<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>infinity loop &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/infinity-loop/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Wed, 08 Nov 2023 13:37:48 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Extra: Round-up (08-11-23)</title>
		<link>https://www.gobike.org/consultation-extra-round-up-08-11-23-20726</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Wed, 08 Nov 2023 09:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Argyll and Bute]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[east ayrshire]]></category>
		<category><![CDATA[East Kilbride]]></category>
		<category><![CDATA[infinity loop]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Kilmarnock]]></category>
		<category><![CDATA[Oban]]></category>
		<category><![CDATA[School Streets]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=20726</guid>

					<description><![CDATA[A second bite… Some consultations have slipped through the net recently (due to limited time to produce the Digest). This Extra rounds up some of the ones that would otherwise have missed out. The following are in date order – you&#8217;ve not got long to respond to the first project, which takes a bite out of &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-extra-round-up-08-11-23-20726" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Extra: Round-up (08-11-23)"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A second bite…</h2>



<p>Some consultations have slipped through the net recently (due to limited time to produce the Digest). This Extra rounds up some of the ones that would otherwise have missed out.</p>



<p>The following are in date order – you&#8217;ve not got long to respond to the first project, which takes a bite out of <a href="https://www.google.com/maps/place/Apple+Infinite+Loop/@37.3316798,-122.0327639,673m/data=!3m2!1e3!4b1!4m6!3m5!1s0x808fb5b6c4951d0f:0xb651414deb31e9fb!8m2!3d37.3316756!4d-122.030189!16s%2Fg%2F1tdwkrc0?entry=ttu" target="_blank" rel="noreferrer noopener">Apple&#8217;s</a> ambitions… </p>



<span id="more-20726"></span>



<h2 class="wp-block-heading">East Ayrshire </h2>



<h3 class="wp-block-heading">Infinity Loop, Kilmarnock</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="436" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Kilmarnock-Infinity-Loop-map.jpeg?resize=525%2C436&#038;ssl=1" alt="Map of proposed Kilmarnock Infinity Loop" class="wp-image-20729" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Kilmarnock-Infinity-Loop-map.jpeg?resize=600%2C498&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Kilmarnock-Infinity-Loop-map.jpeg?resize=300%2C249&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Kilmarnock-Infinity-Loop-map.jpeg?w=1238&amp;ssl=1 1238w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Kilmarnock-Infinity-Loop-map.jpeg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Map of proposed Kilmarnock Infinity Loop</figcaption></figure>



<p><strong>Organisation: </strong>Ayrshire Roads Alliance (ARA).<br><strong>Subject: </strong>A 26km(!) ‘figure of eight’ network of walking, wheeling, and cycling routes in and around Kilmarnock. Consultation is about proposals for route 1 (purple line) and route 2 (orange line). The central Route 1 includes a segregated cycleway on Glasgow Rd by Tesco (taking width from hatching/right-turn lanes and grass verge). The eastern Route 2 has a segregated cycleway on Grassyards Rd towards Kay Park. Both would replace some current painted/soft segregated bike lanes (with shared paths in other sections). This ambitious project will need wide support to avoid a <a href="https://www.gobike.org/time-to-get-councillors-who-support-active-travel-holmston-road-cycle-lane-in-ayr-to-be-ripped-up-1938" target="_blank" rel="noreferrer noopener">Holmston Rd</a>/<a href="https://www.gobike.org/consultation-digest-local-issue-134-04-may-2023-19537#two-two" target="_blank" rel="noreferrer noopener">Causeyside St</a> situation –please consider filling in the multiple choice parts of survey (link below).<br><strong>Website links:</strong> <a href="https://www.ayrshireroadsalliance.org/Information-On/Consultations/Current-consultations/Kilmarnock-Infinity-Loop.aspx" target="_blank" rel="noreferrer noopener">Killie Infinity Loop webpage</a>, <a href="https://storymaps.arcgis.com/stories/253f140e5721475ebcd58b473ab70fb4" target="_blank" rel="noreferrer noopener">KIL project storymap</a> and <a href="https://survey123.arcgis.com/share/e1a791efc026426da4e51c9a6e7aa816" target="_blank" rel="noreferrer noopener">KIL survey</a>.<br><strong>Deadline: Sunday 12 November 2023.</strong></p>



<h3 class="wp-block-heading">School Street Trial, Hurlford</h3>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="335" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Hurlford-school-st-trial.png?resize=525%2C335&#038;ssl=1" alt="Map of Hurlford School Street trial" class="wp-image-20728" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Hurlford-school-st-trial.png?resize=600%2C383&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Hurlford-school-st-trial.png?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/11/Hurlford-school-st-trial.png?w=1053&amp;ssl=1 1053w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Map of Hurlford School Street trial measures</figcaption></figure>



<p><strong>Organisation:&nbsp;</strong>Ayrshire Roads Alliance (ARA).<br><strong>Subject:&nbsp;</strong>School Streets trial in Academy Street and Union Street, Hurlford. Temporary bollards and reduction in parking spaces directly in front of&nbsp;Hurlford Primary School.<br><strong>Website links:</strong> <a href="https://www.ayrshireroadsalliance.org/Information-On/Consultations/Current-consultations/East-Ayrshire-Council-School-Street-Trial-Hurlford.aspx" target="_blank" rel="noreferrer noopener">Hurlford School Streets</a> webpage and (very short) <a href="https://www.smartsurvey.co.uk/s/TIBIJO/" target="_blank" rel="noreferrer noopener">School Streets survey</a>.<br><strong>Deadline: </strong>No obvious deadline.</p>



<h2 class="wp-block-heading">Argyll &amp; Bute </h2>



<h3 class="wp-block-heading">Oban Town Centre North Active Travel </h3>



<p><strong>Council:&nbsp;</strong>Argyll &amp; Bute<br><strong>Subject:&nbsp;</strong>Early stages of project to explore opportunities for new active travel improvements around The Corran Esplanade and George Street in Oban.&nbsp; <br><strong>Website links:</strong> <a href="https://www.argyll-bute.gov.uk/my-community/community-planning/consultations/consultation/oban-town-centre-north-active-travel" target="_blank" rel="noreferrer noopener">Oban Town Centre North Active Travel webpage</a>, <a href="https://www.argyll-bute.gov.uk/sites/default/files/2023-10/LUC%20Oban%20TCN%20Active%20Travel%20Project-web%20version_Alt%20Text%20Accessible.pdf" target="_blank" rel="noreferrer noopener">Oban North AT boards</a>, <a href="https://oban-town-centre-north-active-travel.co.uk/" target="_blank" rel="noreferrer noopener">Oban North AT ‘virtual exhibition’</a> and <a href="https://www.surveymonkey.co.uk/r/HHZBVGW" target="_blank" rel="noreferrer noopener">Oban North AT survey</a> (one page). <br><strong>Deadline: 30 November 2023.</strong></p>



<h2 class="wp-block-heading">South Lanarkshire</h2>



<h3 class="wp-block-heading">East Kilbride South Neighbourhood Planning 2023</h3>



<p><strong>Council:&nbsp;</strong>South Lanarkshire<br><strong>Subject:&nbsp;</strong>Local planning project about a wide range of issues including transport and public spaces. Intended for residents of the southern part of East Kilbride –&nbsp;doesn&#8217;t mention neighbourhoods but presumably Greenhills, Whitehills, Mossneuk, etc.<br><strong>Website links:</strong> <a href="https://www.southlanarkshire.gov.uk/directory_record/664684/east_kilbride_south_neighbourhood_planning_2023" target="_blank" rel="noreferrer noopener">EK South Neighbourhood Planning webpage</a> and <a href="https://online1.snapsurveys.com/interview/33d8cb4f-9c08-48a8-8d68-9f3b1b4ddf83" target="_blank" rel="noreferrer noopener">EK South Neighbourhood Planning survey</a>.<br><strong>Deadline: 30 December 2023.</strong></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20726</post-id>	</item>
	</channel>
</rss>
