<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Coalburn &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/coalburn/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Tue, 30 Sep 2025 23:58:10 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultations: September 2025</title>
		<link>https://www.gobike.org/consultations-september-2025-24787</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Mon, 29 Sep 2025 11:25:30 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Argyll and Bute]]></category>
		<category><![CDATA[Coalburn]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[East Airdrie Link Road]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Irvine]]></category>
		<category><![CDATA[North Ayrshire]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=24787</guid>

					<description><![CDATA[Here’s a list of consultations going on in Glasgow and around Strathclyde (and one we missed…). Argyll &#38; Bute Tarbert Ferry Terminal to Whitehouse – Community Path Continuing consultation on a path between Tarbert’s ferry terminal, on Loch Fyne, across the top of the Kintyre peninsula to Kennacraig ferry terminal/Whitehouse. Stage 2 consultation (Stage 1 &#8230; <p class="link-more"><a href="https://www.gobike.org/consultations-september-2025-24787" class="more-link">Continue reading<span class="screen-reader-text"> "Consultations: September 2025"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Here’s a list of consultations going on in Glasgow and around Strathclyde (and one we missed…).</p>



<span id="more-24787"></span>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-7bf2ce7df4b13dc3236052a42bd3982b" style="color:#008d36">Argyll &amp; Bute</h2>



<h3 class="wp-block-heading">Tarbert Ferry Terminal to Whitehouse – Community Path</h3>



<p>Continuing consultation on a path between Tarbert’s ferry terminal, on Loch Fyne, across the top of the Kintyre peninsula to Kennacraig ferry terminal/Whitehouse. Stage 2 consultation (Stage 1 was in 2024) with concept designs for the route alongside the A83. An in-person consultation event in Tarbert has passed. This path to the south-west seems to be separate from the north-east path project (Tarbet to Inverarnan).<br><strong>Links:&nbsp;</strong><a href="https://connectedtp.com/community-engagement-hub/">Tarbert to Whitehouse Community Path (Engagement Hub)</a>,&nbsp;<a href="https://zoomhub.net/rN9Bb.js?width=535px&amp;height=auto&amp;border=none">large plan image (ZoomHub)</a>,&nbsp;<a href="https://app.connectedtp.com/survey/111967a2-5c62-4307-b988-ff363cb23ca7/">Tarbert–Whitehouse survey</a>,&nbsp;<a href="https://app.connectedtp.com/map/">Feedback Map</a>&nbsp;and&nbsp;<a href="https://www.argyll-bute.gov.uk/my-community/community-planning/consultations/consultation/proposed-active-travel-route-between">ABC website page</a>.<br><strong>Deadline: Tuesday 30 September 2025 (17.00).</strong></p>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-3ec3eade0a74fd5ed2ebc8448560590b" style="color:#008d36">East Renfrewshire</h2>



<h3 class="wp-block-heading">Barrhead Road Active Corridor (Newton Mearns)&nbsp;</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="290" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?resize=525%2C290&#038;ssl=1" alt="Map of Barrhead Rd Active Corridor, East Renfrewshire" class="wp-image-24799" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?resize=600%2C331&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?resize=300%2C165&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?resize=1536%2C847&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?w=1789&amp;ssl=1 1789w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/ERC-Barrhead-Rd-Active-Corridor-map.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Map of Barrhead Rd, Newton Mearns also showing phase 2 to west and Ayr Rd project to east</figcaption></figure>



<p>Updated plans for the third phase of this route on Barrhead Road in Newton Mearns (<a href="https://www.eastrenfrewshire.gov.uk/article/7082/Updated-timescale-for-Aurs-Road-project">phase&nbsp;1 is still under construction on Aurs Road at Balgray Reservoir</a>). This will be an important active travel link across the M77 motorway between Newton Mearns town centre and greenspace at the reservoir.&nbsp;<em>“Barrhead Rd would include improved paths and crossings; priority for people walking, wheeling, and cycling at junctions; traffic calming measures; improved road crossings; and new signage.”</em> <br><strong>Drop-in event</strong> with the project team:&nbsp;<a href="https://www.ercultureandleisure.org/libraries/your-local-library/mearns-library/" target="_blank" rel="noreferrer noopener">Mearns Library</a>&nbsp;on&nbsp;<strong>Wednesday 1 October</strong>&nbsp;from&nbsp;<strong>3-7pm</strong>.<br><strong>Links:&nbsp;</strong><a href="https://getinvolved.eastrenfrewshire.gov.uk/barrheadroadactivecorridor">Barrhead Rd Active Corridor page</a><br><strong>Deadline: 26 October 2025</strong>.</p>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-d53b721acd9190075c1ab7c23a669c2c" style="color:#008d36">Glasgow City</h2>



<h3 class="wp-block-heading">Avenues Plus Duke St/John Knox St </h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="438" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Dennistoun-Library-Community-Drop-in-Event-Poster.png?resize=438%2C600&#038;ssl=1" alt="Dennistoun Library Community Drop-in event 2 October 2025" class="wp-image-24804" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Dennistoun-Library-Community-Drop-in-Event-Poster.png?resize=438%2C600&amp;ssl=1 438w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Dennistoun-Library-Community-Drop-in-Event-Poster.png?resize=219%2C300&amp;ssl=1 219w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Dennistoun-Library-Community-Drop-in-Event-Poster.png?w=570&amp;ssl=1 570w" sizes="(max-width: 438px) 100vw, 438px" /></figure>



<p>A ‘meet the contractor’ event for the Avenues Plus routes currently under construction on Duke St (and planned for John Knox St). Apparently, an <em>“opportunity to view the plans, ask questions, and meet the contractor&#8217;s team from Rainton Construction”</em>. Perhaps also to ask about potential links to the new Avenue on Ark Lane and Westercraigs (which could lead directly into the Drives if it had a contraflow bike lane)? Also, Bike for Good will have a Dr&nbsp;Bike (maintenance/servicing) session outside from 4.30 to 6.30pm.<br><strong>Drop-in event</strong> at Dennistoun Library on <strong>Thursday 2 October 2025, 3.30 to 7.30pm</strong>. <br>In other Dennistoun news, a Traffic Regulation Order for parking controls is due out shortly.</p>



<h3 class="wp-block-heading">Connecting Yorkhill and Kelvingrove – Phase 4</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Corunna-St-S-gi-responsive__994.jpg?resize=525%2C295&#038;ssl=1" alt="Visualisation of Corunna St with contraflow protected cycle lane and raised crossing" class="wp-image-24800" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Corunna-St-S-gi-responsive__994.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Corunna-St-S-gi-responsive__994.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Corunna-St-S-gi-responsive__994.jpg?w=994&amp;ssl=1 994w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Visualisation of contraflow cycle lane and raised crossing on Corunna St</figcaption></figure>



<p><em>“Proposals include an enhanced public realm outside Exhibition Centre Train Station, with plans aiming to create a more inviting and accessible space that supports sustainable travel.&nbsp;This project also explores how Corunna Street, Minerva Street and St Vincent Crescent could be improved to better support walking, wheeling and cycling, while creating more welcoming and accessible public spaces. Proposed improvements include making Corunna Street one-way northbound with a dedicated southbound cycle lane, upgrading pavements and crossings, and adding clearer signage to improve wayfinding.”</em><br><strong>Links:&nbsp;</strong><a href="https://www.smartsurvey.co.uk/s/connecting_yorkhill_kelvingrove/">Connecting Yorkhill–Kelvingrove Smartsurvey</a>.<br><strong>Deadline: 7 November 2025</strong>.</p>



<h3 class="wp-block-heading">Yorkhill to Anderston Liveable Neighbourhood – Phase 1</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Argyle-St-Kent-Rd-gi-responsive__994.jpg?resize=525%2C295&#038;ssl=1" alt="Visualisation of Argyle St looking onto Kent Rd" class="wp-image-24795" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Argyle-St-Kent-Rd-gi-responsive__994.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Argyle-St-Kent-Rd-gi-responsive__994.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Argyle-St-Kent-Rd-gi-responsive__994.jpg?w=994&amp;ssl=1 994w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Visualisation of safer corner build-outs on Kent Rd (but no contraflow lane or greenery)</figcaption></figure>



<p><em>“Plans for the Anderston Liveable Neighbourhood build on earlier community feedback, and focus on improving the environment for pedestrians at Kent Road, Brechin Street, Claremont Street, Breadalbane Street and Dover Street.&nbsp;Proposed changes include upgrading pavements with dropped kerbs and tactile paving, improving pedestrian crossings, and adding new infrastructure such as cycle shelters, green planting and enhanced drainage.”</em> <br><strong>Links:&nbsp;</strong><a href="http://www.smartsurvey.co.uk/s/LiveableNeighbourhoodAnderston1/">Yorkhill–Anderston LN Smartsurvey</a>.<br><strong>Deadline: 7 November 2025</strong>.</p>



<h3 class="wp-block-heading">Townhead Greening and Connectivity event</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="423" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Townhead-open-spaces-539093704_1181573740662952_1814182835859748432_n.jpg?resize=423%2C600&#038;ssl=1" alt="Townhead Greening and Connectivity event flyer 8 Sept 2025" class="wp-image-24803" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Townhead-open-spaces-539093704_1181573740662952_1814182835859748432_n.jpg?resize=423%2C600&amp;ssl=1 423w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Townhead-open-spaces-539093704_1181573740662952_1814182835859748432_n.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Townhead-open-spaces-539093704_1181573740662952_1814182835859748432_n.jpg?resize=1083%2C1536&amp;ssl=1 1083w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Townhead-open-spaces-539093704_1181573740662952_1814182835859748432_n.jpg?w=1444&amp;ssl=1 1444w" sizes="auto, (max-width: 423px) 100vw, 423px" /></figure>



<p>Apologies that we missed this local event in Townhead in the run-up to our AGM. It was about the open spaces in the neighbourhood bordered by the new Avenues under construction on N Hanover St and Kyle St.</p>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-0caa8b1acc014e5b8342c663cd490ed0" style="color:#008d36">North Ayrshire</h2>



<h3 class="wp-block-heading">Maritime Mile, Irvine</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="214" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Irvine-Maritime-Mile-FINAL-reduced-version-250915_Consultation-boards-p5.jpg?resize=525%2C214&#038;ssl=1" alt="Irvine Maritime Mile, Harbour St plans" class="wp-image-24811" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Irvine-Maritime-Mile-FINAL-reduced-version-250915_Consultation-boards-p5.jpg?resize=600%2C245&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Irvine-Maritime-Mile-FINAL-reduced-version-250915_Consultation-boards-p5.jpg?resize=300%2C123&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Irvine-Maritime-Mile-FINAL-reduced-version-250915_Consultation-boards-p5.jpg?w=1523&amp;ssl=1 1523w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/Irvine-Maritime-Mile-FINAL-reduced-version-250915_Consultation-boards-p5.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Aerial plan of Harbour Rd, Irvine showing features (and varying width)</figcaption></figure>



<p>This is a large development programme to improve Irvine&#8217;s harbour area. <em>“Phase 2 will improve the layout and appearance of Harbour Street and Montgomery Street and connections between Irvine Railway Station and the Beach Park. Activity hubs and spaces will also be created providing new opportunities to enjoy the Harbourside area.”</em> Most of the plans appear to be shared use paths.<br><strong>Drop-in events:</strong> <br>Wed 8 October, 12 noon – 3pm: Rivergate Shopping Centre; <br>Wed 8 October, 5pm – 7pm: Fullarton Connexions.<br><strong>Links:</strong> <a href="https://northayrshire.community/consultation/maritime-mile-irvine/">Maritime Mile page</a>, <a href="https://northayrshire.community/wp-content/uploads/2025/09/250915_Consultation-boards_Maritime-Mile-FINAL-reduced-version.pdf">proposals</a> and <a href="https://forms.cloud.microsoft/pages/responsepage.aspx?id=DwvXh_xekUmgZeIFvD2zCDBEq8eTg5JEkRNORwf8gXhUMVNJMkI2S0dWVVBYT1E3TVhWRVhHSVI1Sy4u&amp;route=shorturl">survey</a>.<br><strong>Deadline: Sunday 12 October 2025.</strong></p>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-328ee875cd288f54cd81e2832991caab" style="color:#008d36">North Lanarkshire</h2>



<h3 class="wp-block-heading">East Airdrie Link Road</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="383" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/EALR-screenshot-2025-09-26.jpeg?resize=525%2C383&#038;ssl=1" alt="East Airdrie Link Road map, Stage 3 revisions" class="wp-image-24812" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/EALR-screenshot-2025-09-26.jpeg?resize=600%2C438&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/EALR-screenshot-2025-09-26.jpeg?resize=300%2C219&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2025/09/EALR-screenshot-2025-09-26.jpeg?w=1060&amp;ssl=1 1060w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Revised plan for EALR showing new link from Towers Rd, Airdrie to new hospital site</figcaption></figure>



<p>Major changes for Stage 3 of EALR – a new access road added to the new hospital from Towers Rd. Pavements were previously dropped from the main EALR trunk road between Riggend and Newhouse. The new road, next to a school, and wider road safety measures gives an opportunity to push for better active travel provision to the hospital from both Airdrie and the village of Plains. NCN 75 passes through both places and next to Drumgelloch train station. It&#8217;s important NLC also retain existing plans for an active travel path/bridge between the hospital and station. <br><strong>Links: </strong><a href="https://www.northlanarkshire.gov.uk/regeneration-and-investment/glasgow-city-region-city-deal/pan-lanarkshire-orbital-transport-corridor/east-airdrie-link-road/ealr-consultation">EALR consultation page</a>, <a href="https://storymaps.arcgis.com/stories/14c54c0392a9435e9e5ca5df4b005344">EALR StoryMap</a>.<br><strong>Deadline: Sunday 26 October 2025.</strong></p>



<h2 class="wp-block-heading has-text-color has-link-color wp-elements-4f94025067222f571883cb520d8508e7" style="color:#008d36">South Lanarkshire</h2>



<h3 class="wp-block-heading">Coalburn path openings</h3>



<p>No new consultations but a follow-up on previous <a href="https://www.southlanarkshireview.scot/news/article/2398/have_your_say_on_plans_for_douglas_valley">Douglas Valley consultation</a> and <a href="https://www.gobike.org/consultation-digest-local-issue-134-04-may-2023-19537#one-two">Active Travel studies of Clydesdale</a>. Two new active travel paths recently opened around Coalburn, on NCN74 in rural South Lanarkshire, with a further path to follow between Coalburn and Douglas. Coalburn Community Action Group campaigned for the path project, which was managed by Community Action Lanarkshire. <br>Being close to wind farms and potential for tourism seem to have helped with funding, according to SLC&#8217;s <em>South Lanarkshire View</em>: <br><em>“Construction funding was provided by South Lanarkshire Scotland Renewable Energy Fund (REF) via OnPath Middlemuir Windfarm and Walking Scotland’s Ian Findlay Path Fund.<em>… </em>…The work is part of a larger initiative to enhance the recreational and tourism offer, which includes the development of a Douglas Valley focussed Outdoor Recreation and Adventure Tourism scope, progressed by the Douglas Valley Advisory Group.”</em> <br><strong>Links: </strong><a href="https://www.southlanarkshireview.scot/news/article/2711/family_fun_day_to_celebrate_new_active_travel_path">Coalburn to Poneil active travel path</a>&nbsp;and <a href="https://www.southlanarkshireview.scot/news/article/2699/new_path_opened_between_coalburn_and_lesmahagow">Coalburn to Lesmahagow active travel path</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">24787</post-id>	</item>
	</channel>
</rss>
