<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>cycle lanes &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/cycle-lanes/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Fri, 29 Oct 2021 10:24:57 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (National) Issue 8, 29 October 2021: The one before COP26</title>
		<link>https://www.gobike.org/consultation-digest-national-issue-8-29-october-2021-the-one-before-cop26-15750</link>
		
		<dc:creator><![CDATA[Jim Densham]]></dc:creator>
		<pubDate>Fri, 29 Oct 2021 16:06:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[climate change]]></category>
		<category><![CDATA[COP26]]></category>
		<category><![CDATA[cycle lanes]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[Cycling by Design]]></category>
		<category><![CDATA[Cycling UK]]></category>
		<category><![CDATA[design guide]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[pedal on parliament]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[sustainable transport hierarchy]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=15750</guid>

					<description><![CDATA[There are no official consultations of relevance at present so this digest is different to usual. Instead this month there&#8217;s information on how you can raise your voice for the climate and cycling during COP26, and a look at the new Cycling by Design guidance. COP26 &#8211; How you can raise your voice for cycling &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-national-issue-8-29-october-2021-the-one-before-cop26-15750" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (National) Issue 8, 29 October 2021: The one before COP26"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>There are no official consultations of relevance at present so this digest is different to usual. Instead this month there&#8217;s information on how you can raise your voice for the climate and cycling during COP26, and a look at the new Cycling by Design guidance. </p>



<span id="more-15750"></span>



<p><strong>COP26 &#8211; How you can raise your voice for cycling and climate change</strong></p>



<p>You won&#8217;t have missed that COP26 is coming to town next week, complete with world leaders, cycle lane closures, dodgy diversions and huge demonstrations. There are many ways you can get involved to call for action &#8211; a few of these are highlighted below.</p>



<p>Find out more about cycling, climate action and COP26 on the <a href="http://www.cyclinguk.org/cop26" target="_blank" rel="noreferrer noopener">Cycling UK COP26 webpages</a></p>



<p><strong>Pedal on COP26 &#8211; 6 November </strong>&#8211; Pedal on Parliament have been doing immense work to organise and coordinate action for COP26 &#8211; see the <a href="https://pedalonparliament.org/" target="_blank" rel="noreferrer noopener">PoP website </a>for more details.</p>



<ul class="wp-block-list"><li>Be part of the <a href="https://www.facebook.com/events/1999764146867836/" target="_blank" rel="noreferrer noopener">Cycling Bloc (sustainable transport) at the mass march</a> on 6 November</li><li>Join a <a href="https://pedalonparliament.org/pedal-on-cop-feeder-rides/" target="_blank" rel="noreferrer noopener">feeder ride</a> to the march &#8211; there are 7 rides starting from various locations around Glasgow bringing riders to Kelvingrove Park. </li></ul>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="150" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/PedalOnCOPWebBanner.png?resize=525%2C150&#038;ssl=1" alt="" class="wp-image-15751" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/PedalOnCOPWebBanner.png?resize=600%2C171&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/PedalOnCOPWebBanner.png?resize=300%2C86&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/PedalOnCOPWebBanner.png?w=1400&amp;ssl=1 1400w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/PedalOnCOPWebBanner.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Petitions and online actions</strong> &#8211; take a simple online action to speak up for the climate</p>



<ul class="wp-block-list"><li>Cycling UK &#8211; <a href="https://action.cyclinguk.org/page/92331/tweet/1?ea.tracking.id=GB" target="_blank" rel="noreferrer noopener">social media action </a>&#8211; This online action enables you to send a message to your MSPs via twitter telling them that #ThisMachineFightsClimateChange. If you don’t have twitter there’s a guide to spreading the message via other social media.</li><li>Climate Scotland &#8211; <a href="https://climatescotland.org/" target="_blank" rel="noreferrer noopener">petition</a> &#8211; An online action organised by a coalition of charities with a focus on the impacts of climate change on Scotland’s natural environment.  In the signing process, you can select a topic and say why this matters to you. For example, for many cyclists experiencing the beautiful countryside on a bike is important for mental as well as physical health. Select ‘Beautiful places’ to make this, or a similar point.</li><li>OXFAM &#8211; <a href="https://actions.oxfam.org/great-britain/cop26-climate/petition/?crm_event_code=20CMSPWS15&amp;pscid=ps_ggl_Campaigns+-+Climate+Change_COP26&amp;gclid=Cj0KCQjw8eOLBhC1ARIsAOzx5cEvcRNkinjQjt8-ADSKogvpuw49JzauEH_PYzrxohf0N5-Co3XnYyIaAt2CEALw_wcB&amp;gclsrc=aw.ds" target="_blank" rel="noreferrer noopener">petition</a> &#8211;  Ask the Prime Minister to take decisive action on climate change.</li></ul>



<p><strong>Events</strong> &#8211; So many events are happening during the 2 weeks of COP26</p>



<ul class="wp-block-list"><li><a href="https://bycs.org/cop26/" target="_blank" rel="noreferrer noopener">COP26 Cycling Forum</a> &#8211; Monday November 1st, 2-4pm, Gartnavel Hospital grounds &#8211; This rally will bring together people who have cycled to COP26 and cycling advocates in Glasgow and globally, amplifying voices and celebrating the potential of cycling as a climate solution. <a href="https://airtable.com/shrjbUsuHlWm3FoOl" target="_blank" rel="noreferrer noopener">Register here</a> for this event</li><li><a href="https://climatefringe.org/events-calendar/" target="_blank" rel="noreferrer noopener">Climate Fringe</a> &#8211; Find events to interest you led by civil society for civil society.</li><li><a href="https://cop26coalition.org/peoples-summit/" target="_blank" rel="noreferrer noopener">People&#8217;s Summit </a>&#8211; 7-10 November &#8211; a huge range of events on offer</li></ul>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" decoding="async" width="525" height="315" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?resize=525%2C315&#038;ssl=1" alt="" class="wp-image-15754" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?resize=600%2C360&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?resize=300%2C180&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?resize=1536%2C922&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/FCS5VaWWEAQJTmf.png?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Cycling by Design</strong></p>



<p>Transport Scotland has published its long awaited <a href="https://www.transport.gov.scot/media/50323/cycling-by-design-update-2019-final-document-15-september-2021-1.pdf" target="_blank" rel="noreferrer noopener">Cycling by Design</a> design guidance update. They don&#8217;t have a consultation on the published guidance but rather is welcoming feedback on the content of the document via e-mail to <a href="mailto:cyclingbydesign@transport.gov.scot">cyclingbydesign@transport.gov.scot</a></p>



<p>Government says this new document will be &#8216;updated  regularly to take account of project experience and changes to the legal or design environment&#8217; so its worth providing feedback based on your real-life experience of good and bad cycling infrastructure designs.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" decoding="async" width="525" height="376" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/Cycling-by-Design-cover.jpg?resize=525%2C376&#038;ssl=1" alt="" class="wp-image-15755" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/Cycling-by-Design-cover.jpg?resize=600%2C430&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/Cycling-by-Design-cover.jpg?resize=300%2C215&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/10/Cycling-by-Design-cover.jpg?w=1003&amp;ssl=1 1003w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p>Cycling by Design is a long document and rightly includes invaluable technical guidance for designers and planners.</p>



<p>My analysis and thoughts below are intended to be a guide to the Cycling by Design (CbD) document and a look at the bigger picture, the themes and the use of the document rather than an attempt to assess whether all the design details are to the standard we would like to see. That&#8217;s a lengthy piece of work and we will be looking at this at Cycling UK so that we can provide feedback to Transport Scotland and provide support to campaigners. </p>



<p><strong>Clarity of guidance and use of images</strong> are excellent in CbD. There’s good imagery showing the wide variety of cycles that should be designed for, and this does pervade the document in the design images.</p>



<p><strong>Key messages for designers</strong> &#8211; There is an excellent summary on page 9 which condenses the guidance down to 12 key messages explaining how designers should approach the application of CbD. Unfortunately, the rest of the document doesn’t always fully reflect the same high level of expectation as contained in the key messages.</p>



<p><strong>Application of the guidance</strong> &#8211; Throughout the document there are tables showing 3 levels of delivery in certain situation or applying to specific design factors (high, med and low). Transport Scotland wants designers to go for the high level. The High, Medium and Low Level of Service categories are similar approach to level of service in England’s LTN 1/20 which uses Green, Amber, Red categorisation. However, LTN 1/20 also has a &#8220;<strong>Critical</strong>&#8221; level below Red (Low level of service) which can be considered as &#8220;this is really bad do not do it&#8221;. CbD needs a similar ‘DO NOT DO THIS’ level, as there are many designs on our streets which are plainly dangerous. </p>



<p><strong>Planning for Cycle Users</strong> &#8211; This section, from page 13, is good at explaining that cyclists are a varied bunch and can have differing capabilities – plus they have different needs to both motorists and pedestrians.</p>



<p><strong>Assess demand</strong> for infrastructure comes under section 2.5 on the planning and delivery process. My concern is that guidance explaining the need to ‘estimate future travel patterns’ and that ‘data sources may not reflect the full potential for cycle user trips’ doesn’t convey the same weight as <strong>Key Message</strong> No. 1 on p9 which says ‘We must plan and design for mass cycling’. Using current estimates is unlikely to deliver the infrastructure we so desperately need for mass cycling.</p>



<p><strong>Network planning </strong>&#8211; The section shows that our current active travel network plans at the local authority level are not up to scratch. One of the Principles on p21 is ‘coherence’ and is further described on page 30. However, without a proper network plan for each LA you can’t meet the design guidance standards. It shows an urgent need for a proper Scotland-wide network plan of dense urban networks, cycle lanes along major arterial routes and links between towns and cities. </p>



<p><strong>Provision of appropriate facilities</strong>  on p49 is a really good summary as to why it’s important to provide protection, separation and to enhance places. Cycling interaction with pedestrians is covered on page 53, and there’s a general ongoing principle of keeping cyclists and pedestrians apart wherever possible. This could be clearer and more up-front, especially the interaction with disabled people. The section on <strong>access control</strong> rightly explains the need to not include barriers which stop people in wheelchairs or adaptive cycles from accessing safe infrastructure.</p>



<p><strong>Maintenance</strong> &#8211; A section about the maintenance of cycling infrastructure appears at the end of the section about cycle lanes. Maintenance and planning for maintenance and upkeep, e.g. snowploughing in winter, should be integral to design and delivery. I would like to see this promoted in the document and made more prominent under section 2 – Planning for Cycle Users.</p>



<p><strong>Crossings and junctions </strong>&#8211; There are lengthy sections of geometric guidance for all types of cycle links, design guidance on crossings and on junctions. Some of these, especially, junctions will take some getting used to by cyclists and drivers.</p>



<p>There is a helpful section on <strong>trip end facilities</strong>, including guidance for cycle parking, bike hangars etc, as well as info on links with public transport.</p>



<p>Finally, there’s not much reference to the <strong>Sustainable Travel Hierarchy</strong> in the guidance. Designers and planners need to understand that this should impact on the investment and design decisions – i.e. cycling isn’t just an add on. This problem is compounded by this guidance only being focussed on cycling infrastructure rather than a holistic and all encompassing design guidance for our roads, new build developments and community spaces. </p>



<p><strong>Summary of concerns</strong></p>



<ul class="wp-block-list"><li>The good emphasis on high levels of service in the introductory sections needs to be maintained throughout the document but the guidance also needs to be clear on what designs are unacceptable under any circumstances.</li><li>The process for review of the designs needs greater clarity, especially how this differs in each circumstance. For example, Sustrans may be strict in reviewing Places for Everyone bid designs but councils may be less stringent in designs for new developments.</li><li>There&#8217;s an urgent need for professional training for planners, designers, developers, those assessing designs, LA staff and others inc. Highway Safety Auditors, to apply the guidance appropriately, especially with current inadequate network planning in many places (see next point).</li><li>Network planning needs to catch up with the improved design guidance and MUST aim for mass cycling, rather than current estimates of future need.</li><li>The guidance stands alone as cycling guidance and apart from references to other guidance isn’t fully integrated with other design guidance and could lead to issues, such as problems for disabled people, being missed.</li></ul>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15750</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 53, 04 February 2020: Cars, Parking, 20mph, Avenues and Housing &#8211; it&#8217;s all here.</title>
		<link>https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 04 Feb 2020 22:57:41 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car club]]></category>
		<category><![CDATA[contraflow]]></category>
		<category><![CDATA[cycle lanes]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[one-way]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[regeneration]]></category>
		<category><![CDATA[ride]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9997</guid>

					<description><![CDATA[Glasgow City Council maintain their policy of &#8220;Streets for Cars&#8221; by installing speed cushions to deter high motor speeds rather than installing cycle lanes or doing other public realm works, and we also look at completed works in the east of Glasgow that we previously commented on. Contents Section 1: Current Consultations Glasgow Avenues &#8211; &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-53-04-february-2020-cars-parking-20mph-avenues-and-housing-its-all-here-9997" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 53, 04 February 2020: Cars, Parking, 20mph, Avenues and Housing &#8211; it&#8217;s all here."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Glasgow City Council maintain their policy of &#8220;Streets for Cars&#8221; by installing speed cushions to deter high motor speeds rather than installing cycle lanes or doing other public realm works, and we also look at completed works in the east of Glasgow that we previously commented on.</p>



<span id="more-9997"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>Glasgow Avenues &#8211; Your Avenues Consultation, online, closes 09 February</li><li>Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li>Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme, closes 11 February</li><li>Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February</li><li>**NEW** Glasgow, Mosspark Drive Traffic Calming Scheme, closes 14 February</li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road Traffic Management and Parking Controls, includes cycle lanes, closes 14 February</li><li>Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February</li><li>Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li>Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Transforming Planning, National Planning Framework 4 &#8211; drop-in sessions and workshops February and March </li><li> Glasgow, Byres Road  Traffic Regulation Order: Drop-In Information Session, THURSDAY 06 February </li><li>East Dunbartonshire Travel Survey Week, 10-16 February  </li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li> Glasgow, Mount Florida, Parking and One-Way, with no contraflow &#8211; Motor Traffic 1, Active Travel 0  </li><li> East Dunbartonshire Council: LDP Newsletter No.55 January 2020 </li><li> GoBike Ride 02 February, we visited Sighthill, North East Travel Routes and Robroyston in our tour of the East </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for response</h4>



<h6 class="wp-block-heading">1.1 Glasgow Avenues &#8211; Your Avenues Consultation, online, closes 09 February</h6>



<p><br>Details of this on-line and street public consultation were given in <a aria-label="Digest 52 (opens in a new tab)" rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Items 1.4 and 2.2 and here&#8217;s the critical information:</p>



<p>&#8220;<em>1. You are invited to view and comment on the concept designs online at:&nbsp;</em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a></p>



<p><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>, helping us understand your perception of the street as it is today.</em>&#8220;</p>



<p>Do please complete the online consultation. Currently cycle lanes are shown for the very southern part of Stockwell Street, but not continuing up to Argyle Street and Glassford Street. Apparently discussion is ongoing, so do press them to do better!</p>



<h6 class="wp-block-heading">1.2 Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This was the first of 3 new traffic calming with speed cushions schemes that just made it into our last <a rel="noreferrer noopener" aria-label="Digest (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest</a>,  Item 1.5 and it&#8217;s now been joined by a fourth in this issue. Ardencraig Road is in a residential area and there are 6 schools in the area, so why isn&#8217;t the road being made more people-friendly? It really is depressing that we can&#8217;t have a more people-friendly approach to our streets. This really is a major concern and the City Council continues to treat speeding traffic in this piecemeal way, just as they did with 20mph zones. </p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h6 class="wp-block-heading">1.3 Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme, closes 11 February</h6>



<p>This was detailed as Item 1.6 in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a> and here&#8217;s a view of Bankfoot Road, just off Paisley Road West, leading up to Wedderlea Drive.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As may be seen, the houses all have room for off-road parking, so plenty of room for improvement in line with <a rel="noreferrer noopener" aria-label="Designing Streets (opens in a new tab)" href="https://www.gov.scot/publications/designing-streets-policy-statement-scotland/" target="_blank">Designing Streets</a>. This document was issued in 2010 and &#8220;<em>is the first policy statement in Scotland for street design and marks a change in the emphasis of guidance on street design towards place-making and away from a system focused upon the dominance of motor vehicles.</em>&#8221; We don&#8217;t think it&#8217;s hit the desks of Glasgow City Council&#8217;s staff yet!</p>



<h6 class="wp-block-heading">1.4 Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Castlemilk Drive is a major route down to Croftfoot and King&#8217;s Park railway stations and upwards to Carmunnock and the rural areas of South Lanarkshire, so why isn&#8217;t cycling being encouraged here? All the details of the proposed traffic calming were in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.7<br>We fully understand that finances are tight, with the end of the financial year approaching so money has to be spent or lost, but the lack of forward thinking is extremely disappointing.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Mosspark Drive Traffic Calming Scheme, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="244" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-10047" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This proposal arrived just too late,  on 24 January, for our last Digest; it&#8217;s for the eastern end of Mosspark Drive, from Arran Drive up to the junction with Mosspark Boulevard. A helpful member of staff at the City Council confirmed that west of Arran Drive, where cars are parked both sides it was not considered that traffic calming measures are required. Even here, though, where there are houses both sides, all with gardens, cars reign supreme, taking up the place on the roadway where people would normally cycle. Here&#8217;s the email that we received:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Mosspark Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.</em><br><br><em>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:- &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  </em><strong><em>Mosspark Drive</em></strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>5 sets of 3, 1.9m, 75mm high, speed cushions, </em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>The installation of bollards beside the proposed speed cushions.</em></p>



<p>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  <em>The installation of a pedestrian island at the junction with Mosspark Boulevard</em></p>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 14</em><sup><em>th</em></sup><em> February 2020)</em></strong><em>. <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;</em> etc</p>



<p>Here are the plans associated with the proposal: <a rel="noreferrer noopener" aria-label="Full view (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-A1-Full-view-of-proposals.pdf" target="_blank">Full view</a>, <a rel="noreferrer noopener" aria-label="Island (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Proposed-island-at-Mosspark-Blvd.pdf" target="_blank">Island</a>, <a rel="noreferrer noopener" aria-label="Section 1 and 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-1-and-2.pdf" target="_blank">Section 1 and 2</a>, <a rel="noreferrer noopener" aria-label="Section 3 and 4 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-3-and-4.pdf" target="_blank">Section 3 and 4</a> and <a rel="noreferrer noopener" aria-label="Section 5 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/02/RS.19.04-Mosspark-Drive-TC-proposals-Section-5.pdf" target="_blank">Section 5</a>.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="241" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=525%2C241&#038;ssl=1" alt="" class="wp-image-10053" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?resize=600%2C275&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/Mosspark-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s very upsetting that so many motor drivers, in so many places, drive at speeds that endanger lives and all we do is install a few speed cushions to try to slow them down.</p>



<h6 class="wp-block-heading">1.6 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This featured last in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.8 and it&#8217;s a high-level document that will be used as a basis, or an excuse, for years to come. Our response is still being prepared as this Digest goes out but it will be sent in before the closing date.</p>



<h6 class="wp-block-heading">1.7 Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.9 gave all the details for this consultation and here&#8217;s the <a rel="noreferrer noopener" aria-label="reply (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">reply</a> we sent in for the Stage One consultation. We don&#8217;t object to car clubs as such but they do take up cycling room on our roads and add to the clutter on our footways. Our reply will be similar to that at Stage One but do get your own views in, particularly if you live in the area affected by this or any other car club, or if you are a car club member yourself.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 10 explained this proposal and it really highlights the City Council&#8217;s refusal to implement the default position of contraflow cycling in their selected design guide, <a rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)" href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank">Cycling by Design</a>, Section 5.1.5. Our comments when we replied to the Stage One consultation are in this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">letter</a> and will be repeated; side roads should be available and welcoming to people who choose to respect well-publicised concerns for our health and the environment by cycling. We should not be pushed onto busy main roads when alternatives are available.</p>



<h6 class="wp-block-heading">1.9 Glasgow, Byres Road, Byres Road Traffic Management and Parking Controls, includes cycle lanes, closes 14 February</h6>



<p>The details we were sent of this Order were in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.11 and, as we informed you, we sent in detailed concerns for the Stage One consultation. We received this reply on 23 January, after querying whether our views had been received:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br>I refer to your email of 9</em><sup><em>th</em></sup><em>  January and can confirm that we did receive the stage 1 response. Your  previous objections  will be carried forward into this stage of the consultation process,  however, a large portion of your letter does not specifically relate to  the TRO process (mostly design choices) and will not be considered as  part of the objection to the TRO.</em><br><br><em>In  terms of the design of the cycle lanes, these are for the most part are  finalised in terms of specification (i.e. at footway  level with an asphalt surface). Future design changes would be limited  to localised alignment changes along Byres Road in relation to potential  layout tweaks and potentially colour in addition to street furniture  placement etc. Any other significant changes  would be restricted to the outcome of the TRO consultations.<br><br>I  can also advise that our records have been updated to reflect the  change of contact information for our consultation stage emails  to </em><a href="mailto:consultations@gobike.org"><em>consultations@gobike.org</em></a><em> – any future TRO updates will now be directed to that email address.<br><br>If you require any further information regarding the Byres Road TRO please contact </em><a href="mailto:ByresRoadTRO@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> <br><br>Yours sincerely,</em>&#8221; etc</p>



<p>While we support the limited range of the TRO, as per our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>, we remain extremely concerned that the clear and basic guidance given in Cycling by Design and good practice elsewhere is apparently not being followed for the detailed cycle lane design. See this extract from page 86 of <a href="https://www.transport.gov.scot/media/14173/cycling_by_design_2010__rev_1__june_2011_.pdf" target="_blank" rel="noreferrer noopener" aria-label="Cycling by Design (opens in a new tab)">Cycling by Design</a>:</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10054" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=2016&amp;ssl=1 2016w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/CbD-7.6.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Our response will go in next week, but if you haven&#8217;t sent in your views yet, do please get them in by the 14th.</p>



<h6 class="wp-block-heading">1.10 Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="154" height="121" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2015/01/20mph.jpg?resize=154%2C121&#038;ssl=1" alt="" class="wp-image-652"/></figure></div>



<p><a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.12 gave the details for this proposal, which we support. Suggested wording for you to add your voice was given in our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>, so do write in. Our letter will be going in soon.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/05/on-street-parking.jpg?w=525&#038;ssl=1" alt="" class="wp-image-8587"/></figure></div>



<p>No, the picture&#8217;s not Hillhead but there is parking nose to tail there that severely limits walking and cycling. Details of this order were given in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.13 and our suggested wording for your response was in our <a rel="noreferrer noopener" aria-label="post of 27 January (opens in a new tab)" href="https://www.gobike.org/byres-road-tros-need-your-support-9957" target="_blank">post of 27 January</a>. GoBike generally supports parking restrictions but we have become aware of one general concern and a specific one for this Order. The general concern is that parking charges in Glasgow are so low, only 80p for an hour &#8211; compare this with the cost of a return bus or subway journey and you can easily see that it is the car driver, and not the bus or subway passenger, who is being encouraged to visit Hillhead and Byres Road, and other parts of the city. The specific concern in Hillhead, one of the more affluent areas of Glasgow, is the proposal that residents be offered a second parking permit &#8211; in a city that&#8217;s hosting COP26 this year! Where&#8217;s the City Convener for Sustainability and Carbon Reduction when you need her? Let&#8217;s support her with opposing these 2 aspects of the parking Order.</p>



<h6 class="wp-block-heading">1.12 Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February </h6>



<p>Just about all new housing in Scotland is built as per this example, ie with car parking space and/or a garage, so it&#8217;s no wonder so few people cycle. Do please respond to this national consultation, which was detailed in <a rel="noreferrer noopener" aria-label="Digest 52 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.14. </p>



<p>Here’s the link:&nbsp;<a rel="noreferrer noopener" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a></p>



<p>Do have a look and let’s get lots of responses in that mention cycling and active travel. We know it&#8217;s the way to go.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Transforming Planning, National Planning Framework 4 &#8211; drop-in sessions and workshops February and March</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p>The Scottish Government says: &#8220;<em>We are committed to encouraging interest and wide public involvement  in the preparation of NPF4 and want to engage with the public,  community, voluntary and private sectors, as well as academics, experts  and professional bodies.<br>We will make a particular effort to reach beyond the people and organisations normally involved in planning consultations.</em>&#8220;</p>



<p>Locally drop-in sessions followed by workshops are being held in Foxbar (Paisley) on 18 February, Glasgow on 17 March and Kilmarnock on 27 March. See this <a href="https://www.transformingplanning.scot/national-planning-framework/get-involved/" target="_blank" rel="noreferrer noopener" aria-label="link (opens in a new tab)">link</a> for further information.</p>



<p>Jim, from Cycling UK in Scotland told us about this, with this email:</p>



<p>&#8220;<em>Hi <br><br>This is a quick note to highlight that the Scottish  Government is seeking early views on the National Planning Framework 4  and is holding a series of workshops and drop in sessions throughout  Scotland. See the full list here </em><a href="https://www.transformingplanning.scot/national-planning-framework/get-involved/"><em> https://www.transformingplanning.scot/national-planning-framework/get-involved/</em></a><em> &nbsp;I’m planning to be at the Glasgow event. <br><br>They also are looking for written comments – so check the same page. Its always to get ideas in early!<br><br>The NPF4 will be a hugely important Government plan  for Scotland up to 2050 – it decides national investment, development  and infrastructure plans for the future. They have said they will use is  to take forward the transport projects needed  for the future (from STPR2) – so </em><strong><em>a big opportunity to re-state what infrastructure we think is</em> <em>needed for cycling and active travel</em></strong><em>. NPF3 in 2014 included the National Cycling and Walking Network so NPF4 must do much more. <br><br>Please pass this on through your networks to anyone you think might be interested. <br><br>I will be providing more information on NPF4 opportunities in the future but I’m happy to discuss with anyone.<br><br>Regards<br>Jim<br></em><strong><em>Jim Densham</em></strong><em><br></em><strong><em>Campaigns and Policy Manager &#8211; Scotland</em></strong><em><br></em><strong><em>Cycling UK in Scotland</em></strong><em>&#8220;</em></p>



<p>GoBike needs members to go to these events and feed back &#8211; please get in touch at <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<h6 class="wp-block-heading">2.2 Glasgow, Byres Road  Traffic Regulation Order: Drop-In Information Session, THURSDAY 06 February</h6>



<p>An event at Hillhead Library, hosted by&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/byresroadcorners/?eid=ARBOiOrt04bTkiOvq-x3BnzQreRDRUegAuG3LxjmSMfZxvaeznSGlTJwBtPrPMnsk97CaFzmCnRNa_H0" target="_blank">Byres Road Corners</a>&nbsp;and&nbsp;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/hillheadlibrary/?eid=ARB__vcm2RxkoeYBGvBCEl1QFK0YSMkAdHJFZdDzeTbIkLZmCtT2Gc0Y_qmXDJ2V9lsQnNXXUgOUzjuB" target="_blank">Hillhead Library</a> from 2-6pm. Here&#8217;s the link: <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.facebook.com/events/s/traffic-regulation-order-drop-/622550555222298/" target="_blank">https://www.facebook.com/events/s/traffic-regulation-order-drop-/622550555222298/</a><br><br>Do go along if you wish to know more!</p>



<h6 class="wp-block-heading">2.3 East Dunbartonshire Travel Survey Week, 10-16 February </h6>



<p>Here&#8217;s the info from the East Dunbartonshire Local Development Plan<br> Newsletter, Issue 55 &#8211; January 2020</p>



<p>&#8220;<em>The Draft Local Transport Strategy contained an action for the Council to establish an East Dunbartonshire Travel Survey. Planning has been underway for this project and the inaugural East Dunbartonshire Travel Survey Week will take place from Monday 10 February to Sunday 16 February 2020.<br> Market researchers, Research Resource – on behalf of the Council – will be carrying out on-street surveys during the week beginning Monday 10 February in Kirkintilloch, Milngavie, Bearsden, Bishopbriggs, Lennoxtown, Auchinairn, Hillhead, Harestanes and Twechar.<br> In addition to the on-street survey, an online version is also available which can be completed between now and Sunday 16 February. Follow the link to get involved: <a rel="noreferrer noopener" aria-label="www.researchresource.co.uk/eastduntravel.html (opens in a new tab)" href="http://www.researchresource.co.uk/eastduntravel.html" target="_blank">www.researchresource.co.uk/eastduntravel.html</a><br> The survey aims to compile a picture of local travel behaviours which will provide the basis for long-term regular data collection &#8211; helping the Council to understand evolving travel behaviours and shape plans for the future.<br> Funding has been provided through the Smarter Choices, Smarter Places programme, administered by Paths for All.&#8221;</em></p>



<p>See Section 3.2 for a link to the whole newsletter.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Mount Florida, Parking and One-Way, with no contraflow &#8211; Motor Traffic 1, Active Travel 0 </h6>



<p>Back in July 2019 GoBike objected, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Mount-Florida-letter-220719.pdf" target="_blank">letter</a>, to proposals to change the parking regime in Mount Florida. These proposals included making some streets one way and refusing to countenance contraflow cycling. There was some further correspondence with this <a rel="noreferrer noopener" aria-label="second letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/09/GoBike-Mount-Florida-reply-240919.pdf" target="_blank">second letter</a> from GoBike in September and an <a rel="noreferrer noopener" aria-label="email exchange (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Mount-Florida-email-exchange-Nov19.pdf" target="_blank">email exchange</a> in November.  This latter exchange was published in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 3.1. We did meet with Michael Brady on 12 December at Glasgow City Council offices, and contraflow cycling was discussed, but we have had no further update until this final message confirming adoption of the TRO came in on 27 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (MOUNT FLORIDA)</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 2020</em></strong><em><br><br>I  refer to your objection to the above named Traffic Regulation Order and  can advise that your objection was reported and considered. However,  the  Council have decided under its scheme of delegated functions to proceed  with the proposal with changes as specified below:-</em></p>



<ul class="wp-block-list"><li> <em>Removal  of a small section of proposed no waiting at any time restrictions at  the western extremity of McLennan Street at the request of  a local resident in order to provide additional parking space.</em></li><li><em> The  existing waiting/loading restrictions will remain in place on Cathcart  Road between Prospecthill Road and McLennan Street following  a request from a bus operator.</em></li></ul>



<p><em>The  Order was made on 22 January 2020 and an advert was placed in the  Evening Times on 24 January 2020 stating that the Traffic Regulation  Order has  been made. <br><br>I  realise that this may not be the outcome you wished for, however this  Order will introduce improvements to the existing parking restrictions  in the  area.&nbsp; The specific objective was to assist the local community by  reducing the parking restrictions on Cathcart Road and to facilitate  business activities allowing all vehicle types to utilise the designated  loading areas.<br><br>In  addition to the above, the Council are taking the opportunity to  improve parking practices and road safety within the adjoining  residential areas.&nbsp;  This includes ensuring crossing points are accessible, sightlines at  junctions are sufficient and generally parking practices are safe and  not obstructive. <br><br>Should you require any further information on the above named Order please contact my assistant (name and phone number removed by GoBike).<br><br>Yours sincerely,&#8221; etc</em></p>



<p>So there we have it: a resident gets extra parking space, a bus company gets space for its buses (and quite right too) and we get restrictions for cycling. Just what vehicle/transport/active travel hierarchy does Glasgow City Council work to?</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire Council: LDP Newsletter No.55 January 2020</h6>



<p>This <a href="https://www.gobike.org/wp-content/uploads/2020/02/LDP-Newsletter-55-Jan-2020.pdf" target="_blank" rel="noreferrer noopener" aria-label="newsletter (opens in a new tab)">newsletter</a> contains information on:</p>



<ul class="wp-block-list"><li> The Local Transport Strategy 2020-25  </li><li>  East Dunbartonshire Travel Survey Week  (See Item 2.3 above)</li><li> The Proposed Local Development Plan 2  &#8211; Update </li><li> The Scottish Government&#8217;s Consultation on a Replacement National Planning Framework (NPF4) (See also Item 2.1 above)</li></ul>



<h6 class="wp-block-heading">3.3  GoBike Ride 02 February, we visited Sighthill, North East Travel Routes and Robroyston in our tour of the East  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="257" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=525%2C257&#038;ssl=1" alt="" class="wp-image-10063" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?w=1034&amp;ssl=1 1034w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=300%2C147&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/GoBike-ride-020220.png?resize=600%2C294&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Eight intrepid souls rode out east on Sunday morning and arrived back, still in the rain, just in time for a sunny afternoon!</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10064" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0511.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p> Here&#8217;s the cycle lane alongside Fountainwell Road on the northern edge of Sighthill. It&#8217;s separated from the road and nice and smooth, but stops before that nasty Springburn Road.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-10065" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0512.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>On our approach to Robroyston Railway Station, just opened in December. There are no cycle markings on the new access road or footway (<a aria-label="See Digest 48 (opens in a new tab)" rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">See Digest 48</a> Item 1.6 for consultation for the accesses to this station) but the crossing was a toucan one and there are NO cycle lanes on the road. Of course GoBike requested cycle lanes when we responded to the TRO, but that was only for the double yellow lines. There was NO consultation on cycle access.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0514.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10068"/></figure>



<p>This is the station access on the Robroyston, northern side.</p>



<figure class="wp-block-image"><img decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2020/02/IMG_0515.jpg?fit=525%2C525&amp;ssl=1" alt="" class="wp-image-10069"/></figure>



<p>And the station parking. There is talk of cycle lanes on the south side, the Millerston side, along Station Road, although the boundary between North Lanarkshire and Glasgow runs down the centre of the road &#8230;..</p>



<p>Our ride finished in Govanhill and home via the still unfinished South City Way.</p>



<p>So that&#8217;s it,  another mixed bag of delights, for another two weeks. Thanks for reading.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9997</post-id>	</item>
	</channel>
</rss>
