traffic for quite some time when the railway bridge was reconstructed and Dolphin Road was stopped up for a year during the Shieldhall Tunnel works and John reports that the area was very pleasant at the time with only a modicum of motor traffic.</p>



<h4 class="wp-block-heading">Additional Item: Glasgow City Council response on Traffic Calming</h4>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a>, in the general item 1.4 to 1.8, we published <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/GoBike-Traffic-Calming-response-Gartocher-Prospecthill-Ladyloan-Warriston-and-Greenfield-180820.pdf" target="_blank" rel="noreferrer noopener">this letter</a> in response to 5 traffic calming schemes. Today, 01 September, we have received this very disappointing response:</p>



<p><em><strong>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON, HEAD OF ROADS, NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Ms Fort,<br>Thank you for your undernoted enquiry.<br><br>I can advise that this section within the Council is focused on reducing injury accidents throughout the city. The section has limited funding and resources available to implement traffic calming schemes and in order to make sure these resources are directed at the locations with the greatest potential for casualty reduction, a site risk assessment is undertaken for each request. This process assesses the location against criteria including the history of injury accidents, measured vehicle speeds and the presence of any local amenities such as being close to a nearby school or nursery.</em><br><br><em>I can further advise that in our experience, cushions with a width of 1800mm or less have little impact in reducing the speed of vehicles travelling over them. Previously, this has led to complaints by local road users following the installation of cushions as they consider them to be ineffective. It is therefore our intention to propose cushions of no less than 1900mm and no greater than 2000m for all future traffic calming schemes, depending on the available width of the carriageway.<br><br>I can also advise that the Local Transport Note for Traffic Calming (LTN 1/07), which gives guidance on the design, effectiveness and installation of traffic calming measures, states that “Distances between cushions, or cushions and the kerb, should not generally exceed 1200mm, with 1000mm as an ideal maximum. These dimensions are designed to deter drivers of small vehicles from attempting to drive in the gap.” Whilst we would always aim for 1000mm, the gap between cushions and the kerb is likely to differ at each location depending on the available width of the carriageway.</em><br><br><em>Whilst I appreciate your concerns regarding our proposed traffic calming schemes and note your suggestions for each location, I can advise that your suggestions would involve the re-design of roads, introduction of traffic signals and the promotion of Traffic Regulation Orders as well as a host of other measures. The provision of such measures would involve considerable costs and resources, both of which are unavailable to this section, and I am unable to consider their introduction at this time.<br><br>I trust that this clarifies the current situation.<br><br>Kevin Hamilton<br>Head of Roads, Neighbourhoods And Sustainability</em></p>



<p>This response is disappointing, not simply because it ignores some of our arguments, not simply because this department of Glasgow City Council does not have the funds to make thorough improvements to the city but also because the Scottish Government et al are still spending large amounts of public money, ie our money, on such private motor dominated schemes as the dualling of the A9 and the City Deal projects that North Lanarkshire is so keen on.</p>



<h4 class="wp-block-heading">1.9 Scottish Government, Town Centre Action Plan Expert Review Group, online survey, closes 30 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="283" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=525%2C283&#038;ssl=1" alt="" class="wp-image-11817" style="width:673px;height:362px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=600%2C323&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?w=650&amp;ssl=1 650w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>No doubt you have seen increased use of public space during lockdown, not just with more people cycling but exercise classes being held in public parks and, if we are very lucky, or perhaps with good planning and management, we can get this to continue.</p>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66</a>, Item 1.4 we gave details of this survey and in <a href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">Digest 67</a>, Item 1.3, was the GoBike letter in response to the questions posed on the <a aria-label="undefined (opens in a new tab)" href="https://lovelocal.scot/town-centre-action-plan-expert-review-group/" target="_blank" rel="noreferrer noopener">website</a>, which had to be submitted by 21 August. Also on the <a aria-label="undefined (opens in a new tab)" href="https://lovelocal.scot/town-centre-action-plan-expert-review-group/" target="_blank" rel="noreferrer noopener">website</a> is a link to a short, easy-to-do survey, where you may support your views for people-friendly urban centres. Do please respond to it (I have already done so, on a personal basis, and going back to the site tells me so, but the survey is easy to find on the opening page of the website). </p>



<h4 class="wp-block-heading">1.10 UK Department of Transport, Review of the Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</h4>


<div class="wp-block-image">
<figure class="alignleft size-medium"><img data-recalc-dims="1" loading="lazy" decoding="async" width="162" height="300" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=162%2C300&#038;ssl=1" alt="" class="wp-image-11846" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=162%2C300&amp;ssl=1 162w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=323%2C600&amp;ssl=1 323w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?w=600&amp;ssl=1 600w" sizes="auto, (max-width: 162px) 100vw, 162px" /></figure>
</div>


<p><br><br><br>We are working away on our response to this consultation and hope to be able to publish it later this month.</p>



<p></p>



<p></p>



<p></p>



<p></p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading">2.1 South Lanarkshire Council, East Kilbride cycling routes</h4>



<p>GoBike member, Derek, attended the South Lanarkshire Cycling Partnership meeting on 24 August and reports that segregated cycle lanes are to be consulted on for East Kilbride. There are no details as yet, but as soon as we hear we will let you know.</p>



<h4 class="wp-block-heading">2.2 Glasgow City Council, Transport Strategy, City Centre Transformation Strategy and Liveable Neighbourhoods Plan consultation commences 21 September</h4>


<div class="wp-block-image">
<figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="140" height="140" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/On-Bikes.png?resize=140%2C140&#038;ssl=1" alt="" class="wp-image-11728" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/On-Bikes.png?w=140&amp;ssl=1 140w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/On-Bikes.png?resize=100%2C100&amp;ssl=1 100w" sizes="auto, (max-width: 140px) 100vw, 140px" /></figure>
</div>


<p><a aria-label="undefined (opens in a new tab)" href="https://ayecycleglasgow.org.uk/partner/on-bikes/" target="_blank" rel="noreferrer noopener">On Bikes</a>, based in the north-east of Glasgow, recently held an event at which a Sustrans officer, currently embedded with Glasgow City Council, told the audience that consultation on the City Council&#8217;s Transport Strategy, City Centre Transformation Strategy and Liveable Neighbourhoods Plan would commence on 21 September and will last for 6 weeks. GoBike will be looking out for these and will report back in the Digest.</p>



<p>All 3 are about &#8220;prioritising people over traffic&#8221; but what is the Liveable Neighbourhoods Plan? It was reported on in this <a aria-label="undefined (opens in a new tab)" href="https://www.glasgow.gov.uk/councillorsandcommittees/viewSelectedDocument.asp?c=P62AFQDNDXT1NTDXDX" target="_blank" rel="noreferrer noopener">document</a> from the City Council&#8217;s City Administration Committee and the pertinent information is on page 4 in sections 3.8 and 3.9. Here they are:</p>



<p>&#8220;<em>3.8  The Liveable Neighbourhoods Plan (LNP) for Glasgow aims to reduce the city’s dependency on cars and make walking, cycling and public transport the first choice. It is essential that our residents benefit from safer, quieter streets that facilitate play, walking and cycling. Through a place-based approach, the LNP will help to limit the city’s contribution to climate change and develop an inclusive network of accessible and revitalised neighbourhoods designed for the benefit of all, with integrated green infrastructure and enhanced public spaces.</em></p>



<p><em>3.9 This will be achieved through a variety of physical interventions and behavioural change measures including filtered permeability, traffic reduction around schools, improvements for walking and cycling, secure bike storage and management of residential parking. Through collaborative and purposeful engagement, the LNP will transform streets and neighbourhoods into more pleasant, safe and attractive environments with noise and air pollution being tackled through measures that encourage active travel, helping to reduce<br>inactivity and ultimately improve public health. Progress towards making sure our neighbourhoods are more protective, comfortable, and enjoyable for people spending time there will be measured through inclusive mechanisms such as the Place Standard Too</em>&#8220;</p>



<p>It sounds wonderful, doesn&#8217;t it? The cynic might ask whether the rush to get all the speed cushions in is to clear a shed load of them before the enlightened thinking comes into play. The 2 Strategies are detailed in the same document.</p>



<h4 class="wp-block-heading">2.3 North Lanarkshire Council, new roads to Ravenscraig</h4>



<p>See item 3.3 below for consultation details.</p>



<h3 class="wp-block-heading"><strong>Section 3: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading"><strong> </strong>3.1 GoBike Digest Survey results</h4>



<p>Thank you to everyone who took the time to complete our recent Digest survey. Overall people appreciate the Digest, and recognise its value. Not surprisingly people expressed particular interest in consultations in their own area, and would welcome template responses to help them respond more quickly to consultations. Some respondents find the Digest rather lengthy, but again recognise this might be due to the number of consultations.<br>Many apologies &#8211; this Digest is particularly long, so thank you for reading this far!</p>



<p><strong>Please do get in touch with us via <a aria-label="undefined (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank" rel="noreferrer noopener">consultations@gobike.org</a>, if you were one of the respondents who said they&#8217;d possibly be interested in helping to produce the Digest or respond to the consultations (which most of you did &#8211; which is great!)</strong> <br><br>Tricia, the current author of the Digest, is standing down from this role in November, and we are looking for several GoBike members to collectively keep the Digest going. Whether you responded to the survey or not please get in touch via <a aria-label="undefined (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank" rel="noreferrer noopener">consultations@gobike.org</a> if you are interested in being involved &#8211; and for all those interested we will arrange a zoom call to outline the different roles/pieces of work involved in creating the Digest &#8211; we look forward to hearing from you. (The survey was completely anonymous, so we don&#8217;t know who you are!) </p>



<p>If you are looking for a quick way to respond to consultations, GoBike responds on behalf of its members (and we hope we are getting it right!) So GoBike&#8217;s letters are your letters and you may either simply email the contact address and say that you agree with and  support the GoBike letter of (date) or attach a copy of the letter to your response.</p>



<h4 class="wp-block-heading">3.2 Glasgow City Council, Helensburgh Drive Traffic Calming, 1 year on</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="230" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?resize=525%2C230&#038;ssl=1" alt="" class="wp-image-8978" style="width:673px;height:295px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?resize=600%2C263&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/08/Helensburgh-Drive.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-42-03-september-2019-we-take-the-hump-in-a-tale-of-two-cities-8966" target="_blank" rel="noreferrer noopener">Digest 42</a>, issued 03 September 2019, Item 1.7, we reported on proposals for traffic calming on Helensburgh Drive, Jordanhill Drive, Ryvra Road and Seggielea Road, the leafy area to the west of the High School of Glasgow and north of Jordanhill School. The view above, of Helensburgh Drive clearly shows the setts in the gutter (the new cycling zone for people not willing to cycle over cushions, in the middle of the road or on the footway). Here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/09/GoBike-Helensburghl-Drive-concerns-Letter-020919.pdf" target="_blank" rel="noreferrer noopener">letter</a> that GoBike submitted to express our concerns and to suggest modal filters on 02 September last year, ie in the speed cushion 2019 season (August and September being the season)!</p>



<p>GoBike member Caroline, who lives in the area, has been in touch to say that speed cushions were indeed placed on these roads at the beginning of this year and they are already breaking up.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Jordanhill-speed-cushions-1.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-12005" style="width:674px;height:506px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Jordanhill-speed-cushions-1.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Jordanhill-speed-cushions-1.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Jordanhill-speed-cushions-1.jpg?w=640&amp;ssl=1 640w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>She went on to comment &#8220;<em>Considering all of the SUVs in the area a majority of drivers simply sail over them without having to curb their speed at all. Also what are they using as surface dressing, weetabix? It’s eroded already.&nbsp; Unsure why they didn’t use modal filters to curb rat runners &amp; slow down the local racers</em>.&#8221;&nbsp;</p>



<p>Roll on Liveable Neighbourhoods!</p>



<h4 class="wp-block-heading">3.3 North Lanarkshire Council, New Road Plans on the Agenda!</h4>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/content.govdelivery.com/attachments/fancy_images/UKNLC/2020/08/3608757/cc-2020-00023-city-deal-header-template-600px-x-150_original.jpg?w=525&#038;ssl=1" alt="City Deal Header" style="width:677px;height:169px"/></figure>



<p>An email notice on 18 August tells us:</p>



<h1 class="wp-block-heading">&#8220;<em>Ravenscraig road plans on the agenda</em>&nbsp;</h1>



<p><em>Plans for new roads and improvements to open up access to the Ravenscraig regeneration site will be considered by councillors this month.<br><br>Our <a href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDEsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMDA4MTkuMjU4NTM2MDEiLCJ1cmwiOiJodHRwczovL21hcnMubm9ydGhsYW5hcmtzaGlyZS5nb3YudWsvZWdlbmRhL2ltYWdlcy9hdHQ5NDI5NS5wZGYifQ.FlgwrQNDX-dfo8kfsiUHYpaEqnkxEfcNFFtwNJmc9nk/s/946610161/br/82550420995-l" target="_blank" rel="noreferrer noopener">Enterprise and Growth Committee</a> will hear an update on the design and construction of the £127.2 million <a href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDIsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMDA4MTkuMjU4NTM2MDEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zMzUyNSJ9.fHw8uC-T-kVGZUx1-mesLcoi0I-Q6dskmvUCQ3Jahi8/s/946610161/br/82550420995-l" target="_blank" rel="noreferrer noopener">Ravenscraig Access Infrastructure project</a>.<br><br>The project provides new and improved transport infrastructure to connect Ravenscraig north to the M8 and south to Motherwell and the M74.<br><br>The four elements of the project are:</em></p>



<ul class="wp-block-list">
<li><em>a new dual carriageway from the Ravenscraig Regional Sports Facility to Motherwell, crossing the west coast main line railway;</em></li>



<li><em>a new roundabout with traffic signals at Airbles Road and Windmillhill Street, connecting to the dual carriageway;</em></li>



<li><em>completion of the dualling of Airbles Road; and</em></li>



<li><em>the dualling of the A723 from Ravenscraig to the M8.</em></li>
</ul>



<p><em>It is part of the council’s <a href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDMsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMDA4MTkuMjU4NTM2MDEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zMTkwMSJ9.xAxddzHuY_z7-MA-eTSmOReUu4P4cLqjKJZcL5vbUek/s/946610161/br/82550420995-l" target="_blank" rel="noreferrer noopener">Glasgow City Region City Deal</a> programme to connect the main motorway networks.<br><br>The cost of the council’s Ravenscraig Access Infrastructure project is £127.2 million, including £71.2m for the connection to Motherwell and the M74 and £56m for dualling the existing A723 from Ravenscraig to the M8 at Newhouse.<br><br>The cost of the project are supported by the Glasgow City Region City Deal, providing £61.9 million, with £65.3 million being provided from the council over six years, from 2020 to 2026.</em><br><br><em>The first construction works will be creating the west coast main line crossing which is anticipated to take place in 2022, with construction of the new road to Ravenscraig and roundabout starting in 2023. Dualling of the A723 is planned to begin in 2023/24 and the work on Airbles Road in 2024/25</em>.&#8221;</p>



<p>GoBike has not been made aware of any public consultation on these plans but GoBike member, Derek, has sent further information with a link to <a aria-label="undefined (opens in a new tab)" href="https://www.northlanarkshire.gov.uk/index.aspx?articleid=33525" target="_blank" rel="noreferrer noopener">this page</a> on the North Lanarkshire Council website and GoBike has now asked to be notified when detailed consultations go live.<br>It&#8217;s likely that the junction at the foot of Airbles Road, where it meets Hamilton Road will be popular with motor users as tailbacks are common at this pinch point. There is to be a large roundabout on Windmillhill Street just outside the Civic Centre and the Airbles Road Centre (community hospital), which won&#8217;t make walking or cycling to either of the places any easier.<br>All these new roads could have segregated cycle tracks, if the will was there, but we aren&#8217;t holding our breath.</p>



<h4 class="wp-block-heading">3.4 East Dunbartonshire Council, Local Development Plan Newsletter No 58</h4>



<p>Here&#8217;s the latest <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/LDP-Newsletter-58-Aug-2020.pdf" target="_blank" rel="noreferrer noopener">Newsletter</a> from EDC, the second to be published in August, which we received on 21 August.</p>



<h4 class="wp-block-heading">3.5 Glasgow City Council, Renewal of Planning Consent, Glasgow Harbour, initial response</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="349" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=525%2C349&#038;ssl=1" alt="" class="wp-image-11930" style="width:677px;height:450px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=600%2C399&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=300%2C200&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?w=615&amp;ssl=1 615w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>We have received 2 responses to our submission opposing the renewal of the Planning Application (see <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" target="_blank" rel="noreferrer noopener">Digest 67</a>, Item 1.9), the first on 19 August and the second on 20 August:</p>



<p>&#8220;<em>Dear Ms Fort, <br>I have passed GoBike&#8217;s representation to our admin team to be registered. Please note for future reference, representations can be submitted directly to <a href="mailto:planning.representations@drs.glasgow.gov.uk">planning.representations@drs.glasgow.gov.uk</a>.  <br>Kind regards, <br>For Duty Planner.</em>&#8220;</p>



<p>&#8220;<em>Thank you for the feedback Tricia.  The link below takes you to the page that advises how to make representations on planning applications  <a href="https://www.glasgow.gov.uk/makeacomment">https://www.glasgow.gov.uk/makeacomment</a> <br>Thanks   <br>Planning Enquiries</em>&#8221;  </p>



<p>The first reply will be helpful for any future planning applications that we respond to.</p>



<h4 class="wp-block-heading">3.6 Scottish Government, Response to Town Centre Action Plan Review submission</h4>



<p>Here&#8217;s the acknowledgement for our letter of response received on 20 August:</p>



<p>&#8220;<em>Good evening Tricia, <br>Many thanks for your written evidence to support the Town Centre Action Plan Review.  It is very much appreciated the time and effort you have taken to assist us with your valuable insights to help formulate a robust set of actions. <br>After reviewing all of the evidence we receive we may be back in touch to explore particular avenues with you to gain further insights.   <br>Thank you for your time. <br>Project Executive <br>Scotland’s Towns Partnership</em>&#8220;</p>



<p>Please don&#8217;t forget to complete the survey, see Item 1.9 above.</p>



<h4 class="wp-block-heading">3.7 Glasgow City Council, Govan Partick Strategic Development Framework consultation update</h4>


<div class="wp-block-image">
<figure class="alignright size-full"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/12/Govan-Partick.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7258"/></figure>
</div>


<p>In <a aria-label="undefined (opens in a new tab)" href="http://Govan Partick Strategic Development Framework consultation update" target="_blank" rel="noreferrer noopener">Digest 33</a>, issued 30 April 2019 we printed the first response to our submission on this Framework. On 28 August 2020 we received this update:</p>



<p>&#8220;<em>Dear Ms Fort,<br><br>I am writing to update you with regard to the adoption of the Govan-Partick Strategic Development Framework (SDF), which you commented on during the consultation phase.&nbsp; The Govan-Partick SDF was formally adopted as statutory Supplementary Guidance to the Glasgow City Development Plan (2017) on 31<sup>st</sup> August 2020.&nbsp; You can view the adopted Govan-Partick SDF <a href="https://www.glasgow.gov.uk/article/20787/SG2-Sustainable-Spatial-Strategy">here</a>.<br><br>I would like to take this opportunity to thank you again for your input to the consultation process, which we gave careful consideration to as we worked towards the adopted Govan-Partick SDF.&nbsp; In line with the Scottish Government guidance we produced a Table of Responses, which shows how every comment made was taken account of through the redrafting process.&nbsp; You can view the full Table of Responses, including our response to your own comments, <a href="https://glasgow.gov.uk/CHttpHandler.ashx?id=47393">here</a>.&nbsp;&nbsp; For reference purposes you can view the consultative draft Govan-Partick SDF <a href="https://www.glasgowconsult.co.uk/UploadedFiles/Govan-Partick%20Strategic%20Development%20Framework%20-%20Draft%20Nov%202018.pdf">here</a>.&nbsp;<br><br>It has taken considerably longer than was anticipated at the time of the consultation to bring the SDF to formal adoption.&nbsp; The first major delay was caused by the impact of revised climate change modelling for the River Clyde which emerged in early 2019.&nbsp; This required the Council to review the proposals contained in the Govan-Partick SDF in light of the potential impacts of higher tide levels on the River Clyde.&nbsp; However, whilst this caused delay, we believe that this has been time well spent developing an approach which will be resilient in relation to the impacts of climate change.&nbsp; The other major delay to the process has been caused by the impact of the Covid-19 pandemic.&nbsp;<br><br>Thank you again for taking the time to contribute to the shaping of the SDF.&nbsp; If you do have any questions or comments with regard to the adopted SDF you can contact us via <a href="mailto:DevelopmentPlan@glasgow.gov.uk">DevelopmentPlan@glasgow.gov.uk</a>&nbsp;<br><br>Best regards<br>Spatial Strategy Team<br>Development &amp; Regeneration&#8221;</em></p>



<h4 class="wp-block-heading">3.8 Glasgow City Council, Draft River Strategic Development Framework consultation update</h4>


<div class="wp-block-image">
<figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/12/River-Clyde.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7247"/></figure>
</div>


<p>Our submissions for this, and the above Strategic Development Framework, were both in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-27-05-february-2019-university-avenue-and-bears-way-under-threat-no-cycle-lanes-for-union-street-glasgow-but-a-wee-bit-of-good-news-as-well-7619" target="_blank" rel="noreferrer noopener">Digest 27</a>, Item 1.2 and here&#8217;s the update that we received on 28 August &#8211; could have been a busy day in the Spatial Strategy Team??</p>



<p>&#8220;<em>Dear Ms Fort,<br><br>I am writing to update you with regard to the adoption of the River Clyde Strategic Development Framework (River Clyde SDF), which you commented on during the consultation phase.&nbsp; The River Clyde SDF was formally adopted as statutory Supplementary Guidance to the Glasgow City Development Plan (2017) on 31<sup>st</sup> August 2020.&nbsp; You can view the adopted River Clyde SDF <a href="https://www.glasgow.gov.uk/article/20787/SG2-Sustainable-Spatial-Strategy">here</a>.<br><br>I would like to take this opportunity to thank you again for your input to the consultation process, which we gave careful consideration to as we worked towards the adopted River Clyde SDF.&nbsp; In line with the Scottish Government guidance we produced a Table of Responses, which shows how every comment made was taken account of through the redrafting process.&nbsp; You can view the full Table of Responses, including our response to your own comments, <a href="https://glasgow.gov.uk/CHttpHandler.ashx?id=47391">here</a>.&nbsp;&nbsp; For reference purposes you can view the consultative draft River Clyde SDF <a href="https://www.glasgowconsult.co.uk/UploadedFiles/River%20Corridor%20Strategic%20Development%20Framework%20-%20Draft%20November%202018.pdf">here</a>.&nbsp;</em><br><br><em>It has taken considerably longer than was anticipated at the time of the consultation to bring the SDF to formal adoption.&nbsp; The first major delay was caused by the impact of revised climate change modelling for the River Clyde which emerged in early 2019.&nbsp; This required the Council to review the proposals contained in the River Clyde SDF in light of the potential impacts of higher tide levels on the River.&nbsp; However, whilst this caused delay, we believe that this has been time well spent developing an approach which will be resilient in relation to the impacts of climate change.&nbsp; The other major delay to the process has been caused by the impact of the Covid-19 pandemic.&nbsp;<br><br>Thank you again for taking the time to contribute to the shaping of the SDF.&nbsp; If you do have any questions or comments with regard to the adopted SDF you can contact us via <a href="mailto:DevelopmentPlan@glasgow.gov.uk">DevelopmentPlan@glasgow.gov.uk</a>&nbsp;<br><br>Best regards<br>Spatial Strategy Team<br>Development &amp; Regeneration</em>&#8220;</p>



<h4 class="wp-block-heading">3.9 Glasgow City Council and Sustrans, Stockingfield Bridge &#8211; waiting for an update</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="306" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/08/Bridge-picture-Stockingfield.jpg?resize=525%2C306&#038;ssl=1" alt="" class="wp-image-6147" style="width:675px;height:394px"/></figure>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-64-07-july-2020-lockdown-eases-and-we-see-some-positive-changes-11603" target="_blank" rel="noreferrer noopener">Digest 64</a>, Item 3.5, we gave you news that construction of the new bridge was about to start and that we hoped to get you details of a diversionary route before too long. Well, sorry, we still don&#8217;t have those details but here are 2 photographs confirming, first, that work has started and second, that a bridge over the canal will be much better than the current underbridge, particularly if we get as much rain as we did before last Friday morning, when these pictures were taken.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-site.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-12009" style="width:669px;height:502px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-site.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-site.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-site.jpg?w=640&amp;ssl=1 640w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" width="450" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-underbridge.jpg?resize=450%2C600&#038;ssl=1" alt="" class="wp-image-12010" style="width:670px;height:893px" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-underbridge-rotated.jpg?resize=450%2C600&amp;ssl=1 450w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-underbridge-rotated.jpg?resize=225%2C300&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Stockingfield-underbridge-rotated.jpg?w=480&amp;ssl=1 480w" sizes="auto, (max-width: 450px) 100vw, 450px" /></figure>



<p>A bit of a damp note to end on, but things must surely get better!</p>



<hr class="wp-block-separator has-css-opacity"/>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11968</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 67, 18 August 2020: Speed cushion special.</title>
		<link>https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 18 Aug 2020 17:00:24 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[UK government]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=11876</guid>

					<description><![CDATA[Our feature photo in this Digest shows a road in the east end of Glasgow which is proposed for speed cushion treatment in an attempt to reduce the speed of motor vehicles (see Item 1.4). As private motor cars have increased in width, so has the width of speed cushions and in Section 1 we &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-67-18-august-2020-speed-cushion-special-11876" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 67, 18 August 2020: Speed cushion special."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Our feature photo in this Digest shows a road in the east end of Glasgow which is proposed for speed cushion treatment in an attempt to reduce the speed of motor vehicles (see Item 1.4). As private motor cars have increased in width, so has the width of speed cushions and in Section 1 we include 8 speed cushion proposals with speed cushions of 1.8, 1.9 and 2.0m widths, leaving people cycling with the choice of either cycling up and over the speed cushion at a sensible distance from the kerb of 1.0m or in the gap at the kerb, as narrow as 0.5m in many cases, or out in the middle of the road.<br>Since 18 August last year GoBike has received 20 proposals for traffic calming, primarily on residential streets, in Glasgow using speed cushions, but not one for modal filters to prevent through motor traffic. It is motor traffic that causes deaths and injuries on our roads, with <a aria-label="undefined (opens in a new tab)" href="https://www.brake.org.uk/facts-resources/1653-uk-road-casualties" target="_blank" rel="noreferrer noopener">160 deaths in Scotland </a>recorded in 2018 and many more people injured, yet active travel, particularly in the more deprived areas of the city, fails to get the infrastructure it needs. Speed cushions are tinkering at the edges and a Scotland-wide political solution is required to make our neighbourhoods safe and pleasant for us all.</p>



<p>This isn&#8217;t all about speed cushions, though, so do please read on.</p>



<span id="more-11876"></span>



<h3 class="wp-block-heading"><strong>Contents</strong></h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>GoBike Digest Survey, should close today but now extended by 1 week to 25 August</li><li>Glasgow, Merchant City &amp; Trongate Community Council, Merchant City Park petition</li><li>Scottish Government, Town Centre Action Plan Expert Review Group, closes Friday 21 August for written submissions but the survey is open until 30 September</li><li>Glasgow City Council, Gartocher Road (Shettleston) Traffic Calming Scheme, closes 26 August</li><li>Glasgow City Council, Prospecthill Circus (Toryglen) Traffic Calming Scheme, closes 26 August</li><li>Glasgow City Council, Ladyloan Avenue &#8211; Extension (Drumry) Traffic Calming Scheme, closes 26 August</li><li>Glasgow City Council, Warriston Street (Carntyne)) Traffic Calming Scheme, closes 26 August</li><li>Glasgow City Council, Greenfield Road (Shettleston) Traffic Calming Scheme, closes 27 August</li><li>**NEW** Glasgow City Council, Renewal of Planning Consent 17/00610/DC, Glasgow Harbour East At Castlebank Quay/Pointhouse Quay/ Yorkhill Quay Glasgow, closes 28 August</li><li>**NEW** Glasgow City Council, Hermiston Road (Shettleston) Traffic Calming Scheme, closes 08 September</li><li>**NEW** Glasgow City Council, Muirhead Road (Baillieston) Traffic Calming Scheme, closes 09 September</li><li>**NEW** Glasgow City Council, Newlands Park Area  Traffic Calming Scheme, closes 09 September</li><li>**NEW* South Lanarkshire Council, Hamilton, Abercorn Drive and Chestnut Crescent, Traffic Calming, closes 11 September</li><li>UK Department of Transport, Review of the Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</li></ol>



<h4 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h4>



<h4 class="wp-block-heading"><strong>Section 3: Consultation Feedback</strong></h4>



<ol class="wp-block-list"><li>Multiplex University of Glasgow Campus Development &#8211; August 2020 Newsletter</li><li>East Dunbartonshire Local Development Plan No 57, August 2020</li><li>East Renfrewshire, Cycling UK Networking Event 13 August</li></ol>



<h3 class="wp-block-heading"><strong>Section 1: Current Consultations in date order, apart from the first 2, for responses</strong></h3>



<h4 class="wp-block-heading"><strong> </strong>1.1 GoBike Digest Survey, should close today but now extended by 1 week to 25 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-11861" width="525" height="222" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=600%2C254&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>We do really want to know what you think of these Digests. After over 2 years you must have a view and we have a short, easy-to-do survey for our members. </p>



<ul class="wp-block-list"><li>For members who participate in our discussions on Slack, please go to the Consultations or General  channel and follow the link that is there.</li><li>For members who do not use Slack you may request the link by emailing <a aria-label="undefined (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank" rel="noreferrer noopener">consultations@gobike.org</a></li><li>Not yet a GoBike member? You may join from <a aria-label="undefined (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank" rel="noreferrer noopener">this page</a> and, if you join this week (with a minimum donation of only £5), you will still be eligible to respond to the survey and help us improve the information we are publishing.</li></ul>



<h4 class="wp-block-heading">1.2 Glasgow, Merchant City &amp; Trongate Community Council, Merchant City Park petition</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="217" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Merchant-City-Park.jpg?resize=525%2C217&#038;ssl=1" alt="" class="wp-image-11881" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Merchant-City-Park.jpg?resize=600%2C248&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Merchant-City-Park.jpg?resize=300%2C124&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Merchant-City-Park.jpg?w=725&amp;ssl=1 725w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Many of you will know this wonderful mural on Ingram Street in Glasgow&#8217;s Merchant City. GoBike member, Peter, has told us that it is now under threat with a proposal to redevelop the area infront  of it, currently used as a car park. A Planning Application to build a hotel has been withdrawn but who knows what might come next?<br>Merchant City &amp; Trongate Community Council propose that a City Park is constructed on the site and they are looking for your support, with this <a aria-label="undefined (opens in a new tab)" href="https://you.38degrees.org.uk/petitions/merhcant-city-park" target="_blank" rel="noreferrer noopener">petition</a>. Please do support this; we need more green space in Glasgow and this is a welcome opportunity to green the city.</p>



<h4 class="wp-block-heading">1.3 Scottish Government, Town Centre Action Plan Expert Review Group, closes Friday 21 August for written submissions but the survey is open until 30 September</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=525%2C282&#038;ssl=1" alt="" class="wp-image-11817" width="525" height="282" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=600%2C323&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?w=650&amp;ssl=1 650w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This issue featured as Item 1.4 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66</a> and here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://lovelocal.scot/town-centre-action-plan-expert-review-group/" target="_blank" rel="noreferrer noopener">link to the relevant information</a>. There&#8217;s a clear list of questions to respond to and here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/GoBike-Town-Centre-Action-Plan-response-180820.pdf" target="_blank" rel="noreferrer noopener">GoBike response</a>. Note that written responses were requested in word format, if you intend to submit before closing on Friday.<br>Do please send in your views about our urban centres; they could be so much better than they currently are and the online survey is open for another 6 weeks.</p>



<h4 class="wp-block-heading">Items 1.4 to 1.8 Traffic Calming</h4>



<p>These 5 items were introduced in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66</a> as Items 1.5 to 1.9 and all the relevant drawings were attached to the items there. Here&#8217;s the one <a href="https://www.gobike.org/wp-content/uploads/2020/08/GoBike-Traffic-Calming-response-Gartocher-Prospecthill-Ladyloan-Warriston-and-Greenfield-180820.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">letter</a> that GoBike has submitted in response to cover them all. We give brief details of each below but do please write in to the City Council if you disagree with their policy on traffic calming.</p>



<h4 class="wp-block-heading">1.4 Glasgow City Council, Gartocher Road (Shettleston) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view-3.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-11883" width="525" height="394" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view-3.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view-3.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view-3.jpg?w=640&amp;ssl=1 640w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This view is taken looking south though the disused railway bridge that severely limits the width of Gartocher Road. It also completely, under the present space allocation, eliminates any safe space for cycling and any safe space for social distancing on the footway, which is barely wide enough for 2 good friends to walk side by side. According to the GCC drawings the roadway width under this bridge is 5.8m. Since commercial vehicles may be up to 2.55m wide, excluding mirrors, 2 vans passing each other under this bridge don&#8217;t leave much room for anything else. </p>



<p>The City Council&#8217;s view to resolve concern about speeding vehicles on this road, which runs north from Shettleston Road, is to place 15 speed cushions of varying size and varying spacing along the road, all of them pushing anyone who cycles out of a good position on the road.</p>



<p>It&#8217;s GoBike&#8217;s view that space here could be better allocated and motor vehicle access should be restricted. </p>



<h4 class="wp-block-heading">1.5 Glasgow City Council, Prospecthill Circus (Toryglen) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=525%2C253&#038;ssl=1" alt="" class="wp-image-11829" width="525" height="253" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=600%2C289&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?w=1185&amp;ssl=1 1185w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>A new development, designed with cars, and not people, in mind. Now action has to be taken to reduce the speed of those cars.</p>



<p>The City Council proposes lots of speed cushions; GoBike suggests safe space for cycling, a staggered series of rain gardens and/or a modal filter halfway round the circus to prevent motor cars from doing a circuit.</p>



<h4 class="wp-block-heading">1.6 Glasgow City Council, Ladyloan Avenue &#8211; Extension (Drumry) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=525%2C264&#038;ssl=1" alt="" class="wp-image-11832" width="525" height="264" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=600%2C302&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=300%2C151&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?w=1139&amp;ssl=1 1139w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here we have again, a relatively new development with lots of space for cars, although one driver, at least, has found it &#8220;necessary&#8221; to park on the footway, thus endangering anyone walking or cycling.</p>



<p>The City Council&#8217;s one solution is, of course, speed cushions, but GoBike thinks they should be more imaginative and  we suggest that features from the forthcoming <a href="https://www.glasgow.gov.uk/councillorsandcommittees/viewSelectedDocument.asp?c=P62AFQDNDXT1NTDXDX" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">Liveable Neighbourhoods Strategy</a> are used and that planters are placed judiciously to determine whether one or more modal filters or simply narrowing of the roadway are sufficient to reduce motor speeds.</p>



<h4 class="wp-block-heading">1.7 Glasgow City Council, Warriston Street (Carntyne)) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-view.jpg?resize=525%2C353&#038;ssl=1" alt="" class="wp-image-11884" width="525" height="353" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-view.jpg?w=488&amp;ssl=1 488w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-view.jpg?resize=300%2C202&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Warriston Street is a residential street, with the 38 bus route running along it. With all the cars stored on the street (or the footway) there isn&#8217;t much room for much more than one bus at a time at some locations, yet motor vehicles still exceed the speed limit. Wouldn&#8217;t it be much better if the street were re-engineered to limit through traffic to buses and cycles?</p>



<h4 class="wp-block-heading">1.8 Glasgow City Council, Greenfield Road (Shettleston) Traffic Calming Scheme, closes 27 August</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-11885" width="525" height="394" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>With so many vehicles stored on the road and footway and on quite a gradient, it&#8217;s easy to see how residents are concerned about vehicles travelling at speed. However, if through traffic is moved to nearby Springboig Road and a modal filter installed on this road, life could be much pleasanter.</p>



<h4 class="wp-block-heading">1.9 **NEW** Glasgow City Council, Renewal of Planning Consent 17/00610/DC, Glasgow Harbour East At Castlebank Quay/Pointhouse Quay/ Yorkhill Quay Glasgow, closes 28 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=525%2C349&#038;ssl=1" alt="" class="wp-image-11930" width="525" height="349" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=600%2C399&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?resize=300%2C200&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Harbour.jpg?w=615&amp;ssl=1 615w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Last week GoBike member, Iain, brought this Renewal of Planning Application to our attention. It&#8217;s for the development of the large area around the relatively new Riverside Museum and, not shown on the pretty picture above, is the detail that there will be space for 1300, yes 1300, parked cars! How many bikes? No idea; there&#8217;s no mention of active travel or public transport. This is the <a aria-label="undefined (opens in a new tab)" href="https://www.glasgowlive.co.uk/news/glasgow-news/glasgow-harbour-development-100m-plans-18756308.amp?__twitter_impression=true" target="_blank" rel="noreferrer noopener">link</a> to the report on Glasgow Live.</p>



<p>This is a <a aria-label="undefined (opens in a new tab)" href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=summary&amp;keyVal=QDIPYPEXLH300" target="_blank" rel="noreferrer noopener">Renewal of Planning Consent 17/00610/DC</a>, for Glasgow Harbour East at Castlebank Quay/Pointhouse Quay/ Yorkhill Quay Glasgow, that is, both sides of the River Kelvin and surrounding the Riverside Museum, south of the Expressway. When the museum was moved to this site there was much talk of public transport links, but this has now reduced, as far as we are aware, to the tourist bus stopping here on its circuit of the city. Thus, for the regular citizen it&#8217;s either walking from the bus/train/subway interchange at Partick, cycling, walking or, if you have one, bringing the car.</p>



<p>There is a strong suspicion that this is a done deal, but there are many reasons for concern, most of which have been raised on the GoBike Slack consultation channel:</p>



<ul class="wp-block-list"><li>No mention of public transport</li><li>No mention of cycling and walking access. National Cycle Route 7 runs through the site and there is no mention or visibility of this. It is difficult on the plan to see the path from the riverside that runs under the Expressway to join up with cycling routes on the north side of the Expressway</li><li>The development is not in line with the Scottish Government&#8217;s document <a href="https://www.gov.scot/publications/designing-streets-policy-statement-scotland/">Designing Streets</a> nor is it in line with Glasgow City Council&#8217;s forthcoming  <a aria-label="undefined (opens in a new tab)" href="https://www.glasgow.gov.uk/councillorsandcommittees/viewSelectedDocument.asp?c=P62AFQDNDXT1NTDXDX" target="_blank" rel="noreferrer noopener">Liveable Neighbourhoods Strategy</a></li><li>It is not in accordance with the Town Centre Action Plan, see Item 1.3 above</li><li>There is no mention of the impact this development will have on nearby shopping and leisure areas or on the city centre. Any development here should complement the city not be in competition with existing amenities</li><li>There is no justification given for the number 1300  selected for the number of car parking places to be provided, nor any detail of the charges that will be levied on people leaving their cars here.</li><li>It is not in agreement with the findings from City&#8217;s Climate Emergency Working Group or current City Council policies on increasing active travel and reducing cars entering the city</li><li>How does a development of this sort tally with the City&#8217;s aim of hosting COP26 next year?</li><li>Further housing is planned for South Street, which is already busy with industrial motor traffic; this area around the museum should be developed as a park for people who live in the area, with cycling and walking routes running through it.</li><li>There is no mention of river traffic</li><li>There is no mention of the proposed Govan to Partick pedestrian and cycle bridge, which we are all waiting for and how this will impact on the area</li><li>The Riverside Museum is of notable architectural and engineering interest, and it can be seen from the cycling and walking route, from the Expressway and from the railway. It should not be obliterated from view by buildings of lesser note</li></ul>



<p>From that list it is quite clear that the general view is one of objection and here is the resulting <a href="https://www.gobike.org/wp-content/uploads/2020/08/GoBike-Glasgow-Harbour-Planning-Application-Objection-180820.pdf" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">GoBike letter</a>, which lists and amplifies the above points.</p>



<h4 class="wp-block-heading">Items 1.10 &#8211; 1.12, More Traffic Calming in Glasgow</h4>



<p>The following 3 items are similar to the 5 Traffic Calming Items above and, to save space, only the full email for the first is shown. As we said in our last Digest we understand that the City Council offers one solution only to Community Councils and Councillors who wish to see the speeds of motor traffic reduced, and that is speed cushions.</p>



<h4 class="wp-block-heading">1.10 **NEW** Glasgow City Council, Hermiston Road (Shettleston) Traffic Calming Scheme, closes 08 September</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="244" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-11886" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?w=1257&amp;ssl=1 1257w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s the email that we received on 11 August:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</strong>, <strong>HEAD OF ROADS</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>&#8220;Dear Sir / Madam<br><br><strong>The Glasgow City Council</strong>, <strong>(Hermiston Road)</strong>, <strong>Traffic Calming Scheme</strong><br><br>The Council propose to consider the introduction of the above named Traffic Calming Scheme and I wish to establish the views of your organisation.<br><br><strong>Please note that these proposals will also be released to the public by displaying on-street notices within the affected area.</strong><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme</em><br><em>The road affected by these proposals is:-<br><br>&gt;<strong>Hermiston Road</strong><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>9 sets of 3&#215;1.8m wide speed cushions</em></li><li><em>The installation of 18 bollards</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within <strong>28 days.</strong>&nbsp;</em>&nbsp;&nbsp;&nbsp;</p>



<p><em>Please reply directly to <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a><br><br>In the meantime, should you require any further information or clarification on any points arising from the proposals, please e-mail <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a>.<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br><strong>Kevin Hamilton</strong> <br><strong>Head of Roads</strong><br><strong>Neighbourhoods and Sustainability</strong></em>&#8220;</p>



<p>The &#8220;plan&#8221; referred to is these 4 plans: <br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Hermiston-Road-Section-1-btwn-number-3-and-number-17.pdf" target="_blank" rel="noreferrer noopener">Section-1-btwn-number-3-and-number-17</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Hermiston-Road-Section-2-btwn-number-41-and-number-63.pdf" target="_blank" rel="noreferrer noopener">Section-2-btwn-number-41-and-number-63</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Hermiston-Road-Section-3-btwn-number-67-and-number-97.pdf" target="_blank" rel="noreferrer noopener">Section-3-btwn-number-67-and-number-97</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Hermiston-Road-Section-4-btwn-number-101-and-Tynecastle-Street.pdf" target="_blank" rel="noreferrer noopener">Section-4-btwn-number-101-and-Tynecastle-Street</a></p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-view-3.jpg?resize=525%2C372&#038;ssl=1" alt="" class="wp-image-11896" width="525" height="372" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-view-3.jpg?w=559&amp;ssl=1 559w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Hermiston-Road-view-3.jpg?resize=300%2C213&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Perhaps not too clear on the map above is the fact that Hermiston Road runs parallel to, and 2 streets to the west of, Greenfield Road which, in turn is next to, and parallel to, the main road, Springboig Road. It&#8217;s a small residential area with, as the photo above shows, has lots of on road and footway parking and is, particularly at the north end, quite steep. It&#8217;s easy to see why speeding motors could cause a hazard.</p>



<p>No-one, though, seems to have asked the question as to whether this needs to be a through road. Could a series of filters ensure that through traffic uses the main roads and does not use roads such as this as rat runs?</p>



<h4 class="wp-block-heading">1.11 **NEW** Glasgow City Council, Muirhead Road (Baillieston) Traffic Calming Scheme, closes 09 September</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11897" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s the critical part of the email we received from the City Council on 12 August:</p>



<p>&#8220;<span style="text-decoration: underline;">Details of the proposed Scheme</span><br><em>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>2 sets of 3&#215;1.9m wide speed cushions</em></li><li><em>6 sets of 2x2m wide speed cushions</em></li><li><em>The installation of 16 bollards</em>&#8220;</li></ul>



<p>5 plans were attached to the email:<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.58-Muirhead-Road-TC-proposals-Full-view.pdf" target="_blank" rel="noreferrer noopener">Muirhead-Road-TC-proposals-Full-view</a><br><a href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.58-Muirhead-Road-TC-proposals-Section-1.pdf">Muirhead-Road-TC-proposals-Section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.58-Muirhead-Road-TC-proposals-Section-2.pdf" target="_blank" rel="noreferrer noopener">Muirhead-Road-TC-proposals-Section-2</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.58-Muirhead-Road-TC-proposals-Section-3.pdf" target="_blank" rel="noreferrer noopener">Muirhead-Road-TC-proposals-Section-3</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.58-Muirhead-Road-TC-proposals-Section-4.pdf" target="_blank" rel="noreferrer noopener">Muirhead-Road-TC-proposals-Section-4</a></p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="253" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-view-2.png?resize=525%2C253&#038;ssl=1" alt="" class="wp-image-11903" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-view-2.png?w=1214&amp;ssl=1 1214w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-view-2.png?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-view-2.png?resize=600%2C290&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Muirhead-Road-view-2.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here we have a road that leads from the main part of Muirhead down to Baillieston Train Station and then on towards Hamilton Road and the M74. Primarily straight, the parked cars will make it tricky for residents to cross the road, particularly if motor vehicles are exceeding the speed limit, but hold on, where are the cycle lanes and even the space for social distancing? The footways, if half-covered by cars, don&#8217;t allow for safe distances between people and surely, we should be encouraging people to cycle to the train station, and to cycle generally?</p>



<p>The one solution fits all will do neither, but the speed cushions will push people on bikes either into a gap as narrow as 0.5m at the kerb or well out into the roadway if they wish to avoid the instability and discomfort of cycling over speed cushions.</p>



<h4 class="wp-block-heading">1.12 **NEW** Glasgow City Council, Newlands Park Area Traffic Calming Scheme, closes 09 September</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=525%2C396&#038;ssl=1" alt="" class="wp-image-11904" width="525" height="396" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?w=611&amp;ssl=1 611w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=300%2C226&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Newlands-Park-Area-map.png?resize=600%2C453&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The four roads proposed for the speed reduction treatment are Beverley Road, Calderwood Road, Carlaverock Road and Lubnaig Road. This looks and feels like an  affluent area, with probably a higher proportion of large SUV type cars that can easily cope with speed cushions so why go to the effort and expense of putting them down? Here&#8217;s the critical part of the email that arrived from the City Council on 12 August:</p>



<p>&#8220;<em><span style="text-decoration: underline;">Details of the proposed Scheme</span></em><br><em>The proposed Scheme (<strong>as depicted on the attached plan</strong>) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>2 sets of 4 (differing width), speed cushions</em></li><li><em>19 sets of 3 (differing width), speed cushions</em></li><li><em>The installation of 42 bollards</em>&#8220;</li></ul>



<p>10 plans were attached:<br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Beverley-Road-Section-1.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Beverley-Road-Section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Beverley-Road-Section-2.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Beverley-Road-Section-2</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Calderwood-Road-Section-1.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Calderwood-Road-Section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Calderwood-Road-Section-2.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Calderwood-Road-Section-2</a><br><a aria-label="undefined (opens in a new tab)" href="http://Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-1" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-2.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-2</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-3.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Carlaverock-Road-Section-3</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Lubnaig-Road-Section-1.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Lubnaig-Road-Section-1</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-TC-proposals-Lubnaig-Road-Section-2.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-TC-proposals-Lubnaig-Road-Section-2</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.99-Newlands-Park-area-Traffic-Calming-Proposals.pdf" target="_blank" rel="noreferrer noopener">Newlands-Park-area-Traffic-Calming-Proposals</a></p>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Lubnaig-Road.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-11915" width="525" height="394" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Lubnaig-Road.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Lubnaig-Road.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Lubnaig-Road.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This photograph of the junction where Lubnaig Road meets Merrylee Road shows that attempts have been made to reduce motor traffic speed with the guidance 20s plenty signs. Also, you will notice the pavement buildout to ensure that motor traffic enters and leaves Merrylee Road at a tighter angle than previously, which reduces speeds.</p>



<p>The question has to be asked as to why motorists continue to speed in this residential area? If the roads are being used as a rat run from Merrylee Road to Kilmarnock Road than then this can be easily stopped by putting in some modal filters allowing only cycles and emergency vehicles access.</p>



<div class="wp-block-image"><figure class="alignright size-medium"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="225" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Calderwood-School-for-sale.jpg?resize=300%2C225&#038;ssl=1" alt="" class="wp-image-11920" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Calderwood-School-for-sale.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Calderwood-School-for-sale.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Calderwood-School-for-sale.jpg?w=640&amp;ssl=1 640w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p>There has been a school in the area, Calderwood Lodge Primary, but it&#8217;s now up for sale, probably to be redeveloped into desirable residences for the wealthy. Now is the time to reduce through traffic and encourage people to walk and cycle into and around the very pleasant Newlands Park.</p>



<p></p>



<h4 class="wp-block-heading">1.13 South Lanarkshire Council,  Hamilton, Abercorn Drive and Chestnut Crescent, Traffic Calming, closes 11 September</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11936" width="525" height="273" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-Chestnut-Crescent-map.png?resize=600%2C312&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank" rel="noreferrer noopener">Digest 46</a>, Item 1.3, issued in October last year, were details of a filter proposed by South Lanarkshire Council to remove through motor traffic from Chestnut Crescent to Silvertonhill Avenue in Hamilton. Unfortunately 80% of respondents to the Council&#8217;s survey rejected this idea and the Council now propose traffic calming with, yes, you&#8217;ve guessed, speed cushions on both Abercorn Drive and Chestnut Crescent in an attempt to reduce motor speeds.</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="341" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-view.png?resize=525%2C341&#038;ssl=1" alt="" class="wp-image-11937" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-view.png?w=897&amp;ssl=1 897w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-view.png?resize=300%2C195&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Abercorn-Drive-view.png?resize=600%2C389&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s a Google view of Abercorn Drive near its junction with Chestnut Crescent and it already looks as if it would be difficult to drive at any significant speed. There look to already be speed tables and 20mph roundels on the road, plus illegal parking. </p>



<p><a aria-label="undefined (opens in a new tab)" href="https://www.southlanarkshireview.scot/news/article/687/Have_your_say_on_traffic_management_plan" target="_blank" rel="noreferrer noopener">Here</a> are the details of the proposals and here is a <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/Abercorn_Drive_traffic_management_proposals.pdf" target="_blank" rel="noreferrer noopener">plan of the traffic management proposals</a>. We will be looking at these over the next week or so and hope to have a response in the next Digest. However, if you know the area and have views on the proposals do please respond to the survey and email <a href="mailto:consultations@gobike.org" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">consultations@gobike.org</a> to help our response.</p>



<h4 class="wp-block-heading">1.14 UK Department of Transport, Review of the Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</h4>



<div class="wp-block-image"><figure class="alignleft size-medium"><img data-recalc-dims="1" loading="lazy" decoding="async" width="162" height="300" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=162%2C300&#038;ssl=1" alt="" class="wp-image-11846" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=162%2C300&amp;ssl=1 162w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=323%2C600&amp;ssl=1 323w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?w=600&amp;ssl=1 600w" sizes="auto, (max-width: 162px) 100vw, 162px" /></figure></div>



<p>This UK-wide consultation first appeared as Item 1.10 in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66</a> published 2 weeks ago.<br>We continue to develop our response to this consultation and we are receiving views from several quarters. Unfortunately not many of these are hopeful that the proposed changes will bring about significant improvements for those of us who are vulnerable to injury from large vehicles and the predominance of motor vehicles on our roads. Many of the proposals  are for guidance only, ie using the word &#8220;should&#8221; rather than the mandatory &#8220;must&#8221;. We will, though, continue to draft a responsible input to the discussion and we will keep you informed of progress.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>Nothing that we are aware of just now.</p>



<h3 class="wp-block-heading"><strong>Section 3: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading">3.1 Multiplex University of Glasgow Campus Development &#8211; August 2020 Newsletter</h4>



<div class="wp-block-image"><figure class="alignright size-medium"><img data-recalc-dims="1" loading="lazy" decoding="async" width="215" height="300" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Uni-Aug-newsletter.png?resize=215%2C300&#038;ssl=1" alt="" class="wp-image-11921" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Uni-Aug-newsletter.png?resize=215%2C300&amp;ssl=1 215w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Uni-Aug-newsletter.png?resize=430%2C600&amp;ssl=1 430w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Glasgow-Uni-Aug-newsletter.png?w=642&amp;ssl=1 642w" sizes="auto, (max-width: 215px) 100vw, 215px" /></figure></div>



<p><br>Here&#8217;s the latest edition of the Multiplex University of Glasgow <a href="https://www.gobike.org/wp-content/uploads/2020/08/Glasgow-Uni-Aug-newsletter-1.png">Newsletter August 2020</a>, which we received on 10 August.</p>



<p></p>



<p></p>



<p></p>



<p></p>



<h4 class="wp-block-heading">3.2 East Dunbartonshire Local Development Plan No 57, August 2020</h4>



<p>This <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/LDP-Newsletter-57-August-2020.pdf" target="_blank" rel="noreferrer noopener">newsletter</a> arrived today from East Dunbartonshire Council&#8217;s Land Planning Policy team. There&#8217;s no specific mention of cycling but those of you you know East Dunbartonshire well might see more in the detail.</p>



<h4 class="wp-block-heading">3.3 East Renfrewshire, Cycling UK Networking Event 13 August</h4>



<p>This event was advertised in Digest 66, Item 2.1 and GoBike co-Convenor, Thomas, took part in the virtual event. Here&#8217;s his brief report, a good note on which to end this Digest:</p>



<p>&#8220;<em>The East Ren Networking meeting aimed at cycling was well attended and we give thanks to Cycling U.K. Scotland&#8217;s Eileen Hamill for arranging it all. It wasn’t groundbreaking but it’s a good first step to helping improve access and forward motion to creating a better East Renfrewshire.</em>&#8220;</p>



<p>**********************************************************</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11876</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 66, 04 August 2020: an abundance of new Consultations, some very topical and some old &#8220;favourites&#8221;. So do get involved in improving where you live.</title>
		<link>https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 04 Aug 2020 17:30:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[covid]]></category>
		<category><![CDATA[Cycling UK]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Living Streets]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Pollok Park]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[UK government]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=11804</guid>

					<description><![CDATA[Glasgow City Council seem to have exhausted themselves with providing pop-up cycle lanes etc for social distancing and now we are back to &#8220;normal&#8221; with 5 proposals for traffic calming in different parts of the city. Plus GoBike members have been proactive in informing us that we need to protect what we&#8217;ve got in terms &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 66, 04 August 2020: an abundance of new Consultations, some very topical and some old &#8220;favourites&#8221;. So do get involved in improving where you live."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Glasgow City Council seem to have exhausted themselves with providing pop-up cycle lanes etc for social distancing and now we are back to &#8220;normal&#8221; with 5 proposals for traffic calming in different parts of the city. Plus GoBike members have been proactive in informing us that we need to protect what we&#8217;ve got in terms of current cycle provision and to consider changes to the Highway Code. And there&#8217;s even more, so do please read on.</p>



<span id="more-11804"></span>



<h3 class="wp-block-heading"><strong>Contents</strong></h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>**NEW** We ask what you think of the GoBike Digests, closes 18 August</li><li>**NEW** Share the Road – Support the Increases in Space for Safer Walking and Cycling, no closing date, but please don&#8217;t delay if you wish to sign the petition</li><li>**NEW** Glasgow. Mount Florida Community Council, Letherby Triangle project in Mount Florida, no closing date given</li><li>**NEW** Scottish Government, Town Centre Action Plan Expert Review Group, closes 21 August </li><li>**NEW** Glasgow City Council, Gartocher Road (Shettleston) Traffic Calming Scheme, closes 26 August</li><li>**NEW** Glasgow City Council, Prospecthill Circus (Toryglen) Traffic Calming Scheme, closes 26 August</li><li>**NEW** Glasgow City Council, Ladyloan Avenue &#8211; Extension (Drumry) Traffic Calming Scheme, closes 26 August </li><li>**NEW** Glasgow City Council, Warriston Street (Carntyne) Traffic Calming Scheme, closes 26 August</li><li>**NEW** Glasgow City Council, Greenfield Road (Shettleston) Traffic Calming Scheme, closes 27 August</li><li>**NEW** UK Department for Transport, Review of The Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>East Renfrewshire, Cycling UK&nbsp;Virtual Cycling, Walking and Wheeling in East Renfrewshire Networking Event, 13th&nbsp;August&nbsp;</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow City Council, Pollok Park, Introduction of Active Travel Management Plan including formation of parking, infrastructure and landscaping, acknowledgement of GoBike submission by Development &amp; Regeneration Services</li><li>North Lanarkshire Council, City Deal Proposed East Airdrie Link Road, response to GoBike submission</li><li>North Lanarkshire Council, Active Travel Stakeholder Group online workshop 30 July</li></ol>



<h3 class="wp-block-heading"><strong>Section 1: Current Consultations in date order for responses (where given)</strong></h3>



<h4 class="wp-block-heading">1.1 **NEW** We ask what you think of the GoBike Digests, closes 18 August</h4>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-11861" width="525" height="222" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=600%2C254&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/go-bike-logo-colour-Header.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Yes, as mentioned in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-65-21-july-2020-whats-happened-to-pavement-parking-proposals-approved-but-not-enacted-plus-a-request-to-contribute-to-the-streets-for-all-glasgow-commonplace-map-and-m-11719" target="_blank" rel="noreferrer noopener">Digest 65</a>, Item 2.1, we are being introspective and asking our members their views on these fortnightly Digests. <br>~ If you are already a current GoBike member and on Slack then the survey is there waiting for you in the Consultations channel<br>~ If you are already a current GoBike member but not on Slack, or don&#8217;t wish to be, then email <a aria-label="undefined (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank" rel="noreferrer noopener">consultations@gobike.org</a> and the link to the survey will be sent out to you<br>~ Not yet a GoBike member but you wish to comment on the Digests? It&#8217;s easy and very cheap to <a aria-label="undefined (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank" rel="noreferrer noopener">join</a> and by joining you are helping the campaign for improved cycle facilities.</p>



<h4 class="wp-block-heading">1.2 **NEW** Share the Road – Support the Increases in Space for Safer Walking and Cycling, no closing date, but please don&#8217;t delay if you wish to sign the petition</h4>



<p>GoBike member, Iona, sent this link: <a aria-label="undefined (opens in a new tab)" href="https://www.bikeisbest.com/petition" target="_blank" rel="noreferrer noopener"><span class="has-inline-color has-vivid-cyan-blue-color">https://www.bikeisbest.com/petition</span></a> and we hope you will all sign!<br><br>Here&#8217;s the info from the website:</p>



<h3 class="wp-block-heading">&#8220;<em><span class="has-inline-color has-vivid-cyan-blue-color">SHARE THE ROAD – SUPPORT THE INCREASES IN SPACE FOR SAFER WALKING AND CYCLING<br><br>During the Covid-19 crisis, across the UK there has been a rapid roll out of measures to make walking and cycling feel safer, as public transport capacity was reduced and all but essential journeys were curtailed. Space for walking and cycling has been taken directly from motor vehicles, rebalancing our roads to benefit people, not traffic.<br><br>This approach is proving hugely popular &#8211; a recent YouGov survey by #BikeIsBest showed that 77% of Brits are in support of road space reallocation to enable safer cycling and walking. We want to cycle more &#8211; during lockdown, some areas of England have seen cycling increase by 200%.<br><br>Governments have issued funding and guidance for local authorities across the UK. Despite this, some local authorities are ripping out temporary measures after just a few days because of a few emails and petitions from motoring pressure groups and grumpy residents. The silent majority who would like nicer and healthier places to safely cycle are not being heard.<br><br>Our research shows that there are 6.5 people in favour of measures to enable cycling and walking for every 1 person against. But these voices aren&#8217;t being heard.<br><br>Only 6% of us want to return to pre-pandemic times, says another YouGov poll. There is a rare opportunity to change our streets for the better; for health, for air quality, for the economy and for the community. To not just go back to traffic-dominated communities swathed in smog. But this opportunity for change is in jeopardy and urgent action is required. We need to show local political leaders there is widespread support for these measures.<br><br><strong>By signing, you&#8217;re saying: &#8220;I support infrastructure that will help everyone cycle and walk more.&#8221;</strong><br><br>Show your local politicians you support projects that will help everyone cycle and walk more. Please sign and share this petition today to make your voice heard.<br><br>This petition is open to all UK residents. This petition is being run by the #BikeIsBest campaign on behalf of 50 cycling organisations. We will use the accumulative totals of the petition to present the support to local and national government and other key stakeholders. Your email address will not be shared with third parties or these organisations directly. You can choose to receive campaign email updates but this is optional as an opt in.&#8221;</span></em></h3>



<p>We can all hear people saying &#8220;Oh, the bike boom won&#8217;t last, wait until the rain, the dark mornings etc&#8221;. The bike boom will last if we can get good infrastructure, so please <a href="https://www.bikeisbest.com/petition">sign</a> and let&#8217;s keep what we&#8217;ve got and campaign for more through GoBike.</p>



<h4 class="wp-block-heading">1.3 **NEW** Glasgow. Mount Florida Community Council, Letherby Triangle project in Mount Florida, no closing date given</h4>



<p>GoBike member, Calum, alerted us to this <a href="https://www.surveylegend.com/survey/#/d29yZHByZXNzMTExMzc0~-MCNElRPKYLtTjQemOjE" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">survey</a>:</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="403" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=525%2C403&#038;ssl=1" alt="" class="wp-image-11816" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=600%2C460&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=300%2C230&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=1536%2C1177&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1600&amp;ssl=1 1600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Welcome to the Letherby Triangle consultation</figcaption></figure>



<p>Here&#8217;s the wording from the website:</p>



<p><em>&#8220;Mount Florida Community Council has been consulting with the local community for a<br>number of years on how to improve the Letherby Triangle &#8211; the area at the junction of<br>Cathcart Road and Carmunnock Road beside Mount Florida Primary School. Last year we<br>received funding from Sustrans to allow us to develop it to the stage where we can submit a planning application. The proposal aims to:</em></p>



<ul class="wp-block-list"><li><em>Create an attractive civic space for the local community to meet and hold events</em></li><li><em>Enhance the image of Mount Florida as a vibrant and welcoming community</em></li><li><em>Reduce traffic speeds in the area</em></li><li><em>Make it easier to walk, cycle and scoot</em></li></ul>



<p><em>Now we need your input on how the final design might look. Please complete the<br><a aria-label="undefined (opens in a new tab)" href="https://www.surveylegend.com/survey/#/d29yZHByZXNzMTExMzc0~-MCNElRPKYLtTjQemOjE" target="_blank" rel="noreferrer noopener">survey</a>&#8220;.</em></p>



<p>The <a aria-label="undefined (opens in a new tab)" href="https://www.surveylegend.com/survey/#/d29yZHByZXNzMTExMzc0~-MCNElRPKYLtTjQemOjE" target="_blank" rel="noreferrer noopener">survey</a> is being run by Mount Florida Community Council &#8211; please do respond if you live in the area and/or know the area well.</p>



<h4 class="wp-block-heading">1.4 **NEW** Scottish Government, Town Centre Action Plan Expert Review Group, closes 21 August</h4>



<p>We were alerted to this <a href="https://lovelocal.scot/town-centre-action-plan-expert-review-group/" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">consultation</a> by GoBike member Tia:</p>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=525%2C282&#038;ssl=1" alt="" class="wp-image-11817" width="525" height="282" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Save-Scotlands-towns.jpg?resize=600%2C323&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/a.slack-edge.com/production-standard-emoji-assets/10.2/google-medium/1f4e2.png?w=525&#038;ssl=1" alt=":loudspeaker:"><em>Call for Evidence: revitalising Scotland&#8217;s town centres in the wake of COVID-19<br><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/a.slack-edge.com/production-standard-emoji-assets/10.2/google-medium/1f4a1.png?w=525&#038;ssl=1" alt=":bulb:">The Town Centre Action Plan Expert Review Group is looking for views &amp; ideas to develop thinking about Scotland&#8217;s vision for town centres.</em></p>



<p>The majority of us live in towns and cities, so this will be of interest to most of us. Please do look at the <a aria-label="undefined (opens in a new tab)" href="https://lovelocal.scot/town-centre-action-plan-expert-review-group/" target="_blank" rel="noreferrer noopener">website</a> and put in your views as to how you wish your urban areas to be, either with the changes we have already made or how they should be developed.</p>



<p>Here are the questions we are asked to consider:</p>



<ol class="wp-block-list"><li><em>What are the challenges and opportunities facing town centres in Scotland and how should these be addressed?</em></li><li><em>What are the barriers to developing town centres suitable for their communities and how can these be removed?</em></li><li><em>To what extent has the Town Centre Action Plan (TCAP) delivered against its stated ambitions?&nbsp;In what areas has delivery been successful?&nbsp;In what areas is there room for progress and/or barriers to overcome?</em></li><li><em>To what extent are the stated objectives and policy challenges TCAP seeks to address relevant for the new challenges for our towns?</em></li><li><em>If TCAP were to be revised, what additional or replacement areas and objectives would you recommend should be included and how should these be addressed?</em></li><li><em>Can you provide details and contacts of any examples of excellent practice in town centres which you believe have wider potential?</em></li><li><em>Is there anything else you would like to add?</em></li></ol>



<p>This list makes it relatively simple to organise your thoughts! GoBike will be developing a response that we aim to publish in our next Digest.</p>



<h4 class="wp-block-heading">Items 1.5 &#8211; 1.9, Traffic Calming in Glasgow</h4>



<p>The following 5 items are all similar. They are all roads in the outskirts of the city where drivers are exceeding the speed limit and where the local community have requested, via their Community Council and/or City Councillors, that something be done. GoBike understands that only 1 solution is offered by the City Council and that is speed cushions.</p>



<p>GoBike fully understands the concern about fast and dangerous driving but we consider that there are several options available to reduce speed and even remove through traffic and that each location should be considered for a bespoke solution. </p>



<p>The emails that accompanied the consultation documentation are in a standard format; we only publish it in full for the first of the 5.</p>



<h4 class="wp-block-heading">1.5 **NEW** Glasgow City Council, Gartocher Road (Shettleston) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Gartocher-Road-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11818" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Gartocher-Road-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Gartocher-Road-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Gartocher-Road-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Gartocher-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s the email on this one, the first of 4 received on 29 July:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</strong>, <strong>HEAD OF ROADS</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Sir / Madam,<br><br><strong>The Glasgow City Council</strong>, <strong>(Gartocher Road)</strong>, <strong>Traffic Calming Scheme</strong><br><br>The Council propose to consider the introduction of the above named Traffic Calming Scheme and I wish to establish the views of your organisation.<br></em><br><em><strong><span class="has-inline-color has-vivid-red-color">Please note that these proposals will also be released to the public by displaying on-street notices within the affected area.</span></strong><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Road affected by the proposed Scheme<br>The road affected by these proposals is:-</em></p>



<ul class="wp-block-list"><li><strong>Gartocher Road</strong></li></ul>



<p>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plans) will comprise of:-</p>



<ul class="wp-block-list"><li><em>2 sets of 3&#215;1.8m wide cushions</em></li><li><em>1 set of 3x2m wide cushions</em></li><li><em>3 sets of 2x2m wide cushions</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within <strong>28 days</strong>.&nbsp;&nbsp;&nbsp;<br><br>&nbsp;Please reply directly to <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a><br><br>In the meantime, should you require any further information or clarification on any points arising from the proposals, please also e-mail <a href="mailto:LESTraffic@glasgow.gov.uk">LESTraffic@glasgow.gov.uk</a><br><br>Should the Council proceed with these proposals, I will write to you again and confirm this.<br><br><strong>Kevin Hamilton</strong><br><strong>Head of Roads</strong>, <strong>Neighbourhoods and Sustainability</strong></em>&#8220;</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="266" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view.png?resize=525%2C266&#038;ssl=1" alt="" class="wp-image-11824" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view.png?w=1139&amp;ssl=1 1139w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view.png?resize=300%2C152&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view.png?resize=600%2C304&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Gartocher-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The plans referred to in the email are: <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.56-Gartocher-Road-TC-proposals-Section-1.pdf" target="_blank" rel="noreferrer noopener">Section 1</a>, <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.56-Gartocher-Road-TC-proposals-Section-2.pdf" target="_blank" rel="noreferrer noopener">Section 2</a> and <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.56-Gartocher-Road-TC-proposals-Section-3.pdf" target="_blank" rel="noreferrer noopener">Section 3</a>.</p>



<p>From these plans it may be seen that the gap at the gutter between the cushion and the kerb ranges from 0.5m up to 1.0m with the majority being 0.6m. Thus anyone trying to avoid the cushion has to cycle either out in the middle of the road or in the narrow gap at the edge along with all the grit etc.</p>



<p>As you can see from the map and the photograph the overall roadway narrows to go under the bridge carrying the railway line from Glasgow Queen Street Low Level out to Airdrie and via Bathgate to Edinburgh. But look, the road itself, on which the high motor speeds are occurring,  maintains its width, while one footway disappears and there is no cycleway at all.</p>



<p>An alternative proposal is to use one road lane as a footway plus cycleway for the narrowed length under the bridge. The other lane would be controlled by traffic lights for a one-way motor traffic system. Such a solution would slow the motor traffic down and would deter drivers from using Gartocher Road as a rat run. <br>A further, easier-to-do alternative is to simply close the road to through traffic but only allow pedestrians, bikes and emergency vehicles through the railway bridge.</p>



<p>It&#8217;s time we moved away from the standard one size fits all solution of speed cushions.</p>



<h4 class="wp-block-heading">1.6 **NEW** Glasgow City Council, Prospecthill Circus (Toryglen) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11828" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This area has only just been redeveloped with a mix of houses and flats, so why is the road such that motor cars are allowed to drive too fast? </p>



<p>Here are the relevant sections of the email from the City Council:</p>



<p>&#8220;<em><span style="text-decoration: underline;">Road affected by the proposed Scheme</span><br>The road affected by this proposal is:-</em></p>



<ul class="wp-block-list"><li><strong><em>Prospecthill Circus</em></strong></li></ul>



<p><em><span style="text-decoration: underline;">Details of the proposed Scheme</span></em><br><em>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>1 set of 3&#215;1.7m wide cushions</em></li><li><em>2 sets of 2x2m wide cushions</em></li><li><em>3 sets of 3&#215;1.8m wide cushions</em></li><li><em>2 sets of 3&#215;1.9m wide cushions</em>&#8220;</li></ul>



<p>Here&#8217;s the plan that is referred to: <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.20.62-Prospecthill-Circus-TC-Proposals-A1-Titlebox-P-P.pdf" target="_blank" rel="noreferrer noopener">TC proposals</a></p>



<p>Sadly, there appears to be a discrepancy between the email and the drawing. The email lists 8 sets of cushions and the drawing shows 12.</p>



<p>A further point of concern is the positioning of the cushions. For 10 of the 12 sets the gap between cushion and kerb is only 0.5m with 1 at 0.65 and 1 at 1.0m. GoBike has been told that the recommended gap is 1.2m, so it looks as if the City Council have found a new guidance document?</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="253" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=525%2C253&#038;ssl=1" alt="" class="wp-image-11829" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?w=1185&amp;ssl=1 1185w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?resize=600%2C289&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Prospecthill-Circus-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>We first mentioned the involvement of Urban Roots in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-31-04-april-2019-featuring-glasgow-east-dunbartonshire-and-north-lanarkshire-8133" target="_blank" rel="noreferrer noopener">Digest 31</a>, Item 6 and there are further mentions in subsequent Digests of the local consultation they carried out for this area,  right on the edge of Glasgow, bordering on South Lanarkshire.<br>Urban Roots were hoping to have their proposal for a cycle lane to be constructed right round the circus included in the development of the area.</p>



<p>All the houses have a run-in for a car, so why are all these developments designed for car use and not for active travel and the use of public transport? This really is a damning indictment of the current planning systems that have led to many such schemes in Glasgow and around Scotland, where the car is seen as king. In Crossbank Crescent, in the same development, a much better way of slowing traffic has been found, see below:</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="270" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Crossbank-Crescent-Prospecthill.png?resize=525%2C270&#038;ssl=1" alt="" class="wp-image-11859" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Crossbank-Crescent-Prospecthill.png?w=1221&amp;ssl=1 1221w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Crossbank-Crescent-Prospecthill.png?resize=300%2C154&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Crossbank-Crescent-Prospecthill.png?resize=600%2C308&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Crossbank-Crescent-Prospecthill.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h4 class="wp-block-heading">1.7 **NEW** Glasgow City Council, Ladyloan Avenue &#8211; Extension (Drumry) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Ladyloan-Avenue-location.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-8749" width="525" height="272" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Ladyloan-Avenue-location.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Ladyloan-Avenue-location.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Ladyloan-Avenue-location.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This proposal is an extension to a scheme that we first featured in <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener">Digest 37</a>, Item 1.3 in June last year. which was for the eastern section of Ladyloan Avenue; this proposal is for the western end. Last year GoBike submitted an <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Ladyloan-Avenue-Traffic-Calming-response-030719.pdf" target="_blank" rel="noreferrer noopener">objection</a> suggesting that active travel in this less affluent area of the city should be encouraged by the construction of cycle lanes. We also asked why there was no proposal for car-free areas round the schools in this area. However, the installation of speed cushions won, and now there is a proposal for even more. Here&#8217;s the pertinent section of the City Council&#8217;s email of 29 July:</p>



<p>&#8220;<em><span style="text-decoration: underline;">Roads affected by the proposed Scheme</span><br>The road affected by this proposal is:-</em></p>



<ul class="wp-block-list"><li><strong><em>Ladyloan Avenue</em></strong></li></ul>



<p><em><span style="text-decoration: underline;">Details of the proposed Scheme</span><br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>2 sets of 2&#215;1.8m wide cushions</em></li><li><em>2 sets of 2&#215;1.9m wide cushions</em>&#8220;</li></ul>



<p>Here is the plan referred to: <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.24-Ladyloan-Avenue-proposals-Full-scheme.pdf" target="_blank" rel="noreferrer noopener">Ladyloan Avenue full proposals</a></p>



<p>Unfortunately, there again appear to be errors on the plan. There is a total of 5 sets of cushions, not 4, and the cushion to kerb spacing varies on the drawing from 1.0m down to 0.6m (there is a dimension of 0.55m shown but a check on the arithmetic shows this should be a more generous 0.65m!) Still not sufficient to keep bikes out of the detritus at the edge of the road, though.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=525%2C264&#038;ssl=1" alt="" class="wp-image-11832" width="525" height="264" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=600%2C302&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?resize=300%2C151&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?w=1139&amp;ssl=1 1139w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Ladyloan-Avenue-west-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Plenty of room for cycle lanes on this view!</p>



<h4 class="wp-block-heading">1.8 **NEW** Glasgow City Council, Warriston Street (Carntyne) Traffic Calming Scheme, closes 26 August</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11833" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Street-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s a nice, long street, just right for getting up a bit of speed in the motor, irrespective of any of the residents trying to cross the road, or cycle along! Obviously something has to be done, but why speed cushions?</p>



<p>Here&#8217;s the relevant section of the City Council email:</p>



<p>&#8220;<em><span style="text-decoration: underline;">Roads affected by the proposed Scheme</span><br>The road affected by these proposals is:-</em></p>



<ul class="wp-block-list"><li><strong><em>Warriston Street</em></strong></li></ul>



<p>Details of the proposed Scheme<em><br>The proposed Scheme (as depicted on the attached plans) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>15 sets of 3&#215;1.9m wide speed cushions</em></li><li><em>The supply and installation of 30 bollards.</em>&#8220;</li></ul>



<p>Here are the 5 plans that were attached: <br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.107-Warriston-Street-Traffic-calming-proposals-Section-1-btwn-Cumbernauld-Rd-and-number-68.pdf" target="_blank" rel="noreferrer noopener">Section-1-btwn-Cumbernauld-Rd-and-number-68</a> <br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.107-Warriston-Street-Traffic-calming-proposals-Section-2-btwn-number-102-and-number-156.pdf" target="_blank" rel="noreferrer noopener">Section-2-btwn-number-102-and-number-156</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.107-Warriston-Street-Traffic-calming-proposals-Section-3-btwn-number-186-and-number-250.pdf" target="_blank" rel="noreferrer noopener">Section-3-btwn-number-186-and-number-250</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.107-Warriston-Street-Traffic-calming-proposals-Section-4-btwn-Gartcraig-Road-and-number-324.pdf" target="_blank" rel="noreferrer noopener">Section-4-btwn-Gartcraig-Road-and-number-324</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.107-Warriston-Street-Traffic-calming-proposals-Section-5-btwn-number-342-and-Ruchazie-Road.pdf" target="_blank" rel="noreferrer noopener">Section-5-btwn-number-342-and-Ruchazie-Road</a></p>



<p>The gaps at the side are mostly 1.0m, with 5 sets at 0.9 and 1 at 0.8, but they should be better.</p>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Road-view.png?resize=525%2C281&#038;ssl=1" alt="" class="wp-image-11839" width="525" height="281" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Road-view.png?resize=600%2C322&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Road-view.png?resize=300%2C161&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Road-view.png?w=1167&amp;ssl=1 1167w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Warriston-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>One look at the map shows that, with the judicious use of filters and bus gates, if required, this whole area could be made impermeable to through motor traffic, while still maintaining access for cycles, buses, emergency vehicles and refuse lorries. Instead the City Council propose a dodgems run.</p>



<h4 class="wp-block-heading">1.9 **NEW** Glasgow City Council, Greenfield Road (Shettleston) Traffic Calming Scheme, closes 27 August</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="273" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-map.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-11840" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-map.png?w=1300&amp;ssl=1 1300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-map.png?resize=600%2C312&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This, the fifth, arrived a day later, on 30 July and here&#8217;s the critical section of the City Council email:</p>



<p>&#8220;<em><span style="text-decoration: underline;">Roads affected by the proposed Scheme</span><br>The road affected by these proposals is:-</em></p>



<ul class="wp-block-list"><li><strong><em>Greenfield Road</em></strong></li></ul>



<p><em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>6 sets of 3&#215;1.8m wide speed cushions</em></li><li><em>1 set of 3&#215;1.9m wide speed cushions</em></li><li><em>1 set 2x2m wide speed cushions</em></li><li><em>The installation of 16 bollards</em></li></ul>



<p>And here are the plans that were attached to the email: <br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Greenfield-Road-Section-1-btwn-number-1-and-11.pdf" target="_blank" rel="noreferrer noopener">Section-1-btwn-number-1-and-11</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Greenfield-Road-Section-2-Btwn-number-19-and-41.pdf" target="_blank" rel="noreferrer noopener">Section-2-Btwn-number-19-and-41</a><br><a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Greenfield-Road-Section-3-btwn-number-43-and-61.pdf" target="_blank" rel="noreferrer noopener">Section-3-btwn-number-43-and-61</a><br><a href="https://www.gobike.org/wp-content/uploads/2020/08/RS.19.84-Greenfield-Road-Section-4-btwn-number-63-and-Tynecastle-Street.pdf">Section-4-btwn-number-63-and-Tynecastle-Street</a></p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="260" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.png?resize=525%2C260&#038;ssl=1" alt="" class="wp-image-11845" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.png?w=1175&amp;ssl=1 1175w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.png?resize=300%2C149&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.png?resize=600%2C297&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Greenfield-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The gaps between the gutter and the nearest cushion are generally 0.5m, with one set being 0.6 and another being an astonishing 1.2m, ie the standard we were told the City Council worked to!</p>



<p>Greenfield Road runs parallel to Springboig Road, so could readily be closed to through motor traffic, making the area pleasanter for the local residents, thus dispensing with the need for speed cushions.</p>



<h4 class="wp-block-heading">Items 1.5 &#8211; 1.9, Traffic Calming in Glasgow</h4>



<p>The 5 roads covered above are similar in that they are relatively straight, which can lead drivers to exceed the speed limit, but there are solutions other than speed cushions. Also, of course, drivers who do endanger life by excessive  speed should be penalised. GoBike will be developing responses over the next 2 weeks and should be able to publish them in the next Digest.</p>



<h4 class="wp-block-heading">1.10 **NEW** UK Department for Transport, Review of The Highway Code to improve road safety for cyclists, pedestrians and horse riders, closes 27 October 2020</h4>



<div class="wp-block-image"><figure class="alignleft size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="323" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=323%2C600&#038;ssl=1" alt="" class="wp-image-11846" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=323%2C600&amp;ssl=1 323w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?resize=162%2C300&amp;ssl=1 162w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/The-Highway-Code.jpg?w=600&amp;ssl=1 600w" sizes="auto, (max-width: 323px) 100vw, 323px" /></figure></div>



<p>The Highway Code, which applies to all road users across the UK, is about to be updated for the first time since 2007.</p>



<p>The UK Government website tells us there is:</p>



<p>&#8220;<em>Consultation seeking views on proposed changes to The Highway Code to improve safety for vulnerable road users, particularly the groups of:</em></p>



<ul class="wp-block-list"><li><em>cyclists</em></li><li><em>pedestrians</em></li><li><em>horse riders</em></li></ul>



<p><em>The main alterations to the code being proposed are:</em></p>



<ul class="wp-block-list"><li><em>introducing a hierarchy of road users which ensures that those road users who can do the greatest harm have the greatest responsibility to reduce the danger or threat they may pose to others</em></li><li><em>clarifying existing rules on pedestrian priority on pavements, to advise that drivers and riders should give way to pedestrians crossing or waiting to cross the road,</em></li><li><em>providing guidance on cyclist priority at junctions to advise drivers to give priority to cyclists at junctions when travelling straight ahead</em></li><li><em>establishing guidance on safe passing distances and speeds when overtaking cyclists and horse riders</em>&#8220;</li></ul>



<p>Here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://www.gov.uk/government/consultations/review-of-the-highway-code-to-improve-road-safety-for-cyclists-pedestrians-and-horse-riders" target="_blank" rel="noreferrer noopener">link to the Government website</a>. GoBike is now starting its review and we hope to have this ready in good time for you to use as the basis of your submission. We are aware that other active travel organisations, such as Cycling UK and Living Streets, are developing their responses, so we will be using all the information open to us to make sure we don&#8217;t miss any crucial aspects of this consultation. </p>



<p>The disconcerting aspect of this is not just that there is no legal, only a moral, obligation on any of us to read the Highway Code, but that motor drivers do not require any update after passing their driving test. Most of us who do a driving test will do it in their late teens or twenties, with no further test ever being required.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consulations</strong></h3>



<h4 class="wp-block-heading">2.1 East Renfrewshire, Cycling UK&nbsp;Virtual Cycling, Walking and Wheeling in East Renfrewshire Networking Event, 13th&nbsp;August&nbsp;</h4>



<p>GoBike member, Iona, brought this to our notice and here&#8217;s the detail:</p>



<p><em>Cycling UK&nbsp;would like to invite you to our&nbsp;Virtual Cycling, Walking and Wheeling in East Renfrewshire Networking Event.&nbsp;<br>The event will run from&nbsp;4pm – 6pm&nbsp;on&nbsp;Thursday 13th&nbsp;August&nbsp;on&nbsp;Microsoft Teams<br><br>The Covid Crisis brought increased levels of Cycling, Walking and Wheeling with unprecedented numbers of people getting out of their cars and on to the streets, paths and parks for both travel and exercise.&nbsp;As we emerge from lockdown we now have the opportunity to capitalise on this momentum and make more active travel and leisure part of the new normal.&nbsp;&nbsp;Many more people now want to cycle for leisure, health and everyday travel.&nbsp;We have the opportunity to shape practical measures which will help us to sustain this more active culture.<br>The global pandemic has shown us that where there is a political will and a sense of urgency things can change quickly.&nbsp;Pop up infrastructure and Spaces for People are just the start of what can be done to get more people cycling, walking and wheeling more often in East Renfrewshire.</em><br><br><em>This event is for anyone with an interest in walking and cycling in East Renfrewshire&nbsp;We hope to bring together representatives from Cycling UK, East Renfrewshire Council, local grassroots cycling and walking groups, community cycling organisations, Cycling UK affiliated and Member groups and local residents.&nbsp;Our aim is to discuss cycling and walking provision in the area and look towards improving infrastructure and opportunities.&nbsp;<br>There are also opportunities for organisations to present at the event so if you would like the chance to showcase your work in the area just let me know.<br>Please feel free to share with your friends and networks, as well as any walking and/or paths groups who might be interested in shared initiatives.&nbsp;<br>I look forward to seeing you there!<br>If you are unable to make it to the event but would like to take part in future events and discussions then please feel free to drop me a line<br>Many thanks and best regards<br>Eileen</em>&#8220;</p>



<p>Eileen may be contacted by email at:&nbsp;<a target="_blank" href="mailto:bigbikerevivalscotland@cyclinguk.org" rel="noreferrer noopener">bigbikerevivalscotland@cyclinguk.org</a></p>



<p>Here&#8217;s the <a aria-label="undefined (opens in a new tab)" href="https://teams.microsoft.com/dl/launcher/launcher.html?url=%2f_%23%2fl%2fmeetup-join%2f19%3ameeting_ZjUyMTUzMjAtOWFhZi00ZWIyLWE2NzItNjY0NjgwZDY1OTEy%40thread.v2%2f0%3fcontext%3d%257b%2522Tid%2522%253a%2522da6b1118-d522-464c-91ae-44ffddc646d5%2522%252c%2522Oid%2522%253a%252268e9641b-dc96-491e-9e70-83ab345a6e10%2522%257d%26anon%3dtrue&amp;type=meetup-join&amp;deeplinkId=d8fa7287-5af4-49f0-b63c-f706c0d32200&amp;directDl=true&amp;msLaunch=true&amp;enableMobilePage=true&amp;suppressPrompt=true" target="_blank" rel="noreferrer noopener">link to join the meeting</a>.<br></p>



<h3 class="wp-block-heading"><strong>Section 3: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading">3.1 Glasgow City Council, Pollok Park, Introduction of Active Travel Management Plan including formation of parking, infrastructure and landscaping, acknowledgement of GoBike submission by Development &amp; Regeneration Services</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-11625" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?w=2016&amp;ssl=1 2016w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?resize=1536%2C1152&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Pollok-Park-access-road.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>In <a href="https://www.gobike.org/consultation-digest-issue-64-07-july-2020-lockdown-eases-and-we-see-some-positive-changes-11603" target="_blank" aria-label="undefined (opens in a new tab)" rel="noreferrer noopener">Digest 64</a>, Item 3.1, we published our <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/07/GoBike-Planning-Application-Pollok-Park-Qualified-Objection-300620.pdf" target="_blank" rel="noreferrer noopener">response</a> to the planning application for changes to the traffic system in Pollok Park. On 24 July we received this <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/08/ACKREF-20-01352-FUL-GOBIKE.pdf" target="_blank" rel="noreferrer noopener">letter of acknowledgement</a>. We&#8217;ll keep you updated with any further news.</p>



<h4 class="wp-block-heading">3.2 North Lanarkshire Council, City Deal Proposed East Airdrie Link Road, response to GoBike submission</h4>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="304" height="166" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/03/North-Lanarkshire-logo.jpg?resize=304%2C166&#038;ssl=1" alt="" class="wp-image-8050" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/03/North-Lanarkshire-logo.jpg?w=304&amp;ssl=1 304w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/03/North-Lanarkshire-logo.jpg?resize=300%2C164&amp;ssl=1 300w" sizes="auto, (max-width: 304px) 100vw, 304px" /></figure></div>



<p>In <a aria-label="undefined (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-59-28-april-2020-social-distancing-we-all-want-to-keep-to-the-guidelines-but-its-tricky-11056" target="_blank" rel="noreferrer noopener">Digest 59</a>, Item 1.2 we published this <a href="https://www.gobike.org/wp-content/uploads/2020/04/GoBike-NLC-East-Airdrie-Road-response-140420.pdf">letter of opposition</a> to the building of a new road to the east of the town of Airdrie. On 27 July we received this long email explaining why the Council find it necessary to proceed with the road.</p>



<p>&#8220;<strong><em>City Deal Proposed East Airdrie Link Road (Ref TF/D57</em></strong><br><em>Attn: Tricia Fort<br><br>Thank you for your letter of 14 April 2020 in response to the public consultation exercise on the proposed East Airdrie Link Road.<br><br>We note your opposition to the scheme, primarily on the basis that there requires to be a change of emphasis away from provision of new road capacity and more towards public transport and active travel.&nbsp; You also note that recent government policies aim to reduce pollution, reduce the use of the private motor vehicle, improve public health and effect a modal transfer.<br><br>These aims are acknowledged in the recently published National Transport Strategy which, although at the bottom of the investment hierarchy, still supports road building, particularly in support of inclusive economic growth.</em><br><br><em>Please be assured that the Council is supportive of these shifts in policy and these are recognised in the aims and objectives of the East Airdrie Link Road project.<br><br>As stated in the over-arching project objective, the project seeks to contributing to a co-ordinated and strategic approach to upgrade transport infrastructure and promote economic regeneration through the Pan-Lanarkshire Orbital Transport Corridor project.&nbsp;<br><br>Firstly, the objective explicitly acknowledges the aim to support economic regeneration in the area and, specifically, any proposals are assessed against how well they “support development opportunities for existing businesses and assist in unlocking stalled development sites”.&nbsp; This aligns with the overall aim of the Glasgow City Deal to support economic growth and job creation; in fact, the achievement of this objective is critical in securing City Deal funding.<br><br>The project is also envisioned as a key plank in supporting the Council’s wider aim of encouraging modal shift through the greater use of public transport and active travel.&nbsp; Again, these aims are explicitly acknowledged in options appraisal through assessment</em> <em>against the following project objectives:<br><br><strong>Public Transport </strong>&#8211; Facilitate improvements to public transport infrastructure and reliability,<br>encouraging modal shift<br><br><strong>Active Travel </strong>&#8211; Provide active travel infrastructure linking to existing networks, encouraging modal shift<br><br>The expansion of public transport and active travel provision in and along the existing A73 is limited by the prevailing physical constraints and traffic congestion and it is anticipated that the relief provided by the new link road will allow increased road space to be assigned to buses and active travel.&nbsp; Providing travel choices is key to encouraging modal shift and efficient, fast public transport services are central to encouraging people to not use private cars.&nbsp;<br><br>Another of the objectives is to improve air quality pollution within the Chapelhall AQMA and the project will achieve this for residents and those walking, cycling and wheeling.&nbsp; Indeed, there is also an opportunity for the project to reduce noise pollution for a number of residents and remove freight movements through these densely populated areas.</em><br><br><em>Any option taken forward will be designed to include active travel routes connecting to existing paths and networks and thereby contributing to the overall active travel network in the region.&nbsp; There is an opportunity through the environmental assessment work to provide a range of enhancements in terms of landscaping, ecology and flooding and to create pleasant segregated routes alongside the new road.&nbsp;<br><br>We also note your comment about rail, however, the initial options appraisal concluded that rail options made only limited contribution to project objectives.&nbsp; Nevertheless, the study (Strategy 8) did acknowledge there were opportunities to potentially improve connectivity links at Coatbridge these will be considered further out with the scope of the East Airdrie Link Road project.</em><br><br><em>In summary, it is our view that the proposed project is aligned with many of the objectives outlined in your letter. As we move in to Stage 2 of the current study, we will be seeking to ensure the optimum performance against the overall project objectives and to explore opportunities for maximising benefits of the new scheme towards modal shift.&nbsp; To that end, have invited &nbsp;welcome constructive engagement with GoBike on how your organisation considers these goals might be achieved.<br><br>We have set up stakeholder consultation groups, including on active travel, and acknowledge that your colleague Derek York has agreed to participate in the Active Travel Group.<br><br>We hope the above addresses some of your concerns and that you will be able to contribute further as the project develops through Stage 2.<br><br>In the meantime, if I can be of any further assistance, please contact the undersigned.<br>Regards</em><br><br><em><strong>Yvonne Baker</strong><br><strong>Senior Project Manager (Enterprise Projects)</strong><br><strong>Enterprise &amp; Communities</strong><br><strong>North Lanarkshire Council</strong></em>&#8220;</p>



<p>While this is not the result we had dreamed of, it is probably what we expected, but GoBike has been listened to. The inclusion of GoBike member, Derek, in North Lanarkshire&#8217;s Active Travel Stakeholder Consultation Group is very welcome.</p>



<h4 class="wp-block-heading">3.3 North Lanarkshire Council, Active Travel Stakeholder Group online workshop 30 July</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="382" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/East-Airdrie-Road-possible-alignment.jpg?resize=525%2C382&#038;ssl=1" alt="" class="wp-image-11855" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/East-Airdrie-Road-possible-alignment.jpg?w=1472&amp;ssl=1 1472w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/East-Airdrie-Road-possible-alignment.jpg?resize=300%2C218&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/East-Airdrie-Road-possible-alignment.jpg?resize=600%2C437&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/East-Airdrie-Road-possible-alignment.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Quick on the heels of that email was the first meeting of the Active Travel Group last Thursday, held online and attended by Derek, on behalf of GoBike. The focus of discussion was the East Airdrie Link Road, a new A-road planned by North Lanarkshire Council funded by City Deal.<br>The screenshot above shows the possible route alignments; the final decision is yet to be made. The northern section is quite barren, 600ft above sea level and over peat bog. The southern section is nearer settlements, including Airdrie, Chapelhall, Plains and  Calderbank. Mike Batley of the Central Scotland Green Network suggested the southern section could follow the western route for active travel-only (with road separate to east). It wasn&#8217;t clear if this will be taken on board. The next meeting will be in August but no word on next steps.<br>The proposed shared path would be wider than sections on A73 near Carluke. It&#8217;s nothing to write home about but obviously better than the section between Newhouse and Cleland/Bellside, which has no pavement at all. Other stakeholders were underwhelmed – Sustrans, SPT, Central Scotland Green Network, Glasgow &amp; Clyde Valley Green Network Partnership (<a href="https://www.gcvgreennetwork.gov.uk/guide-to-the-partnership/the-partners" target="_blank" rel="noreferrer noopener">https://www.gcvgreennetwork.gov.uk/guide-to-the-partnership/the-partners</a>).</p>



<p>Derek&#8217;s also given us some background to the proposals:<br><br>The road was initially proposed as a bypass over ten years ago to get HGVs off the current A73 through Airdrie. The Sustrans rep at the meeting asked whether NLC had considered not building road in light of the  climate emergency. North Lanarkshire&#8217;s response was that the  new road was about “redistribution” of traffic, not adding. Active travel infrastructure was added later in process (reminiscent of Stewartfield Way in South Lanarkshire). The proposed line of the road passes two potential sites for a new Monklands hospital (Glenmavis and Wester Moffat). The presentation mentioned economic development but not cycle commuting (aims come from old NLC cycling strategy). Aecom (the design consultants) and North Lanarkshire Council claim they want a modal shift to cycling &#8211; hence their proposal for a shared use path on one side (3m+buffer). They are proposing roundabout junctions with uncontrolled crossings (road is single lane 60mph). Est. 9k motor vehicle flows &#8211; 10k+ would require grade separated junctions &#8211; traffic modelling is to be confirmed.<br>The proposed shared path would be wider than sections on A73 near Carluke. It&#8217;s nothing to write home about but obviously better than the section between Newhouse and Cleland/Bellside, which has no pavement at all. Other stakeholders were underwhelmed – Sustrans, SPT, Central Scotland Green Network, Glasgow &amp; Clyde Valley Green Network Partnership (<a href="https://www.gcvgreennetwork.gov.uk/guide-to-the-partnership/the-partners" target="_blank" rel="noreferrer noopener">https://www.gcvgreennetwork.gov.uk/guide-to-the-partnership/the-partners</a>).<br><br>A decision about a new Monklands hospital site still hasn&#8217;t been taken. If it&#8217;s at one of the sites on the above corridor then that might change things. FYI see: <a href="https://www.nhslanarkshire.scot.nhs.uk/get-involved/consult-engage/monklands-engagement/">https://www.nhslanarkshire.scot.nhs.uk/get-involved/consult-engage/monklands-engagement/</a></p>



<p>That&#8217;s it for now, a welcome return of consultations and plenty to get our teeth into.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11804</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 55, 03 March 2020: GoBike asks for your views &#8211; and your money &#8211; plus much, much more.</title>
		<link>https://www.gobike.org/consultation-digest-issue-55-03-march-2020-gobike-asks-for-your-views-and-your-money-plus-much-much-more-10280</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 03 Mar 2020 22:17:30 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[active travel]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[cycle filter]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[echelon/angled parking]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Low Emission Zone]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[one way streets]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[ScotRail]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=10280</guid>

					<description><![CDATA[Glasgow is now consulting on phase 2 of its Low Emission Zone, plus we have news on parking restrictions, a wee step forward on cycling permeability, and cycle lanes being built. Read on for much, much more. Contents Section 1: Current Consultations **NEW** GoBike, Glasgow Eco Trust and On Bikes, Walking &#38; Cycling in Glasgow: &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-55-03-march-2020-gobike-asks-for-your-views-and-your-money-plus-much-much-more-10280" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 55, 03 March 2020: GoBike asks for your views &#8211; and your money &#8211; plus much, much more."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Glasgow is now consulting on phase 2 of its Low Emission Zone, plus we have news on parking restrictions, a wee step forward on cycling permeability, and cycle lanes being built. Read on for much, much more.</p>



<span id="more-10280"></span>



<h4 class="wp-block-heading">Contents</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>**NEW** GoBike, Glasgow Eco Trust and On Bikes, Walking &amp; Cycling in Glasgow: Give us your views, open</li><li>Glasgow, Connecting Woodside, commonplace map for comments, closes 09 March</li><li>East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</li><li>**NEW** East Dunbartonshire, Townhead, Kirkintilloch, No Waiting at any time restrictions, closes 16 March</li><li> **NEW** Glasgow, North Kelvin and North Woodside, Traffic Management and Parking Controls, closes 27 March </li><li> **NEW** Glasgow, Low Emission Zone Phase 2, online consultation, closes 29 March</li><li>Scottish Government — Fourth National Planning Framework, closes 31 March</li><li>**NEW** Glasgow, Hutchesontown (New Gorbals) Parking Controls, closes 13 April</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li> Scottish Government — Fourth National Planning Framework, drop-in session and workshop, Glasgow, 17 March</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Yorkhill and Kelvingrove Community Council Cycling Village consultation event held on 19 February, brief notes</li><li>ScotRail, future of Cycle Forum uncertain, with completion of contract by Kathryn MacKay, Cycling Officer</li><li>North Lanarkshire, Local Development Plan update</li><li>Glasgow, Ardencraig Road Traffic Calming, City Council&#8217;s response to our proposals</li><li>Glasgow, Belmont, confirmation of Traffic Management Order</li><li>Glasgow, Castlemilk Drive  Traffic Calming, City Council&#8217;s response to our proposals </li><li>Glasgow, Connecting Woodside, Garscube Road, work started on 2-way segregated cycle lane</li><li>Glasgow University, March newsletter from Multiplex</li><li>North Toryglen Greenspace &amp; Active Travel Project update</li><li> South Lanarkshire, new cycle lanes! </li><li> Glasgow, Active Travel Forum </li><li>Sheriffhall success &#8211; what next? Update from Scottish Greens</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 **NEW** Walking &amp; Cycling in Glasgow: Give us your views, open</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="222" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/go-bike-logo-colour-Header.jpg?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-10282" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/go-bike-logo-colour-Header.jpg?w=1000&amp;ssl=1 1000w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/go-bike-logo-colour-Header.jpg?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/go-bike-logo-colour-Header.jpg?resize=600%2C254&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Yes, GoBike is consulting. Along with  Glasgow Eco Trust and On Bikes we are working together to collate information across Glasgow to help improve walking and cycling to create Streets for All, see <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://streetsforallglasgow.commonplace.is/" target="_blank">here</a> for more information and the commonplace map.</p>



<p>If you like what GoBike is doing, with our very limited funds &#8211; our only funding comes from our members, unlike most other groups who get public funding &#8211; then do please join us. Our minimum annual membership fee is £5 and you can join <a rel="noreferrer noopener" aria-label="online here (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank">online here</a>. The more members we have, the stronger our voice.</p>



<h6 class="wp-block-heading">1.2 Glasgow, Connecting Woodside, commonplace map for comments, closes 09 March</h6>



<p>This featured as Item 1.3 in our previous Digest, <a rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank">Digest 54</a> and here&#8217;s the link you need to the <a rel="noreferrer noopener" aria-label="most recent update (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/02/12/just-keep-pinning-until-9th-march!" target="_blank">most recent update</a> and the commonplace map. Do get your comments in soon!</p>



<h6 class="wp-block-heading">1.3 East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-10216" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=300%2C137&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=600%2C273&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> This proposal, to remove on-street parking from a short section of Westerhill Road just off Kirkintilloch Road in Bishopbriggs and the junction areas with Dalkeith Avenue and Wellington Road, arrived by email on 11 February from East Dunbartonshire Council and the details were given in Item 1.4 of <a rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank">Digest 54</a>.  GoBike normally supports the removal of on-street parking, since it generally interferes with clear routes for cycling &#8211; unless we are told of good reasons otherwise. So do please let us know if there are reasons for not supporting this!</p>



<h6 class="wp-block-heading">1.4 **NEW** East Dunbartonshire, Townhead, Kirkintilloch, No Waiting at any time restrictions, closes 16 March</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Townhead-view.png?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-10447" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Townhead-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Townhead-view.png?resize=300%2C137&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Townhead-view.png?resize=600%2C274&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Townhead-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This proposal, which came in on 18 February, just too late for Digest 54, is to remove parking in the section of Townhead where the van is. The wasteland now has flats built on it.<br>Here&#8217;s the email we received from East Dunbartonshire Council:</p>



<p>&#8220;<em>Dear Sir/Madam,    </em><br><br><em>PROPOSED:  THE EAST DUNBARTONSHIRE COUNCIL (TOWNHEAD, KIRKINTILLOCH)     (NO WAITING AT ANY TIME RESTRICTIONS) ORDER     </em><br><br><em>The  Council  is  promoting  a  Traffic  Regulation  Order  which would  introduce no waiting at any time restrictions on a section of Townhead, Kirkintilloch. Enclosed  is  a  copy  of  the  draft  Order, plan and Statement  of  Reasons,  together  with a copy of the Notice that is to appear  in  the  Kirkintilloch Herald which is published on 19 February     2020</em><br><em>Should you wish to comment on the proposal you must do so in writing by Monday,  16 March 2020. Your comments should be sent to Chief Solicitor  &amp;   Monitoring   Officer,   Legal   Services,  12  Strathkelvin  Place,     Kirkintilloch, G66 1TJ. </em><br>(<em>See attached file: <a rel="noreferrer noopener" aria-label="200218 Townhead proposed Order &amp; documentations.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/200218-Townhead-proposed-Order-documentations.pdf" target="_blank">200218 Townhead proposed Order &amp; documentations.pdf</a>)     </em><br><br><em>Yours faithfully     </em><br><em>Fiona Stirling, Legal Services, 12 Strathkelvin Place, Kirkintilloch,  G66 1TJ</em>&#8220;</p>



<p>GoBike will be supporting this proposal.</p>



<h6 class="wp-block-heading">1.5  **NEW** Glasgow, North Kelvin and North Woodside, Traffic Management and Parking Controls, closes 27 March  </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="244" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Jardine-Street.png?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-10449" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Jardine-Street.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Jardine-Street.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Jardine-Street.png?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Jardine-Street.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Jardine Street &#8211; the only street to retain 2-way cycling when streets are made 1-way</figcaption></figure>



<p>Last November, GoBike responded to the Stage One consultation for this proposal and we highlighted 3 concerns:</p>



<ul class="wp-block-list"><li>Removal of 2-way cycling. Streets are proposed to be 1-way with no exemption for cycling. Contraflow cycling is the default on 1-way streets in Cycling by Design and there is no evidence of it being unsafe.</li><li>The lack of cycle parking. We suggested cycle shelters for residents and cycle stands for visitors to the area.</li><li>Angled or perpendicular to the kerb parking. If this type of parking is to be allowed then common sense and guidance suggests that drivers reverse in to their parking place. Thus they will drive forward when leaving, rather than reversing into oncoming traffic.</li></ul>



<p>Have our concerns been included in the public consultation?</p>



<p>Here&#8217;s the email that we received on 28 February:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</strong>, <strong>HEAD OF ROADS</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Sir / Madam<br><br><strong>THE GLASGOW CITY COUNCIL</strong>, <strong>(NORTH KELVIN AND NORTH WOODSIDE)</strong>, <strong>(TRAFFIC MANAGEMENT AND PARKING CONTROLS)</strong>, <strong>ORDER 202_</strong><br><br>Further  to my consultation email of 31 October 2019 regarding the above named  Traffic Regulation Order,  and in accordance with the statutory procedures, I now enclose a copy  for the press notice of the proposed Order, relevant map, statement of  reasons, detailed report and frequently asked questions (FAQs). <br><br>Details of the proposals will also be available on the Glasgow City Council website at <a href="http://www.glasgow.gov.uk/saferparking">www.glasgow.gov.uk/saferparking</a>.<br><br>Please note the following modifications have been made since the consultation phase:</em></p>



<ul class="wp-block-list"><li> <em>The  inclusion of 8 more electric vehicle recharging bays; 1 on Fergus  Drive, 4 on Hopehill Road, 1 on Hotspur Street, 1 on Raeberry Street  and 1 on Shakespeare Street to promote more sustainable vehicles.</em></li><li><em> Removal  of 6 No. shared use parking spaces on Hopehill Road to accommodate a  project to re-design the junction of Hopehill Road with Maryhill  Road. </em></li><li><em> The  inclusion of the following roads which were missed from the previous  list of affected roads due to an administrative error; Belmont Street,  Clouston Lane, Kelvinside Grove, Lothian Lane, Malloch Street, Un-named  Road (north of the west section of Henderson Street) and Yarrow Gardens  Lane. </em></li></ul>



<p><em>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send  details of the grounds for objection in writing to Kevin Hamilton, Head  of Roads, Neighbourhoods and Sustainability, Exchange House, 231 George  Street, Glasgow, G1 1RX or by email to <a href="mailto:NorthKelvinAndNorthWoodside@glasgow.gov.uk">NorthKelvinAndNorthWoodside@glasgow.gov.uk</a>  by Friday 27 March 2020. <br><br>Yours faithfully&#8221; etc</em></p>



<p>The documents referred to in the email are here:  <a rel="noreferrer noopener" aria-label="press notice of the proposed Order (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/NorthKelvin-NorthWoodside-Press-Notice-RTO-24Feb20.pdf" target="_blank">press notice of the proposed Order</a>, <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW_RPZ_Publication_Area_A.pdf" target="_blank">relevant map A</a> (see below &#8211; the link here is to the correct, updated version of this drawing),  <a rel="noreferrer noopener" aria-label="relevant map B (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW-RPZ-Publication-Area-B.pdf" target="_blank">relevant map B</a>,  <a rel="noreferrer noopener" aria-label="relevant map C (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW-RPZ-Publication-Area-C.pdf" target="_blank">relevant map C</a>, <a rel="noreferrer noopener" aria-label="statement of  reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/08.01-Statement-of-Reasons.pdf" target="_blank">statement of  reasons</a>, <a rel="noreferrer noopener" aria-label="detailed report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/09.01-Draft-Report.pdf" target="_blank">detailed report</a> and <a rel="noreferrer noopener" aria-label="frequently asked questions (FAQs) (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/09.02-Frequently-Asked-Questions.pdf" target="_blank">frequently asked questions (FAQs)</a>. </p>



<p>A promising extract from the documentation that local resident and GoBike member, Alasdair, has noticed is: <br>&#8220;Cycling permeability:<br>To assist with cycling throughout the area, a ‘no entry except&nbsp;pedal&nbsp;cycles’ restriction is proposed at the&nbsp;junction of Jardine Street with Garriochmill Road. In addition to this, the physical features on Clouston Street, Doune Gardens, Dunard Street, Hathaway Street, Hopehill Road, Hotspur Street, Kelvin Drive, North Woodside Road, Striven Gardens and Wilton Street to prevent vehicular access will also be assessed and upgraded where necessary to better facilitate cyclist permeability.&#8221;<br><br>We think this means that measures will be taken to prevent car parking where there are already filters across streets!</p>



<p>A query on the drawings was raised by phone with the  Assistant Group  Manager, Traffic and Road Safety in the afternoon of 03 March and 2 hours later this reply was received:</p>



<p>&#8220;<em><strong>Further  to your telephone conversation with AB, Assistant Group  Manager, Traffic and Road Safety, he has advised of a discrepancy  regarding the “No entry except cycles”  signage in the drawing 001 for the proposed North Kelvin and North  Woodside parking control scheme. This has now been rectified and the  online drawings available have been updated to show this. <br><br>I  note your request for the location of proposed “Prohibition of driving,  except pedal cycles” restrictions and can disclose that they are at the  following locations (all areas  where there is a physical barrier preventing vehicles from driving on  the carriageway):-<br><br>Avenuepark Street <br><br>Clouston Street <br><br>Doune Quadrant </strong></em><br><br><em><strong>Hathaway Street <br><br>Kelvin Drive <br><br>Striven Gardens <br><br>The  prohibition of driving except cycles on Shakespeare Street (northwards)  and Maryhill Road onto Trossachs Street will remain in place.<br><br>Pedal  cycles will also be permitted to travel in both directions through the  Bus Gate on Hotspur Street and through the Fire Path on the north  carriageway of Wilton Street.<br><br>As previously discussed there are no plans at this time to include contraflow cycling within the one way streets in this area. &#8220;</strong></em></p>



<p>So there we are, better than it could be but it is still disconcerting that the City Council is ignoring the evidence on contraflow cycling.</p>



<h6 class="wp-block-heading">1.6  **NEW** Glasgow, Low Emission Zone Phase 2, online consultation, closes 29 March</h6>



<p>Here&#8217;s the email that we received on 25 February:</p>



<p>&#8220;<em>Good Afternoon<br><br>Glasgow’s  <a href="https://www.glasgow.gov.uk/LEZ">Low Emission Zone</a> (LEZ) was introduced in 2018 to reduce air pollution from road traffic and to protect public health.<br><br>Our LEZ affects local  service buses only at present, however its second phase, which is  expected to be enforced from 31 December 2022, will apply to all  vehicles driving into the city centre zone, including  private cars. <br><br><strong>LEZ Public Consultation  </strong><br><br>To inform how Glasgow  City Council should implement the second phase of our LEZ, we are  seeking views through consultation on key local aspects; including its  boundary, enforcement dates and temporary exemptions  &#8211; as well as how it might affect your future transport choices. The  online consultation is open until 29 March 2020 and can be accessed at  this <a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">link</a>.</em><br><br><em><strong>LEZ Stakeholder Workshop</strong><br><br>To complement the  online consultation, we are holding a Stakeholder Workshop on Tuesday 10  March 2020 at the Glasgow Royal Concert Hall and we would be delighted  if you would attend. <br><br>Taking part in this  Consultation Workshop will give you the chance to discuss and share your  opinions on Glasgow’s LEZ.&nbsp; There will also be the opportunity to hear  from council air quality officers as well  as Transport Scotland and Cllr Anna Richardson, Convener for  Sustainability and Carbon Reduction.<br><br><strong>Registration is required to attend the  Consultation Workshop as spaces are limited. Should you or a colleague  be able to attend, please reserve your place</strong></em> (link removed by GoBike)<br><br><em><strong>Lunch and refreshments will be provided.</strong><br><br><strong>Many thanks.</strong><br><br><strong>Sustainable Glasgow</strong><br><strong>Neighbourhoods &amp; Sustainability</strong><br><strong>Glasgow City Council</strong></em>&#8220;</p>



<p>One of GoBike&#8217;s committee members will be attending and we will have feedback in Digest 56 in 2 weeks, but do remember to <a rel="noreferrer noopener" aria-label="complete the survey (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">complete the survey</a> on the council website. It&#8217;s an easy one to do, but concerning that they propose exemptions! There&#8217;s always a get-out for the bad guy! So please do the <a rel="noreferrer noopener" aria-label="survey (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">survey</a> and let&#8217;s get the air in Glasgow cleaner.</p>



<h6 class="wp-block-heading">1.7 Scottish Government — Fourth National Planning Framework, closes 31 March</h6>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>We mentioned the drop-in sessions and workshops for this consultation back in <a rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank">Digest 53</a>, Item 2.1. There&#8217;s a drop-in session and workshop in Glasgow on 17 March, see this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transformingplanning.scot/national-planning-framework/get-involved/" target="_blank">link</a> for details of this and other events round Scotland.</p>



<p>The same <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transformingplanning.scot/national-planning-framework/get-involved/" target="_blank">link</a> gives details of just how important this consultation is and GoBike member Sebastian says &#8221; <em>The NPF4 will be a hugely important Government plan for Scotland up to 2050 – it decides national investment, development and infrastructure plans for the future. They have said they will use is to take forward the transport projects needed for the future (from STPR2) – so&nbsp;<strong>a big opportunity to re-state what infrastructure we think is needed for cycling and active travel</strong>. NPF3 in 2014 included the National Cycling and Walking Network so NPF4 must do much more.</em>&#8220;</p>



<p>We were also told about this by our friends in Transform Scotland; see this <a href="http://transformscotland.org.uk/blog/alerts/scottish-government-fourth-national-planning-framework/" target="_blank" rel="noreferrer noopener" aria-label="link (opens in a new tab)">link</a> to their website.</p>



<p>Do we have a volunteer to write GoBike&#8217;s response?</p>



<h6 class="wp-block-heading">1.8 **NEW** Glasgow, Hutchesontown (New Gorbals) Parking Controls, closes 13 April</h6>



<p>GoBike committee member, Thomas alerted us to this <a rel="noreferrer noopener" aria-label="consultation (opens in a new tab)" href="https://www.glasgow.gov.uk/hutchesontown-newgorbals" target="_blank">consultation</a>, which we need to study. There are moves to prevent commuter parking, but a quick glance at the drawings shows a key for &#8220;proposed one / two way operation except pedal cycles&#8221;, which looks promising.</p>



<p>If you live or work in this area, or cycle through, do please have a look on the City Council&#8217;s <a rel="noreferrer noopener" aria-label="website (opens in a new tab)" href="https://www.glasgow.gov.uk/hutchesontown-newgorbals" target="_blank">website</a> and let us know, at <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank">consultations@gobike.org</a> the good and any bad points. We&#8217;ll have more information for you in Digest 56 or 57.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Scottish Government — Fourth National Planning Framework, drop-in session and workshop, Glasgow, 17 March </h6>



<p>See Item 1.7 above and this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transformingplanning.scot/national-planning-framework/get-involved/" target="_blank">link</a> for details of the drop-in session and workshop to be held at the Women&#8217;s Library in Bridgeton on 17 March.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Yorkhill and Kelvingrove Community Council Cycling Village consultation event held on 19 February, brief notes</h6>



<p>Brief notes from GoBike committee member, Brenda, who attended the event on 19 February (advertised in Item 1.2 in <a rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank">Digest 54</a>)</p>



<ul class="wp-block-list"><li>Centred on Argyle Street from PC World to a bit past the Kelvinhaugh Street junction.</li><li>Current plans appear to include:  </li><li>Traffic lights at Argyle Street /Kelvinhaugh Street /Derby Street junction</li><li>Derby Street and Kelvingrove Street to be one-way (opposite directions) between (at least) Sauchiehall Street and Argyle Street</li><li>Bi-directional cycleways in Kelvinhaugh Street and Derby Street (and presumably Kelvingrove Street )</li><li>Possibility of removing parking from the south side  of Argyle Street  and having charging points for electric mobility scooters /  wheelchairs / e-bikes </li></ul>



<p>Overall, it does look as if things have moved on quite a bit since some time ago when we were shown plans of cycle lanes behind Kelvinhall but it does look as if  improvements for people walking and cycling are at a fairly developed stage of planning. </p>



<p>The Community Council in this area is particularly active in its attempts to improve life for its residents. It&#8217;s a shame we don&#8217;t have active Community Councils right across the city.</p>



<h6 class="wp-block-heading">3.2 ScotRail, future of Cycle Forum uncertain, with completion of contract by Kathryn MacKay, Cycling Officer</h6>



<p>GoBike has attended the ScotRail Cycle Forum over the years but here is some perturbing news, with this email that we received on 18 February:</p>



<p>&#8220;<em>Dear Cycle Forum Member.<br><br>I write to advise you that Kathryn’s contract as Cycling Manager with ScotRail will come to an end at the end of this month.<br><br>In the short term, I would ask  that all enquiries regarding cycling activities be directed towards my  colleague (name and contact details removed by GoBike).<br><br>In the longer term, a review of  our resource allocation is taking place in respect of priorities for the  remaining two years of the franchise, and the key objectives of the  recently published National Transport Strategy 2.</em><br><br><em>During her time with ScotRail,  Kathryn has made a significant contribution to the development of our  cycling programme and has overseen a number of successful pieces of  work. It has been a pleasure working with her and I am sure you will  join me in wishing her all the best for the future.<br><br>I will be sending out a note to the wider stakeholders group later today but wanted you to know first.</em><br><br><em>Regards<br><br>James<br>James Ledgerwood<br>Head of Economic Development &amp; Communities<br>ScotRail</em>&#8220;</p>



<p>Kathryn oversaw the introduction of the new 385 Class trains on the Edinburgh &#8211; Glasgow service and it is no doubt down to her that, while not perfect, we have as much bike carriage as we have on our trains. Let&#8217;s hope they take on a new Cycling Officer.</p>



<h6 class="wp-block-heading">3.3 North Lanarkshire, Local Development Plan update</h6>



<p>Here&#8217;s the email that we received on 21 February from North Lanarkshire Council:</p>



<p>&#8220;<em>Dear Sir/Madam,<br><br><strong>NORTH LANARKSHIRE LOCAL DEVELOPMENT PLAN UPDATE</strong><br><br>Our modified proposed Local Development Plan went out to consultation last year. <br><br>We  have since been reviewing the comments provided and the Planning  Committee will be considering our responses at its meeting on 27  February 2020.</em><br><br><em>The relevant documents can be viewed at: <a href="http://www.northlanarkshire.gov.uk/planningdocuments" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">www.northlanarkshire.gov.uk/planningdocuments</a><br><br>Should you wish further information please contact us at <a href="mailto:Yourplan@northlan.gov.uk" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Yourplan@northlan.gov.uk</a> or phone 01236 632622 for assistance.<br><br><strong>Strategy and Policy Team</strong><br><strong>North Lanarkshire Council</strong><br>Enterprise and Communities<br>Fleming House<br>2 Tryst Road<br>Cumbernauld<br>G67 1JW<br>Telephone Number: 01236 632646</em></p>



<h6 class="wp-block-heading">3.4 Glasgow, Ardencraig Road Traffic Calming, City Council&#8217;s response to our proposals</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>In <a rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank">Digest 54</a>, Item 3.3, we published our submission for the proposal to install speed cushions on Ardencraig Road. On 24 February we received the following response, which continues Glasgow&#8217;s love affair with speed cushions:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON, HEAD OF ROADS, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><br><br><em>Dear Ms Fort<br><br>Thank you for your attached enquiry.<br><br>Whilst  I appreciate your concerns regarding the installation of speed cushions  on Ardencraig Road, I can advise that  this section is focused on reducing injury accidents throughout the  city. The council has limited funding and resources available to  implement traffic calming schemes and in order to make sure these  resources are directed at the locations with the greatest  potential for casualty reduction, a site risk assessment is undertaken  for each request. This process assesses the location against criteria  including the history of injury accidents, measured vehicle speeds and  the presence of any local amenities such as  being close to a nearby school or nursery. Given  the presence of Miller Primary School and the results of a recent speed  survey carried out on this section of Ardencraig Road,  this location met the criteria for the introduction of traffic calming  measures.</em><br><br><em>With  respect to your comments regarding a default speed limit of 20mph in  Glasgow, I can advise the Council are currently seeking  to implement mandatory 20mph city-wide speed limit restrictions on  appropriate roads. It should be noted however that not all within  Glasgow roads will be appropriate for the lower limit. <br><br>I  can further advise that whilst the principles of Designing Streets  should be applied on existing roads where practical, this would  be subject to re-design and would involve considerable costs to the  Council. Designing Streets is expected to be used predominantly for the  design, construction, adoption and maintenance of new streets.</em><br><br><em>Finally, you may be  aware that the Council and are currently running a pilot project known  as School Car Free Zones. The project is running for an initial trial  period of 18 months across 6 selected schools  where it is known that traffic related issues at the beginning and end  of the school day already occur. If the trial proves successful, it is  anticipated that this project will be extended to include additional  schools in appropriate locations across the city.  Schools have been advised to contact the Council should they wish to be  included within any future phase of the School Car Free Zone project.<br><br>I  trust that the foregoing is of assistance, however, should you require  further information, please contact (name and phone number removed by GoBike)</em>.&#8221;</p>



<h6 class="wp-block-heading">3.5 Glasgow, Belmont, confirmation of Traffic Management Order</h6>



<p>In <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)">Digest 50</a>, Item 3.1 we supported the move to prohibit commuter parking in this area and on 25 February we received this confirmation that the Order was approved:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF KEVIN&nbsp; HAMILTON</strong>, <strong>HEAD OF ROADS</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Sir/Madam<br><br><strong>THE GLASGOW CITY COUNCIL</strong>, <strong>(BELMONT)</strong>, <strong>(TRAFFIC MANAGEMENT) ORDER 2005 (VARIATION NO.2) ORDER 2020</strong><br><br>I am writing to notify  you that the above named Traffic Regulation Order was made on 18  February 2020 to improve the safety and the actual and perceived  security of travelling within the City by reducing accidents  and enhancing the personal security of all users of the transport  network.<br><br>This Order will:</em></p>



<ul class="wp-block-list"><li> <em>Prevent commuters parking all day, giving residents priority over these commuters.</em></li><li><em> Reduce the availability of long term free parking  to discourage people from using their private car to commute to work and  thereby encouraging them to use other methods of travel such as public  transport, walking and cycling.  This can reduce congestion and pollution.</em></li></ul>



<p><em>An advert will be placed in the Evening Times on 26 February 2020 stating that the Traffic Regulation Order has been made.<br></em><br><em>All those who objected to or supported the proposals will now be written to again and advised of the decision.<br><br>Please find attached a copy of the plans for your information.<br><br>Should you require any further information on the above named Order please contact my assistant (name and phone number removed by GoBike).<br><br>Yours sincerely,</em>&#8221; etc</p>



<p>The <a rel="noreferrer noopener" aria-label="plan attached to the email (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/Belmont__Hamilton_Gardens-A3_Titlebox_-_Transplan.pdf" target="_blank">plan attached to the email</a> shows just how much resident parking there is in this area &#8211; quite a bit.</p>



<p>A further email on 26 February included this information :</p>



<p>&#8220;<em>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have  decided under its scheme of delegated functions to proceed with the  proposal as advertised.<br><br>The Order was made on 18<sup>th</sup> February 2020 and an advert was placed in the Evening Times on 26<sup>th</sup> February 2020 stating that the  Traffic Regulation Order has been made.</em>&#8220;</p>



<h6 class="wp-block-heading">3.6 Glasgow, Castlemilk Drive  Traffic Calming, City Council&#8217;s response to our proposals </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>In <a href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank" rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)">Digest 54</a>, Item 3.5, we published our response to the proposals for the installation of traffic calming measures, ie speed cushions, on Castlemilk Drive. Here&#8217;s the City Council&#8217;s rebuttal of our alternative proposals, received on 26 February:</p>



<p>&#8220;<strong>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON, HEAD OF ROADS, NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Ms Fort<br><br><em>Thank you for your attached enquiry.<br><br>Whilst  I appreciate your concerns regarding the installation of speed cushions  on Castlemilk Drive, I can advise that  this section is focused on reducing injury accidents throughout the  city. The council has limited funding and resources available to  implement traffic calming schemes and in order to make sure these  resources are directed at the locations with the greatest  potential for casualty reduction, a site risk assessment is undertaken  for each request. This process assesses the location against criteria  including the history of injury accidents, measured vehicle speeds and  the presence of any local amenities such as  being close to a nearby school or nursery. Given  the results of a recent speed survey carried out on this section of  Castlemilk Drive, analysis of the Police Scotland injury accident  database and the presence of the nearby primary school, this location  met the criteria for the introduction of traffic calming measures.</em><br><br><em>With  respect to your comments regarding a default speed limit of 20mph in  Glasgow, I can advise the Council are currently seeking  to implement mandatory 20mph city-wide speed limit restrictions on  appropriate roads. It should be noted however that not all roads within  Glasgow will be appropriate for this limit. <br><br>I  can further advise that whilst the principles of Designing Streets  should be applied on existing roads where practical, this would  be subject to re-design and would involve considerable costs to the  Council. Designing Streets is expected to be used predominantly for the  design, construction, adoption and maintenance of new streets.<br><br>I  trust that the foregoing is of assistance, however, should you require  further information, please contact (name and phone number removed by GoBike).</em>&#8220;</p>



<p>There we have it: disappointing news about the use of &#8220;Designing Streets&#8221; and no consideration of our contention that installing cycle lanes would narrow the road and reduce traffic speeds.</p>



<h6 class="wp-block-heading">3.7 Glasgow, Connecting Woodside, Garscube Road, work started on 2-way segregated cycle lane</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="230" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=525%2C230&#038;ssl=1" alt="" class="wp-image-8684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=600%2C263&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s some better news: work has started on the 2-way cycle lanes on the east side of Garscube Road, part of the Connecting Woodside works, (shame it&#8217;s not 2 1-way lanes, but, hey, it&#8217;s better than some of the items in this Digest). Here&#8217;s an email from one of our members, who is also a member of his Community Council, sent out on 27 February:</p>



<p><em><strong>GLASGOW CITY COUNCIL(SAWMILLFIELD STREET, GLASGOW)(TEMPORARY TRAFFIC REGULATION) ORDER 2020</strong>&nbsp;</em><br><br><em>I  am pleased to advise that construction of the first phase of the  Connecting Woodside project, a two-way segregated cycle lane on the  eastern side of Garscube Road commenced on 24 February 2020.&nbsp;<br>J McGeady Ltd is the appointed contractor to undertake the construction works.&nbsp;<br>During  the construction phase, a Temporary Traffic Regulation order will be in  place on the eastern part of Sawmillfield street at junction with  Edington. This section will be inaccessible by the general public as it  will&nbsp; be used as the main compound by the contractor.&nbsp;Traffic  management will be utilised to prevent unnecessary disruption for both  pedestrians and vehicular traffic using Garscube Road and the  surrounding roads network. &nbsp;<br>I trust this is of assistance; however, should you require any further information, please contact&nbsp;<a class="" href="mailto:Sustainabletransport@glasgow.gov.uk">Sustainabletransport@glasgow.gov.uk</a><strong>&nbsp;</strong>&nbsp;<br>Christine Francis,&nbsp;Head of Technical Services, Neighbourhoods and Sustainability</em>&#8220;</p>



<h6 class="wp-block-heading">3.8 Glasgow University, March newsletter from Multiplex</h6>



<p><a rel="noreferrer noopener" aria-label="Latest newsletter on what's happening at this University (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/03/March-2020-Multiplex-UoG.pdf" target="_blank">Latest newsletter on what&#8217;s happening at this University</a>.</p>



<h6 class="wp-block-heading">3.9 North Toryglen Greenspace &amp; Active Travel Project update</h6>



<p>It&#8217;s while since we heard much from Toryglen but here&#8217;s the latest update received on 02 March:</p>



<p>Dear All,<br><br><strong>North Toryglen Greenspace &amp; Active Travel Project</strong><br><br><strong> </strong>The latest design proposals were showcased at an information session in Toryglen Community Base on Tuesday 18th February. Thanks to everyone who came along.&nbsp; For those interested to find out more, please see the latest updates on the project webpage here <a href="https://www.urbanroots.org.uk/workshops/northtoryglen/" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">https://www.urbanroots.org.uk/northtoryglen/</a></p>



<p>There&#8217;s some good stuff going on here: do take a look.</p>



<h6 class="wp-block-heading">3.10 South Lanarkshire, new cycle lanes!</h6>



<p>GoBike member, Derek, told us about this, though we don&#8217;t recall any consultation coming our way:<br><br>Surprise announcement by&nbsp;South&nbsp;Lanarkshire&nbsp;Council that they’re starting to build a short stretch of segregated cycle way in East Kilbride on Monday. Hadn’t heard anything or seen plans beforehand. See:&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://slack-redir.net/link?url=https%3A%2F%2Ftwitter.com%2Fsouthlancouncil%2Fstatus%2F1233425786574639104%3Fs%3D21" target="_blank">https://twitter.com/southlancouncil/status/1233425786574639104?s=21</a>. </p>



<h6 class="wp-block-heading">3.11 Glasgow, Active Travel Forum</h6>



<p>Some news from GoBike committee member, Calum, who attended the recent Active Travel Forum in Glasgow on 26 February:</p>



<p> Officer update from Steve Gray, including updates on many items where GoBike has responded to consultation:</p>



<ul class="wp-block-list"><li> Garscube Road construction started on Monday (see Item 3.7 above) </li><li> East City Way works are to start at Mount Vernon from 01 April </li><li> South City Way, Queens Park to Five Ways, ie Cumberland Street to be complete May 2020 (not before time, do I hear you say?)</li><li>Wallacewell Road &#8211; Spring on site &#8211; this is upgraded and new cycle lanes</li><li>Battlefield &#8211; paternity leave caused delay to consultation planned for 18 February (see item 2.1 in <a rel="noreferrer noopener" aria-label="Digest 54 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" target="_blank">Digest 54</a>) cancelled at very short notice</li><li> George Square &#8211; working on Experimental TRO for July 2020, reducing traffic around the square for an initial 18 months.</li><li> Underline Avenue works from Cambridge Street to St George&#8217;s Road &#8211; delayed until after COP26 to start of 2021. Embargo on construction works, related to security cordons for the event.  </li><li> Sighthill bridge over the M8, construction begins in March  </li></ul>



<h6 class="wp-block-heading">3.12 Sheriffhall success &#8211; what next? Update from Scottish Greens</h6>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=525%2C273&#038;ssl=1" alt="" class="wp-image-9833" width="525" height="273" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?w=540&amp;ssl=1 540w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>You might remember that in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.1, we published a message put out by Alison Johnstone, the Green MSP, asking us to oppose the construction of a massive roundabout at Sheriffhall? Here&#8217;s the next step:</p>



<p><em>&#8220;Success!<br><br>Thanks to you and the thousands of other supporters who  objected to the £120m Sheriffhall flyover, we&#8217;ve secured a review of  this congestion-fuelling, climate-busting scheme. We hope that this will  lead to this project being scrapped in favour of green transport  investment instead.<br><br>The commitment was part of a budget deal the Scottish Greens  negotiated that also includes a commitment to introduce free bus travel  for all under-19s from next year and a £45m climate emergency package  that includes more funding for cycling and walking.<br><br><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=10338&amp;qid=6895140" target="_blank">Read all about the Green budget deal.</a></em><br><br><em>What&#8217;s next?<br><br>As the transport spokesperson&nbsp;for the Scottish Greens in  Edinburgh, I&#8217;ll be writing to the leaders of Edinburgh and Midlothian  councils, Adam McVey and Derek Milligan, and to the Cabinet Secretary  for Transport, Michael Matheson, to urge them to change the plans for  Sheriffhall. I&#8217;ll tell them about your strength of support for investing  £120m in cycling and walking, instead of building a flyover that will  only increase congestion, air pollution and greenhouse gas emissions.<br><br>If politicians like Adam McVey and Michael Matheson want to declare a climate emergency, then they need to act on it!<br><br>Claire Miller<br>Green councillor and transport spokesperson in Edinburgh Council&#8221;</em></p>



<p>________________________________________________</p>



<p>Heartwarming to end with some good news. Let&#8217;s hope there is more in our next Digest, due out on 17 March.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10280</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 54, 18 February 2020: An event today for Battlefield, one tomorrow for Yorkhill &#038; Kelvingrove, and yet more on &#8220;traffic calming&#8221;.</title>
		<link>https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 18 Feb 2020 10:53:16 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car club]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Community Council]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[EV Charging]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[Housing]]></category>
		<category><![CDATA[Low Emission Zone]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Public Hearing]]></category>
		<category><![CDATA[regeneration]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=10097</guid>

					<description><![CDATA[This is, primarily, the feedback issue, with 16 updates on items that have been covered before. These include 10 consultation submissions: 4 for Traffic Calming (speed cushions proposed for all), 3 for Byres Road, 1 for proposed one-way with no contraflow (but see our final item for what we hope is a change for the &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-54-18-february-2020-an-event-today-for-battlefield-one-tomorrow-for-yorkhill-kelvingrove-and-yet-more-on-traffic-calming-10097" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 54, 18 February 2020: An event today for Battlefield, one tomorrow for Yorkhill &#038; Kelvingrove, and yet more on &#8220;traffic calming&#8221;."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>This is, primarily, the feedback issue, with 16 updates on items that have been covered before. These include 10 consultation submissions: 4 for Traffic Calming (speed cushions proposed for all), 3 for Byres Road, 1 for proposed one-way with no contraflow (but see our final item for what we hope is a change for the better) 1 for Car Club Electric Vehicle  Charging Points (the location of which cause some concern, but we include a different approach from North Lanarkshire) and 1 high-level District Regeneration Framework &#8211; thanks to all the people who contributed to the letters submitted, but do please read on for the detail and stushies at 2 big football clubs.</p>



<span id="more-10097"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scotland&#8217;s Low Emission Zones: Consultation on Regulations and Guidance, closes 24 February</li><li>Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li><li> **NEW-ish** Glasgow, Connecting Woodside, commonplace map for comments closes 09 March </li><li>**NEW** East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, additional South City Way event for Battlefield extension, TODAY, 18 February, 4-6pm, Langside Library, Sinclair Drive</li><li>Glasgow, Yorkhill &amp; Kelvingrove Community Council Cycling Village consultation, TOMORROW, 19 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>North Lanarkshire Council tell us about the new Scottish Transforming Planning Website </li><li>Glasgow, Central District Regeneration Framework, submission and  acknowledgement </li><li>Glasgow, Ardencraig Road, Traffic Calming, submission </li><li>Glasgow, Bankfoot Road and Wedderlea Drive, Traffic Calming, submission</li><li>Glasgow, Castlemilk Drive, Traffic Calming Submission</li><li>Glasgow, Mosspark Drive Traffic Calming, submission </li><li>Glasgow, Carmunnock Road Service Road, One-Way with no contraflow, submission</li><li>Glasgow, South Side Car Club TRO, submission</li><li>North Lanarkshire, £5 million electric vehicle charging network</li><li>Glasgow, Byres Road Traffic Management &amp; Parking (for cycle lanes),submission</li><li>Glasgow, Byres Road 20mph TRO, submission</li><li>Glasgow, Hillhead Traffic Management and Parking Controls TRO,  submission </li><li>East Dunbartonshire, Bearsden Town Centre, Waiting &amp; Loading Restrictions confirmed.</li><li>Glasgow, Celtic Park &amp; Emirates Arena, Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 10 March</li><li>Glasgow, Ibrox Stadium,  Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 11 March </li><li>Glasgow University Campus Development February update </li><li>Glasgow, Good News with some Progress on Contraflow Cycling</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations in date order for response</h4>



<h6 class="wp-block-heading">1.1  **NEW** Scotland&#8217;s Low Emission Zones: Consultation on Regulations and Guidance, closes 24 February </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/LEZ.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10238"/></figure></div>



<p>GoBike member, Steph, has alerted us to the Scottish Government&#8217;s <a rel="noreferrer noopener" aria-label="consultation on Low Emission Zones (opens in a new tab)" href="https://www.transport.gov.scot/consultation/scotlands-low-emission-zones-consultation-on-regulations-and-guidance/" target="_blank">consultation on Low Emission Zones</a>. As with the next item on Housing, it&#8217;s a bit confusing at first, but do give it a try if you are concerned about all the pollution in our urban centres. There does seem to be a presumption that contravening an LEZ is a bit like a parking infringement, ie an inconvenience, rather than something that is causing ill-health and death, particularly for the disadvantaged in our society. No doubt cycle uptake would increase if our streets were cleaner, too.</p>



<h6 class="wp-block-heading">1.2 Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<div class="wp-block-image"><figure class="alignleft size-full"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/affordable-housing.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10055"/></figure></div>



<p><br><br></p>



<p></p>



<p>This consultation featured as Item 1.12 in <a rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank">Digest 53</a> and here&#8217;s the link again:  <a rel="noreferrer noopener" aria-label="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/  (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/ </a></p>



<p>This is the link to the start of your response: <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://consult.gov.scot/housing-services-policy-unit/housing-to-2040/consultation/intro/" target="_blank">https://consult.gov.scot/housing-services-policy-unit/housing-to-2040/consultation/intro/</a></p>



<p>I found it all a bit confusing but did manage to mention active travel and my preference for terraced and tenement-style housing linked with good cycleways. Give it a try and let&#8217;s get active travel ranked above the private car.</p>



<h6 class="wp-block-heading">1.3 **NEW-ish** Glasgow, Connecting Woodside, commonplace map for comments closes 09 March</h6>



<p>We&#8217;ve had lots of news about Woodside but the latest <a rel="noreferrer noopener" aria-label="update (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/02/12/just-keep-pinning-until-9th-march!" target="_blank">update</a> signals the closure of the  commonplace map on 09 March. It&#8217;s good to read that 22 dropped kerbs and 80 bike parking stands have been installed in the project area to date, so do have a look and see what else is needed.</p>



<h6 class="wp-block-heading">1.4 **NEW** East Dunbartonshire, Dalkeith Avenue, Wellington Road and Westerhill Road, Bishopbriggs, No Waiting and No Loading at any time, closes 16 March</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="239" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=525%2C239&#038;ssl=1" alt="" class="wp-image-10216" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=300%2C137&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?resize=600%2C273&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This proposal, to remove on-street parking from a short section of Westerhill Road just off Kirkintilloch Road in Bishopbriggs and the junction areas with Dalkeith Avenue and Wellington Road, arrived by email on 11 February from East Dunbartonshire Council:</p>



<p>&#8220;<em>PROPOSED:  THE EAST DUNBARTONSHIRE COUNCIL (DALKEITH AVENUE, WELLINGTON ROAD AND WESTERHILL ROAD, BISHOPBRIGGS) ( NO WAITING AND NO LOADING AT ANY TIME RESTRICTIONS) ORDER     <br><br>The  Council  is  promoting  a  Traffic  Regulation  Order  which would introduce no waiting and no loading at any time restrictions.  <br>Enclosed is <a rel="noreferrer noopener" aria-label=" a  copy of the draft Order, plan and Statement of Reasons, together with  a copy of the Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/200211Dalkeith-Ave-Wellington-Rd-Westerhill-Rd-Order.pdf" target="_blank"> a  copy of the draft Order, plan and Statement of Reasons, together with  a copy of the Notice</a> that is to appear in the Bishopbriggs Herald which is published on 12 February 2020<br>Should you wish to comment on the proposal you must do so in writing by Monday,  16 March 2020. <br>Your comments should be sent to Chief Solicitor &amp;   Monitoring   Officer,   Legal   Services,  12  Strathkelvin  Place,     Kirkintilloch, G66 1TJ.   <br>(See  attached  file:  200211Dalkeith  Ave- Wellington Rd &#8211; Westerhill Rd   Order.pdf)   </em><br><br><em>Regards   <br>Fiona Stirling   <br>Legal Services   <br>12 Strathkelvin Place   <br>Kirkintilloch   G66 1TJ</em>&#8220;</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-10218" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Westerhill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Given the commercial properties in the vicinity and the tendency of people to leave their cars/vans at or near junctions inconveniencing others, particularly people walking or cycling, this proposal seems very sensible. Unless you out there tell us otherwise, this is one that GoBike will be supporting.</p>



<p>Back in June last year, in <a rel="noreferrer noopener" aria-label="Digest 37 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank">Digest 37</a>, Item 3.4 were details of an earlier TRO that we had supported, removing on-road parking from further along Westerhill Road, outside commercial units.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, additional South City Way event for Battlefield extension, TODAY, 18 February, 4-6pm, Langside Library, Sinclair Drive</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="287" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=525%2C287&#038;ssl=1" alt="" class="wp-image-10114" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=300%2C164&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Battlefield-Rest-Feb20.jpg?resize=600%2C328&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As per our <a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" target="_blank" rel="noreferrer noopener" aria-label="Consultation Extra of 07 February (opens in a new tab)">Consultation Extra of 07 February</a>, there is a further consultation event this afternoon for the Queen&#8217;s Drive residents who missed all the earlier publicity and meetings. It&#8217;s open to all, takes place TODAY, 18 February at <a rel="noreferrer noopener" aria-label="Langside Library (opens in a new tab)" href="https://www.glasgowlife.org.uk/libraries/venues/langside-library" target="_blank">Langside Library</a> on Sinclair Drive. Do get along if you can.</p>



<h6 class="wp-block-heading">2.2  Glasgow, Yorkhill &amp; Kelvingrove Community Council Cycling Village consultation, TOMORROW, 19 February </h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="743" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=525%2C743&#038;ssl=1" alt="" class="wp-image-10208" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?w=678&amp;ssl=1 678w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Yokecoco-2.jpg?resize=424%2C600&amp;ssl=1 424w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p> Do get along to the  cycle village consultation on Wed 19 Feb at the Kelvingrove tennis pavilion 5-7.30pm. Get along and have your say, if you live, work, play or cycle in the area.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 North Lanarkshire Council tell us about the new Scottish Transforming Planning Website</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="444" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=525%2C444&#038;ssl=1" alt="" class="wp-image-10185" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?w=716&amp;ssl=1 716w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=300%2C254&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/NL-planning.png?resize=600%2C508&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<h6 class="wp-block-heading">3.2  Glasgow, Central District Regeneration Framework, submission and  acknowledgement </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Central-DRF-response-060220.pdf" target="_blank">response</a>, submitted on 06 February, written by GoBike committee member, Brenda, to this consultation, featured in previous Digests, most recently, <a rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank">Digest 53</a>, Item 1.6. In a nutshell, the framework is good but needs sharpening up if we are to transform our city centre.</p>



<p>Here&#8217;s the acknowledgement, received later that day:</p>



<p>&#8220;<em>Hi Tricia,<br>Thanks  very much for your email and the attached documents. I will include  this representation within the wider responses received  as part of the Central DRF public consultation exercise.<br>Please let me know if you require anything further.<br>Best regards,&#8221;</em> etc</p>



<h6 class="wp-block-heading">3.3 Glasgow, Ardencraig Road, Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation, which was introduced in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.5, closed on 11 February. The proposal, to slow motor traffic down on this straight road past houses and schools, was by using the City Council&#8217;s only solution, the installation of speed cushions. We think much more could be done &#8211; here&#8217;s our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Ardencraig-Road-traffic-calming-response-060220.pdf" target="_blank">letter</a> in response to the proposals.</p>



<h6 class="wp-block-heading">3.4 Glasgow, Bankfoot Road and Wedderlea Drive, Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The consultation to install traffic calming speed cushions in these two roads was Item 1.6 in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>. GoBike fully supports lower traffic speeds but objects to the standard policy of installing speed cushions in every location. Here&#8217;s our <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Bankfoot-Road-and-Wedderlea-traffic-calming-response-100220.pdf" target="_blank">response</a> to the consultation.</p>



<h6 class="wp-block-heading">3.5 Glasgow, Castlemilk Drive, Traffic Calming Submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Castlemilk Drive forms part of the route from the city centre, past King&#8217;s Park and Croftfoot railway stations to the Cathkin Braes Country Park and Mountain Bike Centre. The proposal to install speed cushions to reduce motor traffic speeds in this residential area featured in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.7. A half-hearted attempt was made prior to the 2014 Commonwealth Games to provide a cycle route from the city to the Braes, but a significant part was on the footways etc; it certainly wasn&#8217;t a route that children could use. Glasgow has relatively low car ownership and Castlemilk is one of its less affluent suburbs, yet the road is to be maintained as one for cars. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Castlemilk-Drive-traffic-calming-response-100220.pdf" target="_blank">letter</a> objecting to the standard policy of speed cushions and looking for something more appropriate. </p>



<h6 class="wp-block-heading">3.6 Glasgow, Mosspark Drive Traffic Calming, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="241" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=525%2C241&#038;ssl=1" alt="" class="wp-image-10053" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=600%2C275&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The traffic calming proposal for Mosspark Drive featured as Item 1.5 in <a href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" target="_blank" rel="noreferrer noopener" aria-label="Digest 53 (opens in a new tab)">Digest 53</a>. The standard speed cushion proposal takes no account of the possibilities of blocking through motor traffic,  of installing zebra crossings to allow people to cross safely to the park area or to tightening the radius of the turn from Mosspark Boulevard to 90 degrees. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Mosspark-Drive-traffic-calming-response-100220.pdf" target="_blank">letter of response</a>.</p>



<h6 class="wp-block-heading">3.7 Glasgow, Carmunnock Road Service Road, One-Way with no contraflow, submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The details of this consultation were first given in <a href="https://www.gobike.org/consultation-digest-37-25-june-2019-when-is-a-bus-taxi-cycle-gate-not-a-bus-taxi-cycle-gate-and-other-matters-to-ponder-8726" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.10 but we had previously been invited to comment at Stage One. Our <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a> at that Stage went in on 10 January and we have received no response to the concerns we expressed. In a nutshell, the City Council responded to residents&#8217; concerns about &#8220;traffic&#8221; on the road by proposing that it be made one-way. There was no mention, as far as we can see, about cycles; are they included in the one-way or not? Are people cycling going to be pushed to use the main road, or not? Here&#8217;s the <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Carmunnock-Road-response-100220.pdf" target="_blank">reply</a> we sent in on 10 February, very similar to our response at Stage One.</p>



<h6 class="wp-block-heading">3.8 Glasgow, South Side Car Club TRO, submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/carclub-1.jpg?w=525&#038;ssl=1" alt="" class="wp-image-9837"/></figure></div>



<p>Details of this TRO were first given in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.9. With the assistance of GoBike member, Brenda, we had responded to the Stage One consultation with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">letter</a>, to which we received a fairly general response. We have sharpened up our concerns to objections in this <a href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-South-Side-Car-Club-response-100220.pdf">response</a>. The objections are to:  charging points/car club spaces on arterial routes such as Paisley Road West, where there should be a cycle lane, on streets with shops at ground floor level and where long-term parking is inappropriate.</p>



<p>Soon after submission, on 12 February, we received this detailed email in response:</p>



<p>&#8220;<em><strong>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</strong>, <strong>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</strong>, <strong>NEIGHBOURHOODS AND SUSTAINABILITY</strong><br><br>Dear Ms Fort<br><br><strong>THE GLASGOW CITY COUNCIL, (SOUTH SIDE CAR CLUB), ORDER 202_</strong><br><br>Thank you for your correspondence regarding the above named Traffic Regulation Order on behalf of Go Bike.<br>In answer to the points Go Bike have raised:</em></p>



<ul class="wp-block-list"><li> <em>The electric charging bays will be free for use  only while the vehicle is charging. It is intended to replace current  internal combustion engine car club with electric in future and the  standard electric charging bays will be  converted to car club only as the fleet is updated.</em></li><li><em> There is low take up of electric cars at present  and as you state this will change in future and it is the Council’s  intention to encourage electric use for the environmental benefits. The  Council is committed to expanding and  encouraging sustainable transport but a balance is required to promote  development in line with our policies and aspirations and further  details are available at <a href="https://www.google.com/url?sa=t&amp;rct=j&amp;q=&amp;esrc=s&amp;source=web&amp;cd=11&amp;ved=2ahUKEwj0sbSRrLrmAhVbhlwKHQ3ODFMQFjAKegQIAhAC&amp;url=http%3A%2F%2Fwww.glasgow.gov.uk%2FCouncillorsandCommittees%2FviewSelectedDocument.asp%3Fc%3DP62AFQDN2UUTT10GZ3&amp;usg=AOvVaw0CZz-SRa1YjvwCHkoPJBmt" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)"> link to EV strategy development info</a>.</em></li><li> <em>The Council’s intention is for all car club  vehicles to be electric in future and the order as presented allows for  this growth while providing improved charging facilities for existing  electric vehicles.</em></li><li><em> Car Club bays on arterial routes have been located  to provide suitable locations which can be easily located and accessed  for users. Cycle infrastructure is being developed on major routes and  the existing infrastructure will  be considered and developed when each route is designed. Each route is  likely to require a Traffic Regulation Order to implement and the car  club and electric charging will be considered an amended as appropriate  at this time.</em></li><li><em> The Council are providing car club and electric  charging to help address the environmental issues facing us. The future  of mass charging and faster charging will be considered as development  and policies change.</em></li><li><em> The locations close to shops will provide potential  charging for delivery vehicles and each site has significant  residential premises which are an ideal target to encourage residents to  change private cars for car club vehicles.</em></li><li><em> If space permits consideration will be given to  perpendicular parking, the sites currently promoted are not suitable for  this measure.</em></li></ul>



<p><em>It is unclear from your response if you are  supporting or objecting to this order, I will classify it as an  objection unless otherwise advised.</em><br><br><em>Having considered the above, should you wish to withdraw your objection I would be pleased if you would inform me by 6<sup>th</sup> March by writing to Group Manager, Neighbourhoods and Sustainability, exchange House, 231 George Street,  Glasgow, G1 1RX or e-mailing <a href="mailto:SustainableTransport@glasgow.gov.uk"> SustainableTransport@glasgow.gov.uk</a>.<br><br>If you do not wish to withdraw your objection then there is no requirement for you to write to us again.<br><br>Your objection will be  considered and included within the final report which will inform the  decision. Once a decision has been taken in regards to these proposals I  shall write to you again and advise of the  outcome.<br><br>Yours sincerely</em>&#8220;</p>



<p>A telephone conversation with the writer of the above email has clarified that Paisley Road West is not yet listed as a candidate for cycle lanes, which is disappointing, but as per the email above, the City Council&#8217;s policy on electric cars and charging is clearer. Our comments and objection to parts of the proposals is seen as an objection to the TRO.</p>



<h6 class="wp-block-heading">3.9 North Lanarkshire, £5 million electric vehicle charging network</h6>



<figure class="wp-block-image size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/North-Lanarkshire-EV-points.jpg?resize=525%2C235&#038;ssl=1" alt="" class="wp-image-10239" width="525" height="235"/><figcaption>Vector Eco electric car. Electric car charging at refueling power station on the background of the big city. Flat style vector illustration. Photo provided by North Lanarkshire on the email alert of 13 February,</figcaption></figure>



<p>The approach from North Lanarkshire seems to be quite different from that of Glasgow. We haven&#8217;t been told about any consultation yet, but here&#8217;s an email alert issued on 13 February:</p>



<p>&#8220;<em>Our  Environment and Transportation Committee has backed a project which  could see up to £5m investment in Electric Vehicle (EV) charging and  electricity network infrastructure across Lanarkshire.<br><br>The  public use hubs will be created in car parks owned and operated by both  North and South Lanarkshire Councils, in a bid to meet ambitious plans  by the Scottish Government to phase out the need for new petrol and  diesel cars and vans by 2032.<br><br>Members  of the committee were told that preparatory work with Transport  Scotland and SP Energy Networks is underway, as part of Project PACE,  which aims to determine optimum EV charge point locations and the  electricity network infrastructure required to support them.</em><br><br><em>Locations  being considered align with areas of potential demand, taking into  account existing electricity infrastructure location and capacity,  available land and the need to provide public access.<br><br>Councillor  Michael McPake, Convener of the Environment and Transportation  Committee, welcomed the decision to support the project, saying: “This  is an innovative, ambitious plan for Lanarkshire that will see a real  increase in the electric vehicle charging infrastructure on the  ChargePlace Scotland network in North Lanarkshire, by the end of this  year.</em><br><br>“<em>The  Scottish Government targets aim to phase out the need for new petrol  and diesel cars and vans by 2032, and these plans are designed to pave  the way for that to become a reality. The new network will contribute to  reducing air pollution and providing access to clean energy for our  residents, and the project fits with this council’s ambition to be the  place to live, learn, work, invest and visit.”<br><br>The  Strategic Partnership between the Scottish Government, including  Transport Scotland, SP Energy Networks and Scottish and Southern  Electricity Networks was announced by the First Minister on 29 August  2019.</em><br><br><em>Since  the launch of the partnership, SP Energy Networks and Transport  Scotland have established Project PACE with North Lanarkshire Council  and South Lanarkshire Council, as beneficiaries to trial opportunities  to improve the delivery and co-ordination of investment in electric  vehicle charging infrastructure.</em></p>



<p>It&#8217;s looking like on-street (and, of more concern, with the actual charging points being on footways) in Glasgow and in public car parks in North and South Lanarkshire.</p>



<h6 class="wp-block-heading">3.10 Glasgow, Byres Road Traffic Management &amp; Parking (for cycle lanes),submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Byres-Road.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10061"/></figure></div>



<p>We have now responded to Glasgow City Council&#8217;s proposals for changes on Byres Road to allow construction of a cycle lane on each side with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Byres-Road-Traffic-Management-Parking-Controls-110220.pdf" target="_blank">letter</a>, written by GoBike members Iona and Thomas. Detailed design details for the cycle lanes were not part of the TRO but you will see that we have concerns about the continuity and thus priority, of the cycling, and walking, routes at side road junctions. It is critical that ALL traffic on Byres Road has priority over traffic entering, or leaving, a side road.</p>



<p>Full details of the TRO were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.11</p>



<h6 class="wp-block-heading">3.11  Glasgow, Byres Road 20mph TRO, submission</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="152" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=300%2C152&#038;ssl=1" alt="" class="wp-image-8677" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=300%2C152&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?resize=600%2C303&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1772&amp;ssl=1 1772w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/20mph-coloured-1.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p>Here&#8217;s part of the Byres Road proposals that we fully support! Again, full details of the proposed reduction in speed limit to 20mph were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.12 and here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Byres-Road-20mph-response-110220.pdf" target="_blank">letter of support</a>, written by GoBike members Thomas and Iona.</p>



<h6 class="wp-block-heading">3.12 Glasgow, Hillhead Traffic Management and Parking Controls TRO,  submission</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="157" height="159" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?resize=157%2C159&#038;ssl=1" alt="" class="wp-image-10182" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?w=157&amp;ssl=1 157w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/car-parking-sign.png?resize=100%2C100&amp;ssl=1 100w" sizes="auto, (max-width: 157px) 100vw, 157px" /></figure></div>



<p>We have submitted this <a href="https://www.gobike.org/wp-content/uploads/2020/02/GoBike-Hillhead-Parking-response-110220.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter (opens in a new tab)">letter</a>, again written by Iona and Thomas, in general support of moving parked vehicles from Byres Road into vacant spaces in the surrounding streets, but we do have 2 concerns:</p>



<ol class="wp-block-list"><li>Why are parking charges so low in Glasgow? Why is it cheaper to park a car on a street for an hour than it is to get a return ticket for the bus or subway?</li><li>Why should households be given the option of storing not one, but two, private cars on the public street?</li></ol>



<p>Full details of the proposals were given in <a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank" rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)">Digest 52</a>, Item 1.13</p>



<h6 class="wp-block-heading">3.13 East Dunbartonshire, Bearsden Town Centre, Waiting &amp; Loading Restrictions confirmed.</h6>



<p>Here&#8217;s the email confirming this order that we received on 10 February.</p>



<p>&#8220;<em>The  above-mentioned Traffic Regulation Orders has now been made and will   become  effective  on  Monday,  13 April 2020. Enclosed are copies of the   Order and plan, together with copy of the Notice that is to appear in the   edition  of  the  Milngavie  and Bearsden Herald which is published on 14   February 2020</em>.&#8221;</p>



<p>Here are the <a rel="noreferrer noopener" aria-label="details (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/200120-Bearsden-Town-Centre-Order.pdf" target="_blank">details</a> that were enclosed with the email. GoBike supported this proposal and details were given in Digest </p>



<h6 class="wp-block-heading">3.14 Glasgow, Celtic Park &amp; Emirates Arena, Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 10 March</h6>



<div class="wp-block-image"><figure class="alignleft size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/05/Celtic-Park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5000"/></figure></div>



<p>In 2018 consultation was issued on Event Day Emergency Routes and Parking, which GoBike supported with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/05/GoBike-Celtic-Park-Event-parking-letter-290518.pdf" target="_blank">letter</a>. We last reported on this in <a rel="noreferrer noopener" aria-label="Digest 25 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-25-10-january-2019-happy-new-year-with-more-progress-on-the-south-city-way-good-news-about-byres-road-and-feedback-from-argyll-and-bute-and-north-lanarkshire-7286" target="_blank">Digest 25</a> in January 2019 after we were told there was to be a hearing. It seemed clear then that supporters had been mobilised to object to the proposals, although there are valid concerns about the lack or inadequacy of public transport to the football stadium and the arena and parking moving to areas further away from the stadium.<br>On 07 February, we received this extremely long email from the City Council:</p>



<p>&#8220;<em><strong>THE GLASGOW CITY COUNCIL (CELTIC PARK AND EMIRATES ARENA) (EVENT DAY EMERGENCY ROUTES AND PARKING ZONE) ORDER 20__</strong><br><br><strong>PUBLIC HEARING</strong><br><br>We refer to the above proposed order,  the representation you have made about the proposed order, and the  letter dated 20 December 2018 which was sent to you from the Director of  Operations, Neighbourhoods and Sustainability in this regard.<br><br>Glasgow City Council has now appointed  Ms Sinéad Lynch and Mr Lance R Guilford, reporters from the Scottish  Government, to conduct a public hearing and submit a report to the  council. The council has also established a dedicated Programme Officer  Team to assist with the organisation of the hearing.</em><br><br><em>Participation in the hearing<br><br>The reporters have decided that since  it is now over a year since the above letter was sent to you, we should  write again in order to confirm those who wish to participate in the  hearing. We are providing more information to help you decide.<br><br>If you decide <strong>not</strong> to  participate in the hearing, your representation will be considered on  the basis of your original written submission, although you may submit a  further written submission in support of your representation within the  next 28 days if you wish to do so. It is also important to note that  all representations proceeding by written submission will have the same  weight as those examined at the hearing.<br><br>Therefore, whether or not you responded to the above letter, <strong>please advise us within the next 14 days</strong> if you wish to participate in the hearing.</em><br><br><em>Pre-hearing meeting<br><br>Given the complex nature of this order  and the significant number of representations that have been made, the  reporters have decided that a pre-hearing meeting for hearing  participants is necessary. <a>This meeting will be held in public and will discuss the procedures relating to the hearing.</a> However, there will be no discussion about the merits or otherwise of the order at this meeting.<br><br><strong>The meeting will take place as follows:</strong><br><br>7pm on Tuesday 10<sup>th</sup> March 2020 in the Glasgow Royal Concert Hall (Exhibition Hall), 19 Killermont Street, Glasgow, G2 3NX<br><br>The reporters hope that most hearing  participants will attend the pre-hearing meeting, in order to ensure as  far as possible that the arrangements for the hearing take everyone’s  interest into account.</em><br><br><em>We <strong><a href="https://www.gobike.org/wp-content/uploads/2020/02/PHM-Agenda-Celtic-Park-3.pdf" target="_blank" rel="noreferrer noopener" aria-label="enclose an agenda (opens in a new tab)">enclose an agenda</a></strong>, together with an explanatory note which provides detailed information about the matters to be discussed. <strong>Please read this information to help you prepare for the meeting.</strong></em><br><br><em>However, the reporters recognise that  some people may have prior engagements or other reasons why they cannot  attend the pre-hearing meeting, and being unable to attend the  pre-hearing meeting does not preclude participation in the hearing. It  is suggested that people who cannot attend the meeting may wish to  contact another person (or organisation) who will be attending in order  to represent their interests. There is more on this contained in the  explanatory note attached to the agenda.<br><br>In any event, anyone who cannot attend the meeting may comment on the matters contained in theagenda  before the date of the pre-hearing meeting. Furthermore, a note of  matters agreed at the pre-hearing meeting will be uploaded to the  website after the meeting, and comments on what is contained in the note  of matters may be made within 14 days of that note being uploaded to  the web. All such comments will be taken into account in making the  arrangements for the hearing.<strong>           Please advise us within the next 14  days if you wish to attend the pre-hearing meeting in addition to  participating in the hearing. Please also inform us if you intend to be  represented (providing the details of any such representation) and  advise whether any special access or other arrangements are required to  enable attendance at the meeting.</strong>if you wish to attend the  pre-hearing meeting in addition to participating in the hearing. Please  also inform us if you intend to be represented (providing the details of  any such representation) and advise whether any special access or other  arrangements are required to enable attendance at the meeting.   <br><br> Owing to the limited capacity within  the venue (200 places) an entrance ticket will be provided to those who  have made representations about the order and wish to attend the  pre-hearing meeting.</em><br><br><em>You can register for a ticket using the following link:-<a href="https://www.eventbrite.co.uk/e/celtic-park-and-emirates-arena-traffic-regulation-order-pre-hearing-meeting-tickets-90947196513">https://www.eventbrite.co.uk/e/celtic-park-and-emirates-arena-traffic-regulation-order-pre-hearing-meeting-tickets-90947196513</a><strong>Tickets will be available to download from 4pm On Friday 7<sup>th</sup> February 2020</strong><br><br>In the event that there is any  difficulty relating to the capacity of the venue and the number of  people who wish to attend, you will be advised of any action being taken  before the date of the meeting.<br><br>All representations will be in the public domain<br><br>Please note that your representation, if  maintained, will not be treated as confidential, and that it will be  published unless you provide details of exceptional circumstances as</em> <em>to  why you consider that the substance of your representation should not be  in the public domain. Exceptional circumstances might apply where  publication of the substance of the representation might be considered  to breach the provisions of the General Data Protection Regulations  (GDPR) because it cannot be sufficiently separated from identifying  personal information which should not be in the public domain.<br><br>Alternatively, there might be sensitive  information (for example on mental or physical health), the publication  of which might be considered to breach the right to privacy under the  European Convention on Human Rights (ECHR). In either case you would be  advised whether or not such details are sufficient to justify the  further redaction of certain information or non-publication of the  representation.<br><br>However, please note that as a matter of  course under GDPR all identifying personal information will be redacted  from the representations before they are placed in the public domain.  This will include all names, postal addresses, email addresses,  telephone numbers, job descriptions and details of business premises<strong>.</strong></em><br><br><em>If we have not heard from you within the  next 14 days on this matter, we will assume that you are content that  your representation should be in the public domain.<br><br>Following this period, the maintained  representations (unless excepted under the terms stated above) and  related documents will be published on the council’s website. There will  also be a brief summary of the matters raised in the representations,  and an associated schedule which separates them into basic categories  including the type and whether it is an objection or letter of support.  This may assist you in preparing for the meeting, particularly with  respect to the possible grouping of parties with a similar interest, and  which is referred to in more detail in the explanatory note attached to  the agenda.<br><br>Webcasting<br><br>We would advise that the pre-hearing  meeting will be recorded and webcast, and therefore in the event that  you are unable to attend the meeting, the proceedings may</em> <em>be observed  (after the meeting) online at:<br><br><a href="https://www.glasgow.gov.uk/article/20480/Celtic-ParkEmirates-Arena">https://www.glasgow.gov.uk/article/20480/Celtic-ParkEmirates-Arena</a><br><br>Webcasting is part of a strategy to  enhance public access to this process, and will make it easier for  individuals to keep up to date with proceedings.<br><br>If you require any further  information, please contact the programme officer team at the below  telephone number or email address.<br><br>Yours faithfully,<br>Programme Officer Team<br>Email: &nbsp;<a href="mailto:TROCelticParkandEmiratesArena@glasgow.gov.uk">TROCelticParkandEmiratesArena@glasgow.gov.uk</a><br>Phone: 0141 287 5820 (Please note this phone line is a messaging service only</em>&#8220;</p>



<p> Thus there is a massive expense because people wish to leave their cars near the ground on match days, because other people do not want these cars to move to outside their house, because the second loop of the Subway, mooted in 2007, has never been built and we have not yet got the political and social climate in which people will cycle or walk to such events.</p>



<p>GoBike will not be attending the hearing, although we understand our sister group, Get Glasgow Moving, will be there to push the public transport case, but we will confirm our support for the parking restrictions.</p>



<h6 class="wp-block-heading">3.15  Glasgow, Ibrox Stadium,  Event Day Emergency Routes and Parking Zone, Order 20__, Public Hearing 11 March  </h6>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Ibrox-Stadium.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7343"/></figure></div>



<p>On the same day, 07 February and just a few minutes later a very similar, almost identical  email arrived for  Event Day Emergency Routes and Parking around Ibrox Stadium. Although there is a Subway station near the stadium, there are concerns here about the lack of public transport and private car parking being moved further away from the stadium. That said, there is no doubt the football club has mobilised its supporters to object. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/05/GoBike-Ibrox-Stadium-Event-parking-letter-150518.pdf" target="_blank">letter of support</a> for the proposals that GoBike submitted in May 2018.</p>



<p>Apologies to anyone who hoped to see the Rangers email in full here, but if you do wish to have a copy either contact the club or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="mailto:consultations@gobike.org" target="_blank">consultations@gobike.org</a> and a copy will be sent to you. The hearing is the day after the Celtic hearing and the details are the same.</p>



<p>GoBike won&#8217;t be attending either this or the Parkhead hearing but will confirm our support for parking restrictions on the grounds that all on-street car parking reduces the road space available for cycling and makes it more difficult for people walking to cross the road.</p>



<h6 class="wp-block-heading">3.16  Glasgow University Campus Development February update</h6>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/07/Glasgow-University.jpg?resize=315%2C196&#038;ssl=1" alt="" class="wp-image-8796" width="315" height="196"/></figure></div>



<p> <br>Multiplex, who are carrying out the construction work at Glasgow University, have provided us with details of their <a rel="noreferrer noopener" href="https://campusdevelopment.co.uk/" target="_blank">website</a> and the <a rel="noreferrer noopener" href="https://campusdevelopment.co.uk/wp-content/uploads/2020/01/February-2020.pdf" target="_blank">link to their February Newsletter</a> </p>



<h6 class="wp-block-heading">3.17 Glasgow, Good News with some Progress on Contraflow Cycling</h6>



<div class="wp-block-image"><figure class="alignleft size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="225" height="225" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=225%2C225&#038;ssl=1" alt="" class="wp-image-3788" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?w=225&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2017/11/contraflow-sign.jpg?resize=36%2C36&amp;ssl=1 36w" sizes="auto, (max-width: 225px) 100vw, 225px" /></figure></div>



<p>For our final item we have some good news. We have objected time and time again to Glasgow City Council&#8217;s policy of reducing the city&#8217;s residential streets from 2-way to 1-way to allow for more residential parking, with no exemption for cycling. The City Council&#8217;s design guide, <a rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)" href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank">Cycling by Design</a>, quotes, at Section 5.1.5, page  &#8220;<em>The default position should be to permit two-way cycling on one-way streets.</em>&#8221;  The Council&#8217;s policy of ignoring, or finding an excuse not to apply, this default has caused great inconvenience to people trying to cycle in Dowanhill, Partick and elsewhere, as well as seeming contrary to everything the City Council says in terms of active travel, reducing car use etc. When Ali, Brenda and Tricia met with City Council staff on 12 December, this issue was raised and on 10 February this email arrived:</p>



<p>&#8220;<em>I  can advise that, following the meeting you attended in December, I have  taken a look at the literature you referenced and linked on the GoBike  webpage. &nbsp; I have  now drafted a <a rel="noreferrer noopener" aria-label="specific appendix (attached) (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/Appendix-31-Consideration-of-Pedestrians-Cyclists-and-Public-Transport-Provision.pdf" target="_blank">specific appendix (attached)</a> to be added to the Council&#8217;s  procedures and guidance when promoting Traffic Regulation Orders and  Traffic Calming Schemes. This ensures officers take specific consideration of pedestrians, cyclists and public  transport provision. This should be distributed to all officers by the  end of the month. &nbsp;   In  regards to contra-flow cycling specifically, I agree that this should be  considered where it can be done safely. I understand that within the  Sustrans Design Manual Handbook for cycle-friendly design it states that 3.3m can accommodate contra-flow cycling, however  it is our intention that a minimum free road width should be 3.5m before  any consideration can take place (this is consistent with Edinburgh&#8217;s  Street Design Guidance). &nbsp; In  addition to the above, each situation should be assessed on its own  merits and further consideration will be given where vehicles are parked  on both sides of the road for short and long lengths, taking into account the gradient of the road and ensuring there is a  consistency when proposing changes over a wider area. &nbsp; I trust  this has provided further clarification on the Council&#8217;s position and  can assure you that the current parking control scheme proposals are  being revised to investigate what addition measures can be included to assist cyclists</em>.&#8221; </p>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2016/07/contraflow-cycling.jpg?w=525&#038;ssl=1" alt="" class="wp-image-1737"/><figcaption><br></figcaption></figure></div>



<p><br><br>This has yet to be tested but we are told that we will see a difference in approach in forthcoming schemes. Let&#8217;s hope so!</p>



<p><br><br><br>__________________________________________</p>



<p><br>That was a mixed bag &#8211; let&#8217;s see what the post brings in over the next 2 weeks.</p>



<p>_____________________________________________________________________</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">10097</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 53, 04 February 2020: Cars, Parking, 20mph, Avenues and Housing &#8211; it&#8217;s all here.</title>
		<link>https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 04 Feb 2020 22:57:41 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car club]]></category>
		<category><![CDATA[contraflow]]></category>
		<category><![CDATA[cycle lanes]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[one-way]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[regeneration]]></category>
		<category><![CDATA[ride]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9997</guid>

					<description><![CDATA[Glasgow City Council maintain their policy of &#8220;Streets for Cars&#8221; by installing speed cushions to deter high motor speeds rather than installing cycle lanes or doing other public realm works, and we also look at completed works in the east of Glasgow that we previously commented on. Contents Section 1: Current Consultations Glasgow Avenues &#8211; &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 53, 04 February 2020: Cars, Parking, 20mph, Avenues and Housing &#8211; it&#8217;s all here."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Glasgow City Council maintain their policy of &#8220;Streets for Cars&#8221; by installing speed cushions to deter high motor speeds rather than installing cycle lanes or doing other public realm works, and we also look at completed works in the east of Glasgow that we previously commented on.</p>



<span id="more-9997"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>Glasgow Avenues &#8211; Your Avenues Consultation, online, closes 09 February</li><li>Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li>Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme, closes 11 February</li><li>Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February</li><li>**NEW** Glasgow, Mosspark Drive Traffic Calming Scheme, closes 14 February</li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road Traffic Management and Parking Controls, includes cycle lanes, closes 14 February</li><li>Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February</li><li>Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li>Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Transforming Planning, National Planning Framework 4 &#8211; drop-in sessions and workshops February and March </li><li> Glasgow, Byres Road  Traffic Regulation Order: Drop-In Information Session, THURSDAY 06 February </li><li>East Dunbartonshire Travel Survey Week, 10-16 February  </li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li> Glasgow, Mount Florida, Parking and One-Way, with no contraflow &#8211; Motor Traffic 1, Active Travel 0  </li><li> East Dunbartonshire Council: LDP Newsletter No.55 January 2020 </li><li> GoBike Ride 02 February, we visited Sighthill, North East Travel Routes and Robroyston in our tour of the East </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for response</h4>



<h6 class="wp-block-heading">1.1 Glasgow Avenues &#8211; Your Avenues Consultation, online, closes 09 February</h6>



<p><br>Details of this on-line and street public consultation were given in <a aria-label="Digest 52 (opens in a new tab)" rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Items 1.4 and 2.2 and here&#8217;s the critical information:</p>



<p>&#8220;<em>1. You are invited to view and comment on the concept designs online at:&nbsp;</em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a></p>



<p><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>, helping us understand your perception of the street as it is today.</em>&#8220;</p>



<p>Do please complete the online consultation. Currently cycle lanes are shown for the very southern part of Stockwell Street, but not continuing up to Argyle Street and Glassford Street. Apparently discussion is ongoing, so do press them to do better!</p>



<h6 class="wp-block-heading">1.2 Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This was the first of 3 new traffic calming with speed cushions schemes that just made it into our last <a rel="noreferrer noopener" aria-label="Digest (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest</a>,  Item 1.5 and it&#8217;s now been joined by a fourth in this issue. Ardencraig Road is in a residential area and there are 6 schools in the area, so why isn&#8217;t the road being made more people-friendly? It really is depressing that we can&#8217;t have a more people-friendly approach to our streets. This really is a major concern and the City Council continues to treat speeding traffic in this piecemeal way, just as they did with 20mph zones. </p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h6 class="wp-block-heading">1.3 Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme, closes 11 February</h6>



<p>This was detailed as Item 1.6 in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a> and here&#8217;s a view of Bankfoot Road, just off Paisley Road West, leading up to Wedderlea Drive.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As may be seen, the houses all have room for off-road parking, so plenty of room for improvement in line with <a rel="noreferrer noopener" aria-label="Designing Streets (opens in a new tab)" href="https://www.gov.scot/publications/designing-streets-policy-statement-scotland/" target="_blank">Designing Streets</a>. This document was issued in 2010 and &#8220;<em>is the first policy statement in Scotland for street design and marks a change in the emphasis of guidance on street design towards place-making and away from a system focused upon the dominance of motor vehicles.</em>&#8221; We don&#8217;t think it&#8217;s hit the desks of Glasgow City Council&#8217;s staff yet!</p>



<h6 class="wp-block-heading">1.4 Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Castlemilk Drive is a major route down to Croftfoot and King&#8217;s Park railway stations and upwards to Carmunnock and the rural areas of South Lanarkshire, so why isn&#8217;t cycling being encouraged here? All the details of the proposed traffic calming were in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.7<br>We fully understand that finances are tight, with the end of the financial year approaching so money has to be spent or lost, but the lack of forward thinking is extremely disappointing.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Mosspark Drive Traffic Calming Scheme, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="244" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-10047" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This proposal arrived just too late,  on 24 January, for our last Digest; it&#8217;s for the eastern end of Mosspark Drive, from Arran Drive up to the junction with Mosspark Boulevard. A helpful member of staff at the City Council confirmed that west of Arran Drive, where cars are parked both sides it was not considered that traffic calming measures are required. Even here, though, where there are houses both sides, all with gardens, cars reign supreme, taking up the place on the roadway where people would normally cycle. Here&#8217;s the email that we received:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Mosspark Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.</em><br><br><em>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:- &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  </em><strong><em>Mosspark Drive</em></strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>5 sets of 3, 1.9m, 75mm high, speed cushions, </em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>The installation of bollards beside the proposed speed cushions.</em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>The installation of a pedestrian island at the junction with Mosspark Boulevard</em></p>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 14</em><sup><em>th</em></sup><em> February 2020)</em></strong><em>. <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;</em> etc</p>



<p>Here are the plans associated with the proposal: <a rel="noreferrer noopener" aria-label="Full view (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-A1-Full-view-of-proposals.pdf" target="_blank">Full view</a>, <a rel="noreferrer noopener" aria-label="Island (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Proposed-island-at-Mosspark-Blvd.pdf" target="_blank">Island</a>, <a rel="noreferrer noopener" aria-label="Section 1 and 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-1-and-2.pdf" target="_blank">Section 1 and 2</a>, <a rel="noreferrer noopener" aria-label="Section 3 and 4 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-3-and-4.pdf" target="_blank">Section 3 and 4</a> and <a rel="noreferrer noopener" aria-label="Section 5 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-5.pdf" target="_blank">Section 5</a>.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="241" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=525%2C241&#038;ssl=1" alt="" class="wp-image-10053" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=600%2C275&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s very upsetting that so many motor drivers, in so many places, drive at speeds that endanger lives and all we do is install a few speed cushions to try to slow them down.</p>



<h6 class="wp-block-heading">1.6 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This featured last in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.8 and it&#8217;s a high-level document that will be used as a basis, or an excuse, for years to come. Our response is still being prepared as this Digest goes out but it will be sent in before the closing date.</p>



<h6 class="wp-block-heading">1.7 Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.9 gave all the details for this consultation and here&#8217;s the <a rel="noreferrer noopener" aria-label="reply (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">reply</a> we sent in for the Stage One consultation. We don&#8217;t object to car clubs as such but they do take up cycling room on our roads and add to the clutter on our footways. Our reply will be similar to that at Stage One but do get your own views in, particularly if you live in the area affected by this or any other car club, or if you are a car club member yourself.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 10 explained this proposal and it really highlights the City Council&#8217;s refusal to implement the default position of contraflow cycling in their selected design guide, <a rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)" href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank">Cycling by Design</a>, Section 5.1.5. Our comments when we replied to the Stage One consultation are in this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">letter</a> and will be repeated; side roads should be available and welcoming to people who choose to respect well-publicised concerns for our health and the environment by cycling. We should not be pushed onto busy main roads when alternatives are available.</p>



<h6 class="wp-block-heading">1.9 Glasgow, Byres Road, Byres Road Traffic Management and Parking Controls, includes cycle lanes, closes 14 February</h6>



<p>The details we were sent of this Order were in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.11 and, as we informed you, we sent in detailed concerns for the Stage One consultation. We received this reply on 23 January, after querying whether our views had been received:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br>I refer to your email of 9</em><sup><em>th</em></sup><em>  January and can confirm that we did receive the stage 1 response. Your  previous objections  will be carried forward into this stage of the consultation process,  however, a large portion of your letter does not specifically relate to  the TRO process (mostly design choices) and will not be considered as  part of the objection to the TRO.</em><br><br><em>In  terms of the design of the cycle lanes, these are for the most part are  finalised in terms of specification (i.e. at footway  level with an asphalt surface). Future design changes would be limited  to localised alignment changes along Byres Road in relation to potential  layout tweaks and potentially colour in addition to street furniture  placement etc. Any other significant changes  would be restricted to the outcome of the TRO consultations.<br><br>I  can also advise that our records have been updated to reflect the  change of contact information for our consultation stage emails  to </em><a href="mailto:consultations@gobike.org"><em>consultations@gobike.org</em></a><em> – any future TRO updates will now be directed to that email address.<br><br>If you require any further information regarding the Byres Road TRO please contact </em><a href="mailto:ByresRoadTRO@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> <br><br>Yours sincerely,</em>&#8221; etc</p>



<p>While we support the limited range of the TRO, as per our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>, we remain extremely concerned that the clear and basic guidance given in Cycling by Design and good practice elsewhere is apparently not being followed for the detailed cycle lane design. See this extract from page 86 of <a href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank" rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)">Cycling by Design</a>:</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10054" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=2016&amp;ssl=1 2016w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Our response will go in next week, but if you haven&#8217;t sent in your views yet, do please get them in by the 14th.</p>



<h6 class="wp-block-heading">1.10 Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="154" height="121" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2015/01/20mph.jpg?resize=154%2C121&#038;ssl=1" alt="" class="wp-image-652"/></figure></div>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.12 gave the details for this proposal, which we support. Suggested wording for you to add your voice was given in our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>, so do write in. Our letter will be going in soon.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/on-street-parking.jpg?w=525&#038;ssl=1" alt="" class="wp-image-8587"/></figure></div>



<p>No, the picture&#8217;s not Hillhead but there is parking nose to tail there that severely limits walking and cycling. Details of this order were given in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.13 and our suggested wording for your response was in our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>. GoBike generally supports parking restrictions but we have become aware of one general concern and a specific one for this Order. The general concern is that parking charges in Glasgow are so low, only 80p for an hour &#8211; compare this with the cost of a return bus or subway journey and you can easily see that it is the car driver, and not the bus or subway passenger, who is being encouraged to visit Hillhead and Byres Road, and other parts of the city. The specific concern in Hillhead, one of the more affluent areas of Glasgow, is the proposal that residents be offered a second parking permit &#8211; in a city that&#8217;s hosting COP26 this year! Where&#8217;s the City Convener for Sustainability and Carbon Reduction when you need her? Let&#8217;s support her with opposing these 2 aspects of the parking Order.</p>



<h6 class="wp-block-heading">1.12 Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February </h6>



<p>Just about all new housing in Scotland is built as per this example, ie with car parking space and/or a garage, so it&#8217;s no wonder so few people cycle. Do please respond to this national consultation, which was detailed in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.14. </p>



<p>Here’s the link:&nbsp;<a rel="noreferrer noopener" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a></p>



<p>Do have a look and let’s get lots of responses in that mention cycling and active travel. We know it&#8217;s the way to go.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Transforming Planning, National Planning Framework 4 &#8211; drop-in sessions and workshops February and March</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p>The Scottish Government says: &#8220;<em>We are committed to encouraging interest and wide public involvement  in the preparation of NPF4 and want to engage with the public,  community, voluntary and private sectors, as well as academics, experts  and professional bodies.<br>We will make a particular effort to reach beyond the people and organisations normally involved in planning consultations.</em>&#8220;</p>



<p>Locally drop-in sessions followed by workshops are being held in Foxbar (Paisley) on 18 February, Glasgow on 17 March and Kilmarnock on 27 March. See this <a href="https://www.transformingplanning.scot/national-planning-framework/get-involved/" target="_blank" rel="noreferrer noopener" aria-label="link (opens in a new tab)">link</a> for further information.</p>



<p>Jim, from Cycling UK in Scotland told us about this, with this email:</p>



<p>&#8220;<em>Hi <br><br>This is a quick note to highlight that the Scottish  Government is seeking early views on the National Planning Framework 4  and is holding a series of workshops and drop in sessions throughout  Scotland. See the full list here </em><a href="https://www.transformingplanning.scot/national-planning-framework/get-involved/"><em> https://www.transformingplanning.scot/national-planning-framework/get-involved/</em></a><em> &nbsp;I’m planning to be at the Glasgow event. <br><br>They also are looking for written comments – so check the same page. Its always to get ideas in early!<br><br>The NPF4 will be a hugely important Government plan  for Scotland up to 2050 – it decides national investment, development  and infrastructure plans for the future. They have said they will use is  to take forward the transport projects needed  for the future (from STPR2) – so </em><strong><em>a big opportunity to re-state what infrastructure we think is</em> <em>needed for cycling and active travel</em></strong><em>. NPF3 in 2014 included the National Cycling and Walking Network so NPF4 must do much more. <br><br>Please pass this on through your networks to anyone you think might be interested. <br><br>I will be providing more information on NPF4 opportunities in the future but I’m happy to discuss with anyone.<br><br>Regards<br>Jim<br></em><strong><em>Jim Densham</em></strong><em><br></em><strong><em>Campaigns and Policy Manager &#8211; Scotland</em></strong><em><br></em><strong><em>Cycling UK in Scotland</em></strong><em>&#8220;</em></p>



<p>GoBike needs members to go to these events and feed back &#8211; please get in touch at <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<h6 class="wp-block-heading">2.2 Glasgow, Byres Road  Traffic Regulation Order: Drop-In Information Session, THURSDAY 06 February</h6>



<p>An event at Hillhead Library, hosted by&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/byresroadcorners/?eid=ARBOiOrt04bTkiOvq-x3BnzQreRDRUegAuG3LxjmSMfZxvaeznSGlTJwBtPrPMnsk97CaFzmCnRNa_H0" target="_blank">Byres Road Corners</a>&nbsp;and&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/hillheadlibrary/?eid=ARB__vcm2RxkoeYBGvBCEl1QFK0YSMkAdHJFZdDzeTbIkLZmCtT2Gc0Y_qmXDJ2V9lsQnNXXUgOUzjuB" target="_blank">Hillhead Library</a> from 2-6pm. Here&#8217;s the link: <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/events/s/traffic-regulation-order-drop-/622550555222298/" target="_blank">https://www.facebook.com/events/s/traffic-regulation-order-drop-/622550555222298/</a><br><br>Do go along if you wish to know more!</p>



<h6 class="wp-block-heading">2.3 East Dunbartonshire Travel Survey Week, 10-16 February </h6>



<p>Here&#8217;s the info from the East Dunbartonshire Local Development Plan<br> Newsletter, Issue 55 &#8211; January 2020</p>



<p>&#8220;<em>The Draft Local Transport Strategy contained an action for the Council to establish an East Dunbartonshire Travel Survey. Planning has been underway for this project and the inaugural East Dunbartonshire Travel Survey Week will take place from Monday 10 February to Sunday 16 February 2020.<br> Market researchers, Research Resource – on behalf of the Council – will be carrying out on-street surveys during the week beginning Monday 10 February in Kirkintilloch, Milngavie, Bearsden, Bishopbriggs, Lennoxtown, Auchinairn, Hillhead, Harestanes and Twechar.<br> In addition to the on-street survey, an online version is also available which can be completed between now and Sunday 16 February. Follow the link to get involved: <a rel="noreferrer noopener" aria-label="www.researchresource.co.uk/eastduntravel.html (opens in a new tab)" href="http://www.researchresource.co.uk/eastduntravel.html" target="_blank">www.researchresource.co.uk/eastduntravel.html</a><br> The survey aims to compile a picture of local travel behaviours which will provide the basis for long-term regular data collection &#8211; helping the Council to understand evolving travel behaviours and shape plans for the future.<br> Funding has been provided through the Smarter Choices, Smarter Places programme, administered by Paths for All.&#8221;</em></p>



<p>See Section 3.2 for a link to the whole newsletter.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Mount Florida, Parking and One-Way, with no contraflow &#8211; Motor Traffic 1, Active Travel 0 </h6>



<p>Back in July 2019 GoBike objected, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Mount-Florida-letter-220719.pdf" target="_blank">letter</a>, to proposals to change the parking regime in Mount Florida. These proposals included making some streets one way and refusing to countenance contraflow cycling. There was some further correspondence with this <a rel="noreferrer noopener" aria-label="second letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/09/GoBike-Mount-Florida-reply-240919.pdf" target="_blank">second letter</a> from GoBike in September and an <a rel="noreferrer noopener" aria-label="email exchange (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Mount-Florida-email-exchange-Nov19.pdf" target="_blank">email exchange</a> in November.  This latter exchange was published in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 3.1. We did meet with Michael Brady on 12 December at Glasgow City Council offices, and contraflow cycling was discussed, but we have had no further update until this final message confirming adoption of the TRO came in on 27 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (MOUNT FLORIDA)</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 2020</em></strong><em><br><br>I  refer to your objection to the above named Traffic Regulation Order and  can advise that your objection was reported and considered. However,  the  Council have decided under its scheme of delegated functions to proceed  with the proposal with changes as specified below:-</em></p>



<ul class="wp-block-list"><li> <em>Removal  of a small section of proposed no waiting at any time restrictions at  the western extremity of McLennan Street at the request of  a local resident in order to provide additional parking space.</em></li><li><em> The  existing waiting/loading restrictions will remain in place on Cathcart  Road between Prospecthill Road and McLennan Street following  a request from a bus operator.</em></li></ul>



<p><em>The  Order was made on 22 January 2020 and an advert was placed in the  Evening Times on 24 January 2020 stating that the Traffic Regulation  Order has  been made. <br><br>I  realise that this may not be the outcome you wished for, however this  Order will introduce improvements to the existing parking restrictions  in the  area.&nbsp; The specific objective was to assist the local community by  reducing the parking restrictions on Cathcart Road and to facilitate  business activities allowing all vehicle types to utilise the designated  loading areas.<br><br>In  addition to the above, the Council are taking the opportunity to  improve parking practices and road safety within the adjoining  residential areas.&nbsp;  This includes ensuring crossing points are accessible, sightlines at  junctions are sufficient and generally parking practices are safe and  not obstructive. <br><br>Should you require any further information on the above named Order please contact my assistant (name and phone number removed by GoBike).<br><br>Yours sincerely,&#8221; etc</em></p>



<p>So there we have it: a resident gets extra parking space, a bus company gets space for its buses (and quite right too) and we get restrictions for cycling. Just what vehicle/transport/active travel hierarchy does Glasgow City Council work to?</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire Council: LDP Newsletter No.55 January 2020</h6>



<p>This <a href="https://www.gobike.org/wp-content/uploads/2020/02/LDP-Newsletter-55-Jan-2020.pdf" target="_blank" rel="noreferrer noopener" aria-label="newsletter (opens in a new tab)">newsletter</a> contains information on:</p>



<ul class="wp-block-list"><li> The Local Transport Strategy 2020-25  </li><li>  East Dunbartonshire Travel Survey Week  (See Item 2.3 above)</li><li> The Proposed Local Development Plan 2  &#8211; Update </li><li> The Scottish Government&#8217;s Consultation on a Replacement National Planning Framework (NPF4) (See also Item 2.1 above)</li></ul>



<h6 class="wp-block-heading">3.3  GoBike Ride 02 February, we visited Sighthill, North East Travel Routes and Robroyston in our tour of the East  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="257" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=525%2C257&#038;ssl=1" alt="" class="wp-image-10063" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?w=1034&amp;ssl=1 1034w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=300%2C147&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=600%2C294&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Eight intrepid souls rode out east on Sunday morning and arrived back, still in the rain, just in time for a sunny afternoon!</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10064" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p> Here&#8217;s the cycle lane alongside Fountainwell Road on the northern edge of Sighthill. It&#8217;s separated from the road and nice and smooth, but stops before that nasty Springburn Road.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10065" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>On our approach to Robroyston Railway Station, just opened in December. There are no cycle markings on the new access road or footway (<a aria-label="See Digest 48 (opens in a new tab)" rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">See Digest 48</a> Item 1.6 for consultation for the accesses to this station) but the crossing was a toucan one and there are NO cycle lanes on the road. Of course GoBike requested cycle lanes when we responded to the TRO, but that was only for the double yellow lines. There was NO consultation on cycle access.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0514.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10068"/></figure>



<p>This is the station access on the Robroyston, northern side.</p>



<figure class="wp-block-image"><img decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0515.jpg?fit=525%2C525&amp;ssl=1" alt="" class="wp-image-10069"/></figure>



<p>And the station parking. There is talk of cycle lanes on the south side, the Millerston side, along Station Road, although the boundary between North Lanarkshire and Glasgow runs down the centre of the road &#8230;..</p>



<p>Our ride finished in Govanhill and home via the still unfinished South City Way.</p>



<p>So that&#8217;s it,  another mixed bag of delights, for another two weeks. Thanks for reading.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9997</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!</title>
		<link>https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 21 Jan 2020 16:00:32 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[side streets]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9795</guid>

					<description><![CDATA[Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across a side road, a child in Glasgow should be able to too. Secondly, contraflow cycling &#8211; when cars are going too fast or more on-road parking is needed the first line of response is to make a street one-way, even for bikes. What have we done wrong? Why should we have to make big detours? Do read on for the details of all the current issues.</p>



<span id="more-9795"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</li><li>**NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</li><li>**NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li> **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February </li><li> **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>**NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>**NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </li><li> Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February </li><li> Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li> **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</li><li>Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 February</li><li> Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</li><li>Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns. </li><li>Glasgow, Duror Street, Traffic Calming, GCC response to our concerns </li><li>Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month </li><li>Glasgow, Connecting Woodside Update, with news of new Facebook page</li><li>Glasgow Avenues project, George Square and Blythswood Square. </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<h6 class="wp-block-heading">1.1 **NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=525%2C274&#038;ssl=1" alt="" class="wp-image-9833" width="525" height="274" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?w=540&amp;ssl=1 540w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s a message that has been put out by Alison Johnstone, MSP (Green Party), which is pretty clear and self-explanatory. New road construction means less money to build cycle lanes. Please respond.</p>



<p>&#8220;T<em>he  Government look set to spend £120 million on a new spaghetti junction  on              Edinburgh’s bypass. We can stop them though. Government are  consulting on the new junction now. </em><a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Please take a second to object</em></a><em>  and ask them to invest these funds into   public transport and bike lanes  instead. We can’t just keep on pouring public money      into building new  roads like there is no climate emergency.</em><br><br> <a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><strong><em>Take action now</em></strong></a><em><br> &nbsp;<br> By their own admission, the Government expects this scheme to  increase traffic by 5%. Across the world we’ve learnt that if you build  more road capacity it just fills with more cars and causes more  pollution.</em> <br><br> <em>But the same is true with the alternatives. Invest in public  transport, and the buses,       trains and trams fill up. Build cycle lanes,  and people get on their bikes.</em> <br><br> <em>Business as usual is killing the planet, and it’s time for change.  The Government             declared a climate emergency. Sheriffhall spagetthi  junction is the first test of               whether they mean it.</em> <br><br> <em>Lets make this clear and flood them with objections. </em><a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><em>Please take action and share the campaign now</em></a><em>.</em> <br><br> <em>Yours<br> &nbsp;<br> Alison Johnstone, Scottish Green MSP for Lothian </em> <br><br> <a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Take Action Now&nbsp;</em></a> &#8220;</p>



<h6 class="wp-block-heading">1.2 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This has been mentioned once or twice already,  Item 1.13 in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>&nbsp;gave the details for this on-line consultation, do please respond before it closes. Here’s the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>&nbsp;to the City Council’s consultation page where you have to scroll down to find this one. </p>



<p>The survey is quite short, so won&#8217;t take you long to do &#8211; and do try to ignore all the &#8220;typos&#8221; in the information in the Council&#8217;s consultation information!</p>



<p>While this isn&#8217;t one of the city&#8217;s radial routes, which are so important, a good cycle route out to Pollok Park from the city centre should get people to take to their bikes. You might wish to question why the route is two-way on one side of the road rather than 2 lanes, one each side? Another concern is cycle priority at side roads &#8211; including all the driveways!</p>



<h6 class="wp-block-heading">1.3 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>There&#8217;s no reason given as to why this consultation is being extended but here&#8217;s the email that we got on 07 January:</p>



<p>&#8220;<em>Dear All,<br><br>Firstly, we would like to thank all of you who have already provided responses to the consultation. <br><br>Many  of you have also been in contact to request more time to complete your  responses. We are happy to announce an extension to the consultation  period. &nbsp;<br><br></em><strong><em>We now invite you to respond to the paper by 3 February 2020</em></strong><em>. </em><br><br><em>Our  online portal for submitting responses will remain open until midnight  on this date but we also welcome input in any format. Attached is a word  version of the online  portal &#8211; please feel free to use this form if you prefer. &nbsp;<br><br>The consultation paper, summary and more details on how to respond are available on our project page at </em><a href="https://www.lawcom.gov.uk/project/automated-vehicles/"><em>https://www.lawcom.gov.uk/project/automated-vehicles/</em></a><em>&nbsp;<br><br>Yours sincerely,<br><br>Automated Vehicles Team – Law Commissions</em>&#8220;</p>



<p>Note that the word version of the online portal is not given here. GoBike uses WordPress for its website and this does not permit the uploading of word documents. If you wish to have the word version please request one direct or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter of response</a> that GoBike sent in on 06 January. Be afraid, very afraid!</p>



<h6 class="wp-block-heading">1.4  **NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9834" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Glassford Street</figcaption></figure>



<p>The Avenues programme has been quiet for a while but here&#8217;s a recent email that we received last week, headed &#8220;Glasgow Avenues: Glassford Street and Stockwell Street Online and On Street Consultations&#8221;:</p>



<p> &#8220;<em>On 16 Jan 2020, at 19:56, Avenues &lt;</em><a rel="noreferrer noopener" href="mailto:avenues@ironsidefarrar.com" target="_blank"><em>avenues@ironsidefarrar.com</em></a><em>&gt; wrote: <br><br></em><strong><em>Glasgow Avenues – Your Avenues Consultation</em></strong><em><br></em><br><em>A multi-disciplinary design team led by Ironside  Farrar Ltd has been appointed to deliver the second phase (“Block B”) of  the Glasgow Avenues programme which will invest £115m in the public  realm of the City Centre in the next few years,  introducing a network of connected ‘green’ routes across Glasgow’s city  centre.&nbsp; <br><br>Block B includes </em><strong><em>Stockwell Street</em></strong><em>&nbsp;and </em><strong><em>Glassford Street</em></strong><em> Avenues.<br><br>The Design Team are seeking to consult with you &#8211;  local residents, businesses and stakeholders &#8211;&nbsp; on the draft proposals  for these two streets in the following 3 ways:<br><br>1. You are invited to view and comment on the concept designs online at: </em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a><br><br><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>,  helping us understand your perception of the street as it is today. <br><br>3. Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.<br><br>Please feel free to forward this email to other  parties who may be interested in getting involved.&nbsp; The online  consultation is open until 9</em><sup><em>th</em></sup><em> February 2020.<br><br>Thanks in advance for your assistance. <br><br>Kind Regards,<br><br></em><strong><em>Charlie Griffiths</em></strong><em>&#8220;</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9835" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Stockwell Street</figcaption></figure>



<p>From point 1, clicking on the link will get you to the City Council&#8217;s Avenues page. Click on the down arrow at Consultations and then on &#8220;here&#8221; under &#8220;Current Consultation&#8221;.</p>



<p>Or you can  try this quick link:  <a rel="noreferrer noopener" aria-label="link:https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959 (opens in a new tab)" href="https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959" target="_blank">https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959</a></p>



<p>The questionnaire for point 2 is quite curious &#8211; very generic, but you will be able to comment on the dominance of the motor vehicle, particularly with respect to the large areas on Stockwell Street given over to car parking. Why aren&#8217;t they proper parks, with trees and grass and somewhere to sit?</p>



<p>We&#8217;ve been told that the consultants have 2 rickshaws that will be moving about but do look for them at the Argyle Street precinct or further south at the car park area. If you go, do please have your bike with you, or your children, or ageing aunt in a wheelchair &#8211; anything to demonstrate that we should have priority over all the cars in the area.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>The northern part of Ardencraig Road , near Miller Primary School, is proposed for traffic calming</figcaption></figure>



<p>Glasgow City Council now seem to have an alphabetical approach to traffic calming with this and the next 2 schemes that have arrived in the Consultations mailbox this very morning, 21 January. Here is the email and attachments for the first, Ardencraig Road in Castlemilk:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br></em><br><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Ardencraig Road)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong> <br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. </em><br><br><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-<br></em><br><strong>Ardencraig Road</strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>3 sets of 3, 1.9m, 75mm high, speed cushions, </em></li><li><em> 3 sets of 2, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions</em>.</li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>.  <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the attached documents: <a rel="noreferrer noopener" aria-label="Proposals (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals.pdf" target="_blank">Proposals</a>, <a rel="noreferrer noopener" aria-label="Proposals Section 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-1-From-number-76-to-number-38.pdf" target="_blank">Proposals Section 1</a> and <a rel="noreferrer noopener" aria-label="Proposals Section 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-2.pdf" target="_blank">Proposals Section 2</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s the standard approach to high traffic speeds, yet again, by the City Council, which is now proclaiming itself as &#8220;<strong>Glasgow &#8211; proud host of the 26th&nbsp;UN Climate Change Conference (COP26) &#8211; UK2020</strong>&#8221; but where are the cycle lanes to the school?</p>



<h6 class="wp-block-heading">1.6  **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February  </h6>



<p>Moving on to &#8220;B&#8221; and north-west to Cardonald, here&#8217;s the email from earlier today, 21 January, for these 2 residential roads:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Bankfoot Road and Wedderlea Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Bankfoot Road</em></strong></li><li><em> </em><strong><em>Wedderlea Drive</em></strong></li></ul>



<p> <em>Details of the proposed Scheme<br> The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>6 sets of 3, 1.8m, 75mm high, speed cushions, </em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br>Please reply directly to <a href="mailto:LandServices.Mailroom@glasgow.gov.uk">LandServices.Mailroom@glasgow.gov.uk</a>.<br><br><em>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant Jordan  Tracey on 0141 287 9173.<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Bankfoot Road, looking north from Paisley Road West</figcaption></figure>



<p>Here&#8217;s one of the feeder roads on to the cycle lanes we so desperately need on Paisley Road West if we are to achieve the modal split required to save the world. Not many, sorry, not any, apologies for not reaching the target, the aim, no sorry, just an aspiration of 10% of journeys by bike this year, were there? Let&#8217;s look to doing better this decade.</p>



<h6 class="wp-block-heading">1.7   **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9912" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On that long Castlemilk Drive (singing along to <a rel="noreferrer noopener" aria-label="Devil Gate Drive (opens in a new tab)" href="https://www.youtube.com/watch?v=9vFTksaposs" target="_blank">Devil Gate Drive</a>, a classic from Suzy Q!), struggling up to, or coasting down from, the top of the hill and the countryside of South Lanarkshire, motorists are going too fast and so we must suffer yet more speed cushions. Why can&#8217;t such concerns be declared as public realm schemes and then we might get cycle lanes, giving us enough room to wobble up the hill without danger of being clipped by a close-passing motor vehicle? However, money is tight and the COP26 delegates won&#8217;t be encouraged to visit Castlemilk, so we will be stuck with another rash of speed cushions. Here&#8217;s the email received from the City Council today, 21 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Castlemilk Drive)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme</em><br><em>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Castlemilk Drive</em></strong></li></ul>



<p><em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>4 sets of 3, 1.9m, 75mm high speed cushions. </em></li><li><em> The installation of bollards beside the proposed speed cushions</em></li></ul>



<p><em> Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br><em>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;, </em>etc</p>



<p>Here&#8217;s the plan showing the proposed speed cushions: <a href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.79-Castlemilk-Drive-TC-proposals-Full-view-of-proposals.pdf" target="_blank" rel="noreferrer noopener" aria-label="Castlemilk Drive plan (opens in a new tab)">Castlemilk Drive plan</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Note the active-travel friendly parking! GoBike will applaud the aim, but not the method, of reducing traffic speeds here.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> This consultation featured in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council’s consultation page. This consultation is the second item on page 1. We hope to have the GoBike response in our next Digest.</p>



<p>Note that the area it covers is bounded on the south-east by Glassford Street and Stockwell Street.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><br>Here&#8217;s a consultation that GoBike responded to at Stage One &#8211; details further on &#8211; but this is the email for the public consultation that we received on 16 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(SOUTH SIDE CAR CLUB) ORDER 202_</em></strong><em><br><br>Further to my consultation email of 3</em><sup><em>rd</em></sup><em> December 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose  a copy of the press notice of the proposed Order, relevant drawings, statement of reasons and detailed report.<br><br>The  location proposed for Queen Elizabeth Gardens has been removed from  this order and will be included in a future parking control order for  the area.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><strong><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a></strong><em> <br><br>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing  to Group Manager, Sustainable Transport, Neighbourhoods and  Sustainability, Exchange House, 231 George Street, Glasgow, G! 1RX or by  e-mail to </em><strong><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a></strong><em> by Friday 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully,</em>&#8221; etc</p>



<p>Here are the documents referred to in the email above: <a rel="noreferrer noopener" aria-label="Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-CarClub-Consultation-advert-160120.pdf" target="_blank">Advert</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-Car-Club-TRO-Report-Jan-2020.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-CarClub-TRO-SOR_Jan2020.pdf" target="_blank">Statement of Reasons</a>, <a rel="noreferrer noopener" aria-label="Allison Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-001_Allison-St.pdf" target="_blank">Allison Street plan</a>, <a rel="noreferrer noopener" aria-label="Paisley Road West plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-003_PRW.pdf" target="_blank">Paisley Road West plan</a>, <a rel="noreferrer noopener" aria-label="Torrisdale Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-004_Torrisdale.pdf" target="_blank">Torrisdale Street plan</a>, <a rel="noreferrer noopener" aria-label="Kenmure Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-005_Kenmuir.pdf" target="_blank">Kenmure Street plan</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-006-Albert-1.pdf" target="_blank" rel="noreferrer noopener" aria-label="Albert Drive plan (opens in a new tab)">Albert Drive plan</a>.</p>



<p>At Stage One we were given this information by email:</p>



<p>&#8220;<em>Background to the proposed Order<br> This  order is proposed to provide car club and electric parking on the south  side at the locations below in line with the Council’s policy for  sustainable transport and emission reductions.<br><br>Area affected by the proposed Order<br>The area is the south side of the city.<br><br>Details of the proposed Order<br>The order proposes the following restrictions as shown on the attached drawings:</em></p>



<ul class="wp-block-list"><li> <em>Electric charging and car club bays on Alison Street east of Langside Road.</em></li><li><em> Electric charging and car club bays on Queen Elizabeth Gardens north of Old Rutherglen Road.</em></li><li><em> Electric charging and car club bays on Paisley Road West at Cessnock Street.</em></li><li><em> Electric charging and car club bays on Torrisdale Street west of Victoria Road.</em></li><li><em> Electric charging and car club bays on Kenmuir Street north of Albert Drive.</em></li><li><em> Electric charging and car club bays on Albert Avenue north of Queens Drive.</em>&#8220;</li></ul>



<p>You will see that Queen Elizabeth Gardens in the Gorbals has been removed at the Public Consultation stage, presumably because of local lobbying but GoBike objected, see <a rel="noreferrer noopener" aria-label="this letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">this letter</a>, to the inclusion of Paisley Road West. Paisley Road West is a major arterial road connecting the city centre to the outskirts and one of the most heavily cycled roads into the city; kerbside parking obstructs the construction of the cycle lanes we desperately need on this route if we are to meet climate change targets. We have had no response from the City Council to this well-argued letter written by one of our members.</p>



<p>GoBike will be responding to this public consultation but if you support our views do please write in to comment or object to the proposals.</p>



<h6 class="wp-block-heading">1.10 **NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no, or perhaps with, contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The service road is a residential and shopping side road to the busy Carmunnock Road and at the Stage One consultation GoBike was told that &#8220;<em>The Council have been made aware of road safety issues with the existing two-way traffic flow on Carmunnock Road  (Service Road).&nbsp; Therefore, a  questionnaire was posted to the nearby residents to find out if they  supported the introduction of a proposed one way system.&nbsp; The results of  the returned survey were 23 in favour of the  proposals and 6 against.&#8221; </em><br>In its <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a>, GoBike argued strongly that cycling must be exempt from the one-way order. Since receiving the Public Consultation email below, GoBike has emailed the City Council for an answer to the one-way question. However, we now note, from the Detailed Report issued with this public consultation that improved safety may be achieved by &#8221; <em>Providing a single directional route for vehicular travel</em>.&#8221; Note the use of the word &#8220;vehicular&#8221;, which would not normally include cycles?</p>



<p>Here&#8217;s the Public Consultation email received on 17 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (CARMUNNOCK ROAD (SERVICE ROAD))</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 20__ </em></strong><em><br><br>Further to my consultation email of 6</em><sup><em>th</em></sup><em>  December 2019 regarding the above named Traffic Regulation Order, and  in accordance with statutory procedures, I now enclose a copy of the  press  notice of the proposed Order, relevant map, statement of reasons,  detailed report.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person  wishing to object to the proposed Order should send details of the  grounds for objection in writing to Kevin Hamilton, Head of Roads  Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/NoticeOfProposals-CarmunnockRoad-ServiceRoad-190x114mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Carmunnock_Road_-_Plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/08.01-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label="Detailed Report (opens in a new tab)">Detailed Report</a>.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </h6>



<p>You may be aware that we responded last autumn to the Stage One consultation concerning the proposed cycle lanes on Byres Road and submitted detailed questions related to the design of the cycle lanes. A major concern is about side road junctions where, to us, it&#8217;s obvious that all traffic (motor, cycle, pedestrian) has priority over traffic into and out of side roads. Unfortunately, the City Council appears to take a different view. <br><br><br>We informed you in Digest 51 that the 3 TROs for Byres Road had just been published but full details from the City Council arrived just too late for inclusion in that Digest. </p>



<p>Here&#8217;s the email that we received on 06 January, with almost no detail of the cycle lane design:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(BYRES ROAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Road-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P-5114-0000-Byres-Road-TRO.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Draft-Report.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-TRO.pdf" target="_blank">FAQs</a></p>



<p>Some of our members are busy writing our response and our concern at the lack of information on the cycle lane design has been voiced to the City Council.</p>



<h6 class="wp-block-heading">1.12  Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February  </h6>



<p><br>GoBike supports 20mph speed limits in our towns and cities and Byres Road is no exception. We supported this proposal at the Stage One consultation in the autumn and no doubt we will support it now.</p>



<p>Here&#8217;s the email we received on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (BYRES ROAD)</em></strong><em> </em><strong><em>(20MPH SPEED LIMIT ZONE) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs</em>.<br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:ByresRoad20MPH@glasgow.gov.uk"><em>ByresRoad20MPH@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-20Mph-Zone-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P5114-101-Byres-Road-20MPH.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Draft-Report-Byres20MPH.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Byres20MPH.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-20MPH.pdf" target="_blank">FAQs</a>.</p>



<p>The FAQs are certainly not directed at those of us keen on active travel; here&#8217;s one Q and A:<br>&#8220;<em>Can I park / load in the cycle lanes?<br>  Parking / Loading from the cycle lanes is not permitted</em>&#8220;<br>Yes, the motor driver is still seen as the main customer &#8211; the the FAQs are the same for all 3 TROs.</p>



<h6 class="wp-block-heading">1.13  Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February </h6>



<p>Car parking on the streets around Byres Road is not normally a major concern for most of us in GoBike, but if you live in Hillhead you might have a different view or particular concern about this proposal? If so, do email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a> and we can include it in our response. <br>Points we have noted so far include the introduction of a second car parking permit per household (why should that be introduced in a city that&#8217;s trying to reduce car ownership, reduce pollution and will be hosting COP26 in November?) and the ridiculously cheap parking charges (even if they are the same across the city). Surely parking charges should be at least the cost of a return ticket on the Subway or bus and not just 80p per hour? <br>Here&#8217;s the email received from the City Council on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL (HILLHEAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><br><br><em>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp;<br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:HillheadTRO@glasgow.gov.uk"><em>HillheadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>The attached documents are here: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Advert-Hillhead-TRO.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Hillhead-TRO-Publication-plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Report-Hillhead-TRO.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Hillhead-TRO.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Hillhead-TRO.pdf" target="_blank" rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)">FAQs</a>.</p>



<p>This information was included in the Stage One email, but there is far more information within the Report: <br><br>&#8220;<em>Background to the proposed Order<br>The  proposal is to amend the existing Hillhead parking controls from a  Controlled Parking Zone (CPZ) to a Restricted Parking Zone (RPZ).<br>RPZs  are indicated by zone entry signs which have a no waiting roundel to  inform that no waiting is permitted at any time outwith the bays. The  zone entry signs tell you to “park only in signed bays” with a no  waiting roundel which means no waiting at any time. This is the  restriction which applies outwith all the marked bays.<br>This  order will propose the conversion of “residents only” parking bays to  “shared use” bays in order to bring the parking regime in Hillhead into  line with other residential areas within the west-end.&nbsp;Whilst all bays  will become “shared use”, residents will be able to acquire a second  personal permit and visitor permits, fees will be in line with other  zones. Permits will also be usable in adjacent zones. The order will  also include proposals to pedestrianise Ashton Lane / Great George Lane  with service access limited to specific times and controlled by  drop-bollards. Residential access to the rear of Ashton Road will be  maintained. Cresswell Lane will remain pedestrianised.</em>&#8220;</p>



<p>The private car is still at the top of the transport tree, it seems.</p>



<h6 class="wp-block-heading">1.14  **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike member, Emily, alerted us to this consultation, which has a question on &#8220;Do you have any proposals that would improve the <strong>space around our homes</strong> and promote connected places and vibrant communities?&#8221; and the &#8216;vision&#8217; and background refer to lots of relevant stuff about connectivity, walking and cycling, vibrant local areas, climate emergency, air pollution, etc.</p>



<p>Here&#8217;s the link:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a> </p>



<p>Do have a look and let&#8217;s get lots of responses in that mention cycling and active travel.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" width="525" height="245" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Going hand in hand with Item 1.2 above, the on-line consultation on the SWCW extension along St Andrew&#8217;s Drive, is this public consultation event tomorrow, Wednesday 22 January at  St Albert’s Primary School, 36 Maxwell Drive from 3:30 to 7pm. You may see details of the proposals at this&nbsp;<a rel="noreferrer noopener" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>. Do try and get to the event if you can; there will be the opportunity to speak to the staff involved about the proposals.</p>



<h6 class="wp-block-heading">2.2 Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 January</h6>



<p>Mentioned in Item 1.4 above, is this on-street, meet the people event:</p>



<p>&#8220;<em>Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.</em>&#8220;</p>



<p>We don&#8217;t have any more information but it should be quite easy to spot one or other of the 2 rickshaws that the consultants will have. If you are in the town, do look out for the displays; check out the area at the end of the Argyle Street precinct or the car park areas on Stockwell Street.</p>



<h6 class="wp-block-heading">2.3  Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/burrell-collection-pollok-park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7330"/></figure>



<p>On 17 January GoBike received this email from The Transforming Pollok Country Park Project Team within Glasgow Life:</p>



<p>&#8220;<em>Hello, <br><br>Following  previous consultation events, Glasgow City Council and Glasgow Life  would like to invite you to a public meeting on the access proposals  being developed for Pollok Country Park, as  part of the Transforming Pollok Country Park project. <br><br>The  purpose of this meeting is to share the proposals, summarise recent  changes in response to feedback from previous consultations, and outline  current progress ahead of a formal planning submission  later in February 2020. <br><br></em><strong><em>Transforming Pollok Country Park</em></strong><br><br><strong><em>Public Meeting </em></strong><em><br><br></em><strong><em>Tuesday 4 February, 6.30–7.45pm </em></strong><em><br><br></em><strong><em>at Pollokshaws Burgh Hall,</em></strong><em> </em><strong><em>Pollokshaws Road, G43 1NE</em></strong><em><br><br>The meeting will include a presentation lasting up to 45 minutes followed by up to 30 minutes for questions.<br><br>We hope you can join us. If you’re unable to attend but would like to find out more, please email us at </em><a href="mailto:PollokCountryParkTransformation@glasgowlife.org.uk"><em>PollokCountryParkTransformation@glasgowlife.org.uk</em></a><em>. <br><br>Kind regards,  <br>The Transforming Pollok Country Park Project Team&#8221;</em></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p><br><br>Our objection to the proposal to allow taxis and authorised vehicles to use the bus and cycle lanes on this bridge was published in <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)">Digest 50</a>, Item 1.2 We received this acknowledgement on 07 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Tricia Fort<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>I  am writing to confirm receipt of your correspondence regarding the  above named Traffic Regulation Order. Following the publication period,  officers  shall commence an analysis of all correspondence received and issue you  with a considered response in due course. <br><br>Please  note that timescales for preparing and distributing a considered  response can be influenced by the quantity and nature of correspondence  received.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Let&#8217;s hope they are rethinking the proposal, especially since it is so close to the site of the COP26 Conference in November.</p>



<h6 class="wp-block-heading">3.2 Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9628" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 3.10 Our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a>, sent in on 18 December, raised concerns that the GCC response to speeding on this wide road in the north of the city was to yet again install speed cushions with no thought to narrowing the road with cycle lanes etc. Note that no Traffic Regulation Order is required for the installation of speed cushions. The City Council response to our letter, with this email of 08 January, is illuminating as to how the Council currently operates:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY, GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort<br><br>Thank you for your undernoted enquiry.<br><br>Whilst  I appreciate your concerns regarding Ashgill Road not being included as  part of the city’s cycle  network, I can advise that this section is focused on reducing injury  accidents throughout the city. The council has limited funding and  resources available to implement traffic calming schemes and in order to  make sure these resources are directed at the  locations with the greatest potential for casualty reduction, a site  risk assessment is undertaken for each request. This process assesses  the location against criteria including the history of injury accidents,  measured vehicle speeds and the presence of  any local amenities such as being close to a nearby school or nursery</em><br><br><em>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions, however, in this instance we would  consider that the road bends at this location also act as traffic  calming features.<br><br>Whilst  I appreciate that drivers may accelerate and brake between each set of  cushions, the Council are currently seeking to implement mandatory 20mph  city-wide  speed limit restrictions on appropriate roads. Should the restrictions  be introduced, a reduction in the permitted speed limit would encourage  drivers to maintain a reduced speed whilst negotiating speed cushions or  any other form of traffic calming feature.</em><br><br><em>I trust the above information is of assistance, however, should you require any further information please contact (name and phone number removed by GoBike).</em></p>



<h6 class="wp-block-heading">3.3 Glasgow, Duror Street, Traffic Calming, GCC response to our concerns</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9637" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Again, this consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, item 3.13 and we submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> on 18 December. To reduce speeding by motor vehicles on this wide road in the east of the city it seems to be a reasonable suggestion to stop most through motor traffic with a filter to allow only buses (and emergency vehicles) and bikes through but here&#8217;s the reply that we received on 10 January. Note that the installation of speed cushions does not require a traffic regulation order and that a filter, of the type we propose, ie one with rising bollards or similar, would not prevent residents accessing either side of that filter:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY</em></strong><em>, </em><strong><em>GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br>Thank you for your undernoted enquiry.<br><br>I can advise that the introduction of a bus/cycle gate would require the Council to successfully promote a Traffic Regulation Order (TRO). The  legal  process of promoting a TRO is subject to formal consultation and public  advertisement, is open to objection and can take in excess of 12 months  to complete. The promotion of such an order also requires the support  of emergency services and various other road  user groups. It is highly likely that the introduction of a bus/cycle  gate on Duror Street would lead to objections from local residents as  they would be unable to park near to their properties. In view of the  foregoing, there are no plans at present for a  bus/cycle gate to be introduced at this location.<br><br>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions and this recommendation has been  adhered to in the design of this traffic calming proposal.<br><br>I trust the above information is of assistance, however, should you require any further information please contact</em>&#8221; (name and phone number removed by GoBike)</p>



<h6 class="wp-block-heading">3.4 Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=525%2C340&#038;ssl=1" alt="" class="wp-image-9825" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=600%2C389&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike has responded to several consultations about the regeneration of Sighthill, and some might remember that this was a favourite project of the one-time Cycling Czar Councillor Frank McAveety? Who&#8217;s he? Some newer GoBike members might ask. However, the Glasgow (Evening) Times reported on 11 January that construction of the bridge should start in February, be completed in August 2021 and cost £19m. See: <a rel="noreferrer noopener" aria-label="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln (opens in a new tab)" href="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln" target="_blank">https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln</a></p>



<h6 class="wp-block-heading">3.5 Glasgow, Connecting Woodside Update, with news of the  Woodside ‘Making Places’ project </h6>



<p>If you don&#8217;t subscribe direct to the Connecting Woodside updates then you will have missed the free family fun event on Saturday but there is a new Facebook page about the Making Places project that is working in tandem with the active travel team. See <a rel="noreferrer noopener" aria-label="this link (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/01/15/free-family-fun-event-this-saturday!" target="_blank">this link</a> and if you live in the area do get involved. If you would like to ask a question to the project team about this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Free family fun event this Saturday!" target="_blank">sustainabletransport@glasgow.gov.uk</a>. </p>



<h6 class="wp-block-heading">3.6 Glasgow Avenues project, George Square and Blythswood Square.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="352" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=525%2C352&#038;ssl=1" alt="" class="wp-image-9899" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=300%2C201&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=600%2C402&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption> A vision of what Blythswood Square could look like in the future (Herald photo)</figcaption></figure>



<p>News of the Avenues and these 2 squares and yet more consultation in today&#8217;s Herald newspaper; follow this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.heraldscotland.com/news/18174117.plans-hobbit-house-visitor-centre-cafe-25m-project/" target="_blank">link</a> for the details. Let&#8217;s hope for the best that it happens.</p>



<h6 class="wp-block-heading">3.7 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9112" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The Traffic Regulation Order, which we supported, see <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.2, to limit parking in this area near the car showroom, has now been approved, and here&#8217;s the confirmation from East Dunbartonshire Council, received today, 21 January:</p>



<p>&#8220;<em>Dear Sir/Madam   <br><br>The  Traffic Regulation Orders mentioned below has now been made and will become  effective  on  Monday,  23 March 2020. <br><br>Attached are copies of the Order and plan, together with copy of the Notice that is to appear in the edition of the  Milngavie and Bearsden Herald which is published on 24   January 2020.   <br><br>Yours faithfully   </em><br><em>Fiona Stirling   <br>Legal Services, 12 Strathkelvin Place,  Kirkintilloch, G66 1TJ  <br>Telephone 0300 12345 10 (Ext 8012)   <br><br>Note Referred to:-    1. The East Dunbartonshire Council (Killermont Avenue, Rannoch Drive And Woodvale  Avenue,  Bearsden) (No Waiting And No Loading At Any Time       Restrictions) Order 2020.    <br>(See  attached  file:  <a rel="noreferrer noopener" aria-label="200121  Killermont,  etc  - Waiting Time Order 2020.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/200121-Killermont-etc-Waiting-Time-Order-2020.pdf" target="_blank">200121  Killermont,  etc  &#8211; Waiting Time Order 2020.pdf</a>)</em>&#8220;</p>



<p>Good to get something in from outwith the city, but we do hope to get more positive news in before COP26, which will be upon us before we know it. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9795</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 50, 24 December 2019: 2 on-line consultations for you to do and a variety of consultations from around the area.</title>
		<link>https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 24 Dec 2019 11:59:22 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[bus lanes]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Transport Scotland]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9568</guid>

					<description><![CDATA[We object to the permanent introduction of taxis to all 4 lanes of the Finnieston/Squinty/Clyde Arc Bridge &#8211; where is the active travel space? &#8211; and we learn that traffic calming schemes are a one-stage consultation with no Traffic Regulation Order. Plus, as desks are cleared for the holidays &#8211; a break for some &#8211; &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 50, 24 December 2019: 2 on-line consultations for you to do and a variety of consultations from around the area."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>We object to the permanent introduction of taxis to all 4 lanes of the Finnieston/Squinty/Clyde Arc Bridge &#8211; where is the active travel space? &#8211; and we learn that traffic calming schemes are a one-stage consultation with no Traffic Regulation Order. Plus, as desks are cleared for the holidays &#8211; a break for some &#8211; we have a stack of feedback for you.</p>



<span id="more-9568"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, Sighthill, Mandatory 20mph Limit Speed Zone, closes 27 December</li><li>Glasgow, Finnieston Bridge, taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</li><li>Transport Scotland, Second Strategic Transport Projects Review (STPR2), closes 10 January 2020</li><li>Law Commission, HIghly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li><li> Glasgow, City Centre Strategic Development Framework, closes 17 January 2020</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February 2020</li><li>Glasgow, Central District Regeneration Framework, closing date 14 February 2020</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January 2020</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow, Belmont Traffic Management Order, parking, GoBike submission</li><li>East Dunbartonshire, Proposed TRO and road humps, Maxwell Avenue area, Bearsden, GoBike submission</li><li>Glasgow, Dalmarnock West TRO parking restrictions, GoBike submission and GCC response</li><li>Glasgow, Robroyston Station, parking restrictions, GoBike submission and GCC response</li><li>Glasgow, Garscube Road, parking changes approved</li><li>Glasgow, Connecting Woodside update, construction to start on Cycle Lanes</li><li>Glasgow, Beith Street, developer wins appeal to build flats</li><li>Glasgow, North Kelvin, North Woodside and Woodlands, Mandatory 20mph speed limit zone approved </li><li>East Renfrewshire Proposed Local Development Plan 2 Representation, ERC response</li><li>Renfrewshire, City Deal, GAIA Construction Update</li><li>GoBike met GCC, 13 December </li><li>Glasgow, Ashgill Road traffic calming scheme</li><li>Glasgow, Duror Street, another traffic calming scheme</li><li>Glasgow, Gartnavel Hospital Site Active Travel Meeting 18 December  </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Glasgow, Sighthill, Mandatory 20mph Limit Speed Zone, closes 27 December</h6>



<div class="wp-block-image"><figure class="alignright is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=259%2C142&#038;ssl=1" alt="" class="wp-image-9300" width="259" height="142" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?w=303&amp;ssl=1 303w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=300%2C164&amp;ssl=1 300w" sizes="auto, (max-width: 259px) 100vw, 259px" /></figure></div>



<p>This proposal first featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.9 and here&#8217;s the <a rel="noreferrer noopener" aria-label="GoBike letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Sighthill-Stage-2-response-Letter-121219.pdf" target="_blank">GoBike letter</a> supporting the proposal. Please add your voice, if you have time, particularly if you live, work or cycle in Sighthill.</p>



<h6 class="wp-block-heading">1.2 Glasgow, Finnieston Bridge, taxis and authorised vehicles to use bus and cycle lanes TRO closes 03 January 2020</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p>This consultation was brand new in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.9 and it just makes Fastlink worse if possible. Taxis and authorised vehicles are now able to use all four lanes of this bridge on a permanent basis after a &#8220;trial&#8221; for 18 months. The trial was to check whether the inclusion of taxis slowed buses down, but since the main hold-up for buses is on Lancefield Quay, we are now told that there has been no deterioration, so taxis may stay. The change puts active travel back, not forward and this won&#8217;t look good when COP26, the UN Climate Change Conference, comes to Glasgow next year. Here&#8217;s the <a href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Fastlink-Finnieston-Whitefield-Road-TRO-Objection-191219.pdf">GoBike letter of objection</a>. Do put in your own letter/email of objection &#8211; unless you are a taxi-driver &#8230;&#8230;</p>



<h6 class="wp-block-heading">1.3 Transport Scotland, Second Strategic Transport Projects Review (STPR2) closes 10 January 2020</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This important consultation was Item 1.11 in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a> and, if you haven&#8217;t already, do respond to the survey if you have time over Christmas and the New Year. Here&#8217;s a link to the <a rel="noreferrer noopener" aria-label="survey (opens in a new tab)" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">survey</a>.</p>



<h6 class="wp-block-heading">1.4 Law Commission, HIghly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>We first mentioned this UK consultation back in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and the information and consultation details are <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank">here</a>. Do have a look and see if you find anything that is reassuring!</p>



<h6 class="wp-block-heading">1.5  Glasgow, City Centre Strategic Development Framework, closes 17 January 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="333" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C333&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This consultation appeared in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.11 but was then excluded from Digest 49 in favour of the Central District Regeneration Framework (see Item 1.7 below). Apologies for the confusion but we do have 2 city centre consultations at the same time! This is the higher level document and our in-house expert has been looking at it. The GoBike response should be in the next Digest, appearing in the New Year.</p>



<p>These high-level documents can seem quite vague but more detailed policy is based on them, so it&#8217;s important that we look at them. The link to this one is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a>, although the link is to a list of current consultations and this one is on page 2!</p>



<h6 class="wp-block-heading">1.6 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Item 1.13 in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a> gave the details for this on-line consultation and, although it&#8217;s open for over a month, do please respond before you forget. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a> to the City Council&#8217;s consultation page where you have to scroll down to find this one.</p>



<p>Done well, the South West City Way, running all the way from the City Centre to Pollok Park, could be a significant boost for cycling in Glasgow.</p>



<h6 class="wp-block-heading">1.6 Glasgow, Central District Regeneration Framework, closing date 14 February 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>We featured this in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.14 and we are working on our response. The link, which is the same as the last two items is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a> &#8211; scroll down to the correct document. It&#8217;s similar to the previous Regeneration Frameworks that we have reviewed, more detailed than the  City Centre Strategic Development Framework in Item 1.5 above, but still not a lot of specifics.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="245" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 2.2 this consultation event will be held at  St Albert&#8217;s Primary School,&nbsp; 36 Maxwell Drive, on Wednesday the 22nd of January 2020 between 3.30pm and 7pm.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Belmont Traffic Management Order, parking, GoBike submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike supported the proposal, first featured in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.3, to restrict commuter parking with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Belmont-Hamilton-Gardens-Stage-2-letter-281119.pdf" target="_blank">letter</a> on 28 November.</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire, Proposed TRO and road humps, Maxwell Avenue area, Bearsden, GoBike submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This consultation, which closed on 16 December, was first featured in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.6. We aren&#8217;t too happy with the speed tables, which only leave a narrow gap at the side for cycling &#8211; here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Maxwell-Avenue-Letter-121219.pdf" target="_blank">letter</a> we submitted on 12 December.</p>



<h6 class="wp-block-heading">3.3 Glasgow, Dalmarnock West TRO parking restrictions, GoBike submission and GCC response</h6>



<p><br>GoBike supported the consultation, which closed on 13 December, to control the chaotic commuter parking around Dalmarnock Station and the Police Scotland offices, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">letter</a> on 15 December. All the details were first given in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.5.</p>



<p>On  19 December we received this reply from GCC:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST)(TRAFFIC REGULATION) ORDER 20___</em></strong><br><br><em>Thank you for your correspondence regarding the above named Traffic Regulation Order.<br><br>I  note your comments regarding Shawfield Road and would reiterate that  this falls outwith the Glasgow City boundary, however, I can confirm  that an  officer will contact South Lanarkshire Council to raise your concerns. <br><br>Your  support will be considered and included within the final report which  will inform the decision. Once a decision has been taken in regards to  these  proposals I shall write to you again and advise of the outcome.<br><br>Yours sincerely</em>&#8220;, etc</p>



<p>So, good news that the two neighbouring councils will speak to each other!</p>



<h6 class="wp-block-heading">3.4 Glasgow, Robroyston Station, parking restrictions, GoBike submission and GCC response</h6>



<p>The TRO to prohibit parking on the new road from the M80 to the new Robroyston Railway Station was first featured in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.6. We supported the ban and strongly suggested that now is the time to construct cycle lanes, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Robroyston-M80-Parking-Stage-2-response-121219.pdf" target="_blank">letter</a>, dated 12 December.</p>



<p>On  18 December this reply was received from Glasgow City Council:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>,  </em><strong><em>(ROBROYSTON STATION) </em></strong><em> </em><strong><em>(TRAFFIC REGULATION) ORDER 201_</em></strong><br><br> <em>Thank you for your correspondence regarding the above named Traffic Regulation Order on behalf of GoBike.<br><br>As  previously advised it is intended to provide cycle measures on Station  Road to connect to Robroyston Station and this will be subject to future  consultation which you  will be advised of when progressed.<br><br>Your  support will be considered and included within the final report which  will inform the decision. Once a decision has been taken in regards to  these proposals I shall  write to you again and advise of the outcome.<br><br>Yours sincerely</em>&#8221; etc</p>



<p>We live in hope that this will be both the original Station Road from Cumbernauld Road to the station and the new road from Robroyston and the M80 junction!</p>



<h6 class="wp-block-heading">3.5 Glasgow, Garscube Road, parking changes approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="230" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=525%2C230&#038;ssl=1" alt="" class="wp-image-8684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=600%2C263&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Back in June, and featured in <a rel="noreferrer noopener" aria-label="Digest 36 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-36-12-june-2019-exciting-proposals-for-pollokshields-preparation-for-separated-cycle-lane-on-garscube-road-and-less-exciting-matters-8665" target="_blank">Digest 36</a>, Item 1.4 we were sent proposals for parking restrictions and a two-way cycle lane on Garscube Road, to which we responded with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Garscube-Road-response-010719.pdf" target="_blank">letter</a>. We were sent this email on 04 December:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (GARSCUBE ROAD, (TRAFFIC REGULATION AND PARKING CONTROLS) 2019</em></strong><em><br></em><br><em>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have decided under its scheme of delegated functions to proceed with the  proposal with changes as specified below:-<br><br>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  Provision of on-street short-term pay and display parking on the west side of Firhill Road.<br><br>The Order was made on 11</em><sup><em>th </em></sup><em>November  2019 and an advert was placed in the Evening Times on 22November 2019  stating that the Traffic Regulation Order has been made.<br><br>Should you require any further information on the above named Order please email </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em> SustainableTransport@glasgow.gov.uk</em></a><em><br><br>Yours sincerely</em>&#8221; etc</p>



<p>See the next item for news of the cycle lanes!</p>



<h6 class="wp-block-heading">3.6 Glasgow, Connecting Woodside update, construction to start on Cycle Lanes</h6>



<p>The latest Connecting Woodside update, received on 17 December:</p>



<figure class="wp-block-table"><table><tbody><tr><td>&#8220;<em>New update available:</em></td></tr><tr><td><em>Connecting Woodside end of year update!</em></td></tr><tr><td><a href="http://url8988.commonplace.is/wf/click?upn=stvKIyhiQVtFIL7BreuPmcfPlb6okvWLSXKRED3Co6BajT9bNORx0GcbiFvKFKNTojhNvtZeWwwsXmEWrsOUCiG0ghD3B8wv-2Bm1jFxG7CJikpHX0v2knXDLOUmgBOsk0-2FE7AyI8kT-2BeGVzzwxCs3aQ-3D-3D_wITdTelLcNTF6i-2FMjy9FWN-2BgT7vbMdE9Nz2nqO3kw4MxhJWd07t0DLL51XSV7CofOChdVG6U0h9oP9F4GUoNsfhZxRtHYhz3F3lYV58LHEq-2BZSr6oA3o7GvjGtt2VK2D-2B3y-2BCxVoT47tGQMbAxp0tWNqjOyzdFyCQc3SEBabxXLS6ukz7qCdeTZUUaDhHpRXdXTzmBCCHpTP7Q-2BJLW-2BoxDzNLDqptSRVEAPsLNWch8WVSLpjbA92UamLWKQ2OTq7p6osK8PCiRu-2FaMD1SipX24ZR9Pr9EbRD5QMPO5hBhp3z7XVYVIsPpxqh19zVAC1RKuWfJ3F62fYGqgX9-2BmjbbA4-2FAckY5NpU7BQnm62l0AI-3D" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Read update</a></td></tr><tr><td><em>Button does not work? Try this </em><a rel="noreferrer noopener" target="_blank" href="http://url8988.commonplace.is/wf/click?upn=stvKIyhiQVtFIL7BreuPmcfPlb6okvWLSXKRED3Co6BajT9bNORx0GcbiFvKFKNTojhNvtZeWwwsXmEWrsOUCiG0ghD3B8wv-2Bm1jFxG7CJikpHX0v2knXDLOUmgBOsk0-2FE7AyI8kT-2BeGVzzwxCs3aQ-3D-3D_wITdTelLcNTF6i-2FMjy9FWN-2BgT7vbMdE9Nz2nqO3kw4MxhJWd07t0DLL51XSV7CofOChdVG6U0h9oP9F4GUoNsfhZxRtHYhz3F3lYV58LHEq-2BZSr6oA3o7GvjGtt2VK2D-2B3y-2BCxVoT47tGQMbAxp0tWNqjOyzdFyCQc3SEBabxXLS6ukz7qCdeTZUUaDhHpRX0LdsYqAx4kvIbVdSn3VjII6S0tIkSymDmeK56pVhNKJD06u3nqcaTTKZqXKlbleSGDNNQOzCY3yKYMRHxk1m4xZHEenXJ6mnG89lSlPTaA8kv5k6t5rYkp5x0TymnT-2BAVhmT34E8bk54UfLOQC2Hl7qD9eRgHd63J0K9PKQo9Ew-3D"><em>link</em></a><em>. Like to ask a question to the project team about </em><br><em>this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Connecting Woodside end of year update!" target="_blank">sustainabletransport@glasgow.gov.uk</a>.</em>&#8220;</td></tr></tbody></table></figure>



<p>And here&#8217;s the headline news: &#8221; <strong><em>Construction on the first phase of the Connecting Woodside project will begin in early 2020!</em></strong><em> This is a segregated cycle route on Garscube Road, from Firhill Road to the underpass at Dobbie’s Loan.</em> &#8220;</p>



<h6 class="wp-block-heading">3.7 Glasgow, Beith Street, developer wins appeal to build flats</h6>



<p>This is the saddest and most disgraceful news we have had in a long time. In the face of 160 objections, from local residents, from Patrick Harvie, MSP (Green Party) and GoBike, planning permission has now been granted to the developer who wishes to build 48 flats on the green space shown here, adjacent to the shared cycle/foot path that is National Cycle Route 7.<br>Details of the <a rel="noreferrer noopener" aria-label="planning application are here (opens in a new tab)" href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=neighbourComments&amp;keyVal=PUBY3QEXH3Q00&amp;neighbourCommentsPager.page=3" target="_blank">planning application are here</a> and here are the details of the final outcome: <a rel="noreferrer noopener" aria-label="https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/ (opens in a new tab)" href="https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/" target="_blank">https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/</a></p>



<h6 class="wp-block-heading">3.8 Glasgow, North Kelvin, North Woodside and Woodlands, Mandatory 20mph speed limit zone approved </h6>



<p>A 20mph speed limit has now been approved for this area. Here&#8217;s the email we received on 04 December:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL, (NORTH KELVIN, NORTH WOODSIDE AND WOODLANDS)</em></strong><em> </em><strong><em>(MANDATORY 20MPH SPEED LIMIT ZONE)</em></strong><em> 2</em><strong><em>019</em></strong><em><br><br>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have decided under its scheme of delegated functions to proceed with the  proposal.<br><br>The Order was made on 11</em><sup><em>th </em></sup><em>November 2019 and an advert was placed in the Evening Times on 22</em><sup><em>nd</em></sup><em> November 2019 stating that the Traffic Regulation Order has been made.<br><br>Should you require any further information on the above named Order please email </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em> SustainableTransport@glasgow.gov.uk</em></a><em>.<br><br>Yours sincerely</em>,&#8221; etc</p>



<h6 class="wp-block-heading">3.9 East Renfrewshire Proposed Local Development Plan 2 Representation, ERC response</h6>



<p>GoBike responded to the consultation on the LDP2 with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-ERC-LDP2-response-081219.pdf" target="_blank">letter</a>, as reported in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.3 and we received this response on 12 December:</p>



<p>&#8220;<em>GoBike <br>Dear Sir / Madam  <br></em><strong><em>East Renfrewshire Proposed Local Development Plan 2 (LDP2) and Strategic Environmental Assessment Environmental Report (October 2019)</em></strong><em> <br>Your Reference LDP2/174 <br><br>Thank you for your representation (s) in respect of the above documents.  The Council will aim to resolve issues raised by representations prior to submission of the Proposed LDP2 to Scottish Ministers.  You may be contacted for further information or clarification if required.   Following the close of the consultation a report will be produced summarising all representations received and detailing the Council&#8217;s response.  This will be reported to Council and made available on the Council&#8217;s website.<br><br>If there are unresolved representations the Scottish Ministers will appoint an independent Reporter to examine the Proposed Plan. The Reporter appointed will consider all matters and make recommendations to the Council and to Scottish</em> <em>Ministers on any changes that should be made to the Plan. The Council must incorporate these recommendations prior to adopting the Plan. Once adopted, the Plan has a legal status and is used for the assessment of planning applications and will guide development within East Renfrewshire. <br><br>Please quote reference number LDP2/174 in all future correspondence.  <br>Please do not hesitate to contact the Strategy Team on 577 3001 or email </em><a href="mailto:ldp2@eastrenfrewshire.gov.uk"><em>ldp2@eastrenfrewshire.gov.uk</em></a><em> if you have any further queries.    <br><br>Yours sincerely,     <br>Gillian McCarney  Strategic Services Manager</em>&#8221;  </p>



<h6 class="wp-block-heading">3.10 Renfrewshire, City Deal, GAIA Construction Update</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-9627" width="525" height="244" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?w=1132&amp;ssl=1 1132w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s the latest on what&#8217;s happening out near Glasgow (Renfrew?!) Airport:</p>



<figure class="wp-block-table"><table><tbody><tr><td>&#8221; <em>We wanted to draw your attention to the following updates on two of our City Deal </em><br><em>projects&#8230; </em><br><em><br>As  construction progresses at our Glasgow Airport Investment Area (GAIA)  project, <br>our contractor&nbsp;Wills Bros Civil Engineering, have issued the  first GAIA newsletter <br>which provides an update on progress of  construction works on the project. You can <br>view this from the related  document section of our GAIA webpage at <br></em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=4927c87ea6&amp;e=046567d752" target="_blank"><em>www.renfrewshire.gov.uk/gaia</em></a><em>.</em><br> <br> <em>As part of advance works for the </em><a rel="noreferrer noopener" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=f52195dd0e&amp;e=046567d752" target="_blank"><em>Clyde Waterfront and Renfrew Riverside</em></a><em>  (CWRR) <br>project, our demolition contractor Daltons Demolitions  facilitated a site visit from a <br>group of S5 and S6 pupils preparing for  life in the construction sector. Further details <br>of this visit can be  found on our </em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=9a8cb82a66&amp;e=046567d752" target="_blank"><em>website</em></a><em>.      </em>                                                                     </td></tr></tbody></table></figure>



<figure class="wp-block-table"><table><tbody><tr><td> <em>The 1st official newsletter for the Glasgow Airport Investment Area (GAIA) project. <br>This newsletters, which will be&nbsp;the first in a series updates&nbsp;as the project progresses, <br>includes: Project overview; Traffic management including lane closures required to <br>allow construction to progress; Wright Street bridge update; Protection of Marine Life; and Community updates. <br>You can download the newsletter from the related documents section of&nbsp;our GAIA <br>project page at </em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=4aa8f60fb8&amp;e=046567d752" target="_blank"><em>www.renfrewshire.gov.uk/gaia</em></a><em>.           </em>                                                                 </td></tr></tbody></table></figure>



<h6 class="wp-block-heading">3.11 GoBike met GCC, 13 December </h6>



<p>As we advised in Digest 49, Item 2.1, Ali, Brenda and Tricia from GoBike cycled out to the new Glasgow City Council offices on London Road, to meet Kevin Hamilton, Michael Brady and one of their team who all deal with parking and traffic calming.<br>We had a good discussion and hope to meet again. <br>On parking our main concern is the removal of two-way cycling to allow adequate space for the parking that local residents claim they need, even when commuter parking is being removed by the City Council. We heard that there is a plethora of documents, and opinions, that do or do not support contraflow cycling and the Council is understandably concerned to keep our streets as safe as they think they can.<br>On traffic calming and the universal use of speed cushions, we heard that there is pressure from residents and City Councillors to act quickly to reduce dangerous motor  traffic speeds. Speed cushions certainly do the job but do not necessarily answer our concerns about making streets active-travel-friendly. Unfortunately a decision is made early in the process about which box a proposal fits and currently something that requires speed reduction does not get to be a cycle scheme. Funding is critical too.</p>



<h6 class="wp-block-heading">3.12  Glasgow, Ashgill Road traffic calming scheme </h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?fit=525%2C224&amp;ssl=1" alt="" class="wp-image-9628" width="646" height="276" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Continuing from the item above, Ashgill Road is one that we discussed with the City Council. As you can see from the photo, Ashgill Road is wide and lends itself to high speeds requiring a crash barrier on the bend outside the Community Centre, preventing people from crossing the road to get direct access.</p>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i2.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?fit=525%2C311&amp;ssl=1" alt="" class="wp-image-9633" width="648" height="384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?w=1064&amp;ssl=1 1064w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?resize=300%2C178&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?resize=600%2C355&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Ashgill Road is in the north of the city but has not been designated as a cycle route, even though it connects to Balmore Road, a significant arterial road and is near railway stations. We were given to understand that traffic calming schemes are a 2-part process and the notice we received on 28 November proposing speed cushions was the Stage One consultation. We replied with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a> on 18 December.</p>



<p>We have since learnt that traffic calming using speed cushions does not need a Traffic Regulation Order and that there is local consultation at the same time as the statutory consultees are notified. Here are the plans of the speed cushion locations we were sent on 29 November: <a rel="noreferrer noopener" aria-label="Full proposal (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Full-scheme-proposals.pdf" target="_blank">Full proposal</a>, <a rel="noreferrer noopener" aria-label="Plan 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Section-1-btwn-no-275-and-301.pdf" target="_blank">Plan 1</a>, <a rel="noreferrer noopener" aria-label="Plan 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Section-2-btwn-Ornsay-St-and-opp-no-353.pdf" target="_blank">Plan 2</a>.</p>



<p>We&#8217;ll be on the ball in future!</p>



<h6 class="wp-block-heading">3.13  Glasgow, Duror Street, another traffic calming scheme</h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i2.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?fit=525%2C223&amp;ssl=1" alt="" class="wp-image-9637" width="647" height="275" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s another wide road, in Shettleston, and the residents are concerned about the high speeds of motor vehicles. Here&#8217;s the email that we received on 29 November:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>,  </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Duror Street)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation.<br><br>Background to the proposed Scheme<br><br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br><br>The list of roads affected by these proposals are:-<br></em><br><em> </em><strong><em>Duror Street</em></strong><em><br><br>Details of the proposed Scheme<br><br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>5 sets of 4, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 20 December 2019)</em></strong><em>.&#8221; </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9638" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> submitted on 18 December, suggesting that the road be stopped up to motor traffic midway. As with the item above, from now on, traffic calming proposals will be published in these Digests soon after receipt. However, if you become aware of moves to reduce motor speeds in your locality do let GoBike know and do let your local council know that you want something better than speed cushions or tables.</p>



<h6 class="wp-block-heading">3.14 Glasgow, Gartnavel Hospital Site Active Travel Meeting 18 December </h6>



<p><strong>Notes from Gartnavel Active Travel Route Meeting 18.12.2019</strong> from GoBike member Caroline:<br>&#8220;<em>The meeting was held to discuss plans to improve cycling conditions within the Gartnavel Hospital site.<br>Second Next Bike station, sited in close proximity to Hyndland Train Station exit &#8211; highly likely to be installed.<br>Additional covered bike parking requested, it was advised that there may be additional facilities required e.g. showers to promote cycle commuting to staff.<br>Connectivity with QEUH &#8211; it was advised that this will be reviewed as part of a wider NHSGG strategy to improve access to sites.   Sustrans advised that they would welcome a Glasgow-wide application for matched funding.<br>Widening the existing path from Hyndland Station was touted as a possibility by Sustrans, but their rep was reminded of the conflict this could lead to between pedestrians and those on bikes.<br>Site visit- highlighted need for design improvements at the Great Western Road (GWR) junction and to connect the shared use path that runs parallel to GWR (continuing on road past the restaurant),  desire lines across grass, asked why path wasn&#8217;t continued here &#8211; GCC were too late with funding, allegedly. Also Hughenden residents objected to cycle route running past their homes.<br>Second desire line running alongside steps down to Hyndland Station &#8211; Sustrans rep requested that a ramp be installed here. ScotRail have been consulted about installing</em> <em>a Falco ramp on the Underpass steps at Hyndland Station, but they might object as the stairway width is insufficient. The need for improved signage and wayfinding on proposed routes was highlighted, and it was requested that the access from Claythorn be improved to better accommodate non-standard bikes e.g. tag-alongs/ trikes. I asked what the longer-term strategy was to improve the hostile cycling conditions bordering the hospital site.  Crow Road has been prioritised for 20mph limit, however Sustrans  advised it&#8217;s unlikely to be implemented any time soon, improvements will be made to the Southbrae Drive/ Crow Road junction and access to Jordanhill Station but the future of cycling on Great Western Road remains unknown. I asked if GCC have an interim Transport Strategy to aid decision-making until the Transport Strategy is completed in 2021 but they don&#8217;t; Sustrans stated they are still using the Transport Strategy that related to the Commonwealth Games, which doesn&#8217;t contain much relating to those </em> commutes starting outwith the city-centre.&#8221;&nbsp;</p>



<p>That&#8217;s a lot of information, but Caroline does make the point that Crow Road and Great Western Road are still not attractive cycling routes.</p>



<p>______________________________________________</p>



<p> Enjoy yourself over Christmas and the New Year. Your next Digest will be with you in January.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9568</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East</title>
		<link>https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 26 Nov 2019 17:00:34 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[bus lanes]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[cycle route]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[petition]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[shared footways]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9430</guid>

					<description><![CDATA[Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3, and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3,  and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and North Lanarkshire, East Dunbartonshire and East Renfrewshire as well as the big city.</p>



<span id="more-9430"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Glasgow, Road Satisfaction on-line survey, closes ??</li><li>Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</li><li>East Renfrewshire, Local Development Plan 2, closes 13 December</li><li>**NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</li><li>**NEW** Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ ,  closes 13 December </li><li>East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</li><li>**NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</li><li>**NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li><li> **NEW** Glasgow, City Centre Strategic Development Framework, closes 17 January 2020 </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Scottish Government,  Strategic Transport Projects Review (STPR2) </li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Elmbank Street, we have found an alternative route! </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</li><li>Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</li><li>Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</li><li>Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 **NEW** Glasgow, Road Satisfaction on-line survey, closes ??</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="700" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=525%2C700&#038;ssl=1" alt="" class="wp-image-4243" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?w=756&amp;ssl=1 756w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=225%2C300&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=450%2C600&amp;ssl=1 450w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=357%2C476&amp;ssl=1 357w" sizes="auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px" /></figure>



<p>GoBike members Derek and Neil alerted us to this on-line survey. The City Council is looking for residents&#8217; views of the city&#8217;s roads.  As seems quite standard with these things there is no closing date given, so please try to respond as soon as you can, using this link: <a rel="noreferrer noopener" aria-label="https://www.surveymonkey.co.uk/r/glasgow-city-2 (opens in a new tab)" href="https://www.surveymonkey.co.uk/r/glasgow-city-2" target="_blank">https://www.surveymonkey.co.uk/r/glasgow-city-2</a></p>



<h6 class="wp-block-heading">1.2 Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The publication of these proposals was reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.3 and GoBike fully supports the proposed restriction on parking. We&#8217;ll be writing in later this week confirming our support.</p>



<h6 class="wp-block-heading">1.3 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</h6>



<p>These proposals have been in recent Digests, including <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.4. While we support protected cycle lanes and are concerned about shared footways, we recognise that for those many people who do not wish to cycle on road with all the single occupancy motor commuters at this busy  junction area, these proposals will improve their journey. Our<a rel="noreferrer noopener" aria-label=" letter of response is here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Cluny-Park-A81-Redetermination-letter-111119.pdf" target="_blank"> letter of response is here</a>.</p>



<h6 class="wp-block-heading">1.4 East Renfrewshire, Local Development Plan 2, closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="465" height="260" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=465%2C260&#038;ssl=1" alt="" class="wp-image-9397" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?w=465&amp;ssl=1 465w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=300%2C168&amp;ssl=1 300w" sizes="auto, (max-width: 465px) 100vw, 465px" /></figure>



<p>This was first mentioned in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.5 and we have now started a new channel on Slack for GoBike members who live, work or have a strong interest in East Renfrewshire active travel. Members have been to the Local Consultation events and are busy finding out the issues and concerns about the Local Development Plan 2. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the document and consultation details (opens in a new tab)" href="https://www.eastrenfrewshire.gov.uk/ldp2" target="_blank">link to the document and consultation details</a>. If you would like to get involved, do please contact us. We aim to have a GoBike response ready in good time for 13 December.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Dalmarnock-Railway-Station.jpg?w=525&#038;ssl=1" alt="" class="wp-image-9235"/></figure></div>



<p><br>Yes, this is another that we unwittingly published at the Stage 1 Consultation Stage. Our response, given in Digest 46, Item 1.2, one of support, but also concern about parking being displaced across the river, is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">here</a>. The City Council replied on 12 November with this email:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST) (TRAFFIC REGULATION) ORDER 20__</em></strong><em><br><br>Thank you for your comments on behalf of  GoBike, in relation to the above named Traffic Regulation Order (TRO).<br>I note your comments regarding Shawfield Road and would advise that this falls outwith the Glasgow City  boundary and is not included within the above TRO.<br><br>However, your comments regarding this and your further comments about the National Cycle Route 75, have  been passed to the appropriate team, who will respond to you in due course.&nbsp;  <br><br>I trust this is of assistance, however should you require further information please contact my assistant,  (Name and phone number removed by GoBike). </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-3.png?w=525&#038;ssl=1" alt="" class="wp-image-9436"/></figure>



<p><strong><em>Kevin Hamilton</em></strong><em>, </em><strong><em>Head of Roads</em></strong><em>, </em><strong><em>Neighbourhoods and Sustainability</em></strong>&#8220;</p>



<p>The information now put firmly in the public domain and sent to us with this email on 18 November is here:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST)</em></strong><em> </em><strong><em>(TRAFFIC REGULATION) ORDER 20___</em></strong><em><br><br>Further to my consultation email of 4</em><sup><em>th</em></sup><em> October 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons, detailed report.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Kevin Hamilton, Head of Roads Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 13</em><sup><em>th</em></sup><em> December 2019.<br><br>Yours faithfully</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-4.png?w=525&#038;ssl=1" alt="" class="wp-image-9437"/></figure>



<p><em>Kevin Hamilton, Head of Roads, Neighbourhoods and Sustainability</em>&#8220;</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Dalmarnock_West__TRO-A3_Titlebox_-_Transplan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/NoticeOfProposals-DalmarnockWest-210x85mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Draft Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/09.01-Draft-Report-1.pdf" target="_blank">Draft Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/08-1-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>GoBike will maintain its support for these proposals but will emphasise the points we made before about Cycle Route 75 and our concern about parking transferring to South Lanarkshire, just across the river. Do write in to the Council if these proposals affect you or you have a view on them.</p>



<h6 class="wp-block-heading">1.6 Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ (OFFICIAL), closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="222" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-9449" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=600%2C253&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p><strong>Stage 1, north of the railway</strong><br>GoBike received the initial proposals for this scheme, to restrict parking on a new road (not shown on this map) from the M80 (at the roundabout to the north-west of the new station) to the station itself on 28 October 2019. We replied on 19 November with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Robroyston-M80-Parking-Stage-1-response-191119.pdf" target="_blank">letter</a>, basically saying that we support the parking restrictions but that cycle lanes should be constructed from Robroyston along this new road to the station.</p>



<p>Here&#8217;s the email reply that we received from the City Council on 22 November:</p>



<p>&#8220;<em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY<br><br>Dear Ms Fort,<br><br>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_<br><br>Thank you for your support of the above named Traffic Regulation Order on behalf of GoBike.<br> It  is intended to provide cycle measures on Station Road to connect to  Robroyston Station and this will be subject to future consultation.<br><br>I  trust this is of assistance, however should you require further  information please contact my assistant (name and contact details removed by GoBike).<br><br>Yours sincerely</em>&#8221; etc</p>



<p>Note the intention to &#8220;provide cycle measures&#8221;!</p>



<p><strong>Public consultation 2018, south of the railway</strong><br>This would link in excellently to the proposal we submitted for cycle lanes to be constructed in conjunction with parking restrictions on Station Road  Millerston, linking the new station to the A80 Cumbernauld Road last October. Our final mention of that consultation was Item 1.1 in <a href="https://www.gobike.org/consultation-digest-issue-22-20-november-2018-a-bumper-bundle-of-new-consultations-7056">Digest 22</a>. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of support with comments (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/10/GoBike-Station-Road-Support-and-comments-Letter-171018.pdf" target="_blank">letter of support with comments</a> .</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-6659" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=3264&amp;ssl=1 3264w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Station Road Millerston</figcaption></figure>



<p> For the proposal above, for Station Road, Millerston, it slipped our notice last year that the eastern side of Station Road is in North Lanarkshire, not Glasgow, so residents in the houses on the right-hand side of the road in the photo above might well be plagued by cars left outside their homes once the station opens in a few weeks!</p>



<p><strong>Public Consultation north of the railway</strong><br>This brings us back to the public consultation for the new road north of the railway and this email that we received on 21 November 2019:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br> Dear Sir/Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th</em></sup><em>  October 2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons and  detailed report. Additional corner protection has been added to the  initial draft order at Millersneuk Crescent to ensure safe access for  the local community.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> </em><br><br><em>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing to Group Manager, Technical Services, Neighbourhoods  and Sustainability, Exchange House, 231 George Street, Glasgow, G1 1RX  or by e-mail to </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a><em> by Friday 13</em><sup><em>th</em></sup><em>  December 2019.<br><br>Yours faithfully&#8221;</em> etc</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/RobroystonStation_TRO_Advert_Nov19.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="map/plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/TS-5244-M-000-P-001A.pdf" target="_blank">map/plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-Report-Nov-2019.pdf" target="_blank">Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-SOR.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>We will be repeating our request for cycle lanes on this new road in our response. The overall scheme has the potential of creating good active travel access from Robroyston across to Hogganfield Loch and the <a rel="noreferrer noopener" aria-label="Seven Lochs wetland park (opens in a new tab)" href="https://www.sevenlochs.org/" target="_blank">Seven Lochs wetland park</a> . The east and north of the city has been neglected so far on the active travel front and this is a chance to address that shortfall. Do please write in to support our suggestion!</p>



<p>For these overall works, ie the new road to the north of the railway, the double yellow lining on all the new road and the west side of Station Road south of the railway plus the east side of Station Road at the railway end &#8211; see this <a rel="noreferrer noopener" aria-label="plan from last year (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/The_Glasgow_City_Council_Station_Road_Traffic_Regulation_Order_201_.pdf" target="_blank">plan from last year</a> for the Station Road Millerston proposal, it&#8217;s critical that there is liaison between Glasgow City Council and North Lanarkshire! If you live in Glasgow Ward 17, Robroyston, Glasgow Ward 21, North East or North Lanarkshire Ward 5, Stepps, Chryston &amp; Muirhead do please <a rel="noreferrer noopener" aria-label="contact your councillors (opens in a new tab)" href="https://www.mysociety.org/wehelpyou/contact-your-local-councillor/" target="_blank">contact your councillors</a> to press on them the need for good cycling provision.</p>



<p>One of the councillors for Ward 17 is <a rel="noreferrer noopener" aria-label="Martin McElroy (opens in a new tab)" href="https://www.glasgow.gov.uk/councillorsandcommittees/member.asp?id=1307&amp;t=Councillor+Martin+McElroy" target="_blank">Martin McElroy</a>, who briefly oversaw cycling issues in the previous Glasgow administration and spoke at a GoBike AGM a few years ago. He also cycles regularly, so do please contact him if this is your ward.</p>



<h6 class="wp-block-heading">1.7 East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This was a new public consultation that we publicised in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.6. We commented on the proposal at the initial stage with a view that the gap at the side of the speed tables should be more than 750mm. This hasn&#8217;t been included in the final proposal but we will not object to the scheme overall.</p>



<h6 class="wp-block-heading">1.8 **NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="312" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=312%2C162&#038;ssl=1" alt="" class="wp-image-8162" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?w=312&amp;ssl=1 312w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 312px) 100vw, 312px" /></figure></div>



<p>GoBike member, Derek, posted this on Slack and all those of you who live, work or travel in East Kilbride please do take notice of this. Here is the <a rel="noreferrer noopener" aria-label="link to the proposal (opens in a new tab)" href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank">link to the proposal</a>, with photos and videos plus details of how to respond. </p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=525%2C295&#038;ssl=1" alt="" class="wp-image-9473" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Derek&#8217;s comment on this Stewartfield Way fly through video screenshot is: &#8220;<em>Looks like narrow shared path, not primary cycle route as marked in amended network plan. Huge roundabout in background with few crossings.&#8221;  </em>Certainly, just a quick look at the website link gives the impression that the proposals are to cater for the motor vehicle congestion by building more road, rather than looking for modal change, with the emphasis on public and active travel. Derek gives us another comment, probably from twitter &#8220;<em>consultation on dualling. Narrow shared paths, few crossings but now dressed up like it’s primary route in active travel network</em>.&#8221; </p>



<p>Do please get your views in &#8211; this may be done on-line; see the link given above, and repeated <a href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank" rel="noreferrer noopener" aria-label="here (opens in a new tab)">here</a>.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p>In June 2018 we received the proposals for an experimental TRO to allow taxis and authorised vehicles to use the Finnieston/Clyde Arc/Squinty Bridge for an 18-month period. This was reported in <a rel="noreferrer noopener" aria-label="Digest 11 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-11-going-squinty-about-the-squinty-bridge-byres-road-submission-20mph-parking-etc-etc-5316" target="_blank">Digest 11</a>, Item 1.8 and we were not happy. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of objection (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/06/GoBike-Finnieston-Bridge-Experiment-TRO-Objection-080618.pdf" target="_blank">letter of objection</a> that we submitted on 08 June 2018.</p>



<p>The City Council have apparently decided to make the trial a permanent feature and here&#8217;s the email that we received on 25 November:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><br><br><em>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>The Council propose to consider the introduction of the above named Traffic Regulation Order.<br>Please find enclosed a copy of the press notice of the proposed Order, relevant map, statement of reasons and detailed report.<br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .  <br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Projects Manager, Project Management and Design, Neighbourhoods and Sustainability, 231 George Street, Glasgow G1 1RX  or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by Friday 3</em><sup><em>rd</em></sup><em>  January 2020.<br>Yours faithfully</em>&#8221; etc</p>



<p>The documents referred to in the email are here: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Press-Notice.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Map/Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Relevant-Map.pdf" target="_blank">Map/Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Detailed-Report.pdf" target="_blank">Report</a>.</p>



<p>We are unaware of any improvements that have been made to the active travel regime in the area of this bridge and Fastlink overall, but presumably there have been no incidents reported to Police Scotland in the duration of the temporary TRO. No doubt the taxi operators are delighted with the additional road use they have gained! If you have any views on your experience of using this bridge do please email them to consultations@gobike.org so that they may be reflected in our first message of the New Year to the City Council.</p>



<h6 class="wp-block-heading">1.10 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>This consultation was first given in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and we are hoping that we see the views of those organisations with more insight than us before submitting our response in the New Year. If you do see reviews of this proposal do please send the details to consultations@gobike.org</p>



<h6 class="wp-block-heading">1.11 **NEW**  Glasgow, City Centre Strategic Development Framework, closes 17 January 2020  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike member, Pat, alerted us to this latest in the series of Strategic Development Frameworks for Glasgow. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the consultation (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the consultation</a> and we will be reviewing it over the next few weeks. If you have any specific concerns do please let us know. </p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Scottish Government,  Strategic Transport Projects Review (STPR2) </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p> CyclingUK in Scotland alerted us to this forthcoming consultation and here&#8217;s the email that we got on 18 November:</p>



<p>&#8220;<em>Hi campaigners and supporters<br><br>What’s on your cycling Christmas list? I’m talking  about cycling infrastructure that you want in your area rather than new  tyres for your bike or a thicker pair of gloves! <br><br>Government and their consultants are right now  finalising an online consultation for the Strategic Transport Projects  Review (STPR2) – a kind of spending review of major transport projects  for the next 20 years. See this set of slides abut  STPR2: </em><a href="https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf"><em> https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf</em></a><em> <br></em><br><em>The online consultation is a way of gathering ideas  for consideration in the spending review. It’s massively important that  we use this consultation to say what is needed in Scotland, and use it  to give Government confidence that there  is support for spending money on cycling infrastructure. <br><br>We expect the </em><strong><em>consultation to be launched this month</em></strong><em>  so do look out for it. I want to give you advanced notice so you can  think about how to work with others in your groups, clubs, and networks  to develop ideas. I also want to be  of assistance in helping you and will provide more information when I  know more about the consultation. But please do get in touch if you want  to discuss or if you have questions. </em><br><br><strong><em>This consultation is important</em></strong><em> – STPR2 will  apportion £billions on transport – we need to make the case for  sustainable transport loud and clear and tell Government what we want. </em></p>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&#038;ssl=1" alt="" class="wp-image-9446" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?w=305&amp;ssl=1 305w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p><em>Regards<br><br>Jim<br></em><strong><em>Jim Densham</em></strong><em><br></em><strong><em>Campaigns and Policy Manager &#8211; Scotland</em></strong><em><br></em><strong><em>Cycling UK in Scotland</em></strong><em><br>Email: </em><a href="mailto:jim.densham@cyclinguk.org"><em>jim.densham@cyclinguk.org</em></a>&#8220;<br></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Elmbank Street, we have found an alternative route! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276-600x424.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-7327" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Regular readers of this Digest will surely remember the fury we vented on Glasgow City Council when, as part of the plans for the Sauchiehall Street Avenue and Cycle Lanes project (which we very much support) it became clear that there was to be no easy way to reach Sauchiehall Street from Elmbank Street and the busy area to the south of Bath Street?<br>At a stroke the north part of Elmbank Street was made one-way southbound, and why? To allow car parking on either side! Yes, even though there is a multi-storey car park on Elmbank Crescent to the rear of the King&#8217;s Theatre. Numerous requests were made to the City Council for details of the cycle route from Bath Street to Sauchiehall Street but, we were told, such detail was outwith the remit of the Sauchiehall Street project.</p>



<p>GoBike member, Derek (and note we have 2 very active members with the first name Derek), has now brought it to our attention that Bath Lane, running south to and  parallel to Bath Street has been resurfaced from Elmbank Street to Holland Street. Holland Street, which was made one-way southbound from Sauchiehall Street to Bath Street for the duration of the works, has now reverted to being one-way northbound. Thus there is a feasible route from the two-way section of Elmbank Street, ie <strong>via Bath Lane and Holland Street</strong>.</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="2481" height="3507" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?fit=424%2C600&amp;ssl=1" alt="" class="wp-image-9465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=2481&amp;ssl=1 2481w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=424%2C600&amp;ssl=1 424w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Elmbank Street to Sauchiehall Street, on scrap paper and needing a CAD course!</figcaption></figure>



<p>This route, of course, is not signposted, so won&#8217;t be obvious to the many visitors to our fine city and it does not absolve our City Council of their refusal to allow contraflow cycling and improve permeability for cycle traffic.</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="270" height="186" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/East-Dunbartonshire-Council.jpg?resize=270%2C186&#038;ssl=1" alt="" class="wp-image-9226"/></figure></div>



<p>Back in March we published proposals for parking restrictions in Lenzie and surrounding areas in East Dunbartonshire in <a rel="noreferrer noopener" aria-label="Digest 30 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-30-19-march-2019-get-your-views-in-now-to-the-spt-regional-survey-and-the-get-glasgow-moving-petition-and-is-transformation-possible-8038" target="_blank">Digest 30</a>, Item 1.7. Our <a href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Lenzie-Waiting-Restrictions-support-010419.pdf" target="_blank" rel="noreferrer noopener" aria-label="response (opens in a new tab)">response</a>, supporting the proposals was in <a rel="noreferrer noopener" aria-label="Digest 31 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-31-04-april-2019-featuring-glasgow-east-dunbartonshire-and-north-lanarkshire-8133" target="_blank">Digest 31</a>, Item 1.7. East Dunbartonshire have now approved the TRO and here&#8217;s the email that we received on 12 November:</p>



<p>&#8220;<em>THE EAST DUNBARTONSHIRE COUNCIL (LENZIE)  (WAITING RESTRICTIONS) ORDER   2019<br><br>The  above-mentioned Traffic Regulation Orders has now been made and will become  effective  on  Monday, 6 January 2020. Enclosed are copies of the Order and plan, together with copy of the Notice that is to appear in the   editions  of  the  Kirkintilloch Herald which is published on 13 November   2019.   <br><br>(See   attached   file:   <a rel="noreferrer noopener" aria-label="191112   Lenzie  Area  -  Waiting  and  Loading   Restrictions.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/191112-Lenzie-Area-Waiting-and-Loading-Restrictions.pdf" target="_blank">191112   Lenzie  Area  &#8211;  Waiting  and  Loading   Restrictions.pdf</a>)   <br><br>Regards   <br>Fiona Stirling   <br>Legal Services</em>&#8220;</p>



<h6 class="wp-block-heading">3.3 Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 3.2, Bob Downie&#8217;s petition was heard by the City Council&#8217;s Wellbeing, Empowerment, Community and Citizen Engagement City Policy Committee on 14 November. Here is the <a rel="noreferrer noopener" aria-label="Committee Report (opens in a new tab)" href="http://www.glasgow.gov.uk/councillorsandcommittees/viewDoc.asp?c=P62AFQDN0G81Z30GDX" target="_blank">Committee Report</a> and the recommendations are:<br> &#8220;<em>After consideration, the committee <br>(1) agreed that the issues raised in the petition deserved further attention; and <br>(2) instructed the Executive Director of Neighbourhoods and Sustainability <br>(a) to implement his proposals <br>(i) to develop more robust, clear and visible signage directing cyclists and walkers to the alternative route when temporary closures of the National Cycle Route 75 were required; <br>(ii) to install early warning signs advising of up-coming events; <br>(iii) to arrange that the alternative route via the South embankment of the River Clyde be reviewed and improvements made to the surface and signage to further enhance the diversion; and <br>(iv) to ensure that officers engaged directly with affected groups; and <br>(b) to consider opportunities to consult alongside the major review of  events and public parks. &#8220;</em></p>



<p>So far, so good. We&#8217;ll let you know if and when we hear any more.</p>



<h6 class="wp-block-heading">3.4 Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/20-mph.jpg?resize=525%2C349&#038;ssl=1" alt="" class="wp-image-9456" width="525" height="349"/></figure>



<p>Some of you might remember that back in 2015 Bob Downie presented his <a rel="noreferrer noopener" aria-label="petition (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/20-mph-GCC-Presentation-final.pdf" target="_blank">petition</a> calling for the introduction of a default 20mph speed limit in Glasgow. The petition was well received by Councillors but then fell away and the policy of bit by wee bit was reverted to. Well, a lot has happened since then so we can&#8217;t give Bob all the credit but Glasgow City Council has now agreed to roll out a 20 mph limit across the city, see:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/" target="_blank">https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/</a> </p>



<p>This is good news indeed. GoBike has been supporting every new introduction of a 20 limit in the city but has been appalled at the arbitrary nature of these zones, of which there are now over 80. Yes, that&#8217;s right, over 80. Goodness knows how much all these have cost both in terms of TROs, signage and, of course collisions, as drivers go too fast for the conditions. It will be good to get some standardisation.</p>



<h6 class="wp-block-heading">3.5 Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9466" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=4032&amp;ssl=1 4032w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike members on Slack will be aware that we have been in correspondence with Fairhurst, the Design Consultant for the Barclays Bank development on Clyde Place, about concerns over the South West City Way. GoBike member, Tor, sent in this photo, which is on her daily commute, because vehicle drivers exiting Riverview Gardens, to the right on the photo, appeared to be taking no cognisance of cycle traffic, particularly if it was coming from their left.</p>



<p>The latest news from Fairhurst, is this email, sent today, 26 November:</p>



<p>&#8220;<em>Please find attached our drawing number  <a rel="noreferrer noopener" aria-label="BWHARF-FHS-IN-XX-DR-D-94-151 C01 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/129594-PC-1151.pdf" target="_blank">BWHARF-FHS-IN-XX-DR-D-94-151 C01</a> which shows changes to the road  markings at West St / Riverview Gardens that have been approved by GCC,  following consultation with them.  The edge of carriageway and centre line markings that go through the  cycleway are to be removed to help emphasise that cars are approaching a  junction where they are to give way to cyclists. The Council preferred  to retain give way lines rather than using a  stop line</em>.&#8221; </p>



<p>Lots of good news in the feedback in this Digest. Let&#8217;s hope that it&#8217;s not just a one-off and we have more to tell you in 2 weeks&#8217; time.</p>



<p> </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9430</post-id>	</item>
	</channel>
</rss>
