<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>battlefield &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/battlefield/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Fri, 20 Oct 2023 00:03:07 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 145, 05 October 2023</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-145-05-october-2023-20465</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Fri, 06 Oct 2023 07:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Barmulloch]]></category>
		<category><![CDATA[battlefield]]></category>
		<category><![CDATA[Calton]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Kilbride]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Johnstone]]></category>
		<category><![CDATA[NEATR]]></category>
		<category><![CDATA[pollok]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=20465</guid>

					<description><![CDATA[Wheels turning… As the engine revving goes on in Westminster, active travel consultations continue in the West of Scotland. One is for infrastructure that could be seen as levelling up for the North(-East of Glasgow). There&#8217;s more voting in the East End and Southside as locals have a say in how to spend funding. There &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-145-05-october-2023-20465" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 145, 05 October 2023"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Wheels turning…</h2>



<p>As the engine revving goes on in Westminster, active travel consultations continue in the West of Scotland. One is for infrastructure that could be seen as levelling up for the North(-East of Glasgow). There&#8217;s more voting in the East End and Southside as locals have a say in how to spend funding. There are other city plans and town centre transformations in South Lanarkshire and Renfrewshire. </p>



<span id="more-20465"></span>



<p>Apologies this issue was late – a lot on just now…</p>



<h3 class="wp-block-heading"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>)</h3>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list">
<li><a href="#one-one">Glasgow Transport Strategy – Spatial Delivery Framework</a></li>



<li><a href="#one-two"><strong>Your Citizen Voice: Calton &amp; Greater Pollok</strong></a></li>



<li><a href="#one-three">Local Development Plan for North Lanarkshire (Participation)</a></li>



<li><a href="#one-four">Connecting Battlefield Phase 1 (Queens Drive and Langside Road TRO)</a></li>



<li><a href="#one-five">Our Johnstone (Town Centre consultation)</a></li>



<li><a href="#one-six">Connecting Woodside – Phase 2 (St George’s Road)</a></li>



<li><a href="#one-seven"><strong>North East Active Travel Routes</strong></a></li>



<li><a href="#one-eight">East Kilbride town centre: A new vision</a></li>



<li><a href="#one-nine">Waiting to Happen (junctions consultation)</a></li>
</ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list">
<li><a href="#two-one"><strong>City centre secure cycle parking</strong></a></li>



<li><a href="#two-two"><strong>Duke St Avenue update</strong></a></li>
</ol>



<h4 class="wp-block-heading">3: Proposed Traffic Regulation Orders</h4>



<ol class="wp-block-list">
<li><a href="#three-one">East Ayrshire TROs</a></li>



<li><a href="#three-two">East Dunbartonshire TROs</a></li>



<li><a href="#three-three">Glasgow City TROs &amp; Traffic Calming</a></li>
</ol>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow Transport Strategy – Spatial Delivery Framework</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;A second attempt at this consultation, which seemed to have a false start last month (and still has a broken link to the Transport Strategy –&nbsp;fixed below). The Spatial Delivery Framework covers some important parts of the strategy, especially the&nbsp;<a href="https://experience.arcgis.com/experience/dcb1ce8a723040779c8dd22829d75455/page/Bus-Priority/" target="_blank" rel="noreferrer noopener">Bus Priority Corridors</a>&nbsp;and&nbsp;<a href="https://experience.arcgis.com/experience/dcb1ce8a723040779c8dd22829d75455/page/Active-Travel-Network/" target="_blank" rel="noreferrer noopener">Active Travel Network</a>, which may conflict on some key routes. Also,&nbsp;<a href="https://experience.arcgis.com/experience/dcb1ce8a723040779c8dd22829d75455/page/Mobility-Hubs/" target="_blank" rel="noreferrer noopener">Mobility Hubs</a>,&nbsp;<a href="https://experience.arcgis.com/experience/dcb1ce8a723040779c8dd22829d75455/page/Freight-Hubs/" target="_blank" rel="noreferrer noopener">Freight Hubs</a>,&nbsp;<a href="https://experience.arcgis.com/experience/dcb1ce8a723040779c8dd22829d75455/page/Road-Hierarchy/" target="_blank" rel="noreferrer noopener">Road Hierarchy</a>&nbsp;and the&nbsp;<a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=59916&amp;p=0" target="_blank" rel="noreferrer noopener">Environmental Report</a>.&nbsp;Online sessions with stakeholders are taking place during September and early October.<br><strong>Website links:</strong>&nbsp;<a href="https://www.smartsurvey.co.uk/s/GlasgowTransportSurvey/" target="_blank" rel="noreferrer noopener">Spatial Delivery Framework survey</a>&nbsp;and&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=25934" target="_blank" rel="noreferrer noopener">Glasgow Transport Strategy information</a>.<br><strong>Deadline: 12 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Your Citizen Voice: Calton &amp; Greater Pollok</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="327" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/YCV-Gtr-Pollok_surveyheader_16-10.png?resize=525%2C327&#038;ssl=1" alt="Title image with cartoon of community members for Your Citizen Voice, Greater Pollok" class="wp-image-20468" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/YCV-Gtr-Pollok_surveyheader_16-10.png?resize=600%2C374&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/YCV-Gtr-Pollok_surveyheader_16-10.png?resize=300%2C187&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/YCV-Gtr-Pollok_surveyheader_16-10.png?w=1080&amp;ssl=1 1080w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;A chance for citizens to vote on proposals that came out of an earlier phase of consultation. Just over 500 people took part in the ‘Greater Pollok’ consultation while less than 200 did in Calton. Maybe as a result of that, the Pollok suggestions are more varied –often about upgrading and adding facilities –&nbsp;while the Calton ones are mostly about basic maintenance and CCTV. This process may not deliver much new infrastructure in these areas but it has potential to do so when rolled out elsewhere.<br><strong>Website links:</strong>&nbsp;<a href="https://cciglasgow.org/calton/" target="_blank" rel="noreferrer noopener">YCV Calton webpage</a> and <a href="https://cciglasgow.org/pollok/" target="_blank" rel="noreferrer noopener">YCV Pollok webpage</a>. <br><strong>Deadline: 13 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: Local Development Plan for North Lanarkshire (Participation)</h4>



<p><strong>Council:&nbsp;</strong>North Lanarkshire.<br><strong>Subject:</strong>&nbsp;NLC say:&nbsp;<em>“The LDP… sets out the policies and proposals for future land use and development in North Lanarkshire. For example, it will guide where new housing, business and infrastructure will be located</em>.&nbsp;<em>…we want to make sure everyone with an interest can get involved. To help with this, we have prepared a draft Participation Statement.”</em><br>But, since the Participation Statement is a PDF file:&nbsp;<em>“Accessibility:&nbsp;These files may not be suitable for users of assistive technology. Please contact us to request an accessible format.”</em>&nbsp;Sigh…<br><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations/north-lanarkshire-local-development-plan-participation-statement-survey" target="_blank" rel="noreferrer noopener">NLLDP2: Participation Statement Survey</a>.<br><strong>Deadline:&nbsp;13 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: Connecting Battlefield Phase 1 (Queens Drive and Langside Road TRO)</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;A belated return for this extension to the South City Way. Last time, it had one-way lanes and went down Grange Rd. A lot seems to have happened since, including various comments by residents in Queen’s Drive. So, now there’s a two-way cycleway on the western side of Langside Rd (avoiding Queen’s Dr on the eastern side). Also, the route stays on Langside Rd instead of going down Grange Rd. After some&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/09/2023-07-01-GoBike-Response-ConnectingBattlefieldATTF.pdf" target="_blank" rel="noreferrer noopener">discussion with GCC during Stage 1</a>&nbsp;of this TRO, we received the following:<br><em>“The proposed… Bi-directional cycle lanes on Langside to the monument are an addition to the project. I can confirm the cycle lanes towards the Battlefield monument will not replace the cycle lanes towards the [Battlefield] rest. The Bi-directional cycle lane on Langside to the monument will be constructed using light segregation. To confirm the cycle[way]s do connect, but for TRO purposes we only show the green hatch on the carriageway. The cycle lanes will join within the large buildout at the junction.”</em>&nbsp;So, it seems we get a bonus lane with more still to come (even later than planned).<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-114-7-july-2022-17730#one-seven" target="_blank" rel="noreferrer noopener">Digest 114, 1.7</a>,&nbsp;<a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" target="_blank" rel="noreferrer noopener">Consultation Extra (18 February 2020)</a>&nbsp;and&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-114-7-july-2022-17730#one-seven" target="_blank" rel="noreferrer noopener">earlier</a>.<br><strong>Website links:</strong>&nbsp;<a href="http://www.glasgow.gov.uk/proposedtro">Proposed TRO webpage</a>&nbsp;(<a href="https://storymaps.arcgis.com/stories/81d55a36d6a642a7bc0edeceea8bc6ec" target="_blank" rel="noreferrer noopener">original consultation storymap</a>).<br><strong>Deadline: 14 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5: Our Johnstone (Town Centre consultation)</h4>



<p><strong>Council:&nbsp;</strong>Renfrewshire.<br><strong>Subject:</strong>&nbsp;Consultation for Johnstone town centre, west of Paisley and Elderslie. The council say:&nbsp;<em>“We want to hear from people who live, work and visit Johnstone Town Centre. This is to help us prioritise improvements, identify growth opportunities and develop a new strategic vision for its future.”</em>&nbsp;There’s an online survey (by Page/Park architects no less) but no further details on any plans so far. There was a day of consultation events on 27 September in and around Houston Square.<br><strong>Website links:</strong>&nbsp;<a href="https://www.renfrewshire.gov.uk/article/13526/Shape-the-vision-for-Johnstone-Town-Centre" target="_blank" rel="noreferrer noopener">Johnstone town centre article</a>&nbsp;and&nbsp;<a href="https://pagepark.co.uk/hello/our-johnstone" target="_blank" rel="noreferrer noopener">Our Johnstone online survey</a>.<br><strong>Deadline: 16 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-six">1.6: Connecting Woodside – Phase 2 (St George’s Road)</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;Updated plans for St George’s Road, between Charing Cross and N Woodside Rd. The 2-way protected cycleway will connect from the existing Avenue on Sauchiehall St and eventually link into existing infra next to Garscube Rd. There are some changes to junctions and new crossings along the route. The plans include the more direct crossing option at Phoenix Rd/Maryhill Rd. Also, there’s a rare sighting of a continuous pavement; at a side access road (with barrier) next to Woodside Library. Nearby is a novel cycle crossing going diagonally across a pedestrian crossing (with bike light phase apparently). Two side roads were already going to be restricted: Clarendon Place will be stopped up (opened at other end) and Glenfarg St will be filtered. Lastly, a cycle maintenance station has been added to the plans between Grant St and W Princes St (handy for the M8 off-ramp!).<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624" target="_blank" rel="noreferrer noopener">Digest 121</a>&nbsp;(1.13).<br><strong>Website links:</strong>&nbsp;<a href="https://storymaps.arcgis.com/stories/5fc3acb89e6e498fac8468bfcea3f253" target="_blank" rel="noreferrer noopener">St George’s Rd ‘Storymap’</a>&nbsp;(link fixed now),&nbsp;<a href="https://www.glasgow.gov.uk/ConnectingWoodside" target="_blank" rel="noreferrer noopener">Connecting Woodside webpage</a>&nbsp;(PDF drawings under St George’s Rd heading) and&nbsp;<a href="https://www.smartsurvey.co.uk/s/StGeorgesRoad_Phase2/" target="_blank" rel="noreferrer noopener">St George’s Rd survey</a>.<br><strong>Deadline: 20 October 2023.</strong></p>



<h4 class="wp-block-heading" id="one-seven">1.7: North East Active Travel Routes</h4>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?ssl=1"><img data-recalc-dims="1" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?resize=525%2C295&#038;ssl=1" alt="Portion of plans for junction on Wallacewell Rd, North Glasgow" class="wp-image-20494" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?resize=300%2C168&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?resize=1536%2C863&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?w=1542&amp;ssl=1 1542w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/NEATR_October_2023_Engagement_Drawing_1542px.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></a><figcaption class="wp-element-caption">Plans for Wallacewell Rd showing new traffic light junction at Northgate Rd (click to enlarge)</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;Updated plans for a stretch of permanent protected cycle lanes on Wallacewell Rd, between Broomfield Rd and Northgate Rd. Wallacewell Rd will keep the ‘soft segregated’ lanes it&#8217;s had since before the pandemic. These plans would add permanent infrastructure at junctions and link to neighbouring streets and a school. The current roundabout at Northgate Rd was going to be replaced with a Dutch-style roundabout but will now have a &#8216;cyclops&#8217;-style junction with traffic lights (similar to those on the South City Way and A77 Ayr Rd). It&#8217;s good to see best practice being used with Barmulloch&#8217;s existing 1-way lanes, which were a template for Spaces for People. The mix of ‘soft segregated’ lanes and kerbed junctions in these plans could be a model for the rest of the City Network. However, the rows of black &amp; white ‘armadillos’/‘zebras’ need to be well fixed down to remain continuous and avoid issues with car parking (see main post image).<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-issue-15-21-august-2018-activity-in-glasgow-east-dunbartonshire-scotland-and-the-uk-5993" target="_blank" rel="noreferrer noopener">Digest 15, 1.1</a>.<br><strong>Website links:&nbsp;</strong><a href="https://storymaps.arcgis.com/stories/757e7b96272341b2b0161139d35a7636" target="_blank" rel="noreferrer noopener">NEATR Storymap</a>.<br><strong>Deadline:&nbsp;</strong>No obvious deadline (previous consultation took place in 2018 so this new process may just be for info).</p>



<h4 class="wp-block-heading" id="one-eight">1.8: East Kilbride town centre: A new vision</h4>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:</strong>&nbsp;The same old story of changing (online) shopping habits, empty units and redevelopment. Surprisingly, the most recent building, Centre West, is due to be demolished for housing, with a new north-south street put next to it. Other demolitions would create space for a new town square and car parking by the Queensway trunk road. However, there doesn’t seem to be any new crossing to the square or the path along the south of the site. The existing underpasses often have issues with broken glass and poor sight-lines/personal safety. This is why SLC are building segregated on-road cycle lanes on Churchill Avenue (not in the plans). Will the path be upgraded with improved links west near Blacklands Rd or across to&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/09/Churchill-Ave-cycleway-EK_2280_1200px.jpeg" target="_blank" rel="noreferrer noopener">Churchill Ave’s 2-way protected lanes</a>? Also, could there be a further north-south link between Brouster Gate and the new square? Drop-in events were in the former Toytown shop, Princes Mall.<br><strong>Website links:&nbsp;</strong><a href="https://www.ekfuture.co.uk/wp-content/uploads/2023/09/East-Kilbride-Community-Consultation-Display-Banners_FINAL-1.pdf" target="_blank" rel="noreferrer noopener">EK consultation boards</a>&nbsp;and&nbsp;<a href="https://www.ekfuture.co.uk/questionnaire/" target="_blank" rel="noreferrer noopener">EK questionnaire</a>.<br><strong>Deadline:&nbsp;</strong>No obvious deadline but events finished late September.</p>



<h4 class="wp-block-heading" id="one-nine">1.9: Waiting to Happen (junctions consultation)</h4>



<p><strong>Company:&nbsp;</strong><a href="https://new-practice.co.uk/" target="_blank" rel="noreferrer noopener">New Practice</a>&nbsp;(architecture practice).<br><strong>Subject:</strong>&nbsp;Community engagement by the practice where Emma Burke Newman worked. She was killed by an HGV driver while cycling at the George V bridge/Broomielaw junction, near the casino, in February 2023. This consultation is about that junction and two others –&nbsp;Gorbals St at the Clutha Vaults pub and Albert Bridge/Clyde St (by the High Court). NP say:&nbsp;<em>“These junctions are our focus of study as they feel like incidents-waiting-to-happen, and one is the site of Emma’s death.”</em>&nbsp;Diagrams show movements around each junction (and include the council’s plans for the South City Way extension at the Clutha).&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038#one-nine" target="_blank" rel="noreferrer noopener">New Practice carried out previous consultations like George Square</a>&nbsp;and have applied their knowledge to make a user friendly page.&nbsp;<em>“We want to hear your experiences when walking, wheeling, scooting, or as a driver to help inform solutions specific to these locations and create systems for a safer city for us all.”</em><br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-141-10-august-2023-20066#one-seven" target="_blank" rel="noreferrer noopener">Digest 141, 1.7</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://new-practice.co.uk/waiting-to-happen" target="_blank" rel="noreferrer noopener">Waiting to Happen consultation page</a>.<br><strong>Deadline:&nbsp;</strong>No obvious deadline (but New Practice say they’ll review the submissions and present to councillors).</p>



<h3 class="wp-block-heading" id="one-seven"><strong>Section 2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: City centre secure cycle parking</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?resize=525%2C296&#038;ssl=1" alt="Cyclehoop event outside the Moxy hotel, High St, Glasgow" class="wp-image-20488" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?resize=1536%2C864&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/10/Cyclehoop-High-St-Glasgow-event_2674_1920px.jpeg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;Secure cycle parking pilot scheme run by Cyclehoop (called Trips). It officially launched on 28 Sept with 20 city centre Bikehangars, like the units in many residential areas (but some painted in UCI stripes). You book a space using their mobile phone app, which also locks/unlocks the unit via Bluetooth (apparently, the unit&#8217;s batteries are very efficient and replaced regularly). Prices vary by time, similar to car parking charges (but much cheaper –&nbsp;for example, 30p for up to an hour). While not ideal for people without a smartphone the benefit is detailed data about usage. That will be important as this seems to be the first scheme of its kind in Scotland (if not the UK). <br><strong>Featured:</strong> <a href="https://www.gobike.org/consultation-digest-local-issue-98-15742#one-two" target="_blank" rel="noreferrer noopener">Digest 98, 1.2</a> (indirectly related).<br><strong>Website links:</strong>&nbsp;<a href="https://www.cyclehoop.rentals/types/short-term" target="_blank" rel="noreferrer noopener">Cyclehoop short term parking page</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2:&nbsp;Duke St Avenue update</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong> An ‘Avenues Plus’ route,&nbsp;due to go between High St and Bellgrove St. The summer consultation had two options – putting the 2-way cycleway on either the northern or southern side of Duke St. The team had a stall at the secure cycle parking event and confirmed Option 1 has won. So, the bike lanes will be on the southern, Calton side of Duke St (which the designers told us they preferred at a previous consultation event!). While this option will simplify the junction at High St, it will present issues joining and leaving the 2-way lanes at the edge of Dennistoun. Duke St is Sustrans-funded and expected to start construction in 2024 but isn&#8217;t due to be complete until 2026. The cycleway on George St is part of the City Deal plans for George Sq and won&#8217;t start until later into 2024/2025. In the meantime, the <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=40095&amp;p=0" target="_blank" rel="noreferrer noopener">Meatmarket development is due to build a path</a> between Reidvale St and Melbourne St. Neighbouring <a href="https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038#one-six" target="_blank" rel="noreferrer noopener">‘Calton Village’ will add a filter at Armour St</a> to make a potential ‘Quietway’-style alternative route to Bell St in the Merchant City. <br><strong>Featured:</strong> <a href="https://www.gobike.org/consultation-digest-local-issue-137-15-june-2023-19728#one-five" target="_blank" rel="noreferrer noopener">Digest 137, 1.5</a>.</p>



<h3 class="wp-block-heading"><strong>Section 3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1:&nbsp;East Ayrshire TROs</h4>



<figure class="wp-block-image size-medium is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/09/EastAyrshireCouncilLogo.png?resize=225%2C61&#038;ssl=1" alt="East Ayrshire Council logo" class="wp-image-20299" width="225" height="61" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/09/EastAyrshireCouncilLogo.png?resize=300%2C81&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/09/EastAyrshireCouncilLogo.png?resize=600%2C162&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/09/EastAyrshireCouncilLogo.png?w=667&amp;ssl=1 667w" sizes="auto, (max-width: 225px) 100vw, 225px" /></figure>



<p><strong>Subject:</strong>&nbsp;TRO for&nbsp;<a href="https://www.ayrshireroadsalliance.org/Information-On/Consultations/East-Ayrshire-Council-provision-of-road-humps-on-Dean-Road-Kilmarnock.aspx" target="_blank" rel="noreferrer noopener">road humps on Dean Road, Kilmarnock</a> – deadline: 13 October 2023.&nbsp;</p>



<h4 class="wp-block-heading" id="three-two">3.2:&nbsp;East Dunbartonshire TROs</h4>



<figure class="wp-block-image size-medium is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=225%2C36&#038;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" width="225" height="36" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w" sizes="auto, (max-width: 225px) 100vw, 225px" /></figure>



<p><strong>Subject:</strong>&nbsp;Traffic Management Scheme (speed tables/humps) for Menteith Ave &amp; Springfield Rd, Bishopbriggs – deadline: 3 November 2023.<br><strong>Website links:</strong> <a href="https://www.eastdunbarton.gov.uk/residents/roads-pavements-and-parking/traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3:&nbsp;Glasgow City TROs &amp; Traffic Calming</h4>


<div class="wp-block-image">
<figure class="alignright size-full is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/Glasgow_City_Council_logo.svg_.png?resize=75%2C128&#038;ssl=1" alt="Glasgow City Council logo" class="wp-image-18421" width="75" height="128"/></figure>
</div>


<p><strong>Subject:</strong>&nbsp;As above, TROs for South Portland St and Queens Drive and Langside Road plus the traffic management order for Riverside and Merchant City.&nbsp;Also, a TRO for bus/taxi/cycle lanes on Paisley Rd West (by Bellahouston Park). The number of emails from GCC suggest there may be many more TROs to follow… <br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18127" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>&nbsp;and&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">20465</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 116, 04 August 2022</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038</link>
					<comments>https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038#comments</comments>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 04 Aug 2022 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Argyle St]]></category>
		<category><![CDATA[Ayr]]></category>
		<category><![CDATA[Barras]]></category>
		<category><![CDATA[battlefield]]></category>
		<category><![CDATA[Bishopbriggs]]></category>
		<category><![CDATA[Calton]]></category>
		<category><![CDATA[Carmunnock]]></category>
		<category><![CDATA[east ayrshire]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[George Square]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Inverclyde]]></category>
		<category><![CDATA[Kilmarnock]]></category>
		<category><![CDATA[paisley]]></category>
		<category><![CDATA[pollok]]></category>
		<category><![CDATA[Prestwick]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=18038</guid>

					<description><![CDATA[Putting it all together. August opens with Cycle to Work Day and plenty of Traffic Orders from Glasgow, East Ayrshire&#160;and East Dunbartonshire. There&#8217;s analysis of the event for the eastern side of Argyle St, with accessibility issues raised again. Also, a major city centre plan being pushed by GCC (with several emails to GoBike). It &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 116, 04 August 2022"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Putting it all together. </h2>



<p>August opens with Cycle to Work Day and plenty of Traffic Orders from Glasgow, East Ayrshire&nbsp;and East Dunbartonshire. There&#8217;s analysis of the event for the eastern side of Argyle St, with accessibility issues raised again. Also, a major city centre plan being pushed by GCC (with several emails to GoBike). It has a few surprises which could help connect the city centre. (Tonight&#8217;s Digest was delayed by connection and commuting issues –apologies.)</p>



<span id="more-18038"></span>



<h3 class="wp-block-heading">Forthcoming consultations</h3>



<p>The second stage of consultation about the Raeberry Street Quietway&nbsp;is due to open tomorrow (5 August). This follows the <a href="https://www.gobike.org/consultation-digest-local-issue-99-11-november-2021-15879#one-twelve" target="_blank" rel="noreferrer noopener">first phase consultation from late 2021</a> and is part of the wider <a href="https://www.glasgow.gov.uk/connectingwoodside" target="_blank" rel="noreferrer noopener">Connecting Woodside project</a>. Also starting soon (about a year after the Traffic Order) is the <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#three-three" target="_blank" rel="noreferrer noopener">North Kelvin/North Woodside Restricted Parking Zone</a>. </p>



<h3 class="wp-block-heading"><strong>Contents</strong><br>(new/updated items in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one">Paisley Town Centre – Causeyside Street Regeneration</a></li><li><a href="#one-two">Ayr to Prestwick Active Travel Route</a></li><li><a href="#one-three">Connecting Battlefield</a></li><li><a href="#one-four"><strong>Kittochside Road</strong> <strong>Traffic Calming Scheme</strong></a></li><li><a href="#one-five"><strong>Carmunnock Road Roundabout 20mph Speed Limit Zone</strong></a></li><li><a href="#one-six"><strong>Barras North (Calton Village) TRO</strong></a></li><li><a href="#one-seven"><strong>Laggan Road filter TRO</strong></a></li><li><a href="#one-eight"><strong>Rugby Park, Kilmarnock – Parking Consultation</strong></a></li><li><a href="#one-nine">George Square &amp; ‘Block C’ Avenues – ‘Our Place’</a></li><li><a href="#one-ten"><strong>Glasgow City Centre Transformation Plan</strong></a></li><li><a href="#one-eleven">Greater Pollok Strategic Development Framework</a></li><li><a href="#one-twelve">Greenock to Battery Park SfP lane</a></li></ol>



<h4 class="wp-block-heading">Section 2: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#two-one">A803 &amp; St Helen&#8217;s, Bishopbriggs – Traffic Regulation Orders</a></li><li><a href="#two-two">Garnethill Traffic Management and Parking Controls Order </a></li><li><strong><a href="#two-three">‘Argyle St East’ Avenue webinar notes</a></strong></li></ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Paisley Town Centre – Causeyside Street Regeneration</h4>



<p><strong>Council:&nbsp;</strong>Renfrewshire.<br><strong>Area:</strong>&nbsp;Causeyside St and St Mirren St between Paisley Canal and Gilmour St train stations.<br><strong>Subject:</strong>&nbsp;A potentially very useful link on a main road. A segregated cycletrack is proposed between the pedestrianised part of Gilmour St down Causeyside St to just past Stow Brae (where there’s a link to NCN75 at Telford’s). Renfrewshire Council&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-108-17-march-2022-16958#two-one" target="_blank" rel="noreferrer noopener">removed some Spaces for People projects</a>&nbsp;and have very little protected, on-road infrastructure. So, even though the proposed cycletrack would be 2-way, it’s a big step forward for the area. Talk of keeping/adding car parking spaces may jar but it’s one less stick for critics to beat it with. There will still be many hurdles to clear, including accessibility and reaction from shoppers/shopkeepers. The plans are by Amey, better known for their trunk road work. That may explain the lack of trees and the convoluted junction south of Stow Brae.<br><strong>Website links:</strong> <a href="https://storymaps.arcgis.com/stories/0d4b646bd8d84485915b81df07f0e92f" target="_blank" rel="noreferrer noopener">Causeyside St ‘storymap’</a>&nbsp;(with survey at end).<br><strong>Deadline: 7 August 2022.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Ayr to Prestwick Active Travel Route</h4>



<p><strong>Organisation:</strong>&nbsp;Ayrshire Roads Alliance (on behalf of&nbsp;South Ayrshire Council).<br><strong>Subject:</strong>&nbsp;An upgraded&nbsp;<em>“active travel route linking Ayr Esplanade to Prestwick Town Train Station will be proposed. It is envisaged that the proposed route will also connect to existing core paths in addition to future aspirational schemes such as Accessible Ayr, The Culzean Way and the Prestwick to Barassie Active Travel Route.<em>”</em></em>&nbsp;If it goes ahead, it would replace part of the current NCN7 along the coast, so has potential for cycle tourism as well as local journeys. There are photos of issues along the current route but no plans/visuals. So, it seems to be an early consultation to get comments (and maybe gauge demand?). If so, the more responses the better.<br><strong>Website links:&nbsp;</strong><a href="https://storymaps.arcgis.com/stories/0ee0b360c1604282b587dc26b5adc7b3" target="_blank" rel="noreferrer noopener">Ayr to Prestwick survey</a>.<br><strong>Deadline: 12 August 2022.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: Connecting Battlefield</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Battlefield Road, Grange Road, Langside Road and Queens Drive (between Queen’s Park and Mount Florida).<br><strong>Subject:</strong>&nbsp;Relaunch of the former Battlefield Street Design project after a few years on hold during the pandemic. It features a uni-directional extension to the South City Way cycletrack running alongside Queen’s Park and down Battlefield Road. Also, there would be major changes to junctions at Queen’s Drive, Langside Rd and Battlefield Rest (removing a road between it and the old Victoria Hospital site). The consultation site mentions the Liveable Neighbourhood plans for Langside to Toryglen so hopefully these will dovetail with the Battlefield plans.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" target="_blank" rel="noreferrer noopener">Consultation Extra, February 2020</a>.<br><strong>Website links:&nbsp;</strong><a href="https://storymaps.arcgis.com/stories/81d55a36d6a642a7bc0edeceea8bc6ec" target="_blank" rel="noreferrer noopener">Connecting Battlefield ‘Storymap’</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_Connecting_Battlefield/" target="_blank" rel="noreferrer noopener">Connecting Battlefield survey</a>.<br><strong>Deadline:</strong>&nbsp;<strong>14 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Kittochside Road Traffic Calming Scheme</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="328" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?resize=525%2C328&#038;ssl=1" alt="A view of Kittochside Rd, Carmunnock" class="wp-image-18074" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?resize=600%2C375&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?resize=300%2C188&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?resize=1536%2C960&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?resize=2048%2C1280&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Kittochside-Rd-Screenshot-2022-08-04.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Kittochside Road, looking towards Carmunnock, where speed cushions are proposed</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Northern end of Kittochside Road, Carmunnock (between Glasgow and East Kilbride).<br><strong>Subject:</strong>&nbsp;Installing 13 speed cushions (with bollards) on the wider sections of Kittochside Rd as it comes past housing into the village. On the narrow section south of the village (with hedgerows either side), motor vehicles may have to slow down to pass each other. However, despite having no pavements, the southern part of the road is also used by pedestrians and people cycling. It remains to be seen if this scheme will have any effect on traffic levels and road safety overall.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/08/Kittochside-Road-traffic-calming-proposals-A1.pdf" target="_blank" rel="noreferrer noopener">Kittochside Rd Traffic Calming area (PDF)</a>, <a href="https://www.gobike.org/wp-content/uploads/2022/08/Kittochside-Road-Traffic-calming-proposals-Section-1-From-Waterside-Road-to-south-of-Parklee-Drive.pdf" target="_blank" rel="noreferrer noopener">Kittochside Rd section 1 (PDF)</a> and <a href="https://www.gobike.org/wp-content/uploads/2022/08/Kittochside-Road-Traffic-calming-proposals-Section-2-Between-numbers-18-and-21.pdf" target="_blank" rel="noreferrer noopener">Kittochside Rd section 2 (PDF)</a>.<br><strong>Deadline:</strong>&nbsp;<strong>19 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Carmunnock Road Roundabout 20mph Speed Limit Zone</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="361" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Carmunnock-Rd-20mph-Zone_995px.png?resize=525%2C361&#038;ssl=1" alt="Drawing of 20mph zone covering service roads off Carmunnock Rd" class="wp-image-18094" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Carmunnock-Rd-20mph-Zone_995px.png?resize=600%2C412&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Carmunnock-Rd-20mph-Zone_995px.png?resize=300%2C206&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Carmunnock-Rd-20mph-Zone_995px.png?w=995&amp;ssl=1 995w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of the proposed 20mph zone next to Carmunnock Rd</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Not in Carmunnock –&nbsp;it&#8217;s the roundabout on the main road between King&#8217;s Park and Castlemilk (B766).<br><strong>Subject:</strong>&nbsp;Extending the 20mph zone to the shops on the  Carmunnock Rd/Brakemire Dr service roads next to the roundabout.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/08/Carmunnock-Rd-20mph-TRO-combined.pdf" target="_blank" rel="noreferrer noopener">Carmunnock Rd 20mph TRO documents (combined PDF)</a>.<br><strong>Deadline:</strong>&nbsp;<strong>24 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-six">1.6: Barras North (Calton Village) TRO</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Calton-Village-Barrack-St-building-site_5121_1000px.jpg?resize=525%2C295&#038;ssl=1" alt="Calton Village under construction at Gallowgate" class="wp-image-18106" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Calton-Village-Barrack-St-building-site_5121_1000px.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Calton-Village-Barrack-St-building-site_5121_1000px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Calton-Village-Barrack-St-building-site_5121_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Flats under construction at Gallowgate, Calton</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;North of Gallowgate, between Barrack St and Melbourne St in Calton.<br><strong>Subject:</strong>&nbsp;Parking restrictions and traffic calming in area of new housing. The site, east of the Morrisons supermarket, had lain empty for decades. Wheatley Group is building new flats, called ‘Calton Village’ (for “mid-market rent”) and amending the road layout. Armour St will be filtered at its western end so traffic for Morrisons has to use Barrack St. Various parking bays and build-outs are planned (plus secure bike parking). However, Melbourne St is used as a rat run (to avoid traffic lights) so may be better with a diagonal filter to stop through traffic.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/08/Barras-North-Calton-Village-TRO_docs_combined.pdf" target="_blank" rel="noreferrer noopener">Barras North/Calton Village TRO documents (combined PDF)</a> and <a href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=documents&amp;keyVal=PZVM0IEXLGY00" target="_blank" rel="noreferrer noopener">housing development planning application</a>.<br><strong>Deadline:</strong>&nbsp;<strong>25 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: Laggan Road filter TRO</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="365" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order_1176px.png?resize=525%2C365&#038;ssl=1" alt="Map of proposed filter on Laggan Rd at Coylton Rd" class="wp-image-18100" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order_1176px.png?resize=600%2C417&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order_1176px.png?resize=300%2C209&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order_1176px.png?w=1176&amp;ssl=1 1176w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order_1176px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of the Laggan Rd filter near Merrylea Parish Church</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Laggan Rd in Muirend between Langside Dr and Merrylee Rd/Clarkston Rd.<br><strong>Subject:</strong>&nbsp;Proposals for a filter at the north end of Laggan Rd at Coylton Rd. Presumably to stop drivers taking a shortcut between Langside Dr and Clarkston Rd. The filter has bollards and an exemption for cycling so should be permeable.<br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/08/GCC-Laggan-Road-Traffic-Regulation-Order-docs-combined.pdf" target="_blank" rel="noreferrer noopener">Laggan Rd filter TRO documents (combined PDF)</a>.<br><strong>Deadline:</strong>&nbsp;<strong>26 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Rugby Park, Kilmarnock – Parking Consultation</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Rugby-Park-Kilmarnock-TRO_map.jpg?resize=525%2C295&#038;ssl=1" alt="Portion of the map of proposed parking restrictions around Rugby Park, Kilmarnock" class="wp-image-18067" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Rugby-Park-Kilmarnock-TRO_map.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Rugby-Park-Kilmarnock-TRO_map.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Rugby-Park-Kilmarnock-TRO_map.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>A portion of the map showing parking proposals</figcaption></figure>



<p><strong>Council:&nbsp;</strong>East Ayrshire.<br><strong>Subject:</strong>&nbsp;A Traffic Regulation Order to bring in matchday parking restrictions on 30+ roads around Rugby Park, home of Kilmarnock FC. They&#8217;re newly promoted back to the Scottish Premiership so bigger clubs, with more supporters, will be visiting. The club and stadium are one of the oldest in Scotland so they&#8217;re in the middle of a residential area. The proposed measures seem to be mainly painted lines and signage. More ambitious <a href="https://news.stv.tv/west-central/parking-zones-plan-for-celtic-park-and-ibrox-dropped-by-glasgow-city-council" target="_blank" rel="noreferrer noopener">event day parking zone proposals for Ibrox Stadium and Celtic Park were dropped by GCC in May</a>.<br><strong>Website links:&nbsp;</strong><a href="https://www.tellmescotland.gov.uk/notices/east-ayrshire/traffic/00000277819" target="_blank" rel="noreferrer noopener">Rugby Park TRO page (Tell Me Scotland website</a>) and <a href="https://www.gobike.org/wp-content/uploads/2022/08/Rugby-Park-Kilmarnock-TRO_combined.pdf" target="_blank" rel="noreferrer noopener">TRO documents (combined PDF)</a>.<br><strong>Deadline:</strong>&nbsp;<strong>26 August 2022.</strong></p>



<h4 class="wp-block-heading" id="one-nine">1.9: George Square &amp;&nbsp;‘Block C’ Avenues –&nbsp;‘Our Place’</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/George-Sq_Our-Place-boards_5008_935px.jpg?resize=333%2C250&#038;ssl=1" alt="Our Place display boards in George Square, Glasgow" class="wp-image-18040" width="333" height="250" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/George-Sq_Our-Place-boards_5008_935px.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/George-Sq_Our-Place-boards_5008_935px.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/George-Sq_Our-Place-boards_5008_935px.jpg?w=935&amp;ssl=1 935w" sizes="auto, (max-width: 333px) 100vw, 333px" /><figcaption>Our Place display panels in George Square</figcaption></figure></div>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;George Square and surrounding streets from ‘Block C’ of the&nbsp;<a href="https://www.glasgow.gov.uk/avenues" target="_blank" rel="noreferrer noopener">Avenues project</a> (including West George St, North Hanover St, Hanover St, Miller St, John St, George St and Cochrane St).<br><strong>Subject:</strong>&nbsp;The next step in the consultation about the square and its surroundings (the last round was in Feb/Mar). New visualisations show the designers have got the message about more greenery. They’re an improvement on the current, quite barren, square but are not final. Which is just as well, since the shared spaces and road treatments at north and south look like they’d need more work. There are display panels at the western side of George Sq showing designs for the square and Avenues. Drop-in sessions will be held next to the panels on… <br><em>Saturday 6 August</em> (1pm to 4pm) and <br><em>Thursday 18 August</em> (4pm to 7pm). <br>There are two surveys –&nbsp;one for George Square and one for the proposed Avenues.<br><strong>Featured:</strong> <a href="https://www.gobike.org/consultation-digest-local-issue-106-17-february-2022-16732#one-five" target="_blank" rel="noreferrer noopener">Digest 106, Item 1.5</a>.<br><strong>Website links:</strong> <a href="https://www.ourplaceglasgow.com/get-involved/george-square" target="_blank" rel="noreferrer noopener">George Sq ‘Our Place’ engagement website</a>.<br><strong><strong>Deadline:</strong>&nbsp;2 September 2022.</strong></p>



<h4 class="wp-block-heading" id="one-ten">1.10: Glasgow City Centre Transformation Plan</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="370" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Glasgow_CCTP_Draft_Short_Summary_20-05-22_cover_1198px.jpg?resize=525%2C370&#038;ssl=1" alt="Glasgow City Centre Transformation Plan cover" class="wp-image-18049" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Glasgow_CCTP_Draft_Short_Summary_20-05-22_cover_1198px.jpg?resize=600%2C423&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Glasgow_CCTP_Draft_Short_Summary_20-05-22_cover_1198px.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Glasgow_CCTP_Draft_Short_Summary_20-05-22_cover_1198px.jpg?w=1198&amp;ssl=1 1198w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/08/Glasgow_CCTP_Draft_Short_Summary_20-05-22_cover_1198px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>The cover shows a black and white photo of the cycletrack on Sauchiehall St</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;Another plan about the city centre, with familiar themes from Districts to Avenues, but also some surprises. A few more cycle/pedestrian bridges have appeared in the maps, including across the M8 and River Clyde. Cathedral St is apparently being made bus-only, which raises questions about cycling provision (and traffic on High St). <br>Also, <em>“<strong>Workshops</strong> will be held on Microsoft Teams… </em><br><em>Accessibility: Walk/Cycle/Connections – Tuesday 16th August 2022 (at 10:30am)</em>.<br><em>Greener Glasgow/Streets/Place/Parking/Servicing – Tuesday 23rd August 2022 (morning).<br>Public Transport: Bus/Train/Subway/Metro/Taxi – Thursday 25th August 2022 (morning).<br>Open Forum/Aims/All-Topic Discussion – Wednesday 31st August 2022 (afternoon).”</em><br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/city-centre-transformation-plan/" target="_blank" rel="noreferrer noopener">City Centre Transformation Plan webpage</a> and <a href="https://www.smartsurvey.co.uk/s/GCC_CCTP/" target="_blank" rel="noreferrer noopener">CCTP survey</a>.<br><strong>Deadline:&nbsp;12 September 2022.</strong></p>



<h4 class="wp-block-heading" id="one-eleven">1.11: Greater Pollok Strategic Development Framework</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;South-western corner of Glasgow at edge of M77 and East Renfrewshire. Includes Leverndale, Nitshill, Priesthill and Darnley neighbourhoods.<br><strong>Subject:</strong>&nbsp;The latest SDF follows others for North Glasgow, Inner East, etc. and looks at the economy, environment and transport over the next few decades. This part of Glasgow juts out between Barrhead and Thornliebank so connections with East Renfrewshire are important. It covers part of Dams to Darnley Country Park so has some things in common with the recent&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-112-9-june-2022-17484#one-two" target="_blank" rel="noreferrer noopener">Barrhead consultation map</a>. Also, Braidcraft Rd and Brockburn Rd have Spaces for People lanes (as does Corkerhill Rd to north). However, there are some hellish junctions around Silverburn Shopping Centre. Later in the year GCC should write a draft strategy for further consultation.<br><strong>First featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-113-23-june-2022-17591#one-six" target="_blank" rel="noreferrer noopener">Digest 113, Item 1.6</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://greaterpollokldf.commonplace.is/" target="_blank" rel="noreferrer noopener">Greater Pollok Commonplace map</a>.<br><strong>Deadline:&nbsp;September 2022.</strong></p>



<h4 class="wp-block-heading" id="one-twelve">1.12: Greenock to Battery Park SfP lane</h4>



<p><strong>Council:&nbsp;</strong>Inverclyde.<br><strong>Subject:</strong>&nbsp;A Spaces for People temporary route between Greenock town centre and a coastal park. A council vote was 9:2 in favour of keeping the lanes for another six months, with a further review in September. Photos in the consultation survey show a mixture of on-road ‘soft’ segregation and painted lanes on footways and across side roads. While some of the junction and bus stop treatments may not be ideal, there seem to be decent protected sections too.<br><strong>First featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-108-17-march-2022-16958#one-twelve" target="_blank" rel="noreferrer noopener">Digest 108, Item 1.12</a>.<br><strong>Website links:&nbsp;</strong><a href="https://survey123.arcgis.com/share/d3949238143a4308b9bed86b67560c2e" target="_blank" rel="noreferrer noopener">Greenock Town Centre to Battery Park – Community Engagement</a>&nbsp;and&nbsp;<a href="https://www.inverclydenow.com/greenock-bike-lane-to-stay-for-at-least-another-six-months/" target="_blank" rel="noreferrer noopener">Inverclyde Now article on council vote</a>.<br><strong>Deadline:</strong>&nbsp;No obvious deadline.</p>



<h3 class="wp-block-heading"><strong>Section 2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: A803 &amp; St Helen&#8217;s PS, Bishopbriggs – Traffic Regulation Orders</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:</strong>&nbsp;Orders for parking restrictions in areas around Kirkintilloch Rd and Wester Cleddens Road. EDC say the TROs <em>“have now been made and will become &nbsp;effective&nbsp;on Monday, 5 September 2022.”</em><br><strong>Featured:</strong> <a href="https://www.gobike.org/consultation-digest-local-issue-101-9-december-2021-16159#one-five" target="_blank" rel="noreferrer noopener">Digest 101, Item 1.5</a> / <a href="https://www.gobike.org/consultation-digest-local-issue-106-17-february-2022-16732#one-seven" target="_blank" rel="noreferrer noopener">Digest 106, Item 1.7</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2: Garnethill Traffic Management and Parking Controls Order</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:</strong>&nbsp;GCC say: <em>“your objection was reported and considered. However, the Council have decided under its scheme of delegated functions to proceed with the proposal as advertised. The Order was made on 15th July 2022.”</em><br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-three" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.3</a>.</p>



<h4 class="wp-block-heading" id="two-three">2.3:&nbsp;‘Argyle St East’ Avenue webinar notes</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong> East of the Hielenman&#8217;s Umbrella/Central Station bridge along Argyle St and Trongate to the junction at Tolbooth steeple.<br><strong>Subject:</strong>&nbsp;Notes from a recent online meeting about the eastern end of Argyle St. The meeting was introduced as <em>“more about information than consultation” </em>as plans have been underway since 2018. The main change would be putting a one-way road through the current pedestrianised blocks of Arygle St, to help speed up bus routes (with protected contraflow cycle lane). Further east, there would be one-way cycletracks on either side of the road. There was quite a lot of support for the cycle lanes but many points in the meeting came from blind people objecting to bus stop bypasses and raised road tables. <br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/08/Avenues-ASE-webinar-note-27-7-22.pdf" target="_blank" rel="noreferrer noopener">Argyle St East Avenue webinar note</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.gobike.org/consultation-digest-local-issue-116-04-august-2022-18038/feed</wfw:commentRss>
			<slash:comments>1</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18038</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 115, 21 July 2022</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-115-21-july-2022-17796</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 21 Jul 2022 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Ayr]]></category>
		<category><![CDATA[battlefield]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[George Square]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Greenock]]></category>
		<category><![CDATA[Inverclyde]]></category>
		<category><![CDATA[paisley]]></category>
		<category><![CDATA[pollok]]></category>
		<category><![CDATA[Port Glasgow]]></category>
		<category><![CDATA[Prestwick]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[South Ayrshire]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=17796</guid>

					<description><![CDATA[New shores, Southside and centre. There&#8217;s a wee jaunt along the coast in this issue – taking in Port Glasgow, Greenock, Prestwick and Ayr. Also, a potential route from Paisley&#8217;s (dried up) canal to its town centre. In Glasgow there are Southside surveys and George Sq has gardens galore. Also, East Dunbartonshire Council update on &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-115-21-july-2022-17796" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 115, 21 July 2022"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">New shores, Southside and centre.</h2>



<p>There&#8217;s a wee jaunt along the coast in this issue – taking in Port Glasgow, Greenock, Prestwick and Ayr. Also, a potential route from Paisley&#8217;s (dried up) canal to its town centre. In Glasgow there are Southside surveys and George Sq has gardens galore. Also, East Dunbartonshire Council update on some of their plans.</p>



<h3 class="wp-block-heading"><strong>*Addition*</strong> Forthcoming consultations</h3>



<p>Events about the ‘Argyle St East’ Avenue (Central Station to Barrowfield Park) are taking place early next week: </p>



<ul class="wp-block-list"><li>Monday 25 July 2022 – 10am to 6pm at St Enoch Centre.</li><li>Tuesday 26 July 2022 – <a href="https://www.eventbrite.co.uk/e/glasgow-avenues-argyle-street-east-registration-372832832037" target="_blank" rel="noreferrer noopener">Argyle St East online event, 7–8.30pm</a>.</li></ul>



<span id="more-17796"></span>



<h3 class="wp-block-heading"><strong>Contents</strong><br>(new/updated items in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one"><strong>Port Glasgow 20mph zone</strong></a></li><li><a href="#one-two"><strong>Paisley Town Centre – Causeyside Street Regeneration</strong></a></li><li><a href="#one-three">Ayr to Prestwick Active Travel Route</a></li><li><a href="#one-four">Connecting Battlefield</a></li><li><a href="#one-five"><strong style="font-size: 1rem;">George Square &amp;&nbsp;‘Block C’ Avenues –&nbsp;‘Our Place’</strong></a></li><li><a href="#one-six">Greater Pollok Strategic Development Framework</a></li><li><a href="#one-seven">Greenock to Battery Park SfP lane</a></li></ol>



<h4 class="wp-block-heading">Section 2: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#two-one">Local Development Plan Newsletter (EDC)</a></li></ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Port Glasgow 20mph zone</h4>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="370" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Proposed-Port-Glasgow-20mph-zone.png?resize=525%2C370&#038;ssl=1" alt="Map of proposed Port Glasgow 20mph zone" class="wp-image-17910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Proposed-Port-Glasgow-20mph-zone.png?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Proposed-Port-Glasgow-20mph-zone.png?resize=300%2C212&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of proposed upper Port Glasgow 20mph zone</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Inverclyde.<br><strong>Area:</strong>&nbsp;Part of upper Port Glasgow, west of Kilmacolm Rd/A761. Includes Bardrainney, Mid-Auchinleck and Slaemuir neighbourhoods.<br><strong>Subject:</strong>&nbsp;As well as a 20mph zone this plan links into changes to NCN75. <em>“The proposal is being supported by Sustrans Scotland as part of a proposal to reroute the National Cycle Route 75 along Auchenbothie Road.<em>”</em></em> Auchenbothie Road has a pink dashed line on the map, showing where traffic calming is planned. NCN75 already connects to it (red dotted line on map) but currently goes along Montrose Ave and Dubbs Rd (blue dotted line).<br><strong>Website links:</strong> <a href="https://survey123.arcgis.com/share/1cb9a2e3e6b4478e9e77dfc9084b0c31" target="_blank" rel="noreferrer noopener">Port Glasgow 20mph zone survey</a>.<br><strong>Deadline:&nbsp;29 July 2022.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Paisley Town Centre – Causeyside Street Regeneration</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="261" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Causeyside-St-split-screen_1248px.jpg?resize=525%2C261&#038;ssl=1" alt="Causeyside St split screen visual" class="wp-image-17916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Causeyside-St-split-screen_1248px.jpg?resize=600%2C298&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Causeyside-St-split-screen_1248px.jpg?resize=300%2C149&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Causeyside-St-split-screen_1248px.jpg?w=1248&amp;ssl=1 1248w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Causeyside-St-split-screen_1248px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Split screen view of Causeyside St –&nbsp;current photo on left; proposed visual on right</figcaption></figure>



<p><strong>Council: </strong>Renfrewshire.<br><strong>Area:</strong> Causeyside St and St Mirren St between Paisley Canal and Gilmour St train stations. <br><strong>Subject:</strong> A potentially very useful link on a main road. A segregated cycletrack is proposed between the pedestrianised part of Gilmour St down Causeyside St to just past Stow Brae (where there&#8217;s a link to NCN75 at Telford&#8217;s). Renfrewshire Council <a href="https://www.gobike.org/consultation-digest-local-issue-108-17-march-2022-16958#two-one" target="_blank" rel="noreferrer noopener">removed some Spaces for People projects</a> and have very little protected, on-road infrastructure. So, even though the proposed cycletrack would be 2-way, it&#8217;s still a big step forward for the area. Talk of keeping/adding car parking spaces may jar but it&#8217;s one less stick for critics to beat it with. There will still be many hurdles to clear, including accessibility and reaction from shoppers/shopkeepers. The plans are by Amey, better known for their trunk road work. That may explain the lack of trees and the convoluted junction south of Stow Brae. <br><strong>Website links:</strong> <a href="https://storymaps.arcgis.com/stories/0d4b646bd8d84485915b81df07f0e92f" target="_blank" rel="noreferrer noopener">Causeyside St &#8216;storymap&#8217;</a> (with survey at end).<br><strong>Deadline: 7 August 2022.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: Ayr to Prestwick Active Travel Route</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="347" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Ayr-Prestwick-aerial-view_1000px.jpg?resize=525%2C347&#038;ssl=1" alt="Ayr and Prestwick project areas aerial view" class="wp-image-17915" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Ayr-Prestwick-aerial-view_1000px.jpg?resize=600%2C397&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Ayr-Prestwick-aerial-view_1000px.jpg?resize=300%2C199&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/Ayr-Prestwick-aerial-view_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Aerial photo with project areas marked</figcaption></figure>



<p><strong>Organisation:</strong>&nbsp;Ayrshire Roads Alliance (on behalf of&nbsp;South Ayrshire Council).<br><strong>Subject:</strong>&nbsp;An upgraded <em>“active travel route linking Ayr Esplanade to Prestwick Town Train Station will be proposed. It is envisaged that the proposed route will also connect to existing core paths in addition to future aspirational schemes such as Accessible Ayr, The Culzean Way and the Prestwick to Barassie Active Travel Route.<em>”</em></em> If it goes ahead, it would replace part of the current NCN7 along the coast, so has potential for cycle tourism as well as local journeys. There are photos of issues along the current route but no plans/visuals. So, it seems to be an early consultation to get comments (and maybe gauge demand?). If so, the more responses the better.<br><strong>Website links:&nbsp;</strong><a href="https://storymaps.arcgis.com/stories/0ee0b360c1604282b587dc26b5adc7b3" target="_blank" rel="noreferrer noopener">Ayr to Prestwick survey</a>.<br><strong>Deadline: 12 August 2022.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: Connecting Battlefield</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Battlefield Road, Grange Road, Langside Road and Queens Drive (between Queen’s Park and Mount Florida).<br><strong>Subject:</strong>&nbsp;Relaunch of the former Battlefield Street Design project after a few years on hold during the pandemic. It features a uni-directional extension to the South City Way cycletrack running alongside Queen&#8217;s Park and down Battlefield Road. Also, there would be major changes to junctions at Queen&#8217;s Drive, Langside Rd and Battlefield Rest (removing a road between it and the old Victoria Hospital site). The consultation site mentions the Liveable Neighbourhood plans for Langside to Toryglen so hopefully these will dovetail with the Battlefield plans.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-extra-18-february-additional-south-city-way-event-for-battlefield-extension-10113" target="_blank" rel="noreferrer noopener">Consultation Extra, February 2020</a>.<br><strong>Website links:&nbsp;</strong><a href="https://storymaps.arcgis.com/stories/81d55a36d6a642a7bc0edeceea8bc6ec" target="_blank" rel="noreferrer noopener">Connecting Battlefield ‘Storymap’</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_Connecting_Battlefield/" target="_blank" rel="noreferrer noopener">Connecting Battlefield survey</a>.<br><strong>Deadline:</strong>&nbsp;<strong>14 August 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: George Square &amp;&nbsp;‘Block C’ Avenues –&nbsp;‘Our Place’</h4>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="299" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?resize=525%2C299&#038;ssl=1" alt="George Square visualisation annotated (bird's eye view)" class="wp-image-17899" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?resize=600%2C342&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?resize=300%2C171&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?resize=1536%2C876&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?w=1900&amp;ssl=1 1900w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/07/George-Sq_2214_Option01-Birds-eye-View-annotated_1900px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption>Initial visualisation of how George Square may look (click to enlarge)</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;George Square and surrounding streets from Block C of the&nbsp;<a href="https://www.glasgow.gov.uk/avenues" target="_blank" rel="noreferrer noopener">Avenues project</a>.<br><strong>Subject:</strong>&nbsp;The next step in consultation about the square and surroundings (last round was in Feb/Mar). New visualisations show the designers have got the message about more greenery. They&#8217;re an improvement on the current, quite barren square but are not the finished article. Which is just as well, since the shared spaces and road treatments at north and south look like they&#8217;d need more work. There are panels in the square for the public to view. Drop-in sessions will be held next to them on Saturday 6 August (1pm to 4pm) and Thursday 18 August (4pm to 7pm). There are two surveys –&nbsp;one for George Square and one for the proposed Avenues.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-106-17-february-2022-16732#one-five" target="_blank" rel="noreferrer noopener">Digest 106, Item 1.5</a>.<br><strong>Website links:</strong> <a href="https://www.ourplaceglasgow.com/get-involved/george-square" target="_blank" rel="noreferrer noopener">George Sq ‘Our Place’ engagement website</a>.<br><strong><strong>Deadline:</strong>&nbsp;2 September 2022.</strong></p>



<h4 class="wp-block-heading" id="one-six">1.6: Greater Pollok Strategic Development Framework</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;South-western corner of Glasgow at edge of M77 and East Renfrewshire. Includes Leverndale, Nitshill, Priesthill and Darnley neighbourhoods.<br><strong>Subject:</strong>&nbsp;The latest SDF follows others for North Glasgow, Inner East, etc. and looks at the economy, environment and transport over the next few decades. This part of Glasgow juts out between Barrhead and Thornliebank so connections with East Renfrewshire are important. It covers part of Dams to Darnley Country Park so has some things in common with the recent&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-112-9-june-2022-17484#one-two" target="_blank" rel="noreferrer noopener">Barrhead consultation map</a>. Also, Braidcraft Rd and Brockburn Rd have Spaces for People lanes (as does Corkerhill Rd to north). However, there are some hellish junctions around Silverburn Shopping Centre. Later in the year GCC should write a draft strategy for further consultation.<br><strong>First featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-113-23-june-2022-17591#one-six" target="_blank" rel="noreferrer noopener">Digest 113, Item 1.6</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://greaterpollokldf.commonplace.is/" target="_blank" rel="noreferrer noopener">Greater Pollok Commonplace map</a>.<br><strong>Deadline:&nbsp;September 2022.</strong></p>



<h4 class="wp-block-heading" id="one-seven">1.7: Greenock to Battery Park SfP lane</h4>



<p><strong>Council:&nbsp;</strong>Inverclyde.<br><strong>Subject:</strong>&nbsp;A Spaces for People temporary route between Greenock town centre and a coastal park. A council vote was 9:2 in favour of keeping the lanes for another six months, with a further review in September. Photos in the consultation survey show a mixture of on-road ‘soft’ segregation and painted lanes on footways and across side roads. While some of the junction and bus stop treatments may not be ideal, there seem to be decent protected sections too.<br><strong>First featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-108-17-march-2022-16958#one-twelve" target="_blank" rel="noreferrer noopener">Digest 108, Item 1.12</a>.<br><strong>Website links:&nbsp;</strong><a href="https://survey123.arcgis.com/share/d3949238143a4308b9bed86b67560c2e" target="_blank" rel="noreferrer noopener">Greenock Town Centre to Battery Park – Community Engagement</a>&nbsp;and&nbsp;<a href="https://www.inverclydenow.com/greenock-bike-lane-to-stay-for-at-least-another-six-months/" target="_blank" rel="noreferrer noopener">Inverclyde Now article on council vote</a>.<br><strong>Deadline:</strong>&nbsp;No obvious deadline.</p>



<h3 class="wp-block-heading"><strong>Section 2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp;Local Development Plan Newsletter (EDC)</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:</strong> <em>“This edition includes updates on the following: Proposed Local Development Plan 2 Examination Report; Planning Guidance; Circular Economy Strategy;&nbsp;Parking Management Plan.<em>”</em></em><br><strong>Website links:&nbsp;</strong><a href="https://www.gobike.org/wp-content/uploads/2022/07/LDP-Newsletter-67_EDC_July-2022.pdf" target="_blank" rel="noreferrer noopener">LDP Newsletter, edition 67</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">17796</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 35, 28 May 2019 with some  new feedback, but no new consultations, giving you time to respond to the issues that are still current</title>
		<link>https://www.gobike.org/consultation-digest-issue-35-28-may-2019-with-some-new-feedback-but-no-new-consultations-giving-you-time-to-respond-to-the-issues-that-are-still-current-8575</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 28 May 2019 11:45:37 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[battlefield]]></category>
		<category><![CDATA[consultation]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parking]]></category>
		<category><![CDATA[pollution]]></category>
		<category><![CDATA[south city way]]></category>
		<category><![CDATA[Sustrans]]></category>
		<category><![CDATA[travel to schools]]></category>
		<category><![CDATA[University Avenue]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=8575</guid>

					<description><![CDATA[Quite a concentration on parking in this issue, with waiting/loading restrictions proposed for Bearsden, Laurieston and University Avenue, but also important access proposals for 6 schools in Glasgow plus an update on the workplace parking levy and measures to reduce congestion in Glasgow City Centre. Where would we be without car parking? Do read on &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-35-28-may-2019-with-some-new-feedback-but-no-new-consultations-giving-you-time-to-respond-to-the-issues-that-are-still-current-8575" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 35, 28 May 2019 with some  new feedback, but no new consultations, giving you time to respond to the issues that are still current"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Quite a concentration on parking in this issue, with waiting/loading restrictions proposed for Bearsden, Laurieston and University Avenue, but also important access proposals for 6 schools in Glasgow plus an update on the workplace parking levy and measures to reduce congestion in Glasgow City Centre. Where would we be without car parking? Do read on &#8230;.</p>



<span id="more-8575"></span>



<h4 class="wp-block-heading">Contents</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>TODAY, University of Glasgow Campus Development Meeting, 28 May 18:00hrs</li><li>Glasgow (School Streets, Glasgow) (Prohibition of Motor Vehicles) (Experimental Traffic Regulation) Order 201_. closes TOMORROW, 29 May</li><li>Glasgow Climate Change Survey, closes 31 May</li><li>East Dunbartonshire Council, Order &#8211; West Chapelton Avenue &amp; Crescent, Bearsden &#8211; No Waiting &amp; No Loading Restrictions, closes 03 June</li><li>Glasgow, Laurieston Phase 2 20mph Speed Limit Order 20_, closes 07 June</li><li>Glasgow, Laurieston Phase 2 Trafffic Regulation Order 20_, Waiting and Loading, closes 07 June</li><li>Glasgow, University Avenue and University Place, Traffic Regulation and Parking Controls, Order 201_, closes 07 June</li><li>Glasgow, University Avenue and University Place, 20mph Speed Limit Zone, Order 201_ closes 07 June</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, Battlefield, on-line public consultation 04 &#8211; 14 June and drop-in event (invitation only!) 06 June</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow, Battlefield ongoing design works &#8211; update</li><li>Workplace Parking Levy, outcome of recent consultation</li><li>Glasgow, City Centre Congestion Improvement response</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for response</h4>



<h6 class="wp-block-heading">1.1 TODAY, University of Glasgow Campus Development Meeting, 28 May 18:00hrs</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Glasgow-University.jpg?w=525&#038;ssl=1" alt="" class="wp-image-8536"/></figure></div>



<p>This was noted in <a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.2, which you should check for the full details, but here are the essentials:<br>Venue: Wolfson Medical Building (Yudowitz Seminar Room 1) on University Avenue.<br>Time: 18:00 &#8211; 20:00<br>Tickets: not required, but attendees were asked to register via Eventbrite. Here&#8217;s the link:   <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.eventbrite.com/e/campus-development-public-engagement-evening-tickets-61683780849?aff=ebdssbdestsearch" target="_blank">https://www.eventbrite.com/e/campus-development-public-engagement-evening-tickets-61683780849?aff=ebdssbdestsearch</a> <br></p>



<h6 class="wp-block-heading">1.2 Glasgow (School Streets, Glasgow) (Prohibition of Motor Vehicles) (Experimental Traffic Regulation) Order 201_. closes TOMORROW, 29 May</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="283" height="178" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/school-car-free-zone.jpg?resize=283%2C178&#038;ssl=1" alt="" class="wp-image-8450"/></figure>



<p><a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.3 gives all the details for the proposed road closures around the time of the school day start and finish times for the 6 schools to be included in the pilot: Bankhead, Broomhill, Hillhead, Lourdes, Our Lady of the Rosary and St Blane&#8217;s. If you wish to comment then please email saferparking@glasgow.gov.uk. GoBike&#8217;s letter of support is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/05/GoBike-Schools-Experimental-TRO-letter-of-support-280519.pdf" target="_blank">here</a>.<br>This is a good move by Glasgow City Council to cut down on the so-called &#8220;school run&#8221;, depriving children of a bit of fresh air and exercise on their journey to and from school. If you have time before tomorrow afternoon, please do write in to add your support &#8211; but perhaps send your email to landservices@glasgow.gov.uk since the safer parking email failed when the GoBike letter was sent in!</p>



<h6 class="wp-block-heading">1.3 Glasgow Climate Change Survey, closes 31 May</h6>



<p>Final chance this week to respond to this <a rel="noreferrer noopener" aria-label="survey (opens in a new tab)" href="https://www.smartsurvey.co.uk/s/ClimateChange2019/" target="_blank">survey</a> from Glasgow City Council. There&#8217;s lots of room for you to put your views in so do please get typing!</p>



<h6 class="wp-block-heading">1.4 East Dunbartonshire Council, Order &#8211; West Chapelton Avenue &amp; Crescent, Bearsden &#8211; No Waiting &amp; No Loading Restrictions, closes 03 June.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="229" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?resize=525%2C229&#038;ssl=1" alt="" class="wp-image-8465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?resize=600%2C262&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Screenshot-2019-05-13-16.21.53-1.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Details were in Digest 34, Item 1.5 and here are the documents from East Dunbartonshire: <a rel="noreferrer noopener" aria-label="Traffic Order (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/05/190411-Draft-West-Chapelton-Ave-Cres-Order.pdf" target="_blank">Traffic Order</a> and <a rel="noreferrer noopener" aria-label="Plans (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/05/190410-Bearsden-Consolidated-Town-Centre-Order-2013-plans.pdf" target="_blank">Plans</a>. If you wish to comment then write to:  The Chief Solicitor &amp; Monitoring Officer, Legal Services, 12 Strathkelvin Place, Kirkintilloch, G66 1TJ and you may email your comments in to: Fiona.Stirling@eastdunbarton.gov.uk</p>



<p>Here&#8217;s GoBike&#8217;s <a href="https://www.gobike.org/wp-content/uploads/2019/05/GoBike-EDC-West-Chapelton-letter-of-support-280519.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)">letter of support</a>.</p>



<h6 class="wp-block-heading">1.5 Glasgow, Laurieston Phase 2 20mph Speed Limit Order 20_, closes 07 June</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="339" height="149" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Laurieston.jpg?resize=339%2C149&#038;ssl=1" alt="" class="wp-image-8468" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Laurieston.jpg?w=339&amp;ssl=1 339w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/Laurieston.jpg?resize=300%2C132&amp;ssl=1 300w" sizes="auto, (max-width: 339px) 100vw, 339px" /></figure></div>



<p>Laurieston, to the south of the Clyde, is being redeveloped with some very pleasant-looking housing, as we told you in <a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.6 and Glasgow City Council, in another piecemeal application of 20mph in the city, propose a 20mph speed limit. Oh that they had the resources to enforce it, but we will be supporting the measure. Here&#8217;s our qualified <a href="https://www.gobike.org/wp-content/uploads/2019/05/GoBike-Laurieston-Phase-2-20mph-support-280519.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter of support. (opens in a new tab)">letter of support.</a></p>



<h6 class="wp-block-heading">1.6 Glasgow, Laurieston Phase 2 Trafffic Regulation Order 20_, Waiting and Loading, closes 07 June</h6>



<p>Item 1.7 in <a href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank" rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)">Digest 34</a> gave all the details for this measure, but there are 2 concerns:</p>



<ol class="wp-block-list"><li>There appears to be a dire shortage of people who carry out enforcement of road traffic offences in the city, leading to many, many infringements</li><li>The official language around parking, waiting and stopping is confusing, as you will have seen if you read our recent blog-post &#8220;<a rel="noreferrer noopener" aria-label="It's time for ACTION on University Avenue (opens in a new tab)" href="https://www.gobike.org/its-time-for-action-on-university-avenue-8474#more-8474" target="_blank">It&#8217;s time for ACTION on University Avenue</a>&#8221; so it means that people will stop, but perhaps not wait, or park &#8211; but it&#8217;s still an obstruction for people cycling or trying to cross the road.</li></ol>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="214" height="79" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/double-yellow-lines.jpg?resize=214%2C79&#038;ssl=1" alt="" class="wp-image-8584"/></figure></div>



<p>According to one guide this road marking means  &#8220;You may stop to <strong>load</strong>, unload or for passengers to get in or out of the vehicle providing there are&nbsp;<strong>no signs</strong>&nbsp;saying so. Double yellow lines mean that there is to be&nbsp;<strong>no waiting</strong>&nbsp;at any time unless there are <strong>signs</strong> that specifically specify seasonal restrictions. &#8220;<br>Confusing or what? No wonder so there are so many lawyers advertising to help drivers accused of road traffic offences.</p>



<p>GoBike is supporting the measure but pointing out our concerns in this <a href="https://www.gobike.org/wp-content/uploads/2019/05/GoBike-Laurieston-Phase-2-waiing-and-loading-Reluctant-Support-280519.pdf" target="_blank" rel="noreferrer noopener" aria-label="letter (opens in a new tab)">letter</a>.</p>



<h6 class="wp-block-heading">1.7 Glasgow, University Avenue and University Place, Traffic Regulation and Parking Controls, Order 201_, closes 07 June</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="403" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?resize=525%2C403&#038;ssl=1" alt="" class="wp-image-7686" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?w=2000&amp;ssl=1 2000w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?resize=300%2C230&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?resize=600%2C461&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/UniAve.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Standard parking in the non mandatory University Avenue painted cycle lanes.</figcaption></figure>



<p>Our concern about this proposal was given in both <a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.8 and in our blog-post &#8220;<a href="https://www.gobike.org/its-time-for-action-on-university-avenue-8474#more-8474">It&#8217;s time for ACTION on University Avenue</a>&#8221; and we will be submitting our objection prior to the 07 June deadline. If you support what GoBike is doing then please add your voice by emailing Andy Waddell, Director of Operations, Neighbourhoods and Sustainability, Glasgow City Council at land@glasgow.gov.uk</p>



<p><strong>Do please sign our petition! It&#8217;s at:</strong>  <a href="https://you.38degrees.org.uk/petitions/make-university-avenue-safe-for-cycling#signature-form" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">https://you.38degrees.org.uk/petitions/make-university-avenue-safe-for-cycling#signature-form</a> </p>



<h6 class="wp-block-heading">1.8 Glasgow, University Avenue and University Place, 20mph Speed Limit Zone, Order 201_ closes 07 June</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2015/02/20mph-sign-blue-sky.jpg?w=525&#038;ssl=1" alt="" class="wp-image-739"/></figure></div>



<p><a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.9 gave the details of this proposal for another piecemeal 20mph zone in the city and our concerns with this are about both the piecemeal nature of 20mph implementation in the city and enforcement. We will be submitting our letter of grudging support before the closing date, but we do wish drivers would observe traffic regulations &#8211; for all our sakes.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, Battlefield, on-line public consultation 04 &#8211; 14 June and drop-in event (invitation only!) 06 June</h6>



<p> We tell you below, in the next item, that work is progressing on the design for Battlefield. <br>   On Thursday 6  June Sustrans are inviting &#8220;<em>local residents, businesses, and groups who use the  area along Langside Road, Grange Road, and Queen’s Drive to attend a  focus  group at Queen’s Park Bowling Club to view design proposals for this  space. The proposals incorporate cycle segregation and look at improving  pavement widths, bus stop locations, and simplifying junctions. Please  find a postcard invitation attached with further  details. The event is between 5 pm until 8 pm where you can drop-in and  view the proposed designs and leave your feedback. Refreshments will be  available too.  <br>The designs will also be available online for the wider public to comment from 4</em><sup><em>th</em></sup><em> to the 14</em><sup><em>th</em></sup><em> June through the Sustrans project website</em>&#8221; &#8211; <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://battlefieldproposals.commonplace.is/" target="_blank">https://battlefieldproposals.commonplace.is/</a>. </p>



<p>DO PLEASE NOTE THAT THE EVENT ON THE 6TH IS FOR LOCAL RESIDENTS etc ONLY &#8211; IF YOU LIVE LOCALLY THEN YOU SHOULD HAVE RECEIVED AN INVITATION. The on-line consultation is open to all.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Battlefield ongoing design works &#8211; update</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="521" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?resize=525%2C521&#038;ssl=1" alt="" class="wp-image-8585" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?w=2000&amp;ssl=1 2000w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?resize=300%2C298&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?resize=600%2C596&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/DRAFT_Battlefield_Rest_Option_1.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Design Option 1 for Battlefield, with the old hospital site on the left of the picture.</figcaption></figure>



<p>The working group, including GoBike member, Eachann, is still meeting to discuss proposals for Battlefield and the southwards continuation of the South City Way. The latest news we have is that Sustrans will now concentrate on Design Option 1, linking Battlefield Rest to the old hospital site, see:  <br><a href="https://battlefieldproposals.commonplace.is/schemes/proposals/battlefield-rest-junction-option-1/details">https://</a><a rel="noreferrer noopener" aria-label="battlefieldproposals.commonplace.is (opens in a new tab)" href="https://battlefieldproposals.commonplace.is/schemes/proposals/battlefield-rest-junction-option-1/details" target="_blank">battlefieldproposals.commonplace.is</a><a href="https://battlefieldproposals.commonplace.is/schemes/proposals/battlefield-rest-junction-option-1/details">/schemes/proposals/battlefield-rest-junction-option-1/details</a> <br>We are told that &#8220;<em>Further  design work will also take place on Langside Road and Grange road to  connect the South City way with Battlefield. An update on this design  work and the engagement around this will be provided at the next  meeting</em>.&#8221; This meeting will take place in the first week of June.</p>



<h6 class="wp-block-heading">3.2 Workplace Parking Levy</h6>



<p>In <a rel="noreferrer noopener" aria-label="Digest 34 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-34-17-may-2019-university-avenue-petition-another-contraflow-refusal-and-much-much-more-in-this-mega-issue-8445" target="_blank">Digest 34</a>, Item 1.10, John Finnie, MSP&#8217;s request to support the Parking Levy was outlined &#8211; hopefully some of you added your voice to the consultation, since it&#8217;s now closed. The results are out with almost 3 in 5 of us backing the levy, according to this report:  <br><a href="https://www.heraldscotland.com/news/17654796.almost-three-in-five-back-new-parking-tax-in-holyrood-poll/">https://www.heraldscotland.com/news/17654796.almost-three-in-five-back-new-parking-tax-in-holyrood-poll/</a><br>However, while John Finnie was concerned about Tory opposition, the same newspaper  voices SNP opposition too. Aah, the vagaries of politics, but let&#8217;s just hope that we do get some of these motor vehicles off our streets.</p>



<h6 class="wp-block-heading">3.3 Glasgow, City Centre Congestion Improvement response</h6>



<p>Back in February, in <a href="https://www.gobike.org/consultation-digest-issue-28-19-february-2019-north-lanarkshire-news-upset-on-university-avenue-spt-survey-and-parking-changes-in-glasgow-city-centre-7782" target="_blank" rel="noreferrer noopener" aria-label="Digest 28 (opens in a new tab)">Digest 28</a>, Item 1.3 we gave details of Glasgow City Council&#8217;s proposals for &#8220;Congestion Improvement&#8221; (a curious term, but never mind) and we have, in this email of 14 May, received the outcome of their consultation:</p>



<p><strong>&#8220;<em>MESSAGE SENT ON BEHALF OF ANDY WADDELL, DIRECTOR OF OPERATIONS, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (CITY CENTRE) (TRAFFIC MANAGEMENT) ORDER 2010 (VARIATION NO.26) (CONGESTION IMPROVEMENT) ORDER 2019</em></strong><em><br><br>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have  decided under its scheme of delegated functions to proceed with the  proposal as advertised.</em><br><br><em>The  Order was made on 8 May 2019 and an advert was placed in the Evening  Times on 13 May 2019 stating that the Traffic Regulation Order has been  made. <br><br>Please  note that the new signage, which will replace the existing signage, may  be installed prior to the effective date (Sunday 30 June 2019).  However,  whilst the new signage would show the existing restrictions applying on  a Sunday, enforcement of the new restrictions will not commence until  Sunday 30 June 2019 at the earliest.<br><br>Should you require any further information on the above named Order please contact my assistant John Telfer on 0141 287 3723.<br><br>Yours sincerely</em>&#8221; etc</p>



<p>So, who knows, we might get an improved city centre out of this. It&#8217;s a step in the right direction, at least.</p>



<p>So, a short issue for you this time but we might be back in business full-time in a fortnight.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">8575</post-id>	</item>
	</channel>
</rss>
