<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>cowcaddens &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/cowcaddens/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Mon, 23 Mar 2026 10:59:54 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultations Extra: Woodside &#038; Linthouse</title>
		<link>https://www.gobike.org/consultations-extra-woodside-linthouse-25551</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 26 Feb 2026 00:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[govan]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Linthouse]]></category>
		<category><![CDATA[Replace the M8]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=25551</guid>

					<description><![CDATA[A few major consultations that aren&#8217;t strictly about cycling but are related. Both projects affect their local neighbourhood but also have a knock on effect on nearby active travel projects and the wider area (or region/country for the M8 viaducts). Both have consultation events –&#160;TODAY (Thurs 26th Feb) in Linthouse and next week in Cowcaddens &#8230; <p class="link-more"><a href="https://www.gobike.org/consultations-extra-woodside-linthouse-25551" class="more-link">Continue reading<span class="screen-reader-text"> "Consultations Extra: Woodside &#38; Linthouse"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>A few major consultations that aren&#8217;t strictly about cycling but are related. </p>



<span id="more-25551"></span>



<p>Both projects affect their local neighbourhood but also have a knock on effect on nearby active travel projects and the wider area (or region/country for the M8 viaducts). </p>



<p>Both have consultation events –&nbsp;<strong>TODAY</strong> (Thurs 26th Feb) in Linthouse and next week in Cowcaddens (plus an earlier event just took place).</p>



<h2 class="wp-block-heading">Clyde Waterfront Innovation Campus</h2>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?ssl=1"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="297" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?resize=525%2C297&#038;ssl=1" alt="Aerial visualisation of the Clyde Waterfront Innovation Campus" class="wp-image-25561" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?resize=600%2C339&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?w=1531&amp;ssl=1 1531w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/Clyde-Waterfront-Innovation-Campus-HBhZmWOWwAA5Tho.jpeg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /></a><figcaption class="wp-element-caption">Aerial visualisation of the Clyde Waterfront Innovation Campus (click to enlarge)</figcaption></figure>



<p>Also known as part of <a href="https://www.glasgowriversideinnovationdistrict.com/what-is-grid" target="_blank" rel="noreferrer noopener">Glasgow Riverside Innovation District (GRID)</a>. This will be a new Glasgow Uni campus on the south bank of the Clyde off Govan Road (near the Clyde Tunnel entrance). Since cycle routes in the Greater Govan area have hit opposition, could this be an opportunity to add new ones without <a href="https://theglasgowsplash.substack.com/p/furious-locals-force-u-turn-on-cycle" target="_blank" rel="noreferrer noopener">local shopkeepers holding protest meetings</a>? Also, it could be served by the potential Route 2 to QEU Hospital in Connecting Greater Govan plans (see <a href="https://www.gobike.org/consultations-february-2026-25423">February 2026 Consultation update</a>). The development uses a streamlined planning process which seems to have fewer stages for feedback.</p>



<p>Linthouse Housing Association say: <br><em>“Glasgow City Council are designing a Masterplan Consent Area (MCA) in Govan, between… Elder Park and the Clyde. MCAs proactively grant planning consent to developments that fit within the designed scheme. The proposed MCA will provide development parameters for the establishment of a health and innovation campus on the vacant sites at Govan Road, Holmfauld Road and Linthouse Road. The proposals comprise erection of business accommodation (office, research, laboratory, light industrial and ancillary uses) and associated roads, infrastructure, public realm, and landscaping works. As part of the design, we are proposing several civic and outdoor areas for the public to use, including a new area of public access to the River Clyde and a new civic square.”</em></p>



<p><strong>Event:</strong> Thursday 26th February 2026, 3-7pm <br>Linthouse Housing Association, 1 Cressy St, Glasgow G51 4RB</p>



<p><strong>Links:</strong> <a href="https://www.linthouseha.com/news/clyde-waterfront-innovation-campus" target="_blank" rel="noreferrer noopener">Linthouse HA webpage</a>.</p>



<p><strong>Deadline: </strong>No obvious deadline.</p>



<h2 class="wp-block-heading">M8 Woodside Viaducts</h2>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="305" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/M8-Woodside-viaducts-banner4_image1-Repair.jpg?resize=525%2C305&#038;ssl=1" alt="Visual of the current M8 Woodside viaducts after repair to the concrete structure" class="wp-image-25558" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/M8-Woodside-viaducts-banner4_image1-Repair.jpg?resize=600%2C349&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/M8-Woodside-viaducts-banner4_image1-Repair.jpg?resize=300%2C174&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/M8-Woodside-viaducts-banner4_image1-Repair.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2026/02/M8-Woodside-viaducts-banner4_image1-Repair.jpg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Visual of the M8 Woodside viaducts after repair to the concrete structure</figcaption></figure>



<p>Options for the crumbling Woodside viaducts between M8 Junction 16 (Craighall) and Junction 17 (Charing Cross). Problems with the supports between sections led to remedial works, ongoing since 2021 (due to <a href="https://www.transport.gov.scot/news/challenges-encountered-at-m8-woodside-viaducts/" target="_blank" rel="noreferrer noopener">continue until 2027</a> at a cost of £150+ million). These works restrict the Cowcaddens underpass (causing serious personal safety issues), access to Garscube Rd cycleway/Forth &amp; Clyde canal and are delaying <a href="https://www.glasgow.gov.uk/article/2524/Update-given-on-Avenues-programme-in-Glasgow" target="_blank" rel="noreferrer noopener">The Underline (part of Glasgow&#8217;s Avenues project)</a>.</p>



<p>Transport Scotland say:<br><em>“<strong>Temporary works</strong></em></p>



<ol class="wp-block-list">
<li><em>Lane restrictions are in place and temporary propping of the viaducts is being carried out as a short-term measure to ensure the safety of road users and continued operation of the M8.</em></li>



<li><em>The temporary props have a limited lifespan, will require maintenance, and take up extensive road space below the viaducts. For these reasons they are not an effective long-term solution.</em></li>
</ol>



<p><strong><em>Permanent works</em></strong></p>



<ol class="wp-block-list">
<li><em>Transport Scotland is assessing options for permanent works that ensure the long-term future for this vital stretch of Scotland’s Trunk Road Network.</em></li>



<li><em>The long-term plan is to maintain and invest in the M8 motorway network to ensure that it supports existing and future transport plans and the Scottish economy for many years to come.</em></li>



<li><em>As part of our project development processes, we are considering a range of options for <strong>Repairing</strong>, <strong>Replacing</strong> or <strong>potentially Removing</strong> the viaducts.</em></li>



<li><em>This consultation is being carried out to inform the Strategic Development stage of work, and presents information in a manner that allows high-level comparisons to be made between the strategic options being considered.”</em></li>
</ol>



<p>Removal is the most eye-catching option – especially as the mock-up is more radical than anything proposed by the Replace the M8 campaign! Their petition to the Scottish Parliament asking for a feasibility study for replacing the city centre M8 was turned down in 2022. Transport Scotland have done traffic modelling of removal only – showing knock on effects in the region. However, that seems to have assumed no further changes to the transport network!?</p>



<p><strong>Event: </strong>Wednesday 4 March 2026, 10am to 5pm<br>Woodside Halls, 36 Glenfarg Street, Glasgow, G20 7QE</p>



<p><strong>Links:</strong> <a href="https://www.transport.gov.scot/news/public-invited-to-view-long-term-options-for-m8-woodside-viaducts/" target="_blank" rel="noreferrer noopener">Transport Scotland webpage</a>, <a href="https://www.pinpointcloud.co.uk/M8WoodsideViaducts/" target="_blank" rel="noreferrer noopener">‘Virtual room’ consultation site</a>, <a href="https://www.pinpointcloud.co.uk/M8WoodsideViaducts/resources/content/html/booklet.pdf" target="_blank" rel="noreferrer noopener">M8 Woodside booklet</a>, <a href="https://www.smartsurvey.co.uk/s/3X3PP7/" target="_blank" rel="noreferrer noopener">M8 Woodside survey</a>.</p>



<p><strong>Deadline: Wednesday 25 March 2026</strong>.</p>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">25551</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 128, 02 February 2023</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-128-02-february-2023-19161</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 02 Feb 2023 23:30:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[bike hire]]></category>
		<category><![CDATA[Bothwell]]></category>
		<category><![CDATA[Cambuslang]]></category>
		<category><![CDATA[Clydesdale]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[DRF]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[Merchant City]]></category>
		<category><![CDATA[NCN74]]></category>
		<category><![CDATA[Rutherglen]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[Uddingston]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=19161</guid>

					<description><![CDATA[In the shadow of the bridge… February sees an increase in number and scale of consultations. This (delayed) Digest includes four District Regeneration Frameworks and four projects from South Lanarkshire. Tragically, January ended with the death of Emma Burke Newman, after being hit by a truck driver while cycling near the Broomielaw/George V bridge junction &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-128-02-february-2023-19161" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 128, 02 February 2023"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">In the shadow of the bridge…</h2>



<p>February sees an increase in number and scale of consultations. This (delayed) Digest  includes four District Regeneration Frameworks and four projects from South Lanarkshire.</p>



<p>Tragically, January ended with the death of Emma Burke Newman, after being hit by a truck driver while cycling near the Broomielaw/George V bridge junction in Glasgow. Her local <a href="https://www.glasgowtimes.co.uk/news/23292917.cyclist-died-glasgow-student-art-school/" target="_blank" rel="noreferrer noopener">councillor Jon Molyneux paid tribute to Emma at a meeting to discuss a 20mph limit</a> for the city. GoBike would like to offer sincere condolences to Emma&#8217;s family and friends. </p>



<span id="more-19161"></span>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=525%2C296&#038;ssl=1" alt="View down Broomielaw towards the casino and bridges in May 2020" class="wp-image-19165" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=1536%2C864&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">View down Broomielaw to casino/bridge, showing original Spaces for People lane (May 2020)</figcaption></figure>



<p>The road past the casino is part of the Spaces for People 1-way route along the Clyde. The council mentioned <a href="https://www.gobike.org/consultation-digest-issue-60-12-may-2020-the-lockdown-goes-on-but-will-we-learn-from-it-11199" target="_blank" rel="noreferrer noopener">safety at the George V bridge junction</a> in an online meeting with GoBike in 2020. The <a href="https://www.glasgow.gov.uk/article/25902/New-Space-For-Distancing-lane-ready-for-use" target="_blank" rel="noreferrer noopener">original May 2020 route used cones</a> but had a gap for the Central Station bridge works. The <a href="https://www.glasgow.gov.uk/article/26310/Clyde-St-Pop-Up-Cycle-Lane-Sees-Surge-in-Cycling" target="_blank" rel="noreferrer noopener">cones were replaced with ‘soft segregation’ later in 2020</a> but some sections of the <a href="https://goo.gl/maps/qe1Dbkjt55BL9cbw8" target="_blank" rel="noreferrer noopener">Zebras/‘orcas’ near the bridge have since been removed</a>. Restrictions on the route were made permanent by a <a href="https://www.gobike.org/consultation-digest-local-issue-118-1-september-2022-18246#three-two" target="_blank" rel="noreferrer noopener">Traffic Regulation Order for City Centre –&nbsp;Riverside/Merchant City in Sept 2022</a>. However, no further segregation has been added near the casino (unlike the <a href="https://goo.gl/maps/77UfhsP6gvfxjNU56" target="_blank" rel="noreferrer noopener">traffic islands</a> and ongoing work at the Jamaica St junction). Tragic events like this underline how important it is to have continuous protected routes, especially at junctions. </p>



<h3 class="wp-block-heading">Forthcoming consultations</h3>



<h4 class="wp-block-heading">Glasgow Liveable Neighbourhoods programme</h4>



<p>There&#8217;s a new dedicated website for the next two LN projects:&nbsp;Yoker to Whiteinch and Royston to Hogganfield. An early ‘pop-up’ event in Whiteinch has already passed but there are due to be more in the near future. See: <a href="https://www.my-gln.scot/" target="_blank" rel="noreferrer noopener">www.my-gln.scot</a>.</p>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list">
<li><a href="#one-one">Cambuslang and Rutherglen bike share survey</a></li>



<li><a href="#one-two">Leadhills Village Active Travel project</a></li>



<li><a href="#one-three">Clydesdale Active Travel Studies</a></li>



<li><a href="#one-four">North East Districts: Townhead, Cowcaddens, Learning Quarter and Merchant City DRF</a></li>



<li><a href="#one-five">NCN74 Uddingston to Bothwell realignment</a></li>
</ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list">
<li><a href="#two-one">Glasgow Uni campus redevelopment – December 2022 newsletter</a></li>



<li><a href="#two-two">East Dunbartonshire Local Development Plan Newsletter 70</a></li>



<li><a href="#two-three">Update on Progressing Beyond the Liveable Neighbourhood Longlist</a></li>
</ol>



<h4 class="wp-block-heading">3: Proposed Traffic Calming/Traffic Regulation Orders</h4>



<ol class="wp-block-list">
<li><a href="#three-one">East Dunbartonshire TROs</a></li>



<li><a href="#three-two">Glasgow City TROs</a></li>



<li><a href="#three-three">North Lanarkshire TROs</a></li>
</ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Cambuslang and Rutherglen bike share survey</h4>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:</strong>&nbsp;Survey about feasibility of a bike share scheme for Cambuslang and Rutherglen. Shawfield and Cuningar Woodland Park on the northern fringes of Rutherglen are just across the Clyde from the Glasgow City area. So, it’s an obvious candidate for extending Glasgow’s current OVO/Nextbike scheme. This has been&nbsp;<a href="https://www.glasgowlive.co.uk/news/south-lanarkshire-bike-share-scheme-19959665" target="_blank" rel="noreferrer noopener">talked about by South Lanarkshire Council</a>&nbsp;before and there has already been some consultation on it. In the meantime, new Nextbike stations in the East End and Southside mean Rutherglen already looks like a gap in the&nbsp;<a href="https://www.schemestats.bike/schemes/nextbike-glasgow/liveMap" target="_blank" rel="noreferrer noopener">existing network</a>. Hopefully we’re closer to a scheme actually happening this time. The survey is aimed at those in the Cam/glen area but may be relevant to people in the Southside and East End of the city.<br><strong>Website links:&nbsp;</strong><a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DwvXh_xekUmgZeIFvD2zCB8HDqrd58xFiY6b3P9nhNRUMDZCTEFKM1pKVkFWWlBBV0NNUTlMUjU4Ry4u" target="_blank" rel="noreferrer noopener">Cambuslang/Rutherglen bike share survey</a>.<br><strong>Deadline:&nbsp;10 February 2023.&nbsp;</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Leadhills Village Active Travel project</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="332" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=525%2C332&#038;ssl=1" alt="Leadhills Active Travel plans on map" class="wp-image-19182" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=600%2C379&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=300%2C189&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?w=960&amp;ssl=1 960w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Leadhills Active Travel plans for 20mph limit</figcaption></figure>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:&nbsp;</strong>Leadhills is a small rural village near South Lanarkshire&#8217;s border with Dumfries &amp; Galloway. The project plans include 20mph speed limits and slight changes to junctions. Also, lots of coloured surfacing, including some being used instead of proper pavements. Village streets are obviously narrower than towns and cities but it seems like a missed opportunity. The Make Your Way project already has <a href="http://www.ironsidefarrar.com/keylinks/Make_Your_Way_Key_Links.pdf" target="_blank" rel="noreferrer noopener">plans for a shared path to Wanlockhead</a> in D&amp;G. <br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshire.gov.uk/info/200147/transport_and_streets/2115/active_travel_projects/2" target="_blank" rel="noreferrer noopener">Leadhills AT survey</a>.<br><strong>Deadline:&nbsp;<strong>12 February&nbsp;2023</strong>.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;Clydesdale Active Travel Studies</h4>


<div class="wp-block-image">
<figure class="alignright size-large is-resized"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=258%2C356&#038;ssl=1" alt="Map of Clydesdale split into north-west, north-east and south" class="wp-image-19181" width="258" height="356" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=436%2C600&amp;ssl=1 436w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=218%2C300&amp;ssl=1 218w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?w=594&amp;ssl=1 594w" sizes="auto, (max-width: 258px) 100vw, 258px" /></a><figcaption class="wp-element-caption">Map of Clydesdale areas (click to enlarge)</figcaption></figure>
</div>


<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:&nbsp;</strong>Leadhills is also covered by this wider consultation –&nbsp;it&#8217;s in the southern part of Clydesdale. There are also north-west and north-east areas to divide up this large rural area. Like previous studies in South Lanarkshire&#8217;s towns, there&#8217;s a consultation map to comment on. Some areas have new active travel infrastructure, including Carstairs, with other routes like Leadhills–Wanlockhead to follow. This is a chance to look at gaps like Make Your Way&#8217;s <a href="https://www.gobike.org/consultation-digest-local-issue-102-23-december-2021-16327#two-six" target="_blank" rel="noreferrer noopener">NCN74–Douglas path, which missed out on funding</a>. The map and surveys will inform reports and active travel network maps for each area.<br><strong>Website links:</strong> <a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.placecheck.info%2Fapp%2Fmaps%2Fclydesdale-active-travel&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=s%2Bj5qyI867LVuFjU68vNs1VV71dBS%2BimVDWqan1hXPs%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Clydesdale Placecheck map (all areas)</a>, <a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167524679198&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=vUC0Mj3OjArd2LrLUVNj8hiVlCVgmnIydGVBCc2L47s%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Northwest Clydesdale Active Travel Feasibility Study</a>,&nbsp;<a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167525020181&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=Nik7u7gLEDATGor%2BvOMqKhVQnAvDI22Py9970FJecK8%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Northeast Clydesdale Active Travel Feasibility Study</a>,&nbsp;<a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167525032368&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=8ZNwxx08dAlKFNX3POJB4j2%2F0BlnRn5125Frpgf2x9Q%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">South Clydesdale Active Travel Feasibility Study</a>. <br><strong>Deadline:&nbsp;<strong>24 February&nbsp;2023</strong>.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: North East Districts: Townhead, Cowcaddens, Learning Quarter and Merchant City DRF</h4>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="401" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=525%2C401&#038;ssl=1" alt="North-East DRFs themes map" class="wp-image-19186" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=600%2C458&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=300%2C229&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?w=1443&amp;ssl=1 1443w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption class="wp-element-caption">North-East DRFs – map of themes (click to enlarge)</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:&nbsp;</strong>District Regeneration Frameworks for four areas in the north-east of the city centre. These were developed by teams of European and local consultants after previous <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-two">consultation in late 2020</a>. Each document has a comprehensive plan for its area (50+ pages). These include some fairly radical changes, especially around the M8. Also, there is a refreshing focus on opening up active travel routes through current barriers (improving permeability). However, these may be challenging to deliver. So, a show of support in the consultation should help make the case stronger.<br><strong>Website links:</strong> <a href="https://www.smartsurvey.co.uk/s/NE_DRF_2023/" target="_blank" rel="noreferrer noopener">North-East Districts survey</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58888&amp;p=0" target="_blank" rel="noreferrer noopener">North-East Districts Combined Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58891&amp;p=0" target="_blank" rel="noreferrer noopener">Cowcaddens Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58889&amp;p=0" target="_blank" rel="noreferrer noopener">‘Learning Quarter’ Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58890&amp;p=0" target="_blank" rel="noreferrer noopener">Merchant City Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58892&amp;p=0" target="_blank" rel="noreferrer noopener">Townhead Regeneration Handbook</a>.<br><strong>Deadline:&nbsp;3 March 2023.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5:&nbsp;NCN74 Uddingston to Bothwell realignment</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=525%2C296&#038;ssl=1" alt="Langside Rd looking towards Laighlands Rd at edge of Bothwell" class="wp-image-19183" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">The foot of Langside Rd, Bothwell –&nbsp;hopefully, the road surface will be improved!</figcaption></figure>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:</strong>&nbsp;A long-awaited consultation about plans to divert a section of NCN74 at Strathclyde Park. The current route loops up the (steep) Furlongs, onto Bothwell Rd, up alongside the East Kilbride Expressway to Glasgow Rd, down Station Rd in Blantyre to the pedestrian bridge and up to Station Rd in Bothwell. The proposals would change this to a much more direct route from the Raith Interchange, up the steep, pot-holed Langside Rd and across the busy Hamilton Rd on the way to Station Rd. There&#8217;s a potential alternative to SLC&#8217;s plans (slightly longer but less steep/busy) by turning right onto Laighlands Rd/Bothwellpark Rd then across to Olifard Ave/Appledore Cres. Also, there&#8217;s the question of conflict with pedestrians past Strathclyde Park loch. Elsewhere, the survey has two options to transform the approach to Uddingston train station and some other welcome junction improvements.<br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshire.gov.uk/info/200147/transport_and_streets/2115/active_travel_projects/4" target="_blank" rel="noreferrer noopener">Uddingston to Bothwell survey</a>.<br><strong>Deadline:&nbsp;6 March 2023.</strong></p>



<h3 class="wp-block-heading"><strong>2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow Uni campus redevelopment – December 2022 newsletter</h4>



<p><strong>Organisation:&nbsp;</strong>Glasgow Uni.<br><strong>Subject:</strong>&nbsp;Ongoing construction work at the main campus.&nbsp;The Institute of Health and Wellbeing building is now complete. Apparently it was done to the <a href="https://files.bregroup.com/breeam/technicalmanuals/ndrefurb2014manual/content/07_transport/tra03.htm" target="_blank" rel="noreferrer noopener">BREEAM 2014 certification mark</a>, which should mean there&#8217;s plenty of bike parking. Work continues on the Adam Smith Business School. Also, there&#8217;s a survey for residents who live near the site.<br><strong>Website links:</strong>&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/02/January-2023-Newsletter.pdf" target="_blank" rel="noreferrer noopener">Campus Redevelopment newsletter –&nbsp;January 2023 (PDF)</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2:&nbsp;East Dunbartonshire Local Development Plan Newsletter 70</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:&nbsp;</strong>Updates on the Circular Economy Strategy consultation, LDP2 Action Programme, Planning Guidance, Active Travel Strategy and National Planning Framework 4. NPF4 applies from the middle of February. It includes a few interesting developments like an ‘infrastructure first’ approach, instead of the current lag to (maybe) get bike paths added to an estate using a Section 75 order. <br><strong>Website links:</strong>&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/02/LDP-Newsletter-70-January-2023.pdf" target="_blank" rel="noreferrer noopener">LDP Newsletter 70 &#8211; January 2023 (PDF)</a>, <a href="https://www.eastdunbarton.gov.uk/draft-circular-economy-strategy-consultation-0" target="_blank" rel="noreferrer noopener">Draft Circular Economy Strategy Consultation</a> (ends 3 February 2023).</p>



<h4 class="wp-block-heading" id="two-three">2.3: Update on Progressing Beyond the Liveable Neighbourhood Longlist</h4>



<p><strong>Organisation:&nbsp;</strong>Dennistoun Community Council.<br><strong>Subject:</strong> A response from Glasgow City Council to a community council in  the East End. DCC say it&#8217;s: <em>“</em>…<em>in response to&nbsp;<a href="http://dennistouncc.org.uk/2022/11/07/progressing-beyond-the-liveable-neighbourhood-longlist/">queries</a>&nbsp;regarding the Liveable Neighbourhoods project, the Inner East Strategic Development Framework the Neighbourhood Infrastructure Improvement Fund, and Citizens’ Panels participatory funding arrangements<em>”</em></em>. The questions went to the Director of GCC Neighbourhoods, Regeneration and Sustainability.<br><strong>Website links:</strong>&nbsp;<a href="http://dennistouncc.org.uk/2023/01/29/update-on-progressing-beyond-the-liveable-neighbourhood-longlist/#more-11428" target="_blank" rel="noreferrer noopener">Dennistoun Community Council post</a>.</p>



<h3 class="wp-block-heading"><strong>3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: East Dunbartonshire TROs</h4>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="562" height="90" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=474%2C76&amp;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Areas:&nbsp;</strong>Bishopbriggs and Milton of Campsie.<br><strong>Subject:</strong>&nbsp;Orders about parking restrictions and speed limits.<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-pavements-and-parking/traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs (now on their own page!)</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Traffic Calming/TROs</h4>


<div class="wp-block-image">
<figure class="alignright is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/Glasgow_City_Council_logo.svg_.png?resize=123%2C209&amp;ssl=1" alt="Glasgow City Council logo" class="wp-image-18421" width="96" height="163"/></figure>
</div>


<p><strong>Areas:&nbsp;</strong>City-wide.<br><strong>Subject:</strong>&nbsp;<em>TROs</em>: Laggan Rd filter is out for consultation until 24 February 2023.<br>Orders have been made for Carmunnock Rd and Carmunnock Rd/Letherby Rd (on 20 January – coming into effect on 1 April 2023). Also, for East City Way phases 6 and 7 (on 25 January – coming into effect 19 March 2023). Construction has already  started on London Rd.<br><em>Traffic calming:</em> Three current schemes for Greenfield Avenue/Inveresk St, Waulkglen Road and Boghall Road.<br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>,&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3:&nbsp;North Lanarkshire TROs</h4>


<div class="wp-block-image">
<figure class="alignright is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=231%2C154&amp;ssl=1" alt="North Lanarkshire Council logo" class="wp-image-18420" width="222" height="148" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=300%2C200&amp;ssl=1 300w" sizes="auto, (max-width: 222px) 100vw, 222px" /></figure>
</div>


<p><strong>Areas:&nbsp;</strong>Hareshaw village (between Newhouse and Newmains).<br><strong>Subject:</strong>&nbsp;Orders to add a roundabout, traffic calming, 20mph zone and a pavement at the bridge on Greenhill Road, Hareshaw.&nbsp;<em>Deadline: 15 February 2023.<br></em><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations" target="_blank" rel="noreferrer noopener">North Lanarkshire Live Consultations</a>.</p>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19161</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 124, 24 November 2022</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-124-24-november-2022-18829</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 24 Nov 2022 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[bikehangars]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[Cycle parking]]></category>
		<category><![CDATA[Dobbie&#039;s Loan]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[tro]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=18829</guid>

					<description><![CDATA[Following orders… A short issue as the festive season approaches. Glasgow is still following up its Spaces for People projects with Traffic Regulation Orders, including Royston Rd and Cambridge St. The latter looks better than last year&#8217;s proposed plan but there are still questions about how the council, and its partner agencies, follow guidelines and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-124-24-november-2022-18829" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 124, 24 November 2022"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Following orders…</h2>



<p>A short issue as the festive season approaches. Glasgow is still following up its Spaces for People projects with Traffic Regulation Orders, including Royston Rd and Cambridge St. The latter looks better than last year&#8217;s proposed plan but there are still questions about how the council, and its partner agencies, follow guidelines and share information. For example, compare the Cambridge St/Cowcaddens Rd junction in the TRO and Avenues Plus plans. Both Pitt St and Raeberry St TROs and the Avenues Plus consultation finish tomorrow.</p>



<p>There&#8217;s an early Christmas present for some tenement dwellers as more Bikehangars are installed in parts of the city.</p>



<span id="more-18829"></span>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one">Cowcaddens Road &amp; Dobbie’s Loan (Avenues Plus)</a></li></ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#two-one">New Bikehangars for Glasgow</a></strong></li><li><strong><a href="#two-two">Glasgow Active Travel Forum</a></strong></li><li><strong><a href="#two-three">South Lanarkshire Cycling Partnership</a></strong></li></ol>



<h4 class="wp-block-heading">3: Proposed Traffic Calming/Traffic Regulation Orders</h4>



<ol class="wp-block-list"><li><a href="#three-one">East Dunbartonhire TROs</a></li><li><strong><a href="#three-two">Glasgow City Traffic Calming/TROs</a></strong></li><li><a href="#three-three">North Lanarkshire TROs</a></li><li><a href="#three-four">Renfrewshire Traffic Calming</a></li></ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Cowcaddens Road &amp; Dobbie’s Loan (Avenues Plus)</h4>



<p><strong>Council:</strong>&nbsp;Glasgow City.<br><strong>Area:</strong>&nbsp;The length of Cowcaddens Rd from Cambridge St to Caledonian Uni. A section of Dobbie’s Loan between N Hanover St and Canal St.<br><strong>Subject:</strong>&nbsp;Part of the&nbsp;<a href="https://glasgow.gov.uk/index.aspx?articleid=29102" target="_blank" rel="noreferrer noopener">Avenues Plus project</a>, which also covers Duke St/John Knox Street and S Portland St (which had a&nbsp;<a href="https://twitter.com/GlasgowCC/status/1529070975584804864" target="_blank" rel="noreferrer noopener">consultation event in May 2022</a>). Cowcaddens Rd and Dobbie’s Loan both link to N Hanover St and have a joint consultation. The plans for Cowcaddens Rd look promising, especially the radical redesign options for the Port Dundas Rd junction (in featured image at top). The Dobbie’s Loan plans also add two-way protected lanes (especially useful for students at Glasgow Caledonian Uni and its nearby halls). However, the lanes stop short of the trunk road junction, which leads under the M8 to Craighall Rd and Port Dundas. The boards include an updated Avenues phasing map (now with Block D added). A very&nbsp;<a href="https://twitter.com/GoBikeGlasgow/status/1586778089836650499" target="_blank" rel="noreferrer noopener">short notice consultation event</a>&nbsp;took place on 31 October.<br><strong>Website links:&nbsp;</strong><a href="http://www.ironsidefarrar.com/glasgowavenues/consultation.html" target="_blank" rel="noreferrer noopener">Consultation landing page</a>,&nbsp;<a href="https://www.surveymonkey.co.uk/r/VNZKJWY" target="_blank" rel="noreferrer noopener">survey</a>,&nbsp;<a href="http://www.ironsidefarrar.com/glasgowavenues/consultation_boards.pdf" target="_blank" rel="noreferrer noopener">boards (PDF)</a>,&nbsp;<a href="http://www.ironsidefarrar.com/glasgowavenues/concept_plans.pdf" target="_blank" rel="noreferrer noopener">plans (PDF)</a>,&nbsp;<a href="https://view.mylumion.com/?p=gjqazc4l43blj75m" target="_blank" rel="noreferrer noopener">3D panoramas</a>&nbsp;and&nbsp;<a href="https://www.youtube.com/channel/UCvAPtjaJ12VoEFlwshQyckw/videos" target="_blank" rel="noreferrer noopener">3D fly-through videos</a>.<br><strong>Deadline: 25 November 2022.</strong></p>



<h3 class="wp-block-heading"><strong>2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp;New Bikehangars for Glasgow</h4>



<p><strong>Council:</strong> Glasgow City.<br><strong>Area:</strong> The following postcode districts: G3, G4, G11, G12, G14, G20, G31, G40, G41, G42, G44 and G50.<br><strong>Subject:</strong> The latest expansion to Glasgow&#8217;s on-street secure bike parking. A <a href="https://www.gobike.org/wp-content/uploads/2022/11/GGC_Bikehangars-letter-Nov2022_5884.jpeg" target="_blank" rel="noreferrer noopener">letter from Glasgow City Council</a> was put through doors in the areas near the new locations. As with previous rounds in the last few years, these are Bikehangar units by Cyclehoop (who run the service to rent out spaces). They&#8217;re usually positioned on the road or pavement build-outs. Installations at 70 sites are due to be done by mid-December 2022. <br><strong>Website links: </strong><a href="https://cyclehoop.com/new-glasgow-bikehangar-locations/" target="_blank" rel="noreferrer noopener">Cyclehoop&#8217;s Glasgow announcement page</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2: Glasgow Active Travel Forum</h4>



<p><strong>Council:</strong> Glasgow City.<br><strong>Subject:</strong> GCC give with one hand but take with the other. A GoBike member&#8217;s enquiry about the ATF got a response about its role helping develop the <a href="http://www.glasgow.gov.uk/activetravel" target="_blank" rel="noreferrer noopener">Active Travel Strategy</a> and other projects but then this: <br><em><em>“</em>All of our ongoing projects involve engagement and consultation at specific stages. There is also now an Inclusive and Accessible Design Forum, which provides certain user groups with the opportunity to feed back on inclusive design issues in projects.</em><br><em>We therefore do not propose to continue with the Active Travel Forum, and will update the website accordingly.” </em><br>This is disappointing for all the groups who were involved with the ATF during Anna Richardson&#8217;s time at the council. GCC do offer a small olive branch: <br><em>“We are giving consideration however to occasional information-sharing and feedback events with communities and stakeholders on our overall progress on active travel, and will consider resources for this in 2023. We recommend you continue to engage with the Council’s active travel project development via engagement exercises and consultations, and we thank you for your continued support of active travel policy and project development in the city.<em>”</em></em><br>However, this doesn&#8217;t allow for the networking and planning that voluntary groups and other organisations could do through the ATF. </p>



<h4 class="wp-block-heading" id="two-three">2.3: South Lanarkshire Cycling Partnership</h4>



<p><strong>Council:</strong> South Lanarkshire.<br><strong>Subject:</strong> Happily, while Glasgow stops its forum, South Lanarkshire Council is restarting its cycling partnership later this month. There&#8217;s a change of chair (following a retirement) and South Lanarkshire&#8217;s first Green councillor, Kirsten Robb, will join.</p>



<h3 class="wp-block-heading"><strong>3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: East Dunbartonhire TROs</h4>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=474%2C76&amp;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" width="437" height="70" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 437px) 100vw, 437px" /></figure>



<p><strong>Areas:&nbsp;</strong>Bearsden, Bishopbriggs, Milton of Campsie, Kirkintilloch and Torrance.<br><strong>Subject:</strong>&nbsp;Orders to redetermine footways and parking restrictions (including near the Bearsway).<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-and-pavements/road-works#traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs (at foot of Roadworks page)</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Traffic Calming/TROs</h4>


<div class="wp-block-image">
<figure class="alignright size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" width="329" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=329%2C600&#038;ssl=1" alt="Cambridge St TRO plans (City Centre Order Variation 28)" class="wp-image-18873" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=329%2C600&amp;ssl=1 329w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=165%2C300&amp;ssl=1 165w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=843%2C1536&amp;ssl=1 843w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?resize=1124%2C2048&amp;ssl=1 1124w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?w=1125&amp;ssl=1 1125w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Cambridge_St_42-5168-TRO-001-Rev_A_City_Centre_Order_Variation_P-2050px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 329px) 100vw, 329px" /></a><figcaption><em>Plans for Cambridge St (click to enlarge or see council’s PDF)</em></figcaption></figure>
</div>


<p><strong>Areas: </strong>City-wide.<br><strong>Subject:</strong> <em>TROs</em> – <strong>Cambridge Street</strong> links Sauchiehall St to Cowcaddens Subway station (via the Cowcaddens Rd underpass) and beyond to Garscube Rd. The TRO sets up a move from the current Spaces for People layout towards a permanent Avenues layout (a.k.a. Underline Phase 1). Last seen in <a href="https://www.gobike.org/consultation-digest-local-issue-101-9-december-2021-16159#two-two" target="_blank" rel="noreferrer noopener">Digest 101, Item 2.2</a>, it seems there have been changes in the TRO (but the previous ‘CA’ plan is still linked on the <a href="https://www.glasgow.gov.uk/avenues" target="_blank" rel="noreferrer noopener">Avenues webpage</a>?). The southern end seems to keep the bike-only lights across Renfrew St. Also, the lane is continuous across Hill St. However, it still breaks at the pedestrian crossing and has the big ‘shared space’ gap at the northern corner with Cowcaddens Rd (which doesn&#8217;t show crossing from Avenues Plus plans, above). These may be due to accessibility concerns raised by blind people at the council&#8217;s Inclusive and Accessible Design Forum. It has only met a few times but GoBike hasn&#8217;t made it to all of the meetings.<br><strong>Pitt Street</strong> (a.k.a. ‘Holland St Avenue’) links protected cycle lanes on Sauchiehall St (Avenue) and Waterloo St (West City Way/Connect2). This TRO only sets restrictions but the <a href="https://www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-City-Centre-TM-Amendment-No.34-REV-A.pdf" target="_blank" rel="noreferrer noopener">council’s plans for Pitt St (PDF)</a> are shown too. Also, we got a <a href="https://www.gobike.org/wp-content/uploads/2022/11/Pitt-St-response-from-GCC.pdf" target="_blank" rel="noreferrer noopener">detailed response from the council’s Sustainable Transport team</a> justifying their decisions. <em>Deadline: Friday 25 November 2022.</em><br><strong>Raeberry St</strong> – Mount St/Simpson St junction with local one-ways and a cycling only restriction (part of Connecting Woodside). <em>Deadline: Friday 25 November 2022.</em><br><strong>Royston Road </strong>– another Spaces for People route, which links Royston and Blackhill (including the proposed new prison site). <em>Deadline: 14 December 2022.</em><br><strong>London Rd</strong> – East City Way phases 6 &amp; 7, past the velodrome (as seen in <a href="https://www.gobike.org/consultation-digest-local-issue-113-23-june-2022-17591#one-four" target="_blank" rel="noreferrer noopener">Digest 113, Item 1.4</a>). Hopefully in time for the UCI Cycling World Championships in August 2023. <em>Deadline: 16 December 2022.</em><br>The 20mph Zone (<strong>Carmunnnock Rd</strong>) and Barras North (<strong>Calton Village Development</strong>) TROs were made on 3 November (to come into effect on 16 December).<br><em>Traffic Calming</em> –<strong> </strong>Linkwood Dr, Drumchapel; Wardie Rd, Easterhouse.<strong> </strong><br><strong>Website links: </strong><a href="https://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>, <a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3: North Lanarkshire TROs</h4>


<div class="wp-block-image">
<figure class="alignright"><img loading="lazy" decoding="async" width="600" height="400" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=231%2C154&amp;ssl=1" alt="North Lanarkshire Council logo" class="wp-image-18420" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=300%2C200&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>
</div>


<p><strong>Areas: </strong>Throughout North Lanarkshire.<br><strong>Subject:</strong> Order to introduce timed or total parking restrictions on streets in over a dozen towns and villages.<br><em>Deadline: 14 December 2022.<br></em><strong>Website links:</strong> <a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations" target="_blank" rel="noreferrer noopener">North Lanarkshire Live Consultations</a> (also links to Boundary Commission Scotland review of UK Parliament constituencies).</p>



<h4 class="wp-block-heading" id="three-four">3.4: Renfrewshire Traffic Calming</h4>


<div class="wp-block-image">
<figure class="alignright size-thumbnail is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=210%2C210&#038;ssl=1" alt="Renfrewshire Council logo" class="wp-image-18867" width="210" height="210" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?zoom=2&amp;resize=210%2C210&amp;ssl=1 420w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Renfrewshire-Council-logo-768x623-1.png?zoom=3&amp;resize=210%2C210&amp;ssl=1 630w" sizes="auto, (max-width: 210px) 100vw, 210px" /></figure>
</div>


<p><strong>Areas:&nbsp;</strong>Kilbarchan, Houston, Howwood and Kilbarchan Road, Bridge of Weir.<br><strong>Subject:</strong>&nbsp;<em>“We are looking for feedback on the potential traffic calming measures prior to a final report being prepared.”</em> Also, there is a consultation on guardrails at a junction in Howwood.<br><strong>Website links:</strong>&nbsp;<a href="https://www.renfrewshire.gov.uk/village-traffic-surveys" target="_blank" rel="noreferrer noopener">Renfrewshire village traffic calming proposals</a> and <a href="https://www.renfrewshire.gov.uk/article/13002/Have-your-say-on-the-Bowfield-RoadMidton-Road-junction-in-Howwood" target="_blank" rel="noreferrer noopener">Bowfield Road/Midton Road junction, Howwood</a> (<a href="https://www.renfrewshire.gov.uk/haveyoursay" target="_blank" rel="noreferrer noopener">‘Have your say’ page</a> also links to Boundary Commission Scotland review of UK Parliament constituencies).</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18829</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 123, 10 November 2022</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-123-10-november-2022-18774</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 10 Nov 2022 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Clarkston]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[cycling]]></category>
		<category><![CDATA[Dobbie&#039;s Loan]]></category>
		<category><![CDATA[Eaglesham]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Giffnock]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[Inverclyde]]></category>
		<category><![CDATA[tro]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=18774</guid>

					<description><![CDATA[Avenues and corridors… Major changes are proposed for Cowcaddens Rd/Dobbie&#8217;s Loan (visual of Port Dundas Rd, above). Another Avenues project on Pitt St has a Traffic Regulation Order, as does the East City Way on London Rd. It&#8217;s last call for St George&#8217;s Rd but more from Connecting Woodside in Glasgow&#8217;s TROs.&#160; East Renfrewshire&#8217;s Local &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-123-10-november-2022-18774" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 123, 10 November 2022"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Avenues and corridors… </h2>



<p>Major changes are proposed for Cowcaddens Rd/Dobbie&#8217;s Loan (visual of Port Dundas Rd, above). Another Avenues project on Pitt St has a Traffic Regulation Order, as does the East City Way on London Rd. It&#8217;s last call for St George&#8217;s Rd but more from Connecting Woodside in Glasgow&#8217;s TROs.&nbsp;</p>



<p>East Renfrewshire&#8217;s Local Action Plans close soon but Balgray Connections is open a bit longer. East Dunbartonshire have extended one consultation and started a major one about the Springburn Rd/Kirkintilloch Rd ‘corridor’. Also, good news from Inverclyde. </p>



<span id="more-18774"></span>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one">St George’s Road – Phase 2</a></li><li><a href="#one-two">Giffnock Local Action Plan map</a></li><li><a href="#one-three">Clarkston Local Action Plan map</a></li><li><a href="#one-four">Eaglesham Local Action Plan map</a></li><li><a href="#one-five"><strong>Lennoxtown Main Street Improvement Project Consultation</strong></a></li><li><a href="#one-six">Balgray Connections</a></li><li><a href="#one-seven"><strong>A803 Corridor Improvements Project (Springburn Rd)</strong></a></li><li><strong><a href="#one-eight">Cowcaddens Road &amp; Dobbie&#8217;s Loan (Avenues Plus)</a></strong></li></ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#two-one">Greenock town centre to Battery Park SfP lane</a></li><li><a href="#two-two">Port Glasgow 20mph zone</a></li><li><a href="#two-three">Glasgow Uni campus redevelopment –&nbsp;October 2022 newsletter</a></li></ol>



<h4 class="wp-block-heading">3: Proposed Traffic Calming/Traffic Regulation Orders</h4>



<ol class="wp-block-list"><li><a href="#three-one">East Dunbartonshire TROs</a></li><li><strong><a href="#three-two">Glasgow City Traffic Calming/TROs</a></strong></li></ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;St George’s Road –&nbsp;Phase 2</h4>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Area:</strong>&nbsp;Part of the wider Connecting Woodside project.<br><strong>Subject:</strong>&nbsp;St George’s Rd, including remodelling the dangerous Charing Cross junction. A 2-way protected cycletrack would run from there alongside the M8 (with two options for the crossing at Phoenix Rd). It then crosses from the south to north side of the road at Clarendon Place, which would be stopped up at its south end (and re-opened at north). The route would continue on the north side of St George’s Rd to meet the protected lane already built at Garscube Rd. Also, it would have new pedestrian crossings at Woodside Library, N Woodside Rd and St George’s in the Fields.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-thirteen" target="_blank" rel="noreferrer noopener">Digest 121, Item 1.13</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://glasgow.gov.uk/connectingwoodside" target="_blank" rel="noreferrer noopener">St George’s Rd consultation (foot of page)</a>,&nbsp;<a href="https://storymaps.arcgis.com/stories/5fc3acb89e6e498fac8468bfcea3f253" target="_blank" rel="noreferrer noopener">storymap</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/ConnectingWoodside/" target="_blank" rel="noreferrer noopener">survey</a>.<br><strong>Deadline:&nbsp;14&nbsp;November 2022.</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Giffnock Local Action Plan map</h4>



<p><strong>Council:&nbsp;</strong>East Renfrewshire.<br><strong>Subject:</strong>&nbsp;Three further consultations on East Ren towns (following the&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-112-9-june-2022-17484" target="_blank" rel="noreferrer noopener">five in Digest 112, June 2022</a>). While each varies in size, all are relatively affluent and suburban areas south of Glasgow. All three have drop-in events but Giffnock’s took place earlier in the month. Giffnock includes Fenwick Rd, which had ‘soft segregation’ on its cycle lanes for a while before the temporary bollards were removed in spring (<a href="https://www.gobike.org/consultation-digest-local-issue-107-3-march-2022-16845#one-three" target="_blank" rel="noreferrer noopener">Digest 107</a>). As well as the A77, a rail line goes through the town with only a handful of crossing points. The map has over 150 comments.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-fourteen" target="_blank" rel="noreferrer noopener">Digest 121, Item 1.14</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://giffnock.commonplace.is/" target="_blank" rel="noreferrer noopener">Giffnock Commonplace map</a>.<br><strong>Deadline:&nbsp;14 November 2022.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3: Clarkston Local Action Plan map</h4>



<p><strong>Council:&nbsp;</strong>East Renfrewshire.<br><strong>Subject:</strong>&nbsp;Clarkston’s consultation comes after its neighbour across the White Cart Water, Busby, had its turn in the summer. The southern edge of Clarkston includes Williamwood High School, off Eaglesham Rd (B767), the subject of a current&nbsp;<a href="https://twitter.com/GoBikeGlasgow/status/1566723961848844288" target="_blank" rel="noreferrer noopener">cycle lane petition</a>. The map has over 260 comments.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-fifteen" target="_blank" rel="noreferrer noopener">Digest 121, Item 1.15</a>&nbsp;and&nbsp;<a href="https://www.gobike.org/east-renfrewshire-clarkston-stamperland-busby-active-travel-network-delivery-plan-3934" target="_blank" rel="noreferrer noopener">previous Clarkston consultation</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://clarkston.commonplace.is/" target="_blank" rel="noreferrer noopener">Clarkston Commonplace map</a>.<br><strong>Deadline:&nbsp;14 November 2022.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: Eaglesham Local Action Plan map</h4>



<p><strong>Council:&nbsp;</strong>East Renfrewshire.<br><strong>Subject:</strong>&nbsp;While many of East Ren’s towns bleed into each other, Eaglesham is more rural, between Whitelee Wind Farm and East Kilbride, South Lanarkshire. Also, it’s less connected, without a rail line or cycle paths to nearby towns. The map has over 60 comments.<br><strong>Featured:&nbsp;</strong><a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-sixteen">Digest 121, Item 1.16</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://eaglesham.commonplace.is/" target="_blank" rel="noreferrer noopener">Eaglesham Commonplace map</a>.<br><strong>Deadline:&nbsp;14 November 2022.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5: Lennoxtown Main Street Improvement Project Consultation</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:</strong>&nbsp;Lennoxtown is known as the site of Celtic FC’s training complex. Despite being at the foot of the Campsie Hills, its Main St is not as picturesque as its setting. It has had some regeneration, including Lennoxtown Hub, housing the library and health services. Now a previous improvement project from 2019 is restarting – an initial survey is due to lead to refreshed concept designs for the Main St.<br><strong>Featured:</strong>&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-121-13-october-2022-18624#one-eleven" target="_blank" rel="noreferrer noopener">Digest 121, Item 1.7</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/lennoxtown-main-street-improvement-project-consultation" target="_blank" rel="noreferrer noopener">Lennoxtown project page</a>&nbsp;and&nbsp;<a href="https://survey123.arcgis.com/share/c1f798ddf66f484b90f741d4c07dd73a" target="_blank" rel="noreferrer noopener">survey</a>.<br><strong>Deadline: 20 <strong>November</strong> 2022 (<strong>EXTENDED</strong>).</strong></p>



<h4 class="wp-block-heading" id="one-six">1.6: Balgray Connections</h4>



<p><strong>Council:&nbsp;</strong>East Renfrewshire.<br><strong>Area:</strong>&nbsp;Balgray reservoir in Dams to Darnley Country Park, between Barrhead and Newton Mearns in East Renfrewshire.<br><strong>Subject:</strong>&nbsp;Active travel paths added to Aurs Rd in Barrhead and Barrhead Rd in Newton Mearns. In Barrhead, it seems to be a ‘Quietway’-style route on Springfield Dr, parallel to Aurs Rd. It would have raised road tables at junctions and toucan crossings at&nbsp;Aurs Rd and Springfield Rd. At the Newton Mearns end, there would be a shared pavement around the M77 bridge and Westacre Roundabout. However, east of a toucan crossing, there would be proper segregated cycle lanes. These should go the rest of the way to Mearns Cross but there’s doubt about the design around bus stops (possibly due to accessibility concerns?). The&nbsp;<a href="https://ercbuildingstandards.eastrenfrewshire.gov.uk/buildingstandards/applicationDetails.do?keyVal=QX26UBGPFQP00&amp;activeTab=summary" target="_blank" rel="noreferrer noopener">Aurs Rd re-alignment project</a>&nbsp;is the bit in the middle, due for construction in 2023–24.<br><strong>Featured: </strong><a href="https://www.gobike.org/consultation-digest-local-issue-122-27-october-2022-18710#one-twelve" target="_blank" rel="noreferrer noopener">Digest 122, Item 1.12</a>.<br><strong>Website links:</strong>&nbsp;<a href="https://balgrayconnections.commonplace.is/" target="_blank" rel="noreferrer noopener">Balgray Connections Commonplace map</a>.<br><strong>Deadline:&nbsp;21 November 2022</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: A803 Corridor Improvements Project</h4>


<div class="wp-block-image">
<figure class="alignright size-large is-resized"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?resize=264%2C373&#038;ssl=1" alt="map of A803 route corridor (Springburn Rd/Kirkintilloch Rd)" class="wp-image-18800" width="264" height="373" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?resize=424%2C600&amp;ssl=1 424w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?resize=1086%2C1536&amp;ssl=1 1086w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/a803_route_corridor_map_220120.jpeg?w=1241&amp;ssl=1 1241w" sizes="auto, (max-width: 264px) 100vw, 264px" /></a><figcaption>Map of A803 route (click to enlarge)</figcaption></figure>
</div>


<p><strong>Organisations:</strong> East Dunbartonshire Council, Glasgow City Council and Strathclyde Partnership for Transport (SPT).<br><strong>Area:</strong> Most of the length of the A803, Springburn Rd/Kirkintilloch Rd. It runs from the M8 through North Glasgow to Bishopbriggs.<br><strong>Subject:</strong> Phase 1 of a joint City Deal project about how to improve the A803 corridor. In Glasgow, it&#8217;s a dual carriageway which is a barrier between neighbourhoods. It has some shared paths around it but none are very wide (despite having space on some of its verges). Towards Bishopbriggs it narrows to one lane each way and is a busy main road surrounded by housing, car showrooms and shops. There&#8217;s potential to link to existing protected cycle lanes at Hawthorn St and Fountainwell Rd. Also, to nearby train stations at Springburn and at Bishopbriggs. The A803 project will tie in with <a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/bishopbriggs-town-centre-regeneration" target="_blank" rel="noreferrer noopener">Bishopbriggs Town Centre Regeneration</a>. The survey is a chance to get protected cycle lanes into the plans.<br><em>Drop-in event</em> – Bishopbriggs War Memorial Hall on Tuesday 15 November, 12–6.30pm. Also, the survey is available in Springburn Library, Bishopbriggs Library and Leisuredrome Leisure Centre. <br><strong>Website links: </strong><a href="https://www.eastdunbarton.gov.uk/a803-corridor-improvements-project-survey" target="_blank" rel="noreferrer noopener">A803 Corridor Improvements Project &#8211; Survey</a>  and <a href="https://www.eastdunbarton.gov.uk/filedepot_download/405286/4116" target="_blank" rel="noreferrer noopener">A803 Stage 1 Consultation Boards (PDF, 71MB)</a>. <br><strong>Deadline: 22 November 2022.</strong></p>



<h4 class="wp-block-heading" id="one-eight">1.8: Cowcaddens Road &amp; Dobbie&#8217;s Loan (Avenues Plus)</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="328" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Dobbies-Loan-north-screenshot.jpeg?resize=525%2C328&#038;ssl=1" alt="visualisation of Dobbies Loan protected bike lanes (north)" class="wp-image-18806" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Dobbies-Loan-north-screenshot.jpeg?resize=600%2C375&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Dobbies-Loan-north-screenshot.jpeg?resize=300%2C188&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Dobbies-Loan-north-screenshot.jpeg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Dobbies-Loan-north-screenshot.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Visual of Dobbie&#8217;s Loan plans (looking north-west, where lanes end)</figcaption></figure>



<p><strong>Council:</strong> Glasgow City.<br><strong>Area:</strong> The length of Cowcaddens Rd from Cambridge St to Caledonian Uni. A section of Dobbie&#8217;s Loan between N Hanover St and Canal St.<br><strong>Subject:</strong> Part of the <a href="https://glasgow.gov.uk/index.aspx?articleid=29102" target="_blank" rel="noreferrer noopener">Avenues Plus project</a>, which also covers Duke St/John Knox Street and S Portland St (which had a <a href="https://twitter.com/GlasgowCC/status/1529070975584804864" target="_blank" rel="noreferrer noopener">consultation event in May 2022</a>). Cowcaddens Rd and Dobbie&#8217;s Loan both link to N Hanover St and have a joint consultation. The plans for Cowcaddens Rd look promising, especially the radical redesign options for the Port Dundas Rd junction (in featured image at top). The Dobbie&#8217;s Loan plans also add two-way protected lanes (especially useful for students at Glasgow Caledonian Uni and its nearby halls). However, the lanes stop short of the trunk road junction, which leads under the M8 to Craighall Rd and Port Dundas. The boards include an updated Avenues phasing map (now with Block D added). A very <a href="https://twitter.com/GoBikeGlasgow/status/1586778089836650499" target="_blank" rel="noreferrer noopener">short notice consultation event</a> took place on 31 October.<br><strong>Website links: </strong><a href="http://www.ironsidefarrar.com/glasgowavenues/consultation.html" target="_blank" rel="noreferrer noopener">Consultation landing page</a>, <a href="https://www.surveymonkey.co.uk/r/VNZKJWY" target="_blank" rel="noreferrer noopener">survey</a>, <a href="http://www.ironsidefarrar.com/glasgowavenues/consultation_boards.pdf" target="_blank" rel="noreferrer noopener">boards (PDF)</a>, <a href="http://www.ironsidefarrar.com/glasgowavenues/concept_plans.pdf" target="_blank" rel="noreferrer noopener">plans (PDF)</a>, <a href="https://view.mylumion.com/?p=gjqazc4l43blj75m" target="_blank" rel="noreferrer noopener">3D panoramas</a> and <a href="https://www.youtube.com/channel/UCvAPtjaJ12VoEFlwshQyckw/videos" target="_blank" rel="noreferrer noopener">3D fly-through videos</a>.<br><strong>Deadline: 25 November 2022.</strong></p>



<h3 class="wp-block-heading"><strong>2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1:&nbsp; Greenock town centre to Battery Park SfP lane</h4>



<p><strong>Council: </strong>Inverclyde.<br><strong>Subject:</strong> The council voted to make the Spaces for People route permanent (as its <a href="https://www.inverclyde.gov.uk/meetings/documents/15632/12%20-%20Spaces%20for%20People%201yr%20Update.pdf" target="_blank" rel="noreferrer noopener">SfP update report</a> had recommended). The report also recommended improvements including a kerb between the footway/cycleway, resurfacing and dedicated cycle traffic light phases. There will be a focus on the wider section from Dalrymple Street, Container Way and Custom House Way (where the Coastal Path comes inland around Greenock Ocean Terminal). However, we&#8217;ll have to wait and see what Sustrans come up with in future.<br><strong>Featured:</strong> <a href="https://www.gobike.org/consultation-digest-local-issue-108-17-march-2022-16958#one-twelve" target="_blank" rel="noreferrer noopener">Digest 108, Item 1.12</a>.<br><strong>Website links: </strong><a href="https://www.inverclydenow.com/greenock-bike-lane-to-be-made-permanent/" target="_blank" rel="noreferrer noopener">Inverclyde Now article on October 2022 council vote</a> and <a href="https://www.inverclydenow.com/greenock-bike-lane-to-stay-for-at-least-another-six-months/" target="_blank" rel="noreferrer noopener">Inverclyde Now article on March 2022 council vote</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2:&nbsp;Port Glasgow 20mph zone</h4>



<p><strong>Council:&nbsp;</strong>Inverclyde.<br><strong>Subject:</strong>&nbsp;Staying in Inverclyde, the proposed 20mph zone in Port Glasgow was also approved by the council. This includes changing the route of NCN75 to go along Auchenbothie Road and upgrading some sections of path.<br><strong>Featured:</strong> <a href="" target="_blank" rel="noreferrer noopener">Digest 115, Item 1.1</a>.<br><strong>Website links:</strong> <a href="https://www.inverclydenow.com/port-glasgow-20mph-and-traffic-calming-plan-to-be-progressed/" target="_blank" rel="noreferrer noopener">Inverclyde Now article on Port Glasgow 20mph decision</a>.</p>



<h4 class="wp-block-heading" id="two-three">2.3: Glasgow Uni campus redevelopment –&nbsp;October 2022 newsletter</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="281" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Glasgow-Uni-rain-gardens_October-2022.jpg?resize=525%2C281&#038;ssl=1" alt="Glasgow Uni rain gardens" class="wp-image-18794" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Glasgow-Uni-rain-gardens_October-2022.jpg?resize=600%2C321&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Glasgow-Uni-rain-gardens_October-2022.jpg?resize=300%2C160&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/Glasgow-Uni-rain-gardens_October-2022.jpg?w=836&amp;ssl=1 836w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>New rain gardens on southern slopes of Glasgow Uni campus near Kelvingrove Park </figcaption></figure>



<p><strong>Organisation:&nbsp;</strong>Glasgow Uni.<br><strong>Subject:</strong>&nbsp;Work continues in the West End on Glasgow Uni&#8217;s new buildings. Also, the landscape outside them, including rain gardens to protect against flooding (pictured, above). The zigzag path could make for a technical descent/climb (but at least it seems to be lit). Hopefully other entrances to the site are a bit more direct. Some at the south-west of the site may be disrupted from January, when <a href="https://www.glasgowwestendtoday.scot/news/byres-road-upgrade-to-begin-in-january-2023-1481/" target="_blank" rel="noreferrer noopener">Byres Rd&#8217;s redevelopment is due to start</a>.<br><strong>Website links:</strong> <a href="https://campusdevelopment.co.uk/news/october-2022-newsletter/" target="_blank" rel="noreferrer noopener">Campus redevelopment newsletter –&nbsp;October 2022</a>.</p>



<h3 class="wp-block-heading"><strong>Section 3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1:&nbsp;East Dunbartonshire TROs</h4>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="562" height="90" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=474%2C76&amp;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p id="two-one"><strong>Areas:</strong>&nbsp;Bearsden (‘MacFarlane etc Redetermination’) and Bishopbriggs (Linnhe Ave and Schools Orders).<br><strong>Subject:</strong>&nbsp;Orders to redetermine footways and parking restrictions.<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-and-pavements/road-works#traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs (at foot of Roadworks page)</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Traffic Calming/TROs</h4>


<div class="wp-block-image">
<figure class="alignright size-large is-resized"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?resize=245%2C298&#038;ssl=1" alt="Plans for Pitt St" class="wp-image-18792" width="245" height="298" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?resize=493%2C600&amp;ssl=1 493w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?resize=247%2C300&amp;ssl=1 247w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?resize=1263%2C1536&amp;ssl=1 1263w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?w=1557&amp;ssl=1 1557w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-Amend-No.34-REV-A-cropped.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 245px) 100vw, 245px" /></a><figcaption>Plans for Pitt St –&nbsp;a.k.a. Holland St TRO (click to enlarge or see council&#8217;s PDF)</figcaption></figure>
</div>


<p><strong>Areas: </strong>City-wide.<br><strong>Subject:</strong> <em>TROs</em> – <strong>Pitt Street</strong>&#8216;s TRO is, confusingly, called Holland St Avenue (apparently the lane was going there before a rethink). Pitt St will link between the protected cycle lanes on Sauchiehall St (Avenue) and Waterloo St (West City Way/Connect2). This TRO only sets restrictions but the <a href="https://www.gobike.org/wp-content/uploads/2022/11/GCC_Holland-St-P-5258_Proposed-TRO-City-Centre-TM-Amendment-No.34-REV-A.pdf" target="_blank" rel="noreferrer noopener">council&#8217;s plans for Pitt St (PDF)</a> are shown too. Apart from the tricky junction at Waterloo St, the red lanes look more straightforward than the buff-coloured section at the new Moda development (old police station site). However, there is a pretty steep slope going north between Bothwell St and W George Lane. GoBike asked the council about some of these issues earlier in the process. We got a <a href="https://www.gobike.org/wp-content/uploads/2022/11/Pitt-St-response-from-GCC.pdf" target="_blank" rel="noreferrer noopener">detailed response from the council&#8217;s Sustainable Transport team</a> justifying their decisions. While “gradients of adjacent streets… are similar”, Pitt St is a few blocks longer than Holland St so is a tougher climb.<br><strong>London Rd</strong> – a proposed TRO would set the scene for permanent phases of the East City Way past the velodrome (as seen in <a href="https://www.gobike.org/consultation-digest-local-issue-113-23-june-2022-17591#one-four" target="_blank" rel="noreferrer noopener">Digest 113, Item 1.4</a>). It has its own complicated junctions at Dunn St and Springfield Rd (but the latter does convert a filter lane into cycling space). The council wants to build the project before the UCI Cycling World Championships in August 2023. Stopwatches at the ready…<br><strong>Provanmill Rd</strong> and <strong>Cumbernauld Rd</strong> – two other Spaces for People projects near Hogganfield Park with proposed TROs. <br><strong>Raeberry St</strong> – one-ways and a cycling only restriction proposed for the junction of Mount St/Simpson St (part of Connecting Woodside).<br>The <strong>School Streets</strong> order (for 19 primary schools) was made on  24 October 2022, as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-105-3-february-2022-16627#one-two" target="_blank" rel="noreferrer noopener">Digest 105, Item 1.2</a>. On the same date an order was also made for the <strong>Cardonald area</strong> (see <a href="https://www.gobike.org/consultation-digest-local-issue-97-15669#one-two" target="_blank" rel="noreferrer noopener">Digest 97, Item 1.2</a>).<br><em>Traffic Calming</em> –<strong> </strong>Linkwood Dr, Drumchapel; Wardie Rd, Easterhouse.<strong> </strong><br><strong>Website links: </strong><a href="https://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>, <a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">18774</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 84, 13 April 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 13 Apr 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Ardrossan]]></category>
		<category><![CDATA[barriers]]></category>
		<category><![CDATA[Braidcraft Rd]]></category>
		<category><![CDATA[Brockburn Rd]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[Dawsholm Park]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[Maryhill]]></category>
		<category><![CDATA[Merchant City]]></category>
		<category><![CDATA[planters]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13767</guid>

					<description><![CDATA[A handful of consultations and the latest on Spaces for People. This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire. Again, this Digest features an update about recent infrastructure developments. This time &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 84, 13 April 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A handful of consultations and the latest on Spaces for People. </h2>



<p>This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire.</p>



<p>Again, this Digest features an update about recent infrastructure developments. This time focusing on Glasgow&#8217;s latest Spaces for People measures (following on from Howard St last time). A few new lanes are going in Pollok and some in the north east of the city. The city centre has some new planter boxes and should get another new lane (eventually).</p>



<span id="more-13767"></span>



<h3 class="wp-block-heading" id="infra-update">Glasgow Spaces for People Update</h3>



<ul class="wp-block-list"><li><a href="https://www.glasgow.gov.uk/26693" target="_blank" rel="noreferrer noopener">Braidcraft Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26692" target="_blank" rel="noreferrer noopener">Brockburn Rd plans</a> and <a href="https://www.glasgowtimes.co.uk/news/19226857.cycling-group-hits-back-petition-lanes/" target="_blank" rel="noreferrer noopener">GoBike&#8217;s response to &#8216;bikelash&#8217; in Glasgow Times</a> making front page news!</li><li><a href="https://www.glasgow.gov.uk/26735" target="_blank" rel="noreferrer noopener">Cambridge St plans</a> which may not have started yet due to <a href="https://www.gobike.org/wp-content/uploads/2021/04/Cambridge-St-roadworks_9450_1000px.jpg" target="_blank" rel="noreferrer noopener">water main works</a> (and the usual considerate parking). </li><li><a href="https://twitter.com/RiderGlasgow/status/1377290772832206857?s=20" target="_blank" rel="noreferrer noopener">Planter boxes installed on Candleriggs, Merchant City</a> (to make way for outdoor seating?). More on Bell Street, Wilson Street and Trongate.</li><li><a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Fielden-St_9441_1000px.jpg" target="_blank" rel="noreferrer noopener">London Rd roadworks near Fielden St</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Clyde-Gateway_9439_1000px.jpg" target="_blank" rel="noreferrer noopener">more near Celtic Park</a> (possibly to lay cable?). Missing zebras/armadillos have been replaced outside Celtic Park/Emirates and lane cleaned.</li><li><a href="https://www.glasgow.gov.uk/26852" target="_blank" rel="noreferrer noopener">Royston Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26851" target="_blank" rel="noreferrer noopener">Wallacewell Rd plans</a>.</li></ul>



<h3 class="wp-block-heading">Barriers Overload Update</h3>



<p><a href="https://twitter.com/langoo/status/1379473673044824070?ref_src=twsrc%5Etfw%7Ctwcamp%5Eembeddedtimeline%7Ctwterm%5Eprofile%3Agobikeglasgow%7Ctwgr%5EeyJ0ZndfZXhwZXJpbWVudHNfY29va2llX2V4cGlyYXRpb24iOnsiYnVja2V0IjoxMjA5NjAwLCJ2ZXJzaW9uIjpudWxsfSwidGZ3X2hvcml6b25fdHdlZXRfZW1iZWRfOTU1NSI6eyJidWNrZXQiOiJodGUiLCJ2ZXJzaW9uIjpudWxsfX0%3D&amp;ref_url=https%3A%2F%2Fwww.gobike.org%2Fconsultation-digest-local-issue-83-30-march-2021-13568" target="_blank" rel="noreferrer noopener">Dawsholm Park barriers</a> –&nbsp;three(!) sets added to new path.</p>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Ardrossan Connections –&nbsp;Design Festival</a> (workshops 14/21 April)</strong></li><li><a href="#one-two">Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops</a> (22/26 April)</li><li><a href="#one-three">East Dunbartonshire Council – Climate Conversation</a><span style="font-size: 1rem;">&nbsp;(online event 22 April)</span></li><li><a href="#one-four">Maryhill North Transformational Regeneration Area – Masterplan consultation</a>&nbsp;(ends 23 April)</li><li><a href="#one-five">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Malls Mire newsletter – March 2021</a></li></ol>



<h3 class="wp-block-heading" id="block-ad6eda16-21e7-4a1f-984d-21f675cbe2c1"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Ardrossan Connections –&nbsp;Design Festival</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="249" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=525%2C249&#038;ssl=1" alt="Illustration of key areas of Ardrossan (looking south)" class="wp-image-13791" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=600%2C285&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=300%2C143&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1521&amp;ssl=1 1521w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>First covered in <a href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#one-two" target="_blank" rel="noreferrer noopener">Digest 78 (1.2)</a>, Ardrossan Connections is about improving links and public spaces in the Ayrshire coastal town. See the <a href="https://ardrossanconnections.commonplace.is/about" target="_blank" rel="noreferrer noopener">webpage about the project</a> or <a href="https://s3-eu-west-2.amazonaws.com/commonplace-customer-assets/ardrossandesignfestival/Information%20boards%20Ardrossan%20Connections%20March%202021.pdf" target="_blank" rel="noreferrer noopener">information boards</a> for more background or view comments on the <a href="https://ardrossanconnections.commonplace.is/comments" target="_blank" rel="noreferrer noopener">Ardrossan Commonplace map</a>.</p>



<p>The latest phase of the project is a &#8216;Design Festival&#8217; from 7–27 April.  In other words, some design workshops (announced just after the last Digest). GoBike members will probably be more interested in the &#8216;Connections&#8217; design workshops on 14 and 21 April. There are also &#8216;Placemaking&#8217; workshops on 20 and 26 April. Each workshop is shown on the <a href="https://ardrossandesignfestival.commonplace.is/overview" target="_blank" rel="noreferrer noopener">Design Festival page</a> –&nbsp;click the one you want to go to its sign-up link. </p>



<p>Alternatively, if you can&#8217;t make any of the workshops, you might be able to use the <a href="https://en-gb.padlet.com/eilidhsustrans/Ardrossan" target="_blank" rel="noreferrer noopener">Ardrossan &#8216;padlet&#8217;</a> to add a design idea as a pin on the map (zoom in –&nbsp;a lot!).</p>



<h4 class="wp-block-heading" id="one-two">1.2: Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops </h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="396" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=525%2C396&#038;ssl=1" alt="Map of (Y)our City Centre Districts with current phase highlighted (Cowcaddens, Townhead, 'Learning Quarter and Merchant City)" class="wp-image-13773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?w=530&amp;ssl=1 530w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=300%2C226&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of (Y)our City Centre Districts with current phase highlighted</figcaption></figure>



<p>The city centre districts projects have been featured several times, including <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-two" target="_blank" rel="noreferrer noopener">Digest 74, 1.2</a>. These are about major regeneration, with an emphasis on transport and community. The four districts being consulted on in this phase are Cowcaddens, Townhead, Merchant City and &#8216;Learning Quarter&#8217; (Cathedral St, etc.). The <a href="https://yourcitycentre2020.commonplace.is/comments" target="_blank" rel="noreferrer noopener">districts Commonplace map</a> is still open but the focus will be on the outcome of the latest workshops.</p>



<p>Proposals Workshops are coming up for&nbsp;Merchant City on 22 April and &#8216;Learning Quarter&#8217; on 26 April. Timetables for each online event are on the <a href="https://www.glasgowcitycentrestrategy.com/city-centre-workshops" target="_blank" rel="noreferrer noopener">City Centre Strategy workshops page</a>. </p>



<p>Cowcaddens and Townhead have already had their workshops. The same webpage showcases the themes which came out of those. &#8216;(Y)our Ideas&#8217;, are numbered –&nbsp;clicking each takes you to a PDF summary about it. Underneath the themes is a button to a survey –&nbsp;it asks which ideas you see as highest priority. </p>



<p>In due course, a similar setup will probably appear for Merchant City/&#8217;Learning Quarter&#8217; after their workshops. </p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;East Dunbartonshire Council – Climate Conversation&nbsp;</h4>



<p>This initiative was first covered in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#one-seven" target="_blank" rel="noreferrer noopener">Digest 82, Item 1.7</a>. East Dunbartonshire Council didn&#8217;t apply for Spaces for People funding but sustainable transport is part of their <a href="https://www.eastdunbarton.gov.uk/climate-conversation">Climate Conversation webpage</a>. Subsequently, this will feed into three future consultations on the&nbsp;environment, including a new Active Travel Strategy.</p>



<p>The last of their&nbsp;<a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/east-dunbartonshire-climate-conversation-tickets-143700675589" target="_blank">Climate Conversation events</a> is on&nbsp;22 April (online, using MS Teams). The overall Climate Conversation itself will run until 2 May 2021.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Maryhill North Transformational Regeneration Area – Masterplan consultation&nbsp;</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="321" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min.jpeg?resize=525%2C321&#038;ssl=1" alt="Maryhill TRA – Kilmun St visual" class="wp-image-13784" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=600%2C367&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=300%2C183&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=1536%2C939&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=2048%2C1252&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Kimun St visual –</em> new housing and landscaping but no new pavements?</figcaption></figure>



<p>As mentioned in <a href="https://www.gobike.org/consultation-digest-local-issue-83-30-march-2021-13568#one-four" target="_blank" rel="noreferrer noopener">Digest 83, Item 1.4</a>, this regeneration project is looking at housing and public spaces in Gilshochill, south of Summerston train station. </p>



<p>There are many visualisations on the&nbsp;<a href="https://www.maryhillnorthtra.com/consultations/1" target="_blank" rel="noreferrer noopener">Maryhill North consultation page</a>, most of which look promising. However, there are some very sharp angles in the zigzag paths, which don&#8217;t look very bike-friendly (as seen in the feature photo at the top of this Digest). Also, some of the realigned streets appear to be &#8216;shared space&#8217;, without any pavements. The theory behind shared space is that drivers pay more attention if pavements and markings are removed. However, the reality is often pedestrians get startled by cars and have to dart out the way (or in this case, dive into a hedge!). </p>



<p>If you want to comment on the TRA plans, you have to register first on the above page. Consultation&nbsp;closes on 23 April.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>A few comments in the city centre districts Commonplace map ask about more space for skaters. GUS&#8217;s M74 skatepark project would provide that under a flyover near West St subway station. First covered in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank">Digest 81, Item 1.9</a>, the&nbsp;<a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a>&nbsp;is still open for BMX riders, skaters, or their families, to have their say about the park. </p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Malls Mire newsletter – March 2021</h4>



<p>The first issue of this newsletter featured in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#three-four" target="_blank" rel="noreferrer noopener">Digest 74, Item 3.4</a>. The Malls Mire project is creating play areas and woodland paths between Toryglen and Rutherglen. </p>



<p>The <a href="https://www.gobike.org/wp-content/uploads/2021/04/Malls-Mire-Newsletter-March-2021.pdf" target="_blank" rel="noreferrer noopener">March 2021 newsletter</a> covers the latest construction news about the bike pump track, playgrounds, landscaping and more. See further background about the project on <a href="http://www.clydegateway.com/clyde-gateway-gives-malls-mire-a-new-lease-of-life-as-it-is-transformed-into-a-woodland-retreat/" target="_blank" rel="noreferrer noopener">Clyde Gateway&#8217;s Malls Mire webpage</a>.</p>



<p>&nbsp;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13767</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 74, 24 November 2020</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 24 Nov 2020 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[city centre]]></category>
		<category><![CDATA[City College]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[ldp2]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[north glasgow]]></category>
		<category><![CDATA[onbikes]]></category>
		<category><![CDATA[protected junctions]]></category>
		<category><![CDATA[roadworks]]></category>
		<category><![CDATA[Rutherglen]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[streetscore]]></category>
		<category><![CDATA[Toryglen]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[university of strathclyde]]></category>
		<category><![CDATA[Urban Roots]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=12604</guid>

					<description><![CDATA[Shaping the north of the city plus your reactions to roadworks and more speed cushions. It&#8217;s like buses –&#160;wait for ages for a consultation about the north of the city then loads come along at once. In this case, workshops for a few northern city centre &#8216;districts&#8217;, a future consultation about the uni/college campuses around &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 74, 24 November 2020"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Shaping the north of the city plus your reactions to roadworks and more speed cushions.</h2>



<p>It&#8217;s like buses –&nbsp;wait for ages for a consultation about the north of the city then loads come along at once. In this case, workshops for a few northern city centre &#8216;districts&#8217;, a future consultation about the uni/college campuses around Cathedral St and a strategic document about North Glasgow. </p>



<span id="more-12604"></span>



<p>This Digest also includes links in the Contents page so you can, hopefully, jump straight to a topic if you want to. </p>



<h3 class="wp-block-heading"><strong>Contents</strong> <br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Steer Energy –&nbsp;Streetscore &#8211; Impact of Streetworks Survey</a></strong>, <strong>respond by end November</strong></li><li><strong><a href="#one-two">Glasgow City Council – (Y)our Districts Online Ideas Workshops</a>, Townhead: 2 December / Cowcaddens: 7 December</strong></li><li><a href="#one-three">Glasgow Harbour Ltd – Yorkhill Quay masterplan/&#8221;River Clyde blue corridor vision&#8221;</a>, closes 4 December</li><li><a href="#one-four">East Dunbartonshire Council – Proposed Local Development Plan 2 (LDP2)</a>, closes 15 January 2021</li><li><strong><a href="#one-five">Glasgow City Council –&nbsp;North Glasgow Strategic Development Framework (SDF)</a>, *deadline extended* –&nbsp;closes 29 January 2021</strong></li><li><a href="#one-six">Glasgow City Council – Protected Junction Trial consultation (Victoria Rd)</a></li><li><a href="#one-seven">OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list" id="block-2fe65492-7d15-4b11-8647-53cd2ad123c6"><li><strong><a href="#two-one">University of Strathclyde –&nbsp;Early Engagement Information: Creating people first infrastructure, a city centre context</a></strong></li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list" id="block-2fe65492-7d15-4b11-8647-53cd2ad123c6"><li><a href="#three-one">Glasgow City Council (Maxwell Park area) Traffic Calming Scheme</a></li><li><a href="#three-two">Glasgow City Council (Ryehill Road) Traffic Calming Scheme</a></li><li><a href="#three-three">East Dunbartonshire Council –&nbsp;LDP2 Newsletter</a></li><li><a href="#three-four">Urban Roots –&nbsp;Malls Mire/Toryglen Greenspace &amp; Active Travel Project</a></li></ol>



<h3 class="wp-block-heading" id="block-96eb2584-3877-4536-9fa1-a5301d33d259"><strong>Section 1:</strong> <strong>Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one"><strong>1.1:</strong> <strong>Steer Energy –&nbsp;Streetscore &#8211; Impact of Streetworks Survey, respond by end November</strong></h4>



<p>If you&#8217;ve ever had an annoying experience trying to get around roadworks, here&#8217;s a chance to get it off your chest. Thomas at GoBike was contacted by Megan from Steer Energy, who are doing a survey about the effects of roadworks on different groups; including cyclists. Her message says:</p>



<p><em>&#8220;Steer Energy are carrying out research to engage with people who can give their expert opinion on what the challenges people may face when encountering streetworks in their everyday life. We are targeting the following groups:</em></p>



<ul class="wp-block-list"><li><em>People living with disabilities &nbsp;</em></li><li><em>People living with dementia &nbsp; &nbsp;</em></li><li><em>People with mental health issues &nbsp; &nbsp; &nbsp;</em></li><li><em>Neurodiverse people </em>[including people on the autism spectrum]</li><li><em>Carers &nbsp; &nbsp; &nbsp;</em></li><li><em>Cyclists</em></li></ul>



<p><em>The aim is to gather opinions and ideas from people with lived experience journeying through street works that may have found the experience challenging.</em></p>



<p><em>We would be keen to include the experience of cyclists across Scotland and encourage you to share with any other groups and communities you work with:<br><a href="https://www.surveymonkey.co.uk/r/steerstreetworks" target="_blank" rel="noreferrer noopener">https://www.surveymonkey.co.uk/r/steerstreetworks</a></em></p>



<p><em>Our aim is to gather as much information as possible about the current impacts of streetworks and how they can be better designed with more people in mind.&#8221;</em></p>



<p>We asked for a few more details about what this involved and got a very quick response:</p>



<p><em>&#8220;The design of all streetwork in the UK is carried out using the same national guidelines which is basically a manual used in training and design. Steer Energy is challenging that manual and asking that it be amended to become more accessible and include better designed streetworks to decrease isolation and disruption to peoples lives, especially those who do not use cars and those groups who require more space to move around in public (wheelchair users, people with mobility problems,&nbsp;disabled people, neurodiverse people, etc).&#8221;</em></p>



<p>If you&#8217;d like to take part, see the SurveyMonkey link, above –&nbsp;preferably before the end of November to allow time for the report to be put together.</p>



<h4 class="wp-block-heading" id="one-two">1.2: Glasgow City Council – (Y)our Districts Online Ideas Workshops (Townhead: 2 December/Cowcaddens: 7 December)</h4>



<p>We received emails about upcoming consultations and events for the District Regeneration Frameworks project by Glasgow City Council. These are very wide-ranging consultations covering housing, business, leisure, etc. as well as transport. The &#8216;districts&#8217; are areas around the city centre – some have already had plans completed, including Blythswood, Central, Broomielaw and St Enoch – see the <a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/city-centre-districts" target="_blank">Districts page on the City Centre Strategy website</a> (under their huge map). </p>



<p>The project&#8217;s <strong>CommonPlace map </strong>for all Districts can be found at the links, below. </p>



<p><em>&#8220;You can check out what’s been said so far and contribute your thoughts online at&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqtVElJUBoW1-2BQ4-2Fyv1aQB3za2qYGwMGHJvmpFxa3edanalRs6BN0QnvShGLXfHBZYQ-3D-3DtCRp_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel2wUTa15u-2BSClhVLH8OqLTxxcRUk6wp5yLjtAE0CmW6YL1ZBWNpjkVE48E21CMz5U44-2FTytCr4cAB-2FS6i2ArIxKGuXT-2BpJVu0hewJiz1wIC4snF0bN9c0w5o02kPrqxIVDHfRd1cg8NugGRRzUD85EkvUQCNMa4Ik0PpAIe475KstuZdhm0bzQM6iKQ18Jmg7jMhuDm1-2B8JX8E5256PkXIk47iwChGsvo1JrkknzzRtM-3D" rel="noreferrer noopener">https://yourcitycentre2020.commonplace.is/</a>&nbsp;and&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=pLPX9h3jCRW2L9eCTHMYiYg7uPaUFy7kl7KMPHf0A-2F6IZB5ivfDwrOCkRIXzzG3j8jdu_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nelx-2BHVnUGMcO0L-2Bm-2FgDhJhrSf7TRYKG6CRwjzDaZwFpG3XYZghuIq-2BqL3WWLfW-2FZ-2FHdtkxcXTEASdRKS-2BOPSdyXzr6fv1D-2FqzlNSV91PlOyw0ilyxTMh0PRbKs25trI5fDPuW-2F6UqmV1BOQtdW3ZUi1j-2BsfjT-2BWMi4-2BcE8HFxKm75znHfJUvQWb4DeeDL77d-2F7N1MAPCD23K7hOfJGvuBmGUiTWPirYOYA8EDJ3qL2XEA-3D" rel="noreferrer noopener">http://www.yourplacemap.org/</a>.&#8221;</em></p>



<p>The next two areas with consultation events arranged are Townhead and Cowcaddens (with Merchant City and the &#8216;Learning Quarter&#8217; to follow at some point).</p>



<p><a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/townhead" target="_blank"><strong>Townhead district</strong></a> covers the area you might expect from Cathedral St to&nbsp;the M8. The  &#8220;potential bridge&#8221; in the map is the new pedestrian/cycle bridge to Sighthill (due Spring 2021). The &#8220;route of potential Avenues&#8221; on Castle St and Springburn Rd isn&#8217;t in the current version of the <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/avenues" target="_blank">Avenues Programme</a> (but would be very welcome if GCC want to update it).</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="365" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=525%2C365&#038;ssl=1" alt="" class="wp-image-12623" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=600%2C417&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=300%2C209&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Townhead map</figcaption></figure>



<p><strong>(Y)our Townhead Online Ideas Workshops (via Zoom) –&nbsp;Wednesday 2 December</strong></p>



<ul class="wp-block-list"><li>Afternoon Workshop: 2pm – 4pm,&nbsp;<a href="https://www.eventbrite.co.uk/e/your-townhead-ideas-workshop-afternoon-session-tickets-129478201787" target="_blank" rel="noreferrer noopener">Tickets to the Townhead Workshop, Afternoon session</a></li><li>Evening Workshop: 6pm – 8pm,&nbsp;<a href="https://www.eventbrite.co.uk/e/your-townhead-ideas-workshop-evening-session-tickets-129550574255" target="_blank" rel="noreferrer noopener">Tickets to the Townhead workshop, Evening Session</a></li></ul>



<p><strong><a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/cowcaddens" target="_blank">Cowcaddens district</a></strong> goes from Buchanan Bus Station to an area north of the M8 at St George&#8217;s Cross. This is where the &#8216;Underline&#8217; from GCC&#8217;s <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/avenues" target="_blank">Avenues Programme</a> was due to go (from Cambridge St) but it&#8217;s missing from the map.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="335" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=525%2C335&#038;ssl=1" alt="" class="wp-image-12624" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=600%2C383&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=300%2C192&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Cowcaddens map</figcaption></figure>



<p><strong>(Y)our Cowcaddens Online Ideas Workshops (via Zoom) –&nbsp;Monday 7 December</strong></p>



<ul class="wp-block-list"><li>Afternoon Workshop: 2pm – 4pm, <a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqn6jppcj37yW9d4h9gNIobi-2BSfB8aOdAW8sxAyebFxbThe0K8ECzcS0Qmbp12KaMwUFdpPOk84wfashg1gEd4zfVM3v4vGKWmc2ina57jfSmX4XjGr-2FfvuabTlcqsZVH4w-3D-3Dj06b_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel-2FKmcxl11KBqsqbqnhRU4EO53hi20I2KrIvGb2nmutudaWImKczOjUZfiP8RkJqY74kz7nYzqNvP88QnUV6zoJtNAPZAV05XOfjs10ClgPHMUyk9-2FMSUj7NeoSdPaOqS8jx2-2B3CvueXIY97ChM3Lwo4ZcEqZHje91RfxxngIk0EuMBsvJ16Zi083m6MKv77HkEtlvlQI0YWuJhqhmmV-2BtRR9Q-2BF-2F-2FwWewU8JrHYUknaY-3D" rel="noreferrer noopener">Tickets to the Cowcaddens Afternoon Workshop</a>.</li><li>Evening Workshop: 6pm – 8pm,&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqn6jppcj37yW9d4h9gNIobi-2BSfB8aOdAW8sxAyebFxbThe0K8ECzcS0Qmbp12KaMwVYtyzh4RkRX-2Fcgq2FAxVCYkcUrChqgsTVVebIpm3yIxCnDt2q5stkD0Cya-2Fg2Kj1A-3D-3DYjjv_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel00vBux0XciOVsMLhAMmlHRWwDLauXMImi1C5YNMOctv3WoRjJW2uNlcuTHyqxPkYh2roUIcOZfMZy8hQ2PuIaLzGqM-2FsvtiL-2F-2FS32hrOONMYwW7tbePjDnVx5VJCAhYDSyfKYHhU3TnSJc80mwYHhmRBwzYtM3-2Bz0QRem6r84xA8TzYeWX7btJ-2Bxv2zH844zcLnyNbYjDnWg-2BK3BBSDuPIrarKR4itFG1dqsFwv5Ido-3D" rel="noreferrer noopener">Tickets to the Cowcaddens Evening Workshop</a>.</li></ul>



<p><em>&#8220;Each session will be facilitated by the (Y)our City Centre project team. We hope to map out with you issues and ideas you feel will help make the difference and improve Cowcaddens in the future.</em></p>



<p><em>Sign Up on Eventbrite and join in with these Workshops. If you do not have access to the internet contact the Freephone line number listed below to enable you to #ShareYourIdeas.</em></p>



<p><em>Further Workshops will be scheduled in early 2021 and we hope to arrange some [physical] events&#8230; when Covid restrictions allow.&#8221;</em></p>



<p>These events, and the forthcoming consultation under item 2.1, mean big changes could be  coming for the north of the city centre. They also tie in with the North Glasgow SDF –&nbsp;see item 1.5. </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow Harbour Ltd – Yorkhill Quay masterplan</h4>



<p>This was covered in <a href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455">Digest Issue 73</a>, Item 1.1. However, it arrived just before the Digest went out and we missed a few details. The consultation is by Glasgow Harbour/Peel L&amp;P (not the city council –&nbsp;apologies). </p>



<p>It&#8217;s about potentially building high-rises on the strip of land at the river between Riverside Museum and the new distillery. The intro video talks about a &#8220;long derelict site&#8221; without mentioning Peel (formerly Clydeport) have used it for storage for several years. It&#8217;s a pre-planning consultation as no planning application has gone in yet. There&#8217;s a <a rel="noreferrer noopener" target="_blank" href="https://www.urbanrealm.com/news/9080/Yorkhill_Quay_masterplan_to_fulfil_River_Clyde_blue_corridor_vision.html">summary of the possible proposal</a> (on Urban Realm), <a rel="noreferrer noopener" target="_blank" href="https://peellandp.co.uk/news/online-public-consultation-launched-for-over-1-000-new-homes-at-glasgow-waters/">article by Peel L&amp;P</a>, <a href="https://www.gobike.org/wp-content/uploads/2020/12/Yorkhill-Quay-boards.pdf" target="_blank" rel="noreferrer noopener">Yorkhill Quay &#8216;boards&#8217;</a> (PDF) and <s><a rel="noreferrer noopener" href="http://mcinally-associates.co.uk/yq/index.html#home" target="_blank">consultation website</a></s> [removed Dec 2020]. Deadline for &#8220;formal&#8221; comments is 4 December (but deadline to view plans/ask questions is 30 November –&nbsp;email: <a rel="noreferrer noopener" href="mailto:advice@mcinally-associates.co.uk" target="_blank">advice@mcinally-associates.co.uk</a>).</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council – Proposed Local Development Plan 2 (LDP2), <br>(closes 15 January 2021)</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="84" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=525%2C84&#038;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As covered in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342" target="_blank">Digest issue 72</a>, Item 1.8. You&#8217;ve to email EDC if you want to comment about local development issues, like the lack of Spaces for People projects or phase 2 of the <a rel="noreferrer noopener" href="https://www.gobike.org/campaigns/mini-campaigns/friends-of-bearsway" target="_blank">Bearsway</a>, for example. See the EDC website:&nbsp;<a rel="noreferrer noopener" href="http://www.eastdunbarton.gov.uk/LDP2" target="_blank">www.eastdunbarton.gov.uk/LDP2</a>. </p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow City Council – North Glasgow Strategic Development Framework</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=525%2C371&#038;ssl=1" alt="Glasgow North - principles of active travel map" class="wp-image-12646" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?w=1202&amp;ssl=1 1202w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>An active travel map from the Glasgow North SDF</figcaption></figure>



<p>This document is about a huge area north of the M8 from the length of Maryhill Rd across to Milton, Springburn and Royston. It&#8217;s looking decades ahead and has already been five years in the making. Brenda has written a detailed <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/GoBike-NGlasgowSDF-letter-171120.pdf" target="_blank">GoBike response to the North Glasgow SDF</a>. See the <a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">North Glasgow SDF consultation</a> on GCC&#8217;s website. The deadline has been extended to 29 January 2021.</p>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow City Council – Protected Junction Trial consultation</h4>



<p>This consultation is about the new protected junctions on Victoria Rd, at Calder St and Allison St, as part of the South City Way. It was covered in <a href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" target="_blank" rel="noreferrer noopener">Digest 73</a>, Item 1.5. If you want to show support for the new junctions, or just find out more, see <a rel="noreferrer noopener" href="https://glasgow.gov.uk/protectedjunctions" target="_blank">GCC&#8217;s Protected Junctions webpage</a> for further images, a video, a PDF document and a contact link. The junction trial will last two years but there&#8217;s no deadline mentioned for feedback. </p>



<h4 class="wp-block-heading" id="one-seven">1.7: OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</h4>



<p>This <a rel="noreferrer noopener" href="https://docs.google.com/forms/d/e/1FAIpQLSdRjYngGGZTaojHa1NjhbIUn3lcuSxpj68IdsHuzrxEerZbtQ/viewform" target="_blank">multiple choice survey</a> (as covered in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342">Digest issue 72</a>, Item 1.1) was originally looking for quick feedback but remains open. OnBikes and St Paul’s Youth Forum are working on a Places for Everyone project to improve active travel infrastructure in parts of North East Glasgow like Smithycroft, Riddrie and Blackhill. </p>



<h3 class="wp-block-heading"><strong>Section 2:</strong> <strong>Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow –&nbsp;Early Engagement Information: Creating people first infrastructure, a city centre context</h4>



<p>This is potentially a lot more important than the vague title would suggest. We received an email from Stantec (a multi-national design/engineering company) on behalf of the University of Strathclyde. They want to develop active travel routes through their campus and the &#8216;Learning Quarter&#8217; around Cathedral St and North Hanover St: </p>



<p><em>&#8220;The University of Strathclyde, in partnership with, City of Glasgow College and Glasgow City Council have secured Sustrans&#8217; Places for Everyone funding for the project &#8216;Creating People-First Infrastructure in a City Centre Campus&#8217;. Stantec are assisting the project team in this exciting endeavour.</em></p>



<p><em>The vision of this project is to create an attractive, safe and walkable &#8216;learning quarter&#8217; in the north-east of the city centre through the design of an innovative urban realm, which improves the physical environment and allows the general public, residents, students and staff to travel to, and move freely between the University of Strathclyde, City of Glasgow College, nearby Glasgow Caledonian University and the rest of the city centre.</em></p>



<p><em>The improvements that are being explored in the project area will provide significant value to the extended community. By aligning this project with other projects being delivered by Glasgow City Council, &#8216;Creating People-First Infrastructure in a City Centre Campus&#8217; will also benefit a range of other people who live, work and travel through the city centre.&nbsp;The&nbsp;<a target="_blank" href="https://www.glasgow.gov.uk/avenues" rel="noreferrer noopener">Avenues Programme</a>&nbsp;and&nbsp;<a target="_blank" href="https://www.glasgow.gov.uk/spacesforpeople" rel="noreferrer noopener">Spaces for People</a>&nbsp;are examples of Glasgow City Council’s ambitions to rebalancing streets in favour of people walking cycling or wheeling in the city centre.</em></p>



<p><em>The key routes to be enhanced in the learning quarter as part of this project have been identified through a feasibility and options appraisal process and are shown in the figure below.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=525%2C371&#038;ssl=1" alt="Map of proposed active travel routes to north-east of George Square" class="wp-image-12607" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?w=1141&amp;ssl=1 1141w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Route A –&nbsp;Glasgow Queen St. Station –&nbsp;Cathedral Square; <br>Route B –&nbsp;Buchanan Bus Station/Glasgow Caledonian University –&nbsp;Merchant City; <br>Route C –&nbsp;Sighthill Bridge –&nbsp;Cathedral St; <br>Route D –&nbsp;High St. Station –&nbsp;&#8216;Heart of the Campus&#8217; (Rottenrow); <br>Other Routes in Study (Minor Upgrades); <br>Avenues Programme and Intervention (delivered by other projects).</figcaption></figure>



<p><em>&#8220;In the next few weeks we will be launching a public consultation website to present and receive feedback on proposals developed for the learning quarter so far. This site will be updated as the project progresses, proving an important resource. We hope that you will be able to contribute to this consultation to help shape the project for your local community by viewing proposals, leaving feedback and sharing the consultation website with your networks.</em></p>



<p><em>For any further information in the meantime please contact the project team at&nbsp;<a href="mailto:PfEGlasgow@stantec.com" target="_blank" rel="noreferrer noopener">PfEGlasgow@stantec.com</a></em></p>



<p><em>Kind regards, <br>The Project Team&#8221;</em></p>



<p>This may be of interest to current and former students of the universities/colleges in this area. It sounds quite wide-ranging but seems to emphasise walking rather than cycling. A lot of change is due in the next few years, including Strathclyde Uni demolishing the current &#8216;Strathy Union&#8217; on John St as part of their ongoing campus redevelopment (see their <a rel="noreferrer noopener" href="https://www.strath.ac.uk/whystrathclyde/campusupdate/" target="_blank">Campus Update</a> for more details). </p>



<p>This consultation is also relevant to the &#8216;(Y)our Learning Quarter&#8217; district consultation due soon. Nearby streets are earmarked as &#8216;Avenues&#8217; and the <a rel="noreferrer noopener" href="https://reglasgow.com/work-to-start-on-additional-people-friendly-avenues-on-edge-of-city-centre-in-2023/" target="_blank">&#8216;Avenues Plus&#8217; project</a> (due to be built between 2023–25). So, there&#8217;s a lot of potential to transform the area north-east of George Square. Once Stantec update us about the website, we&#8217;ll pass on the link.</p>



<h3 class="wp-block-heading"><strong>Section 3: Consultations Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council – Maxwell Park area, Traffic Calming Scheme</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="229" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=525%2C229&#038;ssl=1" alt="map of the Maxwell Park area" class="wp-image-11993" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=600%2C262&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>We have a few more responses from the city council about traffic calming. Firstly, this one for the Maxwell Park area was first covered in <a href="https://www.gobike.org/consultation-digest-issue-68-01-september-2020-humps-all-the-way-in-glasgow-and-in-north-lanarkshire-its-roads-roads-and-more-roads-11968">Digest 68</a>, Item 1.8. I wonder if GCC have changed their mind about the speed cushions?</p>



<p>&#8220;<em>Further to my preliminary email of 25<sup>th</sup>&nbsp;August 2020, I can confirm that it is my intention to proceed with the introduction of the above named Traffic Calming Scheme.</em></p>



<p><em>I can confirm that there has been no changes to the original proposed scheme which will comprise of:</em></p>



<ul class="wp-block-list"><li><em>5 sets of 3,&nbsp;2m wide 75mm high, speed cushions on Dolphin Road,</em></li><li><em>6 sets of 3, 2m wide 75mm high, speed cushions on Fotheringay Road,</em></li><li><em>11 sets of 3, 2m wide 75mm&nbsp;high, speed cushions on Springkell Avenue</em></li><li><em>The installation of 44 bollards</em></li></ul>



<p><em>Roads affected by the proposed Scheme:</em></p>



<ul class="wp-block-list"><li><em><strong>Dolphin Road</strong></em></li><li><em><strong>Fotheringay Road</strong></em></li><li><em><strong>Springkell Avenue</strong></em></li></ul>



<p><em>I enclose a plan of the scheme.</em></p>



<p><em>Should you require any further information or clarification, please e-mail&nbsp;<a href="mailto:LESTraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">LESTraffic@glasgow.gov.uk</a>.&#8221;</em></p>



<p>Nope, nothing has changed despite GoBike&#8217;s letter of objection. The previous plans were in Digest 68, as above if you want to see them. </p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Council – Ryehill Road, Traffic Calming Scheme</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="303" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=525%2C303&#038;ssl=1" alt="map of the area around Ryehill Road" class="wp-image-12074" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=600%2C346&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=300%2C173&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?w=885&amp;ssl=1 885w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s another one from the following <a href="https://www.gobike.org/consultation-digest-issue-69-15-september-2020-what-price-public-opinion-12044">Digest 69</a>, Item 1.9. Maybe this response will be the one where GCC have a &#8216;road to Damascus&#8217;-style revelation and change their minds?</p>



<p><em>&#8220;Further to my preliminary email of 10<sup>th</sup>&nbsp;September 2020, I can confirm that it is my intention to proceed with the introduction of the above named Traffic Calming Scheme.</em></p>



<p><em>I can confirm that there has been no changes to the original proposed scheme which will comprise of:</em></p>



<ul class="wp-block-list"><li><em>The installation of 12 speed cushions</em></li><li><em>The supply and installation of 8 bollards</em></li></ul>



<p><em>I enclose a plan of the scheme.</em></p>



<p><em>Should you require any further information or clarification, please e-mail&nbsp;<a href="mailto:LESTraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">LESTraffic@glasgow.gov.uk</a>.&#8221;</em></p>



<p>Nope, no changes there either. Again, see Digest 69 to pore over the unchanged plans. </p>



<h4 class="wp-block-heading" id="three-three">3.3 East Dunbartonshire Council –&nbsp;LDP2 November Newsletter</h4>



<p>On the subject of councils not changing their minds about things, here are EDC again with a nice <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/East-Dunbarton-LDP-Newsletter-61-November-2020.docx.pdf" target="_blank">LDP2 newsletter, November edition</a> (PDF).&nbsp;Previous issues on EDC&#8217;s <a rel="noreferrer noopener" href="https://www.eastdunbarton.gov.uk/residents/planning-and-building-standards/planning-policy/newsletter" target="_blank">LDP2 Newsletters</a> webpage in case you want some light reading for the winter nights.</p>



<h4 class="wp-block-heading" id="three-four">3.4: Urban Roots –&nbsp;Malls Mire/Toryglen Greenspace &amp; Active Travel Project</h4>



<p>GoBike received an email from Dr Gemma Jennings at Urban Roots about an ongoing project: </p>



<p><em>&#8220;Dear All, <br>I am excited to share with you the latest news from the the North Toryglen Greenspace &amp; Active Travel Project, which following our community consultation has been rebranded simply as &#8216;Malls Mire&#8217;. Work begins on site this week and will run until summer 2021 &#8211; please find attached the first Malls Mire newsletter from Clyde Gateway for details. I have also attached details of path closures and diversions that will be in place for the first phase of works.&nbsp;<br>We will share ongoing project updates on social media via our Malls Mire facebook and twitter pages &#8211; both @MallsMire.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="293" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=525%2C293&#038;ssl=1" alt="Malls Mire map" class="wp-image-12657" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=600%2C335&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=300%2C167&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?w=914&amp;ssl=1 914w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Malls Mire site</figcaption></figure>



<p>Malls Mire is the name of the greenspace between Rutherglen and Toryglen. While it&#8217;s possible to trudge your bike over the hill next to the woods, upgrading the paths will make a big difference to the area. As mentioned, Urban Roots sent us drawings of closures and diversions – <a href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-Site-Sketch-017-Rev001-201120.pdf" target="_blank" rel="noreferrer noopener">works on the west of Malls Mire</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-site-sketch-018-161120.pdf" target="_blank" rel="noreferrer noopener">works on the east of Malls Mire</a>. There&#8217;s also a short <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-Newsletter-Nov2020-reduced.pdf" target="_blank">newsletter about the Malls Mire project</a>.</p>



<p></p>



<p>Hope you like the changes in this Digest. New editor, new improved ideas, says the previous editor!</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12604</post-id>	</item>
	</channel>
</rss>
