<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>townhead &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/townhead/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Thu, 20 Apr 2023 01:11:18 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 128, 02 February 2023</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-128-02-february-2023-19161</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Thu, 02 Feb 2023 23:30:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[bike hire]]></category>
		<category><![CDATA[Bothwell]]></category>
		<category><![CDATA[Cambuslang]]></category>
		<category><![CDATA[Clydesdale]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[DRF]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[Merchant City]]></category>
		<category><![CDATA[NCN74]]></category>
		<category><![CDATA[Rutherglen]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[Uddingston]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=19161</guid>

					<description><![CDATA[In the shadow of the bridge… February sees an increase in number and scale of consultations. This (delayed) Digest includes four District Regeneration Frameworks and four projects from South Lanarkshire. Tragically, January ended with the death of Emma Burke Newman, after being hit by a truck driver while cycling near the Broomielaw/George V bridge junction &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-128-02-february-2023-19161" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 128, 02 February 2023"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">In the shadow of the bridge…</h2>



<p>February sees an increase in number and scale of consultations. This (delayed) Digest  includes four District Regeneration Frameworks and four projects from South Lanarkshire.</p>



<p>Tragically, January ended with the death of Emma Burke Newman, after being hit by a truck driver while cycling near the Broomielaw/George V bridge junction in Glasgow. Her local <a href="https://www.glasgowtimes.co.uk/news/23292917.cyclist-died-glasgow-student-art-school/" target="_blank" rel="noreferrer noopener">councillor Jon Molyneux paid tribute to Emma at a meeting to discuss a 20mph limit</a> for the city. GoBike would like to offer sincere condolences to Emma&#8217;s family and friends. </p>



<span id="more-19161"></span>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=525%2C296&#038;ssl=1" alt="View down Broomielaw towards the casino and bridges in May 2020" class="wp-image-19165" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?resize=1536%2C864&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Broomielaw-casino-May2020_4248_1920px.jpg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">View down Broomielaw to casino/bridge, showing original Spaces for People lane (May 2020)</figcaption></figure>



<p>The road past the casino is part of the Spaces for People 1-way route along the Clyde. The council mentioned <a href="https://www.gobike.org/consultation-digest-issue-60-12-may-2020-the-lockdown-goes-on-but-will-we-learn-from-it-11199" target="_blank" rel="noreferrer noopener">safety at the George V bridge junction</a> in an online meeting with GoBike in 2020. The <a href="https://www.glasgow.gov.uk/article/25902/New-Space-For-Distancing-lane-ready-for-use" target="_blank" rel="noreferrer noopener">original May 2020 route used cones</a> but had a gap for the Central Station bridge works. The <a href="https://www.glasgow.gov.uk/article/26310/Clyde-St-Pop-Up-Cycle-Lane-Sees-Surge-in-Cycling" target="_blank" rel="noreferrer noopener">cones were replaced with ‘soft segregation’ later in 2020</a> but some sections of the <a href="https://goo.gl/maps/qe1Dbkjt55BL9cbw8" target="_blank" rel="noreferrer noopener">Zebras/‘orcas’ near the bridge have since been removed</a>. Restrictions on the route were made permanent by a <a href="https://www.gobike.org/consultation-digest-local-issue-118-1-september-2022-18246#three-two" target="_blank" rel="noreferrer noopener">Traffic Regulation Order for City Centre –&nbsp;Riverside/Merchant City in Sept 2022</a>. However, no further segregation has been added near the casino (unlike the <a href="https://goo.gl/maps/77UfhsP6gvfxjNU56" target="_blank" rel="noreferrer noopener">traffic islands</a> and ongoing work at the Jamaica St junction). Tragic events like this underline how important it is to have continuous protected routes, especially at junctions. </p>



<h3 class="wp-block-heading">Forthcoming consultations</h3>



<h4 class="wp-block-heading">Glasgow Liveable Neighbourhoods programme</h4>



<p>There&#8217;s a new dedicated website for the next two LN projects:&nbsp;Yoker to Whiteinch and Royston to Hogganfield. An early ‘pop-up’ event in Whiteinch has already passed but there are due to be more in the near future. See: <a href="https://www.my-gln.scot/" target="_blank" rel="noreferrer noopener">www.my-gln.scot</a>.</p>



<h4 class="wp-block-heading">1: Current Consultations</h4>



<ol class="wp-block-list">
<li><a href="#one-one">Cambuslang and Rutherglen bike share survey</a></li>



<li><a href="#one-two">Leadhills Village Active Travel project</a></li>



<li><a href="#one-three">Clydesdale Active Travel Studies</a></li>



<li><a href="#one-four">North East Districts: Townhead, Cowcaddens, Learning Quarter and Merchant City DRF</a></li>



<li><a href="#one-five">NCN74 Uddingston to Bothwell realignment</a></li>
</ol>



<h4 class="wp-block-heading">2: Consultation Feedback</h4>



<ol class="wp-block-list">
<li><a href="#two-one">Glasgow Uni campus redevelopment – December 2022 newsletter</a></li>



<li><a href="#two-two">East Dunbartonshire Local Development Plan Newsletter 70</a></li>



<li><a href="#two-three">Update on Progressing Beyond the Liveable Neighbourhood Longlist</a></li>
</ol>



<h4 class="wp-block-heading">3: Proposed Traffic Calming/Traffic Regulation Orders</h4>



<ol class="wp-block-list">
<li><a href="#three-one">East Dunbartonshire TROs</a></li>



<li><a href="#three-two">Glasgow City TROs</a></li>



<li><a href="#three-three">North Lanarkshire TROs</a></li>
</ol>



<h3 class="wp-block-heading"><strong>1: Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Cambuslang and Rutherglen bike share survey</h4>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:</strong>&nbsp;Survey about feasibility of a bike share scheme for Cambuslang and Rutherglen. Shawfield and Cuningar Woodland Park on the northern fringes of Rutherglen are just across the Clyde from the Glasgow City area. So, it’s an obvious candidate for extending Glasgow’s current OVO/Nextbike scheme. This has been&nbsp;<a href="https://www.glasgowlive.co.uk/news/south-lanarkshire-bike-share-scheme-19959665" target="_blank" rel="noreferrer noopener">talked about by South Lanarkshire Council</a>&nbsp;before and there has already been some consultation on it. In the meantime, new Nextbike stations in the East End and Southside mean Rutherglen already looks like a gap in the&nbsp;<a href="https://www.schemestats.bike/schemes/nextbike-glasgow/liveMap" target="_blank" rel="noreferrer noopener">existing network</a>. Hopefully we’re closer to a scheme actually happening this time. The survey is aimed at those in the Cam/glen area but may be relevant to people in the Southside and East End of the city.<br><strong>Website links:&nbsp;</strong><a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DwvXh_xekUmgZeIFvD2zCB8HDqrd58xFiY6b3P9nhNRUMDZCTEFKM1pKVkFWWlBBV0NNUTlMUjU4Ry4u" target="_blank" rel="noreferrer noopener">Cambuslang/Rutherglen bike share survey</a>.<br><strong>Deadline:&nbsp;10 February 2023.&nbsp;</strong></p>



<h4 class="wp-block-heading" id="one-two">1.2: Leadhills Village Active Travel project</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="332" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=525%2C332&#038;ssl=1" alt="Leadhills Active Travel plans on map" class="wp-image-19182" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=600%2C379&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?resize=300%2C189&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/063769_WEB_Leadhills_Active_Travel_maps_resize_2.jpeg?w=960&amp;ssl=1 960w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">Leadhills Active Travel plans for 20mph limit</figcaption></figure>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:&nbsp;</strong>Leadhills is a small rural village near South Lanarkshire&#8217;s border with Dumfries &amp; Galloway. The project plans include 20mph speed limits and slight changes to junctions. Also, lots of coloured surfacing, including some being used instead of proper pavements. Village streets are obviously narrower than towns and cities but it seems like a missed opportunity. The Make Your Way project already has <a href="http://www.ironsidefarrar.com/keylinks/Make_Your_Way_Key_Links.pdf" target="_blank" rel="noreferrer noopener">plans for a shared path to Wanlockhead</a> in D&amp;G. <br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshire.gov.uk/info/200147/transport_and_streets/2115/active_travel_projects/2" target="_blank" rel="noreferrer noopener">Leadhills AT survey</a>.<br><strong>Deadline:&nbsp;<strong>12 February&nbsp;2023</strong>.</strong></p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;Clydesdale Active Travel Studies</h4>


<div class="wp-block-image">
<figure class="alignright size-large is-resized"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?ssl=1"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=258%2C356&#038;ssl=1" alt="Map of Clydesdale split into north-west, north-east and south" class="wp-image-19181" width="258" height="356" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=436%2C600&amp;ssl=1 436w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?resize=218%2C300&amp;ssl=1 218w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Clydesdale-AT-areas-map.png?w=594&amp;ssl=1 594w" sizes="(max-width: 258px) 100vw, 258px" /></a><figcaption class="wp-element-caption">Map of Clydesdale areas (click to enlarge)</figcaption></figure>
</div>


<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:&nbsp;</strong>Leadhills is also covered by this wider consultation –&nbsp;it&#8217;s in the southern part of Clydesdale. There are also north-west and north-east areas to divide up this large rural area. Like previous studies in South Lanarkshire&#8217;s towns, there&#8217;s a consultation map to comment on. Some areas have new active travel infrastructure, including Carstairs, with other routes like Leadhills–Wanlockhead to follow. This is a chance to look at gaps like Make Your Way&#8217;s <a href="https://www.gobike.org/consultation-digest-local-issue-102-23-december-2021-16327#two-six" target="_blank" rel="noreferrer noopener">NCN74–Douglas path, which missed out on funding</a>. The map and surveys will inform reports and active travel network maps for each area.<br><strong>Website links:</strong> <a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.placecheck.info%2Fapp%2Fmaps%2Fclydesdale-active-travel&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=s%2Bj5qyI867LVuFjU68vNs1VV71dBS%2BimVDWqan1hXPs%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Clydesdale Placecheck map (all areas)</a>, <a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167524679198&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=vUC0Mj3OjArd2LrLUVNj8hiVlCVgmnIydGVBCc2L47s%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Northwest Clydesdale Active Travel Feasibility Study</a>,&nbsp;<a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167525020181&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=Nik7u7gLEDATGor%2BvOMqKhVQnAvDI22Py9970FJecK8%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Northeast Clydesdale Active Travel Feasibility Study</a>,&nbsp;<a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwh1.snapsurveys.com%2Fs.asp%3Fk%3D167525032368&amp;data=05%7C01%7Cderek.york%40lanarkshire.scot.nhs.uk%7Cdd249399063f4fe2683d08db0526d9ee%7C10efe0bda0304bca809cb5e6745e499a%7C0%7C0%7C638109436665413885%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=8ZNwxx08dAlKFNX3POJB4j2%2F0BlnRn5125Frpgf2x9Q%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">South Clydesdale Active Travel Feasibility Study</a>. <br><strong>Deadline:&nbsp;<strong>24 February&nbsp;2023</strong>.</strong></p>



<h4 class="wp-block-heading" id="one-four">1.4: North East Districts: Townhead, Cowcaddens, Learning Quarter and Merchant City DRF</h4>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?ssl=1"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="401" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=525%2C401&#038;ssl=1" alt="North-East DRFs themes map" class="wp-image-19186" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=600%2C458&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?resize=300%2C229&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?w=1443&amp;ssl=1 1443w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/NE-DRFs_themes-map.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption class="wp-element-caption">North-East DRFs – map of themes (click to enlarge)</figcaption></figure>



<p><strong>Council:&nbsp;</strong>Glasgow City.<br><strong>Subject:&nbsp;</strong>District Regeneration Frameworks for four areas in the north-east of the city centre. These were developed by teams of European and local consultants after previous <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-two">consultation in late 2020</a>. Each document has a comprehensive plan for its area (50+ pages). These include some fairly radical changes, especially around the M8. Also, there is a refreshing focus on opening up active travel routes through current barriers (improving permeability). However, these may be challenging to deliver. So, a show of support in the consultation should help make the case stronger.<br><strong>Website links:</strong> <a href="https://www.smartsurvey.co.uk/s/NE_DRF_2023/" target="_blank" rel="noreferrer noopener">North-East Districts survey</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58888&amp;p=0" target="_blank" rel="noreferrer noopener">North-East Districts Combined Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58891&amp;p=0" target="_blank" rel="noreferrer noopener">Cowcaddens Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58889&amp;p=0" target="_blank" rel="noreferrer noopener">‘Learning Quarter’ Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58890&amp;p=0" target="_blank" rel="noreferrer noopener">Merchant City Regeneration Handbook</a>, <a href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=58892&amp;p=0" target="_blank" rel="noreferrer noopener">Townhead Regeneration Handbook</a>.<br><strong>Deadline:&nbsp;3 March 2023.</strong></p>



<h4 class="wp-block-heading" id="one-five">1.5:&nbsp;NCN74 Uddingston to Bothwell realignment</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=525%2C296&#038;ssl=1" alt="Langside Rd looking towards Laighlands Rd at edge of Bothwell" class="wp-image-19183" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2023/02/Bothwell_Langside-Laighlands_3517.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption class="wp-element-caption">The foot of Langside Rd, Bothwell –&nbsp;hopefully, the road surface will be improved!</figcaption></figure>



<p><strong>Council:&nbsp;</strong>South Lanarkshire.<br><strong>Subject:</strong>&nbsp;A long-awaited consultation about plans to divert a section of NCN74 at Strathclyde Park. The current route loops up the (steep) Furlongs, onto Bothwell Rd, up alongside the East Kilbride Expressway to Glasgow Rd, down Station Rd in Blantyre to the pedestrian bridge and up to Station Rd in Bothwell. The proposals would change this to a much more direct route from the Raith Interchange, up the steep, pot-holed Langside Rd and across the busy Hamilton Rd on the way to Station Rd. There&#8217;s a potential alternative to SLC&#8217;s plans (slightly longer but less steep/busy) by turning right onto Laighlands Rd/Bothwellpark Rd then across to Olifard Ave/Appledore Cres. Also, there&#8217;s the question of conflict with pedestrians past Strathclyde Park loch. Elsewhere, the survey has two options to transform the approach to Uddingston train station and some other welcome junction improvements.<br><strong>Website links:</strong>&nbsp;<a href="https://www.southlanarkshire.gov.uk/info/200147/transport_and_streets/2115/active_travel_projects/4" target="_blank" rel="noreferrer noopener">Uddingston to Bothwell survey</a>.<br><strong>Deadline:&nbsp;6 March 2023.</strong></p>



<h3 class="wp-block-heading"><strong>2: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow Uni campus redevelopment – December 2022 newsletter</h4>



<p><strong>Organisation:&nbsp;</strong>Glasgow Uni.<br><strong>Subject:</strong>&nbsp;Ongoing construction work at the main campus.&nbsp;The Institute of Health and Wellbeing building is now complete. Apparently it was done to the <a href="https://files.bregroup.com/breeam/technicalmanuals/ndrefurb2014manual/content/07_transport/tra03.htm" target="_blank" rel="noreferrer noopener">BREEAM 2014 certification mark</a>, which should mean there&#8217;s plenty of bike parking. Work continues on the Adam Smith Business School. Also, there&#8217;s a survey for residents who live near the site.<br><strong>Website links:</strong>&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/02/January-2023-Newsletter.pdf" target="_blank" rel="noreferrer noopener">Campus Redevelopment newsletter –&nbsp;January 2023 (PDF)</a>.</p>



<h4 class="wp-block-heading" id="two-two">2.2:&nbsp;East Dunbartonshire Local Development Plan Newsletter 70</h4>



<p><strong>Council:&nbsp;</strong>East Dunbartonshire.<br><strong>Subject:&nbsp;</strong>Updates on the Circular Economy Strategy consultation, LDP2 Action Programme, Planning Guidance, Active Travel Strategy and National Planning Framework 4. NPF4 applies from the middle of February. It includes a few interesting developments like an ‘infrastructure first’ approach, instead of the current lag to (maybe) get bike paths added to an estate using a Section 75 order. <br><strong>Website links:</strong>&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2023/02/LDP-Newsletter-70-January-2023.pdf" target="_blank" rel="noreferrer noopener">LDP Newsletter 70 &#8211; January 2023 (PDF)</a>, <a href="https://www.eastdunbarton.gov.uk/draft-circular-economy-strategy-consultation-0" target="_blank" rel="noreferrer noopener">Draft Circular Economy Strategy Consultation</a> (ends 3 February 2023).</p>



<h4 class="wp-block-heading" id="two-three">2.3: Update on Progressing Beyond the Liveable Neighbourhood Longlist</h4>



<p><strong>Organisation:&nbsp;</strong>Dennistoun Community Council.<br><strong>Subject:</strong> A response from Glasgow City Council to a community council in  the East End. DCC say it&#8217;s: <em>“</em>…<em>in response to&nbsp;<a href="http://dennistouncc.org.uk/2022/11/07/progressing-beyond-the-liveable-neighbourhood-longlist/">queries</a>&nbsp;regarding the Liveable Neighbourhoods project, the Inner East Strategic Development Framework the Neighbourhood Infrastructure Improvement Fund, and Citizens’ Panels participatory funding arrangements<em>”</em></em>. The questions went to the Director of GCC Neighbourhoods, Regeneration and Sustainability.<br><strong>Website links:</strong>&nbsp;<a href="http://dennistouncc.org.uk/2023/01/29/update-on-progressing-beyond-the-liveable-neighbourhood-longlist/#more-11428" target="_blank" rel="noreferrer noopener">Dennistoun Community Council post</a>.</p>



<h3 class="wp-block-heading"><strong>3: Proposed Traffic Regulation Orders</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: East Dunbartonshire TROs</h4>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="562" height="90" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=474%2C76&amp;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p><strong>Areas:&nbsp;</strong>Bishopbriggs and Milton of Campsie.<br><strong>Subject:</strong>&nbsp;Orders about parking restrictions and speed limits.<br><strong>Website links:</strong>&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/roads-pavements-and-parking/traffic-regulation-orders" target="_blank" rel="noreferrer noopener">East Dunbartonshire TROs (now on their own page!)</a>.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Traffic Calming/TROs</h4>


<div class="wp-block-image">
<figure class="alignright is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/Glasgow_City_Council_logo.svg_.png?resize=123%2C209&amp;ssl=1" alt="Glasgow City Council logo" class="wp-image-18421" width="96" height="163"/></figure>
</div>


<p><strong>Areas:&nbsp;</strong>City-wide.<br><strong>Subject:</strong>&nbsp;<em>TROs</em>: Laggan Rd filter is out for consultation until 24 February 2023.<br>Orders have been made for Carmunnock Rd and Carmunnock Rd/Letherby Rd (on 20 January – coming into effect on 1 April 2023). Also, for East City Way phases 6 and 7 (on 25 January – coming into effect 19 March 2023). Construction has already  started on London Rd.<br><em>Traffic calming:</em> Three current schemes for Greenfield Avenue/Inveresk St, Waulkglen Road and Boghall Road.<br><strong>Website links:</strong>&nbsp;<a href="https://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">Glasgow City Proposed TROs</a>,&nbsp;<a href="https://www.glasgow.gov.uk/index.aspx?articleid=18878" target="_blank" rel="noreferrer noopener">Glasgow City Proposed Traffic Calming Schemes</a>.</p>



<h4 class="wp-block-heading" id="three-three">3.3:&nbsp;North Lanarkshire TROs</h4>


<div class="wp-block-image">
<figure class="alignright is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=231%2C154&amp;ssl=1" alt="North Lanarkshire Council logo" class="wp-image-18420" width="222" height="148" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?w=600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2022/09/NLC-logo-2018-600px.jpg?resize=300%2C200&amp;ssl=1 300w" sizes="auto, (max-width: 222px) 100vw, 222px" /></figure>
</div>


<p><strong>Areas:&nbsp;</strong>Hareshaw village (between Newhouse and Newmains).<br><strong>Subject:</strong>&nbsp;Orders to add a roundabout, traffic calming, 20mph zone and a pavement at the bridge on Greenhill Road, Hareshaw.&nbsp;<em>Deadline: 15 February 2023.<br></em><strong>Website links:</strong>&nbsp;<a href="https://www.northlanarkshire.gov.uk/your-community/working-communities/consultations/live-consultations" target="_blank" rel="noreferrer noopener">North Lanarkshire Live Consultations</a>.</p>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">19161</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 92, 3 August 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 03 Aug 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Auldhouse]]></category>
		<category><![CDATA[Bellshill]]></category>
		<category><![CDATA[Bishopbriggs]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[City Deal]]></category>
		<category><![CDATA[Claypits]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[Garscube Rd]]></category>
		<category><![CDATA[GHA]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[Kirkintilloch]]></category>
		<category><![CDATA[LEZ]]></category>
		<category><![CDATA[motherwell]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Sauchiehall St]]></category>
		<category><![CDATA[Sighthill]]></category>
		<category><![CDATA[south city way]]></category>
		<category><![CDATA[St Paul&#039;s Youth Forum]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=14734</guid>

					<description><![CDATA[Consultations dropping in from around Glasgow. This Digest comes after Great Britain &#38; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-92-3-august-2021-14734" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 92, 3 August 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Consultations dropping in from around Glasgow.</h2>



<p>This Digest comes after Great Britain &amp; Northern Ireland won a handful of cycling medals at Toyko 2020. One was for mountain biking while the rest were in BMX (where Sir Chris Hoy started). Both are covered by the Velo Park proposal from North Lanarkshire Council (but NLC have dropped the cycleway to Motherwell train station). There are also several consultations for East Dunbartonshire and Glasgow plus one for East Renfrewshire.</p>



<p>The ban on pavement parking was made law in the Scottish Parliament in 2019. Last year, GoBike wondered when it would come into force (<a href="https://www.gobike.org/consultation-digest-issue-65-21-july-2020-whats-happened-to-pavement-parking-proposals-approved-but-not-enacted-plus-a-request-to-contribute-to-the-streets-for-all-glasgow-commonplace-map-and-m-11719" target="_blank" rel="noreferrer noopener">Digest 65, Item 3.4</a>) – it seems it&#8217;s due to be 2023. <a href="https://e-activist.com/page/87240/action/1?utm_medium=email&amp;utm_source=engagingnetworks&amp;utm_campaign=pp&amp;utm_content=Pavement+Parking+Scotland+ban+MSP+prev+PP+actn&amp;ea.url.id=5427510&amp;forwarded=true" target="_blank" rel="noreferrer noopener">Living Streets want you to write to your MSPs about bringing it forward</a>. </p>



<p>People of all abilities can cycle at facilities run by <a href="https://twitter.com/freewheel_north/status/1417846827991195648?s=20" target="_blank" rel="noreferrer noopener">Freewheel North – who are trying to fundraise just now</a>, in case you want to contribute. </p>



<span id="more-14734"></span>



<h3 class="wp-block-heading">Infrastructure Update</h3>



<ul class="wp-block-list"><li><a href="https://twitter.com/EyeintheskyGla/status/1421811255279603713?s=20" target="_blank" rel="noreferrer noopener">Sighthill&#8217;s new pedestrian/cycle bridge has been installed over the M8</a><span style="font-size: 1rem;"> (but won&#8217;t be open for a while yet).</span> <a href="https://twitter.com/UrbanistTOC/status/1422272043060547586?s=20" target="_blank" rel="noreferrer noopener">GoBike convenor, Thomas, spoke about it on STV!</a></li><li>At the canal, the Claypits nature reserve officially opened at the weekend, including the <a href="https://twitter.com/KineticsGlasgow/status/1421391556129574916?s=20" target="_blank" rel="noreferrer noopener">zigzag ramp from Garscube Rd</a>.</li><li>The <a href="https://twitter.com/Invest_Glasgow/status/1420749763310350347?s=20" target="_blank" rel="noreferrer noopener">Stockingfield Bridge at the canal is being assembled</a> but won&#8217;t be up and running until next year. </li><li><a href="https://twitter.com/reglasgow_web/status/1417460267936534531?s=20" target="_blank" rel="noreferrer noopener">North Canal Bank St – work is getting there</a> but it missed its July re-opening date.</li><li>At Kelvin Hall, <a href="https://twitter.com/YorkhillT/status/1419778370989084673?s=20" target="_blank" rel="noreferrer noopener">Argyle St/Bunhouse Rd has bike lights installed, but not yet operational</a>.</li><li>Thomas visited <a href="https://twitter.com/UrbanistTOC/status/1420724476996734980" target="_blank" rel="noreferrer noopener">Corkerhill Rd&#8217;s soft segregated lanes</a>. </li><li>He also let us know <a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener"></a><a href="https://twitter.com/UrbanistTOC/status/1422497685962170371?s=20" target="_blank" rel="noreferrer noopener">South City Way&#8217;s new cycle counters are up-and-running</a>.</li><li><span style="font-size: 1rem;">Outdoor seating in the sun was popular along </span><a style="font-size: 1rem;" href="https://twitter.com/LinesDashed/status/1419022365971959809?s=20" target="_blank" rel="noreferrer noopener">Sauchiehall St&#8217;s permanent lanes and the pop-ups at Candleriggs/George Square</a><span style="font-size: 1rem;"> and </span><a style="font-size: 1rem;" href="https://www.gobike.org/wp-content/uploads/2021/07/Cambridge-St-seating_1233.jpeg" target="_blank" rel="noreferrer noopener">Cambridge St</a><span style="font-size: 1rem;">.</span> </li><li>In East Kilbride, University Hospital <a href="https://eastkilbride.cyclestreets.net/location/172687/" target="_blank" rel="noreferrer noopener">Hairmyres has a new path into south of site</a> (from Strathtay Ave).</li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-94ad3f9e-5c10-4412-bc03-d3df722422ba"><li><a href="#one-one">Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</a> (ends 3 Aug – <strong>today!</strong>)</li><li><a href="#one-two">St. Paul&#8217;s Youth Forum – Flourishing Molendinar second consultation</a> (ends 6 Aug)</li><li><a href="#one-three">Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</a> (ends 13 Aug)</li><li><a href="#one-four">East Dunbartonshire Council – Bishopbriggs Town Centre Regeneration</a> (ends 15 Aug)</li><li><strong><a href="#one-five">East Dunbartonshire Council – Schools waiting and loading orders</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-six">East Dunbartonshire Council – Lenzie Rd, Kirkintilloch waiting and loading order</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-seven" target="_blank" rel="noreferrer noopener">East Dunbartonshire Council – Civic Way/Lenzie Rd, traffic management</a> (ends 16 Aug)</strong></li><li><strong><a href="#one-eight">Glasgow City Council – Auldhouse Area Traffic Management Order</a> (ends 20 Aug)</strong></li><li><strong><a href="#one-nine">North Lanarkshire Council – Bellshill Entrance/Velo Park Project</a> (until end of Aug)</strong></li><li><a href="#one-ten">East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</a></li><li><a href="#one-eleven">Glasgow City Council – Low Emission Zone consultation</a> (ends 2 Sep)</li><li><a href="#one-twelve">Glasgow City Council – Inner East Strategic Development Framework</a> (ends 3 Sep)</li><li><a href="#one-thirteen">East Dunbartonshire Council – Active Travel Discussion</a> (ends 28 Sep)</li><li><a href="#one-fourteen">Glasgow Urban Sports – GUSM74 Urban Sports Sculpture Park</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#three-one">North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</a></strong></li></ol>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</h4>



<p>Glasgow Housing Association&#8217;s parking areas are in Townhead, east of Buchanan Bus Station, behind the high flats.&nbsp;Resident’s parking spaces around Kennedy St and St Mungo Avenue have been used as free parking by shoppers/commuters. This order introduces parking restrictions (as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-one" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.1</a>). </p>



<p>GoBike agreed with these measures in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-Parking-Stage-One-response-010421.pdf" target="_blank" rel="noreferrer noopener">Stage 1 GHA response</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-City-Centre-GHA-Townhead-parking-response-280721.pdf" target="_blank" rel="noreferrer noopener">latest GHA response</a>. </p>



<p>There are the usual documents for a TRO:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/002-GCC-City-Centre-Traffic-Management-Order-2010-Variation-No.29....pdf" target="_blank" rel="noreferrer noopener">plan of GHA parking areas</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">GHA areas draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-11.01-Publication-of-Proposals-Press-Notice-Draft-Variation-29.pdf" target="_blank" rel="noreferrer noopener">GHA areas press notice</a>&nbsp;and the usual&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a>. Respond by e-mail to&nbsp;<a href="mailto:lestraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">lestraffic@glasgow.gov.uk</a>&nbsp; by<strong>&nbsp;3 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: St. Paul’s Youth Forum –&nbsp;Flourishing Molendinar second consultation</h4>



<p>The Flourishing Molendinar project covers an area around Blackhill in the north east of Glasgow. As seen in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-two" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.2</a>, the next stage of the&nbsp;<a href="https://twitter.com/_OnBikes/status/1413513153124737026?s=20" target="_blank" rel="noreferrer noopener">Flourishing Molendinar project has produced new plans</a> for consultation. Proposals include a pedestrianised section on Langdale St, segregated cycleways on Cumbernauld Rd and Royston Rd.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="372" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=525%2C372&#038;ssl=1" alt="Proposal for Royston Rd at Langdale St/Robroyston Rd" class="wp-image-14745" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=600%2C425&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Royston-Rd_E53OsxdWUAA0G4m.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plans for a permanent cycletrack along Royston Rd at junction with Langdale St and Robroyston Rd</figcaption></figure>



<p>Permanent segregated lanes on Royston Rd would continue east of Provanmill Rd, where the current pop-up lanes peter out, past the Langdale St/Robroyston Rd junction. This wouldn&#8217;t just connect Blackhill towards the city centre, it&#8217;s also just across the M80 footbridge from Barmulloch. The junction is also a route to a school,&nbsp;<a href="https://twitter.com/_OnBikes/status/1401112056217030661?s=20" target="_blank" rel="noreferrer noopener">St Philomena&#8217;s RC Primary School, where pupils have been doing their own plans in Minecraft</a> software. </p>



<p>For more on the above, see the&nbsp;<a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DQSIkWdsW0yxEjajBLZtrQAAAAAAAAAAAAMAADcjbltUNUg0SldZR0JBR1VPTEhOVDJLNTdCN0QwUC4u" target="_blank" rel="noreferrer noopener">FloMo survey</a>&nbsp;(ends&nbsp;<strong>6 August</strong>). </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</h4>



<p>Garnethill is perched above Sauchiehall St and Cambridge St, up some of the steepest streets in the city centre. As we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-three" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.3</a>, it&#8217;s due to get parking controls, which stem from a&nbsp;<a href="https://www.gobike.org/garnethill-car-parking-but-no-cycle-contraflow-public-exhibition-on-parking-controls-thursday-22-and-saturday-24-march-2018-4503" target="_blank" rel="noreferrer noopener">consultation event in 2018</a>. </p>



<p>Garnethill also has a lot of existing one way streets, which don&#8217;t allow for contraflow cycling. In our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-Stage1-response-090120.pdf" target="_blank" rel="noreferrer noopener">Garnethill Stage 1 response</a>, GoBike objected to this and other measures. Very little had changed since, apart from a few parking spaces, so we re-iterated our objections in our <a href="https://www.gobike.org/wp-content/uploads/2021/08/GoBike-Garnethill-Parking-response-300721.pdf" target="_blank" rel="noreferrer noopener">response to the published Garnethill order</a>.</p>



<p>See the restrictions in the TRO documents:&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/05-Garnethill-Proposed-CPZ-Plan.pdf" target="_blank" rel="noreferrer noopener">Garnethill plan</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">Garnethill draft report</a>,&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">Garnethill press notice</a>&nbsp;and the standard&nbsp;<a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>. Email:&nbsp;<a href="mailto:garnethillparking@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">garnethillparking@glasgow.gov.uk</a>&nbsp;by&nbsp;<strong>13 August</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</h4>



<p>This consultation is about not just Bishopbriggs town centre, but also&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/delivery-brr5-and-westerhill-masterplan" target="_blank" rel="noreferrer noopener">phase 5 of Bishopbriggs Relief Road (BRR5)</a>&nbsp;and the&nbsp;<a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/a803-corridor-improvements" target="_blank" rel="noreferrer noopener">A803 corridor</a>. Cycling doesn&#8217;t get much of a mention, as we said in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-four" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.4</a>. That&#8217;s despite Bishopbriggs being so close to the Forth &amp; Clyde canal and to Glasgow (where the A803 changes from Kirkintilloch Rd to Springburn Rd). If you want to put a word in for cycling, see the&nbsp;<a href="https://www.eastdunbarton.gov.uk/bishopbriggs-town-centre-regeneration-consultation" target="_blank" rel="noreferrer noopener">Bishopbriggs consultation webpage</a>&nbsp;and&nbsp;<a href="https://storymaps.arcgis.com/stories/7f0516541d9e45cc8d00ac151ae67143" target="_blank" rel="noreferrer noopener">Bishopbriggs Public Realm Plan survey</a> by&nbsp;<strong>15 August</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: East Dunbartonshire Council –&nbsp;Schools waiting and loading orders</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="208" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=525%2C208&#038;ssl=1" alt="Map of St Matthews and Wester Cleddens primary schools, Bishopbriggs" class="wp-image-14771" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=600%2C238&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?resize=300%2C119&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC-Bishopbriggs-schools-ScreenShot-2021-08-02.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Schools include St Matthew&#8217;s and Wester Cleddens primary schools, Bishopbriggs</figcaption></figure>



<p>A series of orders from East Dunbartonshire bring in parking restrictions around the following nine primary schools: </p>



<ul class="wp-block-list"><li>Clober Primary School, Milngavie </li><li>Westerton Primary School, Bearsden </li><li>Meadowburn Primary School, Bishopbriggs </li><li>St Matthew’s Primary School, Bishopbriggs </li><li>Wester Cleddens Primary School, Bishopbriggs </li><li>Gartconner Primary School, Kirkintilloch </li><li>Holy Family Primary School, Kirkintilloch </li><li>Craighead Primary School, Milton of Campsie </li><li>Torrance Primary School, Torrance</li></ul>



<p>All include &#8216;no waiting&#8217; restrictions between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. The Clober, Westerton, Craighead and Torrance school plans have sections with no waiting at any time (mostly on corners/school entry roads).</p>



<p>See the plans and other PDF documents for details: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-Statement-of-reasons-west-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;west&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Bearsden-Milngavie-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bearsden/Milngavie schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Plans-East-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs/Kirkintilloch/Milton of Campsie/Torrance schools plans</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-order-Bishopbriggs-Kirkintilloch-Milton-of-Campsie-Torrance-schools-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Schedules-statement-of-reasons-east-schools-waiting-Loading.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools Schedules &amp; Statement of reasons</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Kirkintilloch-Bishopbriggs-Milton-of-Campie-Torrance-schools.pdf" target="_blank" rel="noreferrer noopener">&#8216;east&#8217; schools notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Bishopbriggs-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Bishopbriggs consolidated order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-MoC-Consolidated-OCR.pdf" target="_blank" rel="noreferrer noopener">Milton of Campsie consolidated order</a>. </p>



<p>Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-six">1.6: East Dunbartonshire Council –&nbsp;Linnhe Ave/Thums Ave/Ochil Rd waiting and loading order</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="235" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02.jpg?resize=525%2C235&#038;ssl=1" alt="Map of Linnhe Ave/Thums Ave/Ochil Rd, Bishopbriggs
" class="wp-image-14773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=600%2C269&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=300%2C134&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=1536%2C688&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?resize=2048%2C917&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bishopbriggs_Linnhe-Thrums-Ave-ScreenShot-2021-08-02-scaled.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Linnhe Ave/Thums Ave are either side of Woodhill Rd, south of Woodhill Primary School</figcaption></figure>



<p>Immediately east of the above map are Linnhe Ave, Thums Ave and the Ochil Rd cul-de-sac (near Wester Cleddens Rd). Linnhe Ave is due to have no waiting or loading at any time, across from the shops on Woodhill Rd. Thums Ave and Ochil Rd are due to have restrictions only between 8.30 – 9.30am and 2.30 –&nbsp;4.30pm. Presumably, the times relate to the nearby Thomas Muir Primary School and Bishopbriggs Academy, which have a gate on Ochil Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Ochil-Rd-Thrums-Ave-Linnhe-Ave-plan.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Linnhe-Ave-Thrums-Ave-Ochil-Rd-waiting-loading.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd order</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Linnhe-Ave-Thums-Ave-Ochil-rd.pdf" target="_blank" rel="noreferrer noopener">Linnhe Ave/Thums Ave/Ochil Rd notice</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: East Dunbartonshire Council –&nbsp;Civic Way/Lenzie Rd, traffic management</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" height="295" width="525" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/EDC_TJ-House_1000px-600x337.jpg?resize=525%2C295&#038;ssl=1" alt="F
ormer EDC headquarters building" class="wp-image-14838"/><figcaption><em>Tom Johnston House, the former EDC headquarters on Civic Way, Kirkintilloch</em></figcaption></figure>



<p>Civic Way, Kirkintinlloch was the site of the former East Dunbartonshire Council headquarters (<a href="https://www.kirkintilloch-herald.co.uk/news/bulldozers-move-demolish-landmark-2561377" target="_blank" rel="noreferrer noopener">the building was demolished in 2015</a>). <a href="https://www.urbanrealm.com/news/7951/Opinions_sought_on_Kirkintilloch_social_housing.html" target="_blank" rel="noreferrer noopener">New, affordable housing is being built</a> on the site, south of Civic Way. On the road itself, EDC plan to add a speed bump with parking restrictions round the corner on Lenzie Rd. </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Lenzie-Road-Plan.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Draft-Order-Lenzie-Road-waiting-loading-restrictions.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd order</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Notice-Lenzie-Road-no-waiting-and-no-loading.pdf" target="_blank" rel="noreferrer noopener">Lenzie Rd notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Notice-for-Civic-Way-road-hump.pdf" target="_blank" rel="noreferrer noopener">Civic Way notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener"></a><a href="https://www.gobike.org/wp-content/uploads/2021/08/Order-for-amendment-Kirkintilloch-consolidation-Order.pdf" target="_blank" rel="noreferrer noopener">Kirkintilloch consolidated order</a>. Send any comments to the Chief Solicitor &amp; Monitoring Officer by post or email by <strong>16 August</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Glasgow City Council –&nbsp;Auldhouse Area Traffic Management Order</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=298%2C356&#038;ssl=1" alt="Auldhouse area map" class="wp-image-14813" width="298" height="356" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=502%2C600&amp;ssl=1 502w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?resize=251%2C300&amp;ssl=1 251w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Auldhouse-ScreenShot-2021-08-02.png?w=694&amp;ssl=1 694w" sizes="auto, (max-width: 298px) 100vw, 298px" /></figure></div>



<p>The Auldhouse area in this order is just south of Pollokshaws East train station and the White Cart Water. It&#8217;s a triangle bounded by Kilmarnock Rd, Auldhouse Rd and Nether Auldhouse Rd. </p>



<p>It&#8217;s mostly along similar lines to other parking controls elsewhere. However, there are a few back lanes between Riverford Rd and Ellisland Rd which will be signed as &#8216;access only&#8217; for motor vehicles. If those are followed, they should allow bikes to have a slightly quieter north-south route. However, the road surfaces are either rough tarmac or cobbles so they might not be that quiet! </p>



<p>See the PDF documents: <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Traffic-Management-Order-plan.pdf" target="_blank" rel="noreferrer noopener">Auldhouse plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/Auldhouse-Area-Report.pdf" target="_blank" rel="noreferrer noopener">Auldhouse report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/08/NoticeOfProposals-AuldhouseRoad-230x85mm.pdf" target="_blank" rel="noreferrer noopener">Auldhouse notice</a> and the catch-all <a href="https://www.gobike.org/wp-content/uploads/2021/08/Statement_of_Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>.</p>



<h4 class="wp-block-heading" id="one-nine">1.9: North Lanarkshire Council –&nbsp;Bellshill Entrance/Velo Park Project</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="375" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=525%2C375&#038;ssl=1" alt="Map highlighting the northern part of Strathclyde Country Park around the South Calder Water" class="wp-image-14794" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=600%2C428&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?resize=300%2C214&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1231&amp;ssl=1 1231w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Bellshill-entr_222069428_4318965511497271_8570776801464639653_n.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map shows the South Calder Water (blue dashed line). Pink dashed line shows bus route between Bellshill and Motherwell train stations. Will people be able to take their BMX on the bus?</figcaption></figure>



<p>The &#8216;entrance&#8217; is a bit confusing as most people don&#8217;t realise Strathclyde Country Park goes past Bothwellhaugh Rd and the railway, up to Bellshill Rd (A721). The area north of the loch includes the South Calder Water, Bothwellhaugh Cemetery, Bellshill Golf Club and the South Calder Walkway off-road path network. NLC propose to thread mountain bike trails around these, as shown in image, below.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="479" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=525%2C479&#038;ssl=1" alt="Map of proposed mountain bike trails around South Calder Water" class="wp-image-14795" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=600%2C547&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?resize=300%2C273&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Strathy-Park-Velo-trails_k4HV2edxTMzIha.jpeg?w=800&amp;ssl=1 800w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of proposed mountain bike trails. The note about partially sharing one trail with pedestrians doesn&#8217;t sound like a good idea. The &#8216;green link to Ravenscraig&#8217; peters out around the Aquatec leisure centre</figcaption></figure>



<p>NLC have a patchy record with similar projects like mountain bike trails in Forgewood and skate ramps in Motherwell and Wishaw. However, there is a successful skatepark in Airdrie and a BMX race track in Cumbernauld. The council have taken some input from <a href="https://socialtrack.co.uk/" target="_blank" rel="noreferrer noopener">Socialtrack</a>, who created and run the excellent <a href="https://socialtrack.co.uk/pages/wishawhill-wood-pumptrack" target="_blank" rel="noreferrer noopener">Wishawhill Wood pump track</a> in Craigneuk. These plans include a pump track but it&#8217;s not designed yet (there&#8217;s just an example track photo). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="360" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=525%2C360&#038;ssl=1" alt="Plan of proposed 'Hub and Skills area' including pump track" class="wp-image-14796" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=600%2C411&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?resize=300%2C206&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Bellshill-velo-park-hub_QBwa1bVg9vFZx_.jpeg?w=826&amp;ssl=1 826w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of proposed &#8216;Hub and Skills area&#8217; on the eastern edge of Bellshill</figcaption></figure>



<p>The &#8216;Hub/Skills area&#8217; of the new velo park would be at the edge of Bellshill (next to the roundabout on Motherwell Rd/A721). It could be a great facility for young people around the Bellshill area. The existing Greenlink path makes it more accessible from North Motherwell too (but it doesn&#8217;t link to Ravenscraig, as claimed). </p>



<p>The new route into Strathclyde Country Park should broaden active travel access from Bellshill and Motherwell. This project doesn&#8217;t include any paths near the Raith Interchange bridges (as <a href="https://www.facebook.com/nlccountryparks/photos/a.833729946687529/4330993900294432/" target="_blank" rel="noreferrer noopener">suggested on Facebook</a>). The new routes are indirect and sloping, so are less likely to help cycle commuters around Bellshill. </p>



<p>If you cycle in the area, see the <a href="https://sway.office.com/RsgVUssczf0waxaJ?ref=Link" target="_blank" rel="noreferrer noopener">Bellshill Entrance &amp; Velo Park info page</a>. You can email comments to GreenspaceProjects@northlan.gov.uk. The page says the process should lead to a Sport Scotland application this month so email <strong>before the end of August</strong>.</p>



<h4 class="wp-block-heading" id="one-ten">1.10: East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</h4>



<p>As covered in <a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629#one-five" target="_blank" rel="noreferrer noopener">Digest 91, Item 1.5</a>, Ayr Rd through Newton Mearns is a main active travel route into Glasgow. This phase 2 consultation is about replacing the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-pop-up-bike-roll-corridor" target="_blank" rel="noreferrer noopener">phase 1 cones</a> with light segregation, removing some segregation and adding parking bays (one with the bike lane outside it and trialing a parking-protected bike lane for the other). </p>



<p>Light segregation options include &#8216;flexible delineator posts&#8217; or &#8216;wand orca&#8217; units. For examples, maps and more details, see the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-phase-2" target="_blank" rel="noreferrer noopener">Ayr Road Phase 2 Commonplace page</a>. No obvious deadline on this one.</p>



<h4 class="wp-block-heading" id="one-eleven">1.11: Glasgow City Council –&nbsp;Low Emission Zone consultation</h4>



<p>As in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-three" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.3</a> this consultation is about phase 2 of the Low Emission Zone in Glasgow city centre (between the M8, river and High St). Phase 1 only applied to local buses. Phase 2&nbsp;will include all vehicles entering the zone area (unless exempt) but&nbsp;enforcement is only due to start in June 2023.</p>



<p>The short survey asks you about issues like the size of the LEZ area and the grace periods. See the&nbsp;<a href="https://glasgow.gov.uk/27143" target="_blank" rel="noreferrer noopener">Glasgow LEZ consultation page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_LEZ2021/" target="_blank" rel="noreferrer noopener">LEZ online survey</a>. Closes on <strong>2 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-twelve">1.12: Glasgow City Council – Inner East Strategic Development Framework</h4>



<p>The other side of High St out to Carntyne and Tollcross is the &#8216;Inner East&#8217; area, covered in the latest SDF (as in <a href="https://www.gobike.org/consultation-digest-local-issue-90-6-july-2021-14538#one-four" target="_blank" rel="noreferrer noopener">Digest 90, Item 1.4</a>). The &#8216;Connected&#8217; section mentions quite a few cycling infrastructure projects but the focus is still on public transport and roads, including the so-called East End Regeneration Route (EERR) dual carriageway.</p>



<p>See the&nbsp;<a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener">Inner East consultation page</a>&nbsp;for link to the&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_SDF_InnerEast/">SDF survey</a> –&nbsp;ends <strong>3 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-thirteen">1.13: East Dunbartonshire Council –&nbsp;Active Travel Discussion</h4>



<p>This has been featured since&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927#one-two" target="_blank" rel="noreferrer noopener">Digest 86, Item 1.2</a>, including its ‘<a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">Ideas Map</a>‘ for the area. It&#8217;s an opportunity to focus on active travel (walking, cycling and wheeling). EDC were pioneers when they built phase 1 of the Bearsway cycletrack in Milngavie. However, <a href="https://www.scotsman.com/news/transport/hundreds-join-mass-cycle-back-scrapped-bears-way-bike-lane-extension-1463105" target="_blank" rel="noreferrer noopener">since phase 2 was scrapped</a>, they&#8217;ve fallen behind other local authorities; not even bidding for Spaces for People funding. </p>



<p>Further online discussion events are due later in August. See a full list of events and background info on the&nbsp;<a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. Closing date – <strong>28 Sep 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-fourteen">1.14: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park</h4>



<div class="wp-block-image"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=301%2C301&#038;ssl=1" alt="" class="wp-image-14836" width="301" height="301" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=600%2C600&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=300%2C300&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=150%2C150&amp;ssl=1 150w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?resize=100%2C100&amp;ssl=1 100w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/GUS_m74-plaza-plan-small.jpeg?w=929&amp;ssl=1 929w" sizes="auto, (max-width: 301px) 100vw, 301px" /><figcaption>A cut away view of the skate park plan</figcaption></figure></div>



<p>Charlotte Worthington&#8217;s gold medal at Tokyo 2020 in the BMX Freestyle Park event seems like a good reminder about <a href="https://glasgowurbansports.co.uk/" target="_blank" rel="noreferrer noopener">Glasgow Urban Sports</a>&#8216;&nbsp;skate park project. GUS want to bring land under the M74 extension into productive use as a park for ‘urban sports’ – BMX, skateboarding, inline skating, parkour, etc. Their site is between the back of West St Subway station and Eglinton St. The sculptures would enhance the area even when they didn&#8217;t have skaters jumping off them!</p>



<p>See <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUS&#8217;s survey</a>&nbsp;to try and find out what skaters, or their families, want from the park. Or see the <a href="https://www.facebook.com/groups/177902472310943/" target="_blank" rel="noreferrer noopener">GUS Facebook</a> or <a href="https://twitter.com/GlasUrbSpo" target="_blank" rel="noreferrer noopener">GUS Twitter</a> accounts.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: North Lanarkshire Council –&nbsp;Planning Application (20/00345/FUL) Access to Motherwell train station</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="302" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=525%2C302&#038;ssl=1" alt="Visualisation of the new station" class="wp-image-14829" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=600%2C345&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=300%2C173&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?resize=1536%2C884&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1768&amp;ssl=1 1768w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Motherwell-Station_GCR-External-Perspective-1.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Visualisation of the new station –&nbsp;the access road would come from behind the view in this image</em></figcaption></figure>



<div class="wp-block-image"><figure class="alignright size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="294" height="600" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&#038;ssl=1" alt="Plan of new access to west of Muir St" class="wp-image-14831" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=294%2C600&amp;ssl=1 294w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?resize=147%2C300&amp;ssl=1 147w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Mwell-station-access_20_00345_FUL-General_Arrangement-1322173_12000px.jpg?w=590&amp;ssl=1 590w" sizes="auto, (max-width: 294px) 100vw, 294px" /><figcaption>Plan of new access to west of Muir St</figcaption></figure></div>



<p>The planning application for this City Deal project first came up back in <a href="https://www.gobike.org/consultation-digest-issue-61-26-may-2020-11310" target="_blank" rel="noreferrer noopener">Digest 61, Item 1.1</a>. It was to create a new access to the station from the roundabout at the junction of Hamilton Rd (A723), West Hamilton Rd (A721) and Merry St. Running along derelict land behind the row of shops on Muir St, it would join the current road at the station. It would include a bus lane, taxi rank, disabled parking and short cycleway. </p>



<p>However, the cycleway seems to have been dropped from the latest drawings (29 Jun 2021) –see <a href="https://eplanning.northlanarkshire.gov.uk/online-applications/applicationDetails.do?activeTab=summary&amp;keyVal=Q7HWDIBAGXS00" target="_blank" rel="noreferrer noopener">planning application 20/00345/FUL</a>. It would&#8217;ve been pretty short and isolated but would at least have helped cycle to the station from the south. Another example of NLC&#8217;s inconsistent approach –&nbsp;a few steps forward (like the <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-two" target="_blank" rel="noreferrer noopener">RATL path</a>) then a few steps back (like the <a href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-two" target="_blank" rel="noreferrer noopener">RAI dual carriageway</a>).</p>



<p><a href="https://eplanning.northlanarkshire.gov.uk/online-applications/files/BBF1588F0DEB7D45D2D230D860D5010B/pdf/20_00345_FUL-DECISION_NOTICE-1321427.pdf" target="_blank" rel="noreferrer noopener">North Lanarkshire Council have now granted planning permission</a> for this access road to go ahead. Redevelopment has already taken place at nearby Park &amp; Ride car parks. <a href="https://www.scotrail.co.uk/about-scotrail/news/work-continues-motherwell-station-redevelopment" target="_blank" rel="noreferrer noopener">Work is now underway on the station building</a> (using the service road to get passengers down to the middle platforms while stairs are replaced). The Muir St works are expected to start late 2021 and finish summer 2022.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14734</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 91, 20 July 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 20 Jul 2021 18:49:21 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[active travel]]></category>
		<category><![CDATA[Ayr Road]]></category>
		<category><![CDATA[Beith St]]></category>
		<category><![CDATA[East City Way]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[Garnethill]]></category>
		<category><![CDATA[GHA]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Inner East]]></category>
		<category><![CDATA[LEZ]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Mount Vernon]]></category>
		<category><![CDATA[Sighthill]]></category>
		<category><![CDATA[St Paul&#039;s Youth Forum]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=14629</guid>

					<description><![CDATA[Consultations around the edge of Glasgow (and city centre parking). There&#8217;s plenty in this Digest despite it being holiday time, with weather to match for a change (in Glasgow Fair!). This issue is mostly about the fringes – both inside and outside the city boundary; in more and less deprived areas. It&#8217;s also about city &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-91-20-july-2021-14629" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 91, 20 July 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Consultations around the edge of Glasgow (and city centre parking).</h2>



<p>There&#8217;s plenty in this Digest despite it being holiday time, with weather to match for a change (in Glasgow Fair!). </p>



<p>This issue is mostly about the fringes – both inside and outside the city boundary; in more and less deprived areas. It&#8217;s also about city centre parking and emissions, which is often linked to people driving in from areas around the edge of Glasgow. </p>



<p>The Infrastructure Update has a bit more from north and east but also a project from the West End, just in case anyone&#8217;s getting withdrawal symptoms…</p>



<span id="more-14629"></span>



<h3 class="wp-block-heading">Infrastructure Update</h3>



<ul class="wp-block-list"><li><a href="https://twitter.com/mark_mcintyre/status/1417147339861602309" target="_blank" rel="noreferrer noopener">A thread about recent route developments in Glasgow,</a> looking great in sunshine.</li><li><a href="https://twitter.com/UrbanistTOC/status/1415259968035557380" target="_blank" rel="noreferrer noopener">Beith St has new access and drop kerbs added</a>.</li><li><a href="https://www.glasgowlive.co.uk/news/removal-cycle-lane-bumps-celtic-21009807" target="_blank" rel="noreferrer noopener">London Rd has had soft segregation removed at Celtic Park (but chalk added)</a>.</li><li><a href="https://twitter.com/UrbanistTOC/status/1417040730242048004" target="_blank" rel="noreferrer noopener">At the other end of London Rd, photos of Mount Vernon junction</a>. It&#8217;s good this phase of the East City Way is complete but there are <a href="https://twitter.com/UrbanistTOC/status/1417071202238140416" target="_blank" rel="noreferrer noopener">issues going eastbound</a>, as <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-five" target="_blank" rel="noreferrer noopener">GoBike warned previously</a>.</li><li><a href="https://www.reglasgow.com/in-pictures-transformation-in-progress-at-sighthill/" target="_blank" rel="noreferrer noopener">A bird&#8217;s eye view of the new Sighthill</a> and a few close-ups of its new, but rusty, <a href="https://twitter.com/GlasgowCC/status/1414868471188533249?s=20" target="_blank" rel="noreferrer noopener">pedestrian/cycle bridge</a> before it&#8217;s installed.</li></ul>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</a> (ends 3 Aug)</strong></li><li><strong><a href="#one-two">St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar second consultation</a> (ends 6 Aug)</strong></li><li><strong><a href="#one-three">Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</a> (ends 13 Aug)</strong></li><li><strong><a href="#one-four">East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</a> (ends 15 Aug)</strong></li><li><strong><a href="#one-five">East Renfrewshire Council –&nbsp;Ayr Road (A77): Spaces for People, Phase 2</a></strong></li><li><a href="#one-six">Glasgow City Council – Low Emission Zone consultation</a> (ends 2 Sep)</li><li><a href="#one-seven">Glasgow City Council –&nbsp;Inner East Strategic Development Framework</a> (ends 3 Sep)</li><li><a href="#one-eight">East Dunbartonshire Council – Active Travel Discussion</a>&nbsp;(ends 28 Sep)</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><strong><a href="#three-one">Mount Florida Community Council – Letherby Triangle planning decision</a></strong></li><li><strong><a href="#three-two">St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar first consultation feedback</a></strong></li></ol>



<h3 class="wp-block-heading" id="block-cc85ef75-cc87-4a82-a726-8f744aa66a48"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – City Centre Traffic Management Order 2010: Variation No.29, GHA Parking Areas</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="251" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=525%2C251&#038;ssl=1" alt="Townhead area around Kennedy St and St Mungo Ave" class="wp-image-14652" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=600%2C287&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?resize=300%2C144&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Townhead-GHA_ScreenShot_2021-07-19.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Townhead –&nbsp;GHA parking areas are mostly side streets off Kennedy St and St Mungo Ave</figcaption></figure>



<p>&#8216;GHA Parking Areas&#8217; refers to land in Townhead owned by Glasgow Housing Association. The area is east of Buchanan Bus Station and Glasgow Caledonian University, behind the high flats. Resident&#8217;s parking spaces around Kennedy St and St Mungo Avenue have been used as free parking by shoppers/commuters. This order introduces parking restrictions which can be enforced. </p>



<p>There are the usual documents for a TRO: <a href="https://www.gobike.org/wp-content/uploads/2021/07/002-GCC-City-Centre-Traffic-Management-Order-2010-Variation-No.29....pdf" target="_blank" rel="noreferrer noopener">plan of GHA parking areas</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">GHA areas draft report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-11.01-Publication-of-Proposals-Press-Notice-Draft-Variation-29.pdf" target="_blank" rel="noreferrer noopener">GHA areas press notice</a> and the usual <a href="https://www.gobike.org/wp-content/uploads/2021/07/GCC-GHA-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a>. Respond by e-mail to&nbsp;<a href="mailto:lestraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">lestraffic@glasgow.gov.uk</a>&nbsp; by<strong> 3 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar second consultation </h4>



<p>The last mention of the Flourishing Molendinar project was in <a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#one-eight" target="_blank" rel="noreferrer noopener">Digest 82, Item 1.8</a> (when it changed to its current name). The main image on this Digest shows the area covered by the project in the north east of Glasgow. </p>



<p>The next stage of the <a href="https://twitter.com/_OnBikes/status/1413513153124737026?s=20" target="_blank" rel="noreferrer noopener">Flourishing Molendinar project has produced some eye-catching plans</a>. In particular, the pedestrianised area proposed for Langdale St, which could be an example for other so-called &#8216;liveable&#8217; neighbourhoods. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="349" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=525%2C349&#038;ssl=1" alt="Flourishing Molendinar plan for Langdale St" class="wp-image-14655" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=600%2C399&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?resize=300%2C199&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Langdale-St_E53OswaXEAETiBg.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Illustration of proposal for Langdale St, Blackhill (where St Paul&#8217;s Youth Forum are based –&nbsp;at bottom right of image)</figcaption></figure>



<p>However, there was also big news for anyone who cycles on Cumbernauld Rd (A80) across the M8 motorway. The bridge is a four/five lane dual carriageway, which many pupils have to cross to get to Smithycroft Secondary School. FloMo&#8217;s plan would reduce the (wide) lanes and add segregated cycleways. If it goes ahead, this would transform that stretch of road into a far more people-friendly place.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="406" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=525%2C406&#038;ssl=1" alt="Flourishing Molendinar plan for Cumbernauld Rd (A80)" class="wp-image-14654" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=600%2C464&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?resize=300%2C232&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/FloMo-Cumb-Rd_E53OsvZXEAUt68U.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Illustration of proposal for</em> Cumbernauld Rd (A80) with amended on/off-ramps to <em>M8 junction 12</em> (on right of image –&nbsp;blue car is going the wrong way!)</figcaption></figure>



<p>For more on the above (and Royston Rd) go to the <a href="https://forms.office.com/Pages/ResponsePage.aspx?id=DQSIkWdsW0yxEjajBLZtrQAAAAAAAAAAAAMAADcjbltUNUg0SldZR0JBR1VPTEhOVDJLNTdCN0QwUC4u" target="_blank" rel="noreferrer noopener">FloMo survey</a> (ends <strong>6 August</strong>). We look forward to seeing what comes out of it. </p>



<p>For more about the phase 1 consultation, see Item 3.2.</p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council – Garnethill Traffic Management and Parking Controls Order</h4>



<p>Garnethill, north of Sauchiehall St, is known for (what&#8217;s left of) Glasgow School of Art. It&#8217;s also home to a few schools, places of worship, hotels and several thousand residents. The area has steep, tight streets and existing one-ways, as well as the usual parking issues. </p>



<p>GoBike posted about the <a href="https://www.gobike.org/garnethill-car-parking-but-no-cycle-contraflow-public-exhibition-on-parking-controls-thursday-22-and-saturday-24-march-2018-4503" target="_blank" rel="noreferrer noopener">consultation events for Garnethill back in March 2018</a>. The plans involve a lot of yellow lines, parking restrictions on back lanes and the creation of car parking bays. One thing that isn&#8217;t included in the plan is the <a href="https://www.gobike.org/consultation-digest-local-issue-85-27-april-2021-13844#three-one" target="_blank" rel="noreferrer noopener">two-way section of Hill St, at St Aloysius College, created by TTRO in April</a> (Digest 85, 3.1). However, the parking bays are still included, which reduce the road to one car width. </p>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?ssl=1" target="_blank" rel="noopener"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="311" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=525%2C311&#038;ssl=1" alt="Detail of Garnethill parking plans" class="wp-image-14680" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=600%2C355&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=300%2C177&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=1536%2C908&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?resize=2048%2C1211&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Garnethill-parking-plan_detail_ScreenShot_2482px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption>Detail of Garnethill parking plans showing St Aloysius College, GSA, etc. <strong>Click image to enlarge</strong></figcaption></figure>



<p>Any neighbourhood plan is of most interest to people who live in the area. However, issues in Garnethill could have a knock-on effect on Sauchiehall St and Cambridge St so it&#8217;s in our wider interest that it works. </p>



<p>Again, there are the usual TRO documents: <a href="https://www.gobike.org/wp-content/uploads/2021/07/05-Garnethill-Proposed-CPZ-Plan.pdf" target="_blank" rel="noreferrer noopener">Garnethill plan</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener">Garnethill draft report</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-Press-Notice.pdf" target="_blank" rel="noreferrer noopener">Garnethill press notice</a> and the standard <a href="https://www.gobike.org/wp-content/uploads/2021/07/Garnethill-08.01-Statement-of-Reasons.pdf" target="_blank" rel="noreferrer noopener">Statement of Reasons</a>. Respond by email:&nbsp;<a href="mailto:garnethillparking@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">garnethillparking@glasgow.gov.uk</a> by <strong>13 August 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council –&nbsp;Bishopbriggs Town Centre Regeneration</h4>



<p>This consultation covers Bishopbriggs town centre and two City Deal projects – <a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/delivery-brr5-and-westerhill-masterplan" target="_blank" rel="noreferrer noopener">phase 5 of Bishopbriggs Relief Road (BRR5)</a> and the <a href="https://www.eastdunbarton.gov.uk/residents/council-democracy/city-deal/a803-corridor-improvements" target="_blank" rel="noreferrer noopener">A803 corridor</a> (Springburn Rd/Kirkintilloch Rd). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="254" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=525%2C254&#038;ssl=1" alt="" class="wp-image-14661" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=600%2C290&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?resize=300%2C145&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-map_ScreenShot_1200px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Bishopbriggs map showing NCN754 (in red) and &#8216;Wester Way&#8217; (blue dashed line on right of image)</figcaption></figure>



<p>Bishopbriggs town centre is marooned between NCN754 (Forth &amp; Clyde canal) and the &#8216;Wester Way&#8217; shared path, without good active travel links to either. The Wester Way was built alongside the BRR on Westerhill Rd, where <a href="https://www.kirkintilloch-herald.co.uk/news/what-went-wrong-bishopbriggs-relief-road-project-284659" target="_blank" rel="noreferrer noopener">BRR phase 4 caused years of disruption</a>. Both road and path peter out opposite the Aviva offices, north of the rail line to Lenzie. BRR5 doesn&#8217;t have a route decided yet but could affect some paths in the area. </p>



<p>The striking thing about the town centre &#8216;Future&#8217; images is how little the infrastructure changes apart from slightly wider footways and planting more trees. There are a few cyclists in the images but no segregated cycle lanes. The town centre work is part of a City Deal project worth nearly £35m, so they&#8217;re not skint. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="233" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=525%2C233&#038;ssl=1" alt="Kirkintilloch Rd – before/after image" class="wp-image-14686" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=600%2C266&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?resize=300%2C133&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?w=1247&amp;ssl=1 1247w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Bishopbriggs-Kirkie-Rd-before-after_ScreenShot_1247px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Kirkintilloch Rd –&nbsp;before/after visualisation showing very little change</figcaption></figure>



<p>If you&#8217;ve ridden any routes in the area, it&#8217;s worth putting a word in for cycling. See the <a href="https://www.eastdunbarton.gov.uk/bishopbriggs-town-centre-regeneration-consultation" target="_blank" rel="noreferrer noopener">Bishopbriggs consultation webpage</a> and <a href="https://storymaps.arcgis.com/stories/7f0516541d9e45cc8d00ac151ae67143" target="_blank" rel="noreferrer noopener">Bishopbriggs Public Realm Plan survey</a>. Consultation closes <strong>15 August</strong>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: East Renfrewshire Council – Ayr Road (A77): Spaces for People, Phase 2</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-15110" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/08/Ayr-Rd-A77_ScreenShot-2021-07-19-attribution.jpg?w=1078&amp;ssl=1 1078w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Ayr Road (A77) showing cones on painted cycle lane</em></figcaption></figure>



<p>The Ayr Rd section of the A77 route at Newton Mearns is south of the <a href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#one-four" target="_blank" rel="noreferrer noopener">Fenwick Rd Spaces for People lanes, which we covered back in January 2021</a> (Digest 78, 1.4). GoBike staged a <a href="https://www.gobike.org/pedal-on-parliament-pop-up-protests-throughout-next-weekend-8308" target="_blank" rel="noreferrer noopener">local Pedal on Parliament event about parking on Ayr Rd&#8217;s bike lanes</a> back in 2019.  </p>



<p>The phase 2 consultation is partly about replacing the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-pop-up-bike-roll-corridor" target="_blank" rel="noreferrer noopener">phase 1 cones</a> with light segregation. However, it also removes the segregation in some sections (like at Mearns Cross). It includes adding parking bays with the bike lane outside it in one location but trialing a parking-protected bike lane at Ashtree Grove (as in image, below). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="293" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=525%2C293&#038;ssl=1" alt="" class="wp-image-14681" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=600%2C335&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?resize=300%2C168&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?w=1528&amp;ssl=1 1528w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Ayr-Rd_A77_Ashtree-Grove-parking-protected-lane.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan of bike lane protected <em>from carriageway</em> by car parking near Ashtree Grove</figcaption></figure>



<p>The mixed approach probably reflects that on-road, segregated cycleways are still very new in East Renfrewshire (or anywhere outside a city). Issues in other towns, like <a href="https://www.gobike.org/sunday-06-november-gobike-ride-and-bears-way-advocacy-ride-2008" target="_blank" rel="noreferrer noopener">the Bearsway extension being scrapped</a> and the <a href="https://www.gobike.org/time-to-get-councillors-who-support-active-travel-holmston-road-cycle-lane-in-ayr-to-be-ripped-up-1938" target="_blank" rel="noreferrer noopener">removal of lanes on Holmston Rd</a>, cast a long shadow. Newton Mearns is just as affluent and <a href="https://www.gov.scot/publications/scottish-household-survey-2019-supplementary-analysis/pages/6/" target="_blank" rel="noreferrer noopener">around 90% of people in East Ren have access to a car</a>. However, it has younger demographics than either Milngavie or Ayr. </p>



<p>East Ren differ from Glasgow by only asking how to improve the scheme, not whether people want rid of it. If ERC wait to get feedback before making changes then that would be an improvement on London Rd too. A few comments in the Commonplace survey allude to Glasgow ripping out segregation so that seems to have had an effect beyond the city boundary. </p>



<p>Light segregation options include &#8216;flexible delineator posts&#8217; or &#8216;wand orca&#8217; units. For examples, maps and more details, see the <a href="https://erspacesforpeople.commonplace.is/proposals/a-77-ayr-road-phase-2" target="_blank" rel="noreferrer noopener">Ayr Road Phase 2 consultation page</a>. No obvious deadline on this one. </p>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow City Council – Low Emission Zone consultation </h4>



<p>Glasgow&#8217;s city centre Low Emission Zone (LEZ) has only applied to some buses so far. GCC are consulting before it changes to include cars and other motor vehicles. It covers most of the city centre –&nbsp;north of the river, conveniently inside the M8 and eastwards to High St/Saltmarket. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=525%2C340&#038;ssl=1" alt="Plan of boundary of Glasgow Low Emission Zone" class="wp-image-14684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=600%2C388&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Glasgow-LEZ-area_1200px.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plan showing boundary of Glasgow Low Emission Zone</figcaption></figure>



<p>However, the LEZ won&#8217;t include cars any time soon as there are some &#8216;grace periods&#8217; built into the plan at the moment. One year until it comes in, so summer 2022. Then another year until it becomes enforceable –&nbsp;1 June 2023. There will be a further year&#8217;s grace for folk who live in the city centre (until 1 June 2024). Some exemptions apply to people with disabilities, emergency vehicles, etc. </p>



<p>One good thing about the short survey is it does ask you about the above. So, if you think the LEZ area is too small or the grace periods are too long, you can tick those boxes and add a comment too. </p>



<p>See the&nbsp;<a href="https://glasgow.gov.uk/27143" target="_blank" rel="noreferrer noopener">Glasgow LEZ consultation page</a>&nbsp;and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_LEZ2021/" target="_blank" rel="noreferrer noopener">LEZ online survey</a>. Closes on <strong>2 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: Glasgow City Council –&nbsp;Inner East Strategic Development Framework</h4>



<p>The ‘Inner East’ goes from High St out to Carntyne and Tollcross, between the River Clyde and the M8 (just short of FloMo&#8217;s patch).&nbsp;Like previous SDFs for other areas, it has themes about connections and sustainability but is mostly about identifying development opportunities. Some planned cycle routes and the Avenues Plus active travel scheme are included on a map with &#8216;missing links&#8217;. There are some issues with the map, like the red line between Barrowfield and Parkhead, counting the bus lane on one side as &#8220;off road/segregated&#8221;. Although it&#8217;s patchy, it puts more focus on active travel than previous strategies about the East End.</p>



<figure class="wp-block-image size-large"><a href="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?ssl=1" target="_blank" rel="noopener"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="350" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=525%2C350&#038;ssl=1" alt="Map: Connected Inner East" class="wp-image-14691" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=600%2C400&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?resize=300%2C200&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?w=1500&amp;ssl=1 1500w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/07/Inner-East_connects_ScreenShot-2021_1500px.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></a><figcaption><em>Draft map of &#8220;Seemless&#8221; Active Travel Routes –&nbsp;Freudian slip? </em><strong>Click image to enlarg</strong><em><strong>e</strong></em></figcaption></figure>



<p>A few of the rail improvements in the document have been talked about for over ten years, such as the Parkhead rail halt. However, it&#8217;s the East End Regeneration Route (EERR phase 3) that seems to be back on the agenda due to new funding. It&#8217;s&nbsp;a dual carriageway that would run through Hogarth Park and under Edinburgh Rd and Cumbernauld Rd to the M8. </p>



<p>See the&nbsp;<a href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank" rel="noreferrer noopener">Inner East consultation page</a>&nbsp;for link to the PDF document and&nbsp;<a href="https://www.smartsurvey.co.uk/s/GCC_SDF_InnerEast/">SDF survey</a>. Ends <strong>3 September 2021</strong>.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: East Dunbartonshire Council – Active Travel Discussion</h4>



<p>This was first in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-86-11-may-2021-13927#one-three" target="_blank" rel="noreferrer noopener">Digest 86, Item 1.2</a>, with its ‘<a href="https://edc.mapthis.place/" target="_blank" rel="noreferrer noopener">Ideas Map</a>‘ for the area. Recently, East Dunbartonshire Council has brought in new <a href="https://www.kirkintilloch-herald.co.uk/news/people/bearsden-more-misery-at-new-allander-junction-traffic-lights-system-3302472" target="_blank" rel="noreferrer noopener">parking restrictions on Milngavie Rd</a>, opposite the remodeled junction to Allanton Sports Centre. It&#8217;s small but possibly the first parking restriction since the Bearsway was built? </p>



<p>The Bearsway was due to extend to Kessington on the way to Glasgow. While researching this Digest, it emerged it has one of the oldest populations in Scotland. <a href="https://www.nrscotland.gov.uk/files//statistics/population-estimates/sape-19/sape-19-publication.pdf" target="_blank" rel="noreferrer noopener">52% of people of Kessington West are over 65 years old</a> (page 19). Will the Bearsway ever get there? </p>



<p>There are no more consultation events until August/September. See a full list of events and background info on the&nbsp;<a href="https://www.eastdunbarton.gov.uk/active-travel-discussion" target="_blank" rel="noreferrer noopener">Active Travel Discussion webpage</a>. Closing date – <strong>28 September 2021</strong>.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Mount Florida Community Council – Letherby Triangle planning decision</h4>



<p>This project was first in <a href="https://www.gobike.org/consultation-digest-issue-66-04-august-2020-an-abundance-of-new-consultations-some-very-topical-and-some-old-favourites-so-do-get-involved-in-improving-where-you-live-11804" target="_blank" rel="noreferrer noopener">Digest 66, 1.3</a> when Mount Florida Community Council (MoFloCoCo) were consulting about it. It&#8217;s good to see it progressing towards being built. </p>



<p>The plan is to close the end of Carmunnock Road at Cathcart Rd to link a triangular traffic island to nearby shops. It will have a viewing platform added and be used for leisure and cultural events. There&#8217;s a handy <a href="https://www.reglasgow.com/mount-florida-civic-space-plan-gets-go-ahead/" target="_blank" rel="noreferrer noopener">overview of the proposal on the ReGlasgow website</a>. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="403" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=525%2C403&#038;ssl=1" alt="" class="wp-image-11816" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=600%2C460&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=300%2C230&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?resize=1536%2C1177&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1600&amp;ssl=1 1600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/07/Letherby-Triangle.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Artist&#8217;s impression of how Letherby Triangle could look </figcaption></figure>



<p>It&#8217;s <a href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=documents&amp;keyVal=QK1LJ1EXJDM00" target="_blank" rel="noreferrer noopener">planning application 20/03067/FUL</a> if you want to look at it on GCC&#8217;s planning portal. Good luck to MoFloCoCo and their partners for the next stage. </p>



<h4 class="wp-block-heading" id="three-two">3.2: St. Paul&#8217;s Youth Forum –&nbsp;Flourishing Molendinar first consultation feedback</h4>



<p>In addition to the new plans in Item 1.2, above, Flourishing Molendinar published data from their earlier consultation (Jan–May 2021). There are plenty of interesting results on the website homepage and in their <a href="https://b6c3af05-b5ec-46fa-897c-166bcced266b.filesusr.com/ugd/428ac6_61e36f4281be4e75899a9a852cf8037e.pdf" target="_blank" rel="noreferrer noopener">Summary Report (PDF)</a>. </p>



<p>In particular, the data shows <a href="https://www.flourishingmolendinar.com/?pgid=kpi7qu3r-a2668058-130b-498a-b41e-7bb616a8b9a6" target="_blank" rel="noreferrer noopener">strong support for keeping Spaces for People measures, as long as they can be adjusted/improved</a>. Overall, 89% wanted to keep the SfP measures in some form while only 11% wanted them removed (out of 152 responses). While FloMo is focussed on one local area, it&#8217;s hopefully a good sign for the results of Glasgow City Council&#8217;s wider SfP consultation (whenever those are published).</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">14629</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 84, 13 April 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 13 Apr 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Ardrossan]]></category>
		<category><![CDATA[barriers]]></category>
		<category><![CDATA[Braidcraft Rd]]></category>
		<category><![CDATA[Brockburn Rd]]></category>
		<category><![CDATA[Cambridge St]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[Dawsholm Park]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[Maryhill]]></category>
		<category><![CDATA[Merchant City]]></category>
		<category><![CDATA[planters]]></category>
		<category><![CDATA[townhead]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13767</guid>

					<description><![CDATA[A handful of consultations and the latest on Spaces for People. This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire. Again, this Digest features an update about recent infrastructure developments. This time &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-84-13-april-2021-13767" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 84, 13 April 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A handful of consultations and the latest on Spaces for People. </h2>



<p>This is the second Digest during the pre-election period so things are still a bit quiet. This Digest is mostly about Glasgow with a wee bit from North Ayrshire and East Dunbartonshire.</p>



<p>Again, this Digest features an update about recent infrastructure developments. This time focusing on Glasgow&#8217;s latest Spaces for People measures (following on from Howard St last time). A few new lanes are going in Pollok and some in the north east of the city. The city centre has some new planter boxes and should get another new lane (eventually).</p>



<span id="more-13767"></span>



<h3 class="wp-block-heading" id="infra-update">Glasgow Spaces for People Update</h3>



<ul class="wp-block-list"><li><a href="https://www.glasgow.gov.uk/26693" target="_blank" rel="noreferrer noopener">Braidcraft Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26692" target="_blank" rel="noreferrer noopener">Brockburn Rd plans</a> and <a href="https://www.glasgowtimes.co.uk/news/19226857.cycling-group-hits-back-petition-lanes/" target="_blank" rel="noreferrer noopener">GoBike&#8217;s response to &#8216;bikelash&#8217; in Glasgow Times</a> making front page news!</li><li><a href="https://www.glasgow.gov.uk/26735" target="_blank" rel="noreferrer noopener">Cambridge St plans</a> which may not have started yet due to <a href="https://www.gobike.org/wp-content/uploads/2021/04/Cambridge-St-roadworks_9450_1000px.jpg" target="_blank" rel="noreferrer noopener">water main works</a> (and the usual considerate parking). </li><li><a href="https://twitter.com/RiderGlasgow/status/1377290772832206857?s=20" target="_blank" rel="noreferrer noopener">Planter boxes installed on Candleriggs, Merchant City</a> (to make way for outdoor seating?). More on Bell Street, Wilson Street and Trongate.</li><li><a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Fielden-St_9441_1000px.jpg" target="_blank" rel="noreferrer noopener">London Rd roadworks near Fielden St</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/04/London-Rd-Clyde-Gateway_9439_1000px.jpg" target="_blank" rel="noreferrer noopener">more near Celtic Park</a> (possibly to lay cable?). Missing zebras/armadillos have been replaced outside Celtic Park/Emirates and lane cleaned.</li><li><a href="https://www.glasgow.gov.uk/26852" target="_blank" rel="noreferrer noopener">Royston Rd plans</a>.</li><li><a href="https://www.glasgow.gov.uk/26851" target="_blank" rel="noreferrer noopener">Wallacewell Rd plans</a>.</li></ul>



<h3 class="wp-block-heading">Barriers Overload Update</h3>



<p><a href="https://twitter.com/langoo/status/1379473673044824070?ref_src=twsrc%5Etfw%7Ctwcamp%5Eembeddedtimeline%7Ctwterm%5Eprofile%3Agobikeglasgow%7Ctwgr%5EeyJ0ZndfZXhwZXJpbWVudHNfY29va2llX2V4cGlyYXRpb24iOnsiYnVja2V0IjoxMjA5NjAwLCJ2ZXJzaW9uIjpudWxsfSwidGZ3X2hvcml6b25fdHdlZXRfZW1iZWRfOTU1NSI6eyJidWNrZXQiOiJodGUiLCJ2ZXJzaW9uIjpudWxsfX0%3D&amp;ref_url=https%3A%2F%2Fwww.gobike.org%2Fconsultation-digest-local-issue-83-30-march-2021-13568" target="_blank" rel="noreferrer noopener">Dawsholm Park barriers</a> –&nbsp;three(!) sets added to new path.</p>



<h3 class="wp-block-heading" id="block-2e87f9c2-a8af-4262-bff7-8842c5412bae"><strong>Contents</strong><br>(new consultations in&nbsp;<strong>bold</strong>&nbsp;– link jumps to article)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Ardrossan Connections –&nbsp;Design Festival</a> (workshops 14/21 April)</strong></li><li><a href="#one-two">Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops</a> (22/26 April)</li><li><a href="#one-three">East Dunbartonshire Council – Climate Conversation</a><span style="font-size: 1rem;">&nbsp;(online event 22 April)</span></li><li><a href="#one-four">Maryhill North Transformational Regeneration Area – Masterplan consultation</a>&nbsp;(ends 23 April)</li><li><a href="#one-five">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Malls Mire newsletter – March 2021</a></li></ol>



<h3 class="wp-block-heading" id="block-ad6eda16-21e7-4a1f-984d-21f675cbe2c1"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1:&nbsp;Ardrossan Connections –&nbsp;Design Festival</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="249" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=525%2C249&#038;ssl=1" alt="Illustration of key areas of Ardrossan (looking south)" class="wp-image-13791" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=600%2C285&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?resize=300%2C143&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1521&amp;ssl=1 1521w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Ardrossan-Connection-illustration.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>First covered in <a href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#one-two" target="_blank" rel="noreferrer noopener">Digest 78 (1.2)</a>, Ardrossan Connections is about improving links and public spaces in the Ayrshire coastal town. See the <a href="https://ardrossanconnections.commonplace.is/about" target="_blank" rel="noreferrer noopener">webpage about the project</a> or <a href="https://s3-eu-west-2.amazonaws.com/commonplace-customer-assets/ardrossandesignfestival/Information%20boards%20Ardrossan%20Connections%20March%202021.pdf" target="_blank" rel="noreferrer noopener">information boards</a> for more background or view comments on the <a href="https://ardrossanconnections.commonplace.is/comments" target="_blank" rel="noreferrer noopener">Ardrossan Commonplace map</a>.</p>



<p>The latest phase of the project is a &#8216;Design Festival&#8217; from 7–27 April.  In other words, some design workshops (announced just after the last Digest). GoBike members will probably be more interested in the &#8216;Connections&#8217; design workshops on 14 and 21 April. There are also &#8216;Placemaking&#8217; workshops on 20 and 26 April. Each workshop is shown on the <a href="https://ardrossandesignfestival.commonplace.is/overview" target="_blank" rel="noreferrer noopener">Design Festival page</a> –&nbsp;click the one you want to go to its sign-up link. </p>



<p>Alternatively, if you can&#8217;t make any of the workshops, you might be able to use the <a href="https://en-gb.padlet.com/eilidhsustrans/Ardrossan" target="_blank" rel="noreferrer noopener">Ardrossan &#8216;padlet&#8217;</a> to add a design idea as a pin on the map (zoom in –&nbsp;a lot!).</p>



<h4 class="wp-block-heading" id="one-two">1.2: Glasgow City Council –&nbsp;(Y)our City Centre Districts, (Y)our Ideas &amp; Proposals Workshops </h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="396" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=525%2C396&#038;ssl=1" alt="Map of (Y)our City Centre Districts with current phase highlighted (Cowcaddens, Townhead, 'Learning Quarter and Merchant City)" class="wp-image-13773" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?w=530&amp;ssl=1 530w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Your-City-Centre-Districts-Base-Map.jpeg?resize=300%2C226&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map of (Y)our City Centre Districts with current phase highlighted</figcaption></figure>



<p>The city centre districts projects have been featured several times, including <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-two" target="_blank" rel="noreferrer noopener">Digest 74, 1.2</a>. These are about major regeneration, with an emphasis on transport and community. The four districts being consulted on in this phase are Cowcaddens, Townhead, Merchant City and &#8216;Learning Quarter&#8217; (Cathedral St, etc.). The <a href="https://yourcitycentre2020.commonplace.is/comments" target="_blank" rel="noreferrer noopener">districts Commonplace map</a> is still open but the focus will be on the outcome of the latest workshops.</p>



<p>Proposals Workshops are coming up for&nbsp;Merchant City on 22 April and &#8216;Learning Quarter&#8217; on 26 April. Timetables for each online event are on the <a href="https://www.glasgowcitycentrestrategy.com/city-centre-workshops" target="_blank" rel="noreferrer noopener">City Centre Strategy workshops page</a>. </p>



<p>Cowcaddens and Townhead have already had their workshops. The same webpage showcases the themes which came out of those. &#8216;(Y)our Ideas&#8217;, are numbered –&nbsp;clicking each takes you to a PDF summary about it. Underneath the themes is a button to a survey –&nbsp;it asks which ideas you see as highest priority. </p>



<p>In due course, a similar setup will probably appear for Merchant City/&#8217;Learning Quarter&#8217; after their workshops. </p>



<h4 class="wp-block-heading" id="one-three">1.3:&nbsp;East Dunbartonshire Council – Climate Conversation&nbsp;</h4>



<p>This initiative was first covered in&nbsp;<a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425#one-seven" target="_blank" rel="noreferrer noopener">Digest 82, Item 1.7</a>. East Dunbartonshire Council didn&#8217;t apply for Spaces for People funding but sustainable transport is part of their <a href="https://www.eastdunbarton.gov.uk/climate-conversation">Climate Conversation webpage</a>. Subsequently, this will feed into three future consultations on the&nbsp;environment, including a new Active Travel Strategy.</p>



<p>The last of their&nbsp;<a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/east-dunbartonshire-climate-conversation-tickets-143700675589" target="_blank">Climate Conversation events</a> is on&nbsp;22 April (online, using MS Teams). The overall Climate Conversation itself will run until 2 May 2021.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Maryhill North Transformational Regeneration Area – Masterplan consultation&nbsp;</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="321" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min.jpeg?resize=525%2C321&#038;ssl=1" alt="Maryhill TRA – Kilmun St visual" class="wp-image-13784" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=600%2C367&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=300%2C183&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=1536%2C939&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?resize=2048%2C1252&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/04/Maryhill-Visual-B-Annotated-min-scaled.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption><em>Kimun St visual –</em> new housing and landscaping but no new pavements?</figcaption></figure>



<p>As mentioned in <a href="https://www.gobike.org/consultation-digest-local-issue-83-30-march-2021-13568#one-four" target="_blank" rel="noreferrer noopener">Digest 83, Item 1.4</a>, this regeneration project is looking at housing and public spaces in Gilshochill, south of Summerston train station. </p>



<p>There are many visualisations on the&nbsp;<a href="https://www.maryhillnorthtra.com/consultations/1" target="_blank" rel="noreferrer noopener">Maryhill North consultation page</a>, most of which look promising. However, there are some very sharp angles in the zigzag paths, which don&#8217;t look very bike-friendly (as seen in the feature photo at the top of this Digest). Also, some of the realigned streets appear to be &#8216;shared space&#8217;, without any pavements. The theory behind shared space is that drivers pay more attention if pavements and markings are removed. However, the reality is often pedestrians get startled by cars and have to dart out the way (or in this case, dive into a hedge!). </p>



<p>If you want to comment on the TRA plans, you have to register first on the above page. Consultation&nbsp;closes on 23 April.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>A few comments in the city centre districts Commonplace map ask about more space for skaters. GUS&#8217;s M74 skatepark project would provide that under a flyover near West St subway station. First covered in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank">Digest 81, Item 1.9</a>, the&nbsp;<a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a>&nbsp;is still open for BMX riders, skaters, or their families, to have their say about the park. </p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Malls Mire newsletter – March 2021</h4>



<p>The first issue of this newsletter featured in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#three-four" target="_blank" rel="noreferrer noopener">Digest 74, Item 3.4</a>. The Malls Mire project is creating play areas and woodland paths between Toryglen and Rutherglen. </p>



<p>The <a href="https://www.gobike.org/wp-content/uploads/2021/04/Malls-Mire-Newsletter-March-2021.pdf" target="_blank" rel="noreferrer noopener">March 2021 newsletter</a> covers the latest construction news about the bike pump track, playgrounds, landscaping and more. See further background about the project on <a href="http://www.clydegateway.com/clyde-gateway-gives-malls-mire-a-new-lease-of-life-as-it-is-transformed-into-a-woodland-retreat/" target="_blank" rel="noreferrer noopener">Clyde Gateway&#8217;s Malls Mire webpage</a>.</p>



<p>&nbsp;</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13767</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 82, 16 March 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 16 Mar 2021 20:27:12 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[Flourishing Molendinar]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Glasgow University]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[Inchinnan]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[yorkhill]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13425</guid>

					<description><![CDATA[A rush of closing consultations from inside and outside the city. In this Digest there&#8217;s a mix of consultations from Glasgow and from all directions outside the city. Most are over before late March, which will mark six weeks until the Scottish Parliament election. This is the Public Sector&#8217;s &#8216;purdah&#8217; pre-election period when projects tend &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-82-16-march-2021-13425" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 82, 16 March 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">A rush of closing consultations from inside and outside the city.</h2>



<p>In this Digest there&#8217;s a mix of consultations from Glasgow and from all directions outside the city. Most are over before late March, which will mark six weeks until the Scottish Parliament election. This is the Public Sector&#8217;s &#8216;purdah&#8217; pre-election period when projects tend to avoid new announcements (which could get caught up in electioneering). </p>



<p>That may be why there&#8217;s been a flurry of news about the <a rel="noreferrer noopener" href="https://www.reglasgow.com/further-spaces-for-people-measures-include-more-low-traffic-neighbourhoods-and-extra-10-kilometres-of-bike-lanes/" target="_blank">next lot of Glasgow&#8217;s Spaces for People projects</a> –&nbsp;including <a rel="noreferrer noopener" href="https://www.reglasgow.com/work-to-improve-further-city-centre-bike-lane-announced/" target="_blank">Howard St</a>, <a rel="noreferrer noopener" href="https://www.reglasgow.com/city-centre-street-getting-better-bike-route/" target="_blank">Cambridge St</a> and <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/26852" target="_blank">Royston Rd</a>. GoBike first heard about these at the revived Glasgow Active Travel Forum, which met for the first time online earlier this month (previous meeting was Sept 2019!). </p>



<span id="more-13425"></span>



<p>Ahead of the election in May, see the&nbsp;<a rel="noreferrer noopener" href="https://action.cyclinguk.org/page/75816/petition/1" target="_blank">Cycling for everyone election petition</a> by Cycling UK in Scotland (closes 26 March) and <a rel="noreferrer noopener" href="https://pedalonparliament.org/" target="_blank">Pedal on Parliament&#8217;s &#8216;Light the Way&#8217; campaign</a> on 24 April.</p>



<p>If you&#8217;re in the city, see <a rel="noreferrer noopener" href="https://www.gobike.org/not-1-but-3-infrastructure-rides-for-january-12877" target="_blank">Andy&#8217;s three infrastructure routes</a> around Glasgow to take in Spaces for People infrastructure. Andy has also started to inform GoBike about closures and diversions; if you hear of any please do let us know.</p>



<p>This Digest includes links in the Contents page so you can jump straight to a topic if you want to.</p>



<h3 class="wp-block-heading" id="block-85aea166-a937-4431-9c26-67f7a1578d90"><strong>Contents</strong><br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-d9dde381-de55-44b2-8cd5-c99e5f8a6057"><li><strong><a href="#one-one">Renfrewshire Council –&nbsp;Inchinnan cycling and walking route</a> –&nbsp;closes 17 March</strong></li><li><a href="#one-two">North Lanarkshire Council – Town hub community engagement events</a> – events 16–18 March</li><li><a href="#one-three">Scottish Canals –&nbsp;Stockingfield Junction art survey &amp; public meeting</a> – 18 March</li><li><strong><a href="#one-four">Glasgow City Council –&nbsp;(Y)our Townhead Proposals Workshops</a> – 18 March</strong></li><li><a href="#one-five">Glasgow Harbour Ltd – Yorkhill </a><a href="#one-six">Quay Phase 2</a> –&nbsp;closes Friday 19 March</li><li><a href="#one-six">North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall</a> – closes Sunday 21 March</li><li><strong><a href="#one-seven">East Dunbartonshire Council –&nbsp;Climate Conversation</a> –&nbsp;online events 22 &amp; 30 March/22 April</strong></li><li><strong><a href="#one-eight">Flourishing Molendinar (North East Glasgow) – Public workshops</a> 23–25 March</strong></li><li><a href="#one-nine">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li><a href="#two-one">Glasgow City Council –&nbsp;(Y)our Cowcaddens, &#8216;Learning Quarter&#8217; and Merchant City Proposals Workshops</a></li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</a></li><li><a href="#three-two">Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</a></li><li><a href="#three-three">Multiplex – Glasgow University Newsletter March 2021</a></li></ol>



<h3 class="wp-block-heading" id="block-4347ee24-314e-4146-bc8a-6da0cd17f192"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Renfrewshire Council –&nbsp;Inchinnan cycling and walking route</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="166" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=525%2C166&#038;ssl=1" alt="" class="wp-image-13474" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=600%2C190&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=300%2C95&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?resize=1536%2C485&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?w=2038&amp;ssl=1 2038w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GreenockRd-Ren-pics.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Renfrewshire Council supply Exhibits 1–4 about current &#8220;provision&#8221; on the northern footway on Greenock Rd. At least they might scrape back the grass verge&#8230;</figcaption></figure>



<p><a rel="noreferrer noopener" href="https://goo.gl/maps/BKNujw97QdDfcVCJ6" target="_blank">Greenock Rd</a> (A8) runs between Inchinnan Business Park and Renfrew. This proposed route will be on the north side of the road, apparently starting as a shared path before becoming a segregated cycleway. It will pass McGills bus depot and a few scraps of current infrastructure before going south to Glasgow Airport. It will lead to the new pedestrian/cycle bridge over the Black Cart Water, one of the projects in <a rel="noreferrer noopener" href="http://www.renfrewshire.gov.uk/gaia" target="_blank">Glasgow Airport Investment Area (GAIA)</a>, as mentioned in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest 39, Item 3.3</a>.  </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="480" height="360" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?resize=480%2C360&#038;ssl=1" alt="" class="wp-image-13476" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?w=480&amp;ssl=1 480w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Black-Cart-bridge_Inchinnan.jpeg?resize=300%2C225&amp;ssl=1 300w" sizes="auto, (max-width: 480px) 100vw, 480px" /><figcaption>A still from Renfrewshire Council&#8217;s fly-through video from August 2019 shows the Greenock Rd cycle route <em>from the new Black Cart bridge</em> on the south/west side of the road.</figcaption></figure>



<p>The new bridge sits on the southern side of the road (after enhancing its active travel credentials when it <a rel="noreferrer noopener" href="https://www.dailyrecord.co.uk/authors/paisley-daily-express/blunder-bridge-chaos-near-glasgow-23054261" target="_blank">fell off a loader and crushed a white van</a>!). <a href="http://www.renfrewshire.gov.uk/Greenock-Road-Inchinnan-walking-cycling-route" target="_blank" rel="noreferrer noopener">Renfrewshire Council&#8217;s Inchinnan webpage</a> says a toucan crossing will be installed near the bridge. However, it doesn&#8217;t say why the route has now switched to the northern side, especially as the Business Park is also south of the road. Perhaps to avoid the airport&#8217;s approach lights (or someone else&#8217;s land)? Or for future connections into Inchinnan itself? If you want to comment you&#8217;ll need to be quick –&nbsp;the <a href="https://survey123.arcgis.com/share/82d1da254142402298a5f83b8f2265a8" target="_blank" rel="noreferrer noopener">Greenock Rd survey</a> closes on Wednesday 17 March.</p>



<h4 class="wp-block-heading" id="one-two">1.2: North Lanarkshire Council –&nbsp;Town hub community engagement events</h4>



<p>These events first featured in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-two" target="_blank" rel="noreferrer noopener">Digest 81, 1.2</a>. North Lanarkshire Council have <em>&#8220;ambition to replace every school not replaced or remodelled since 1996, our vision is to make these places for the whole community rather than only the school community</em>.<em>&#8220;</em> So, that should include active travel.</p>



<p>Most of the events have already passed but it you get your skates on you can catch the last two for Wishaw and Shotts. The link for each town goes to an Eventbrite sign-up page to register for the event:</p>



<ul class="wp-block-list"><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-wishaw-tickets-141447652737" target="_blank" rel="noreferrer noopener">Wishaw</a>&nbsp;– Wednesday 17th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-shotts-tickets-141448322741" target="_blank" rel="noreferrer noopener">Shotts</a>&nbsp;– Thursday 18th March – 6:30pm</li></ul>



<h4 class="wp-block-heading" id="one-three"> 1.3: Scottish Canals – Stockingfield Junction art survey &amp; public meeting</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="306" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/08/Bridge-picture-Stockingfield.jpg?resize=525%2C306&#038;ssl=1" alt="Stockingfield Bridge" class="wp-image-6147"/><figcaption>Visualisation of new bridge at Stockingfield Junction on Forth &amp; Clyde canal.</figcaption></figure>



<p>Details about the Stockingfield Junction public meeting on 18 March were in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-five" target="_blank" rel="noreferrer noopener">Digest 81, Item 1.5</a>. Since then a <a href="https://www.surveymonkey.co.uk/r/R95QQ5M" target="_blank" rel="noreferrer noopener">survey about Stockingfield</a> has opened asking what kind of artwork people want around the new bridge. There are different views about what form the bridge should have taken so there are sure to be plenty about what (if any) artworks should surround it. Many of us will probably pass through the area once it&#8217;s finished so we might as well chip in our 2p&#8217;s worth. </p>



<p>Scottish Canals want to hear what represents the local communities of Gilshochill, Maryhill and Ruchill (be kind!). Just don&#8217;t say <a href="https://www.glasgowtimes.co.uk/news/13234544.45m-plan-for-bigman-bridge-cut-down-to-size/" target="_blank" rel="noreferrer noopener">The Big Man</a>! </p>



<h4 class="wp-block-heading" id="one-four">1.4: Glasgow City Council –&nbsp;(Y)our Townhead Proposals Workshops</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=525%2C263&#038;ssl=1" alt="Townhead Proposals Workshops – Thursday 18 March. Online – sign-up via Eventbrite" class="wp-image-13464" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=600%2C300&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Townhead-18Mar2021.jpg?w=1024&amp;ssl=1 1024w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Also on Thursday is the next lot of meetings about the District regeneration projects. GoBike received an email about Townhead: </p>



<p><em>&#8220;An Action Plan and Framework for the regeneration of Townhead is currently being prepared by a consultant team appointed by Glasgow City Council. We want your input to help shape and influence the priority projects to improve Townhead.&#8221;</em></p>



<p>There is a series of workshops throughout a &#8216;Co-Design Day&#8217; on Thursday 18 March:</p>



<ul class="wp-block-list"><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-co-design-day-launch-tickets-144243224367" target="_blank" rel="noreferrer noopener">Co-Design Day Launch</a> </strong>(1000 &#8211; 1030) </li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-getting-around-workshops-tickets-144248209277" target="_blank" rel="noreferrer noopener">Getting Around &#8211; Workshops</a>&nbsp;</strong>(1030 &#8211; 1230)</li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-city-centre-communities-workshops-tickets-144250076863" target="_blank" rel="noreferrer noopener">City Centre Communities – Workshops</a>&nbsp;</strong>(1300 &#8211; 1500)</li><li><strong><a href="https://www.eventbrite.co.uk/e/your-townhead-proposals-workshop-reimaging-your-townhead-tickets-144250447973" target="_blank" rel="noreferrer noopener">Reimagining (Y)our Townhead</a>&nbsp;</strong>(1530 &#8211; 1730)</li></ul>



<p>These suggest a much more collaborative approach than many of these events. Obviously, the most interesting one for us is the morning &#8216;Getting Around&#8217; workshop: </p>



<p><em>&#8220;A participatory workshop considering how to make Townhead more accessible and better connected. Potential projects include:</em></p>



<ul class="wp-block-list"><li><em>Connecting to ‘Townhead Island’</em></li><li><em>Active Travel : walking, wheeling, cycling</em></li><li><em>Junction 15 on M8</em></li><li><em>Cathedral Street</em></li><li><em>Stirling Road Triangle</em></li><li><em>Canal to Cathedral : Dobbies Loan to St James Road</em></li><li><em>…?&#8221;</em></li></ul>



<p>Plenty to get our teeth into there. Alternatively, the <a href="https://yourcitycentre2020.commonplace.is/" target="_blank" rel="noreferrer noopener">Districts Commonplace map</a> is still available if you want to see what suggestions have been made so far or add your own.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow Harbour Ltd – Yorkhill Quay Phase 2</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="291" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=525%2C291&#038;ssl=1" alt="Yorkhill Quay Phase 2 render" class="wp-image-13494" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=600%2C332&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=300%2C166&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=1536%2C851&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?resize=2048%2C1134&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay_Banner-Image-1-Scene-46-scaled-1.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>The latest visualisation of the Phase 2 tower blocks (now on stilts above underground car park).</figcaption></figure>



<p>This development first sprung up in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" target="_blank">Digest 73, Item 1.1</a>. It&#8217;s now nearing the end of a pre-application period before actual plans are submitted to the council.</p>



<p>The <a rel="noreferrer noopener" href="http://yorkhillquay.com/next-steps-and-feedback" target="_blank">Next Steps and Feedback page</a> has a webform you can use to send comments. Or you can email: yorkhillquay@iceniprojects.com by Friday 19 March.</p>



<h4 class="wp-block-heading" id="one-six">1.6: North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall</h4>



<p>North Lanarkshire Council is consulting about traffic in the villages of Calderbank and Chapelhall, between Airdrie and the M8 (as covered in <a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-seven" target="_blank" rel="noreferrer noopener">Digest 81, Item 1.7</a>). See the&nbsp;<a href="https://storymaps.arcgis.com/stories/1bcf196100854629b3b0d5fbc32a5d58" target="_blank" rel="noreferrer noopener">Chapelhall Traffic Study</a> and&nbsp;<a href="https://storymaps.arcgis.com/stories/fec286268a3c4ee0994aa71aecbd84e5" target="_blank" rel="noreferrer noopener">Calderbank Traffic Study</a>&nbsp;for a survey link at the end of each. If you know the areas you have until Sunday 21 March to respond.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: East Dunbartonshire Council –&nbsp;Climate Conversation</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=525%2C272&#038;ssl=1" alt="East Dunbartonshire's climate conversation" class="wp-image-13465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?resize=1536%2C796&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?w=1628&amp;ssl=1 1628w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/climate_conversation_brandingv2.jpeg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Actual roads in East Dunbartonshire may vary.</figcaption></figure>



<p>As many of us know, East Dunbartonshire Council was the only mainland Scottish council not to bid for Spaces for People funding. However, they do seem to be trying to engage their residents about climate change. It almost seems timed as a response to a nearby city having some sort of globally important climate event (which isn’t mentioned).</p>



<p>Their <a href="https://www.eastdunbarton.gov.uk/climate-conversation">Climate Conversation webpage</a> says: <em>&#8220;The Climate Conversation is the first stage in preparing an area-wide Climate Action Plan (CAP) for East Dunbartonshire&#8230; We are also commencing work during 2021 on new strategies that will support the objectives of the CAP: the Open Space Strategy; Circular Economy Strategy; and Active Travel Strategy.&#8221;</em> The last one will obviously be of most interest to GoBike (but the other two are also welcome). </p>



<p>EDC have various surveys to fill in –&nbsp;one general, one for businesses and one for young people (all want an email address upfront). There are also <a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/east-dunbartonshire-climate-conversation-tickets-143700675589" target="_blank">Climate Conversation events</a>, on 22 March,&nbsp;30 March&nbsp;and&nbsp;22 April. The events are all online (on MS Teams) so it&#8217;s likely to be more civil than <a rel="noreferrer noopener" href="https://www.milngavieherald.co.uk/news/police-called-last-thursdays-meeting-about-bears-way-2134078" target="_blank">previous public meetings where the police were called</a>. Perhaps EDC will have their own version of <a href="https://www.theguardian.com/uk-news/2021/feb/05/handforth-parish-council-jackie-weaver-internet-star" target="_blank" rel="noreferrer noopener">Jackie Weaver</a> to guide proceedings?</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Flourishing Molendinar (formerly North East City Ways) –&nbsp;Public workshops</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="329" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=525%2C329&#038;ssl=1" alt="" class="wp-image-13467" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=600%2C376&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?resize=300%2C188&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/molendinar-st-sketch.png?w=1052&amp;ssl=1 1052w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Blackhill might not quite look like this –&nbsp;yet!</figcaption></figure>



<p>This initiative, started by On Bikes and St Paul&#8217;s Youth Forum, was <a href="https://www.gobike.org/north-east-city-ways-needs-you-12345" target="_blank" rel="noreferrer noopener">first mentioned in a GoBike blog</a>. Their original name, North East City Ways, may have been inspired by a certain city council. The new name, <a href="https://www.flourishingmolendinar.com/" target="_blank" rel="noreferrer noopener">Flourishing Molendinar</a>, comes from the stream that runs from Hogganfield Loch past Blackhill (mostly in a culvert) towards the city centre. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=525%2C296&#038;ssl=1" alt="" class="wp-image-13479" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Molendinar-Park_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Not always blue skies in the North East –&nbsp;this park is also named after the Molendinar Burn</figcaption></figure>



<p>Along with the new name comes a change in focus from the wider area to Provanmill Rd and Langdale St. Both these streets had Spaces for People projects installed over the summer and showed potential for active travel routes. FloMo (it&#8217;s easier to spell!) are looking to build on that with <a href="https://www.eventbrite.co.uk/e/flourishing-molendinar-public-workshop-tickets-121601496349" target="_blank" rel="noreferrer noopener">public workshops on 22, 23 and 24 March</a>. They still have their <a href="https://docs.google.com/forms/d/e/1FAIpQLSdRjYngGGZTaojHa1NjhbIUn3lcuSxpj68IdsHuzrxEerZbtQ/viewform" target="_blank" rel="noreferrer noopener">survey about getting around the North East</a> of the city. Also, there&#8217;s the <a href="https://streetsforallglasgow.commonplace.is/" target="_blank" rel="noreferrer noopener">Streets for All Commonplace map</a> (which On Bikes share with GoBike and <a href="https://www.glasgowecotrust.org.uk/" target="_blank" rel="noreferrer noopener">Glasgow Eco Trust</a>). </p>



<h4 class="wp-block-heading" id="one-nine">1.9: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</h4>



<p>A different kind of active travel project but also driven by young (and not so young) people. First covered in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315#one-nine" target="_blank">Digest 81, Item 1.9</a>, it&#8217;s for a skate park under the M74 extension near West St underground station. The <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">GUSM74 survey</a> is still open for skaters, or their families, to have their say about what they want to see in the park.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow City Council –&nbsp;(Y)our Cowcaddens, &#8216;Learning Quarter&#8217; and Merchant City Proposals Workshops</h4>



<p>The email for item 1.4 also said: <em>&#8220;Townhead, alongside Cowcaddens, the Learning Quarter and the Merchant City, is the focus of the current phase of (Y)our City Centre District Regeneration Frameworks.&#8221;</em> So, workshops for the other three will no doubt follow sometime soon.</p>



<h3 class="wp-block-heading"><strong>Section 3:</strong>&nbsp;<strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</h4>



<p>Some swift feedback from the city council about Tricia&#8217;s points in the <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-ECW-Phase-1-response-260221.pdf" target="_blank">GoBike response to the ECW order</a>. Let&#8217;s skip the &#8216;thank you&#8217; and &#8216;COVID-19 happened&#8217; bit and go to the following paragraph: </p>



<p><em>&#8220;The left turn from London Road to Hamilton Road has been banned for all traffic to allow the slip road to be closed and provide a large and safe pedestrian area for crossing.&nbsp;A segregate cycle route will be provided on the south side of London Road and Hamilton Road and will have signal controlled crossing facilities for pedestrians and cycles at Mount Vernon Junction which will link to all potential movements. This junction had no cycle or pedestrian facilities prior to these works. Cycle counts undertaken July 2017 recorded that 4 cycles per day made the left turn from London Road to Hamilton Road which included cyclists on the footway. A classified traffic count, counting all traffic categories, undertaken in October 2017 supported this.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=525%2C263&#038;ssl=1" alt="" class="wp-image-6416" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=600%2C301&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/GBMount_Vernon_Junction.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Image of the Mount Vernon junction from the original consultation in 2018.</figcaption></figure>



<p>It&#8217;s not clear if the first part really is talking about the turn from London Rd eastbound to Hamilton Rd westbound, as Tricia asked. However, the count gives us an idea of how many people it might have affected in 2017. Will last summer&#8217;s surge in cycling numbers make a difference to that? And will the new junction attract all eastbound cyclists across the road to the 2-way lane? I guess we&#8217;ll find out in the near future.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</h4>



<p>GoBike also received a shorter response from GCC about Tricia&#8217;s <a href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-Hamilton-Road-30mph-response-260221.pdf" target="_blank" rel="noreferrer noopener">GoBike response to the 30mph order</a>. Not a lot of detail in this one –&nbsp;it thanks us for our support then basically says East City Way will be done in stages and the police enforce speed limits. It&#8217;s just as well we&#8217;ve got GCC officers to keep us right on these things. </p>



<h4 class="wp-block-heading" id="three-three">3.3: Multiplex – Glasgow University campus newsletter</h4>



<p>Having just missed our publication time for the last Digest I&#8217;m sure everyone will be delighted to see the latest <a href="https://campusdevelopment.co.uk/wp-content/uploads/2021/03/March-2021.pdf" target="_blank" rel="noreferrer noopener">Glasgow Uni campus newsletter</a> this time. There are some nice pictures of large steel frames. However, it doesn&#8217;t include that <a href="https://campusdevelopment.co.uk/wp-content/uploads/2021/03/March-2021.pdf https://campusdevelopment.co.uk/news/university-place-pedestrian-diversion/" target="_blank" rel="noreferrer noopener">University Place has closed to pedestrians and cycling for three months</a>. Nor does it mention a change to the road layout on University Ave: </p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
https://twitter.com/kaisertia/status/1371466915781222400?s=20
</div></figure>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13425</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 74, 24 November 2020</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 24 Nov 2020 18:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[city centre]]></category>
		<category><![CDATA[City College]]></category>
		<category><![CDATA[cowcaddens]]></category>
		<category><![CDATA[districts]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[ldp2]]></category>
		<category><![CDATA[Malls Mire]]></category>
		<category><![CDATA[north glasgow]]></category>
		<category><![CDATA[onbikes]]></category>
		<category><![CDATA[protected junctions]]></category>
		<category><![CDATA[roadworks]]></category>
		<category><![CDATA[Rutherglen]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[streetscore]]></category>
		<category><![CDATA[Toryglen]]></category>
		<category><![CDATA[townhead]]></category>
		<category><![CDATA[university of strathclyde]]></category>
		<category><![CDATA[Urban Roots]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=12604</guid>

					<description><![CDATA[Shaping the north of the city plus your reactions to roadworks and more speed cushions. It&#8217;s like buses –&#160;wait for ages for a consultation about the north of the city then loads come along at once. In this case, workshops for a few northern city centre &#8216;districts&#8217;, a future consultation about the uni/college campuses around &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 74, 24 November 2020"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Shaping the north of the city plus your reactions to roadworks and more speed cushions.</h2>



<p>It&#8217;s like buses –&nbsp;wait for ages for a consultation about the north of the city then loads come along at once. In this case, workshops for a few northern city centre &#8216;districts&#8217;, a future consultation about the uni/college campuses around Cathedral St and a strategic document about North Glasgow. </p>



<span id="more-12604"></span>



<p>This Digest also includes links in the Contents page so you can, hopefully, jump straight to a topic if you want to. </p>



<h3 class="wp-block-heading"><strong>Contents</strong> <br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#one-one">Steer Energy –&nbsp;Streetscore &#8211; Impact of Streetworks Survey</a></strong>, <strong>respond by end November</strong></li><li><strong><a href="#one-two">Glasgow City Council – (Y)our Districts Online Ideas Workshops</a>, Townhead: 2 December / Cowcaddens: 7 December</strong></li><li><a href="#one-three">Glasgow Harbour Ltd – Yorkhill Quay masterplan/&#8221;River Clyde blue corridor vision&#8221;</a>, closes 4 December</li><li><a href="#one-four">East Dunbartonshire Council – Proposed Local Development Plan 2 (LDP2)</a>, closes 15 January 2021</li><li><strong><a href="#one-five">Glasgow City Council –&nbsp;North Glasgow Strategic Development Framework (SDF)</a>, *deadline extended* –&nbsp;closes 29 January 2021</strong></li><li><a href="#one-six">Glasgow City Council – Protected Junction Trial consultation (Victoria Rd)</a></li><li><a href="#one-seven">OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</a></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list" id="block-2fe65492-7d15-4b11-8647-53cd2ad123c6"><li><strong><a href="#two-one">University of Strathclyde –&nbsp;Early Engagement Information: Creating people first infrastructure, a city centre context</a></strong></li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list" id="block-2fe65492-7d15-4b11-8647-53cd2ad123c6"><li><a href="#three-one">Glasgow City Council (Maxwell Park area) Traffic Calming Scheme</a></li><li><a href="#three-two">Glasgow City Council (Ryehill Road) Traffic Calming Scheme</a></li><li><a href="#three-three">East Dunbartonshire Council –&nbsp;LDP2 Newsletter</a></li><li><a href="#three-four">Urban Roots –&nbsp;Malls Mire/Toryglen Greenspace &amp; Active Travel Project</a></li></ol>



<h3 class="wp-block-heading" id="block-96eb2584-3877-4536-9fa1-a5301d33d259"><strong>Section 1:</strong> <strong>Current Consultations</strong><br>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one"><strong>1.1:</strong> <strong>Steer Energy –&nbsp;Streetscore &#8211; Impact of Streetworks Survey, respond by end November</strong></h4>



<p>If you&#8217;ve ever had an annoying experience trying to get around roadworks, here&#8217;s a chance to get it off your chest. Thomas at GoBike was contacted by Megan from Steer Energy, who are doing a survey about the effects of roadworks on different groups; including cyclists. Her message says:</p>



<p><em>&#8220;Steer Energy are carrying out research to engage with people who can give their expert opinion on what the challenges people may face when encountering streetworks in their everyday life. We are targeting the following groups:</em></p>



<ul class="wp-block-list"><li><em>People living with disabilities &nbsp;</em></li><li><em>People living with dementia &nbsp; &nbsp;</em></li><li><em>People with mental health issues &nbsp; &nbsp; &nbsp;</em></li><li><em>Neurodiverse people </em>[including people on the autism spectrum]</li><li><em>Carers &nbsp; &nbsp; &nbsp;</em></li><li><em>Cyclists</em></li></ul>



<p><em>The aim is to gather opinions and ideas from people with lived experience journeying through street works that may have found the experience challenging.</em></p>



<p><em>We would be keen to include the experience of cyclists across Scotland and encourage you to share with any other groups and communities you work with:<br><a href="https://www.surveymonkey.co.uk/r/steerstreetworks" target="_blank" rel="noreferrer noopener">https://www.surveymonkey.co.uk/r/steerstreetworks</a></em></p>



<p><em>Our aim is to gather as much information as possible about the current impacts of streetworks and how they can be better designed with more people in mind.&#8221;</em></p>



<p>We asked for a few more details about what this involved and got a very quick response:</p>



<p><em>&#8220;The design of all streetwork in the UK is carried out using the same national guidelines which is basically a manual used in training and design. Steer Energy is challenging that manual and asking that it be amended to become more accessible and include better designed streetworks to decrease isolation and disruption to peoples lives, especially those who do not use cars and those groups who require more space to move around in public (wheelchair users, people with mobility problems,&nbsp;disabled people, neurodiverse people, etc).&#8221;</em></p>



<p>If you&#8217;d like to take part, see the SurveyMonkey link, above –&nbsp;preferably before the end of November to allow time for the report to be put together.</p>



<h4 class="wp-block-heading" id="one-two">1.2: Glasgow City Council – (Y)our Districts Online Ideas Workshops (Townhead: 2 December/Cowcaddens: 7 December)</h4>



<p>We received emails about upcoming consultations and events for the District Regeneration Frameworks project by Glasgow City Council. These are very wide-ranging consultations covering housing, business, leisure, etc. as well as transport. The &#8216;districts&#8217; are areas around the city centre – some have already had plans completed, including Blythswood, Central, Broomielaw and St Enoch – see the <a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/city-centre-districts" target="_blank">Districts page on the City Centre Strategy website</a> (under their huge map). </p>



<p>The project&#8217;s <strong>CommonPlace map </strong>for all Districts can be found at the links, below. </p>



<p><em>&#8220;You can check out what’s been said so far and contribute your thoughts online at&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqtVElJUBoW1-2BQ4-2Fyv1aQB3za2qYGwMGHJvmpFxa3edanalRs6BN0QnvShGLXfHBZYQ-3D-3DtCRp_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel2wUTa15u-2BSClhVLH8OqLTxxcRUk6wp5yLjtAE0CmW6YL1ZBWNpjkVE48E21CMz5U44-2FTytCr4cAB-2FS6i2ArIxKGuXT-2BpJVu0hewJiz1wIC4snF0bN9c0w5o02kPrqxIVDHfRd1cg8NugGRRzUD85EkvUQCNMa4Ik0PpAIe475KstuZdhm0bzQM6iKQ18Jmg7jMhuDm1-2B8JX8E5256PkXIk47iwChGsvo1JrkknzzRtM-3D" rel="noreferrer noopener">https://yourcitycentre2020.commonplace.is/</a>&nbsp;and&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=pLPX9h3jCRW2L9eCTHMYiYg7uPaUFy7kl7KMPHf0A-2F6IZB5ivfDwrOCkRIXzzG3j8jdu_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nelx-2BHVnUGMcO0L-2Bm-2FgDhJhrSf7TRYKG6CRwjzDaZwFpG3XYZghuIq-2BqL3WWLfW-2FZ-2FHdtkxcXTEASdRKS-2BOPSdyXzr6fv1D-2FqzlNSV91PlOyw0ilyxTMh0PRbKs25trI5fDPuW-2F6UqmV1BOQtdW3ZUi1j-2BsfjT-2BWMi4-2BcE8HFxKm75znHfJUvQWb4DeeDL77d-2F7N1MAPCD23K7hOfJGvuBmGUiTWPirYOYA8EDJ3qL2XEA-3D" rel="noreferrer noopener">http://www.yourplacemap.org/</a>.&#8221;</em></p>



<p>The next two areas with consultation events arranged are Townhead and Cowcaddens (with Merchant City and the &#8216;Learning Quarter&#8217; to follow at some point).</p>



<p><a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/townhead" target="_blank"><strong>Townhead district</strong></a> covers the area you might expect from Cathedral St to&nbsp;the M8. The  &#8220;potential bridge&#8221; in the map is the new pedestrian/cycle bridge to Sighthill (due Spring 2021). The &#8220;route of potential Avenues&#8221; on Castle St and Springburn Rd isn&#8217;t in the current version of the <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/avenues" target="_blank">Avenues Programme</a> (but would be very welcome if GCC want to update it).</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="365" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=525%2C365&#038;ssl=1" alt="" class="wp-image-12623" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=600%2C417&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?resize=300%2C209&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Townhead-District.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Townhead map</figcaption></figure>



<p><strong>(Y)our Townhead Online Ideas Workshops (via Zoom) –&nbsp;Wednesday 2 December</strong></p>



<ul class="wp-block-list"><li>Afternoon Workshop: 2pm – 4pm,&nbsp;<a href="https://www.eventbrite.co.uk/e/your-townhead-ideas-workshop-afternoon-session-tickets-129478201787" target="_blank" rel="noreferrer noopener">Tickets to the Townhead Workshop, Afternoon session</a></li><li>Evening Workshop: 6pm – 8pm,&nbsp;<a href="https://www.eventbrite.co.uk/e/your-townhead-ideas-workshop-evening-session-tickets-129550574255" target="_blank" rel="noreferrer noopener">Tickets to the Townhead workshop, Evening Session</a></li></ul>



<p><strong><a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/cowcaddens" target="_blank">Cowcaddens district</a></strong> goes from Buchanan Bus Station to an area north of the M8 at St George&#8217;s Cross. This is where the &#8216;Underline&#8217; from GCC&#8217;s <a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/avenues" target="_blank">Avenues Programme</a> was due to go (from Cambridge St) but it&#8217;s missing from the map.</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="335" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=525%2C335&#038;ssl=1" alt="" class="wp-image-12624" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=600%2C383&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?resize=300%2C192&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Cowcaddens-District.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Cowcaddens map</figcaption></figure>



<p><strong>(Y)our Cowcaddens Online Ideas Workshops (via Zoom) –&nbsp;Monday 7 December</strong></p>



<ul class="wp-block-list"><li>Afternoon Workshop: 2pm – 4pm, <a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqn6jppcj37yW9d4h9gNIobi-2BSfB8aOdAW8sxAyebFxbThe0K8ECzcS0Qmbp12KaMwUFdpPOk84wfashg1gEd4zfVM3v4vGKWmc2ina57jfSmX4XjGr-2FfvuabTlcqsZVH4w-3D-3Dj06b_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel-2FKmcxl11KBqsqbqnhRU4EO53hi20I2KrIvGb2nmutudaWImKczOjUZfiP8RkJqY74kz7nYzqNvP88QnUV6zoJtNAPZAV05XOfjs10ClgPHMUyk9-2FMSUj7NeoSdPaOqS8jx2-2B3CvueXIY97ChM3Lwo4ZcEqZHje91RfxxngIk0EuMBsvJ16Zi083m6MKv77HkEtlvlQI0YWuJhqhmmV-2BtRR9Q-2BF-2F-2FwWewU8JrHYUknaY-3D" rel="noreferrer noopener">Tickets to the Cowcaddens Afternoon Workshop</a>.</li><li>Evening Workshop: 6pm – 8pm,&nbsp;<a target="_blank" href="http://url8988.commonplace.is/ls/click?upn=nSX9oJDE2dLgmKTcQYJRqn6jppcj37yW9d4h9gNIobi-2BSfB8aOdAW8sxAyebFxbThe0K8ECzcS0Qmbp12KaMwVYtyzh4RkRX-2Fcgq2FAxVCYkcUrChqgsTVVebIpm3yIxCnDt2q5stkD0Cya-2Fg2Kj1A-3D-3DYjjv_zSdhWDREQyxqtNEH3IGDBe3byPW2b56Hwg0uIWlEL03W-2FQ6xZNcElK-2BhK09IFWjqSK3MjR-2Fpud41BJCELU-2FHjzFnTB06gd20TS-2BZbUvt7X79qmW6i48d-2BOOOgx90-2FRFkiwCYJx-2FVxhJ5yKmZ4sciy9YVntcK0ubYkUvT8LtV-2BsAk2EQmBGpqi0RNjfRq2nel00vBux0XciOVsMLhAMmlHRWwDLauXMImi1C5YNMOctv3WoRjJW2uNlcuTHyqxPkYh2roUIcOZfMZy8hQ2PuIaLzGqM-2FsvtiL-2F-2FS32hrOONMYwW7tbePjDnVx5VJCAhYDSyfKYHhU3TnSJc80mwYHhmRBwzYtM3-2Bz0QRem6r84xA8TzYeWX7btJ-2Bxv2zH844zcLnyNbYjDnWg-2BK3BBSDuPIrarKR4itFG1dqsFwv5Ido-3D" rel="noreferrer noopener">Tickets to the Cowcaddens Evening Workshop</a>.</li></ul>



<p><em>&#8220;Each session will be facilitated by the (Y)our City Centre project team. We hope to map out with you issues and ideas you feel will help make the difference and improve Cowcaddens in the future.</em></p>



<p><em>Sign Up on Eventbrite and join in with these Workshops. If you do not have access to the internet contact the Freephone line number listed below to enable you to #ShareYourIdeas.</em></p>



<p><em>Further Workshops will be scheduled in early 2021 and we hope to arrange some [physical] events&#8230; when Covid restrictions allow.&#8221;</em></p>



<p>These events, and the forthcoming consultation under item 2.1, mean big changes could be  coming for the north of the city centre. They also tie in with the North Glasgow SDF –&nbsp;see item 1.5. </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow Harbour Ltd – Yorkhill Quay masterplan</h4>



<p>This was covered in <a href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455">Digest Issue 73</a>, Item 1.1. However, it arrived just before the Digest went out and we missed a few details. The consultation is by Glasgow Harbour/Peel L&amp;P (not the city council –&nbsp;apologies). </p>



<p>It&#8217;s about potentially building high-rises on the strip of land at the river between Riverside Museum and the new distillery. The intro video talks about a &#8220;long derelict site&#8221; without mentioning Peel (formerly Clydeport) have used it for storage for several years. It&#8217;s a pre-planning consultation as no planning application has gone in yet. There&#8217;s a <a rel="noreferrer noopener" target="_blank" href="https://www.urbanrealm.com/news/9080/Yorkhill_Quay_masterplan_to_fulfil_River_Clyde_blue_corridor_vision.html">summary of the possible proposal</a> (on Urban Realm), <a rel="noreferrer noopener" target="_blank" href="https://peellandp.co.uk/news/online-public-consultation-launched-for-over-1-000-new-homes-at-glasgow-waters/">article by Peel L&amp;P</a>, <a href="https://www.gobike.org/wp-content/uploads/2020/12/Yorkhill-Quay-boards.pdf" target="_blank" rel="noreferrer noopener">Yorkhill Quay &#8216;boards&#8217;</a> (PDF) and <s><a rel="noreferrer noopener" href="http://mcinally-associates.co.uk/yq/index.html#home" target="_blank">consultation website</a></s> [removed Dec 2020]. Deadline for &#8220;formal&#8221; comments is 4 December (but deadline to view plans/ask questions is 30 November –&nbsp;email: <a rel="noreferrer noopener" href="mailto:advice@mcinally-associates.co.uk" target="_blank">advice@mcinally-associates.co.uk</a>).</p>



<h4 class="wp-block-heading" id="one-four">1.4: East Dunbartonshire Council – Proposed Local Development Plan 2 (LDP2), <br>(closes 15 January 2021)</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="84" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=525%2C84&#038;ssl=1" alt="East Dunbartonshire Council logo" class="wp-image-12376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?w=562&amp;ssl=1 562w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/10/East-Dunbartonshire-Council.png?resize=300%2C48&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As covered in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342" target="_blank">Digest issue 72</a>, Item 1.8. You&#8217;ve to email EDC if you want to comment about local development issues, like the lack of Spaces for People projects or phase 2 of the <a rel="noreferrer noopener" href="https://www.gobike.org/campaigns/mini-campaigns/friends-of-bearsway" target="_blank">Bearsway</a>, for example. See the EDC website:&nbsp;<a rel="noreferrer noopener" href="http://www.eastdunbarton.gov.uk/LDP2" target="_blank">www.eastdunbarton.gov.uk/LDP2</a>. </p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow City Council – North Glasgow Strategic Development Framework</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=525%2C371&#038;ssl=1" alt="Glasgow North - principles of active travel map" class="wp-image-12646" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?w=1202&amp;ssl=1 1202w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Glasgow-North-SDF-30-09-2020-33_active-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>An active travel map from the Glasgow North SDF</figcaption></figure>



<p>This document is about a huge area north of the M8 from the length of Maryhill Rd across to Milton, Springburn and Royston. It&#8217;s looking decades ahead and has already been five years in the making. Brenda has written a detailed <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/GoBike-NGlasgowSDF-letter-171120.pdf" target="_blank">GoBike response to the North Glasgow SDF</a>. See the <a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">North Glasgow SDF consultation</a> on GCC&#8217;s website. The deadline has been extended to 29 January 2021.</p>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow City Council – Protected Junction Trial consultation</h4>



<p>This consultation is about the new protected junctions on Victoria Rd, at Calder St and Allison St, as part of the South City Way. It was covered in <a href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" target="_blank" rel="noreferrer noopener">Digest 73</a>, Item 1.5. If you want to show support for the new junctions, or just find out more, see <a rel="noreferrer noopener" href="https://glasgow.gov.uk/protectedjunctions" target="_blank">GCC&#8217;s Protected Junctions webpage</a> for further images, a video, a PDF document and a contact link. The junction trial will last two years but there&#8217;s no deadline mentioned for feedback. </p>



<h4 class="wp-block-heading" id="one-seven">1.7: OnBikes and St Paul’s Youth Forum – short survey for Sustrans’ Places for Everyone scheme</h4>



<p>This <a rel="noreferrer noopener" href="https://docs.google.com/forms/d/e/1FAIpQLSdRjYngGGZTaojHa1NjhbIUn3lcuSxpj68IdsHuzrxEerZbtQ/viewform" target="_blank">multiple choice survey</a> (as covered in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342">Digest issue 72</a>, Item 1.1) was originally looking for quick feedback but remains open. OnBikes and St Paul’s Youth Forum are working on a Places for Everyone project to improve active travel infrastructure in parts of North East Glasgow like Smithycroft, Riddrie and Blackhill. </p>



<h3 class="wp-block-heading"><strong>Section 2:</strong> <strong>Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: Glasgow –&nbsp;Early Engagement Information: Creating people first infrastructure, a city centre context</h4>



<p>This is potentially a lot more important than the vague title would suggest. We received an email from Stantec (a multi-national design/engineering company) on behalf of the University of Strathclyde. They want to develop active travel routes through their campus and the &#8216;Learning Quarter&#8217; around Cathedral St and North Hanover St: </p>



<p><em>&#8220;The University of Strathclyde, in partnership with, City of Glasgow College and Glasgow City Council have secured Sustrans&#8217; Places for Everyone funding for the project &#8216;Creating People-First Infrastructure in a City Centre Campus&#8217;. Stantec are assisting the project team in this exciting endeavour.</em></p>



<p><em>The vision of this project is to create an attractive, safe and walkable &#8216;learning quarter&#8217; in the north-east of the city centre through the design of an innovative urban realm, which improves the physical environment and allows the general public, residents, students and staff to travel to, and move freely between the University of Strathclyde, City of Glasgow College, nearby Glasgow Caledonian University and the rest of the city centre.</em></p>



<p><em>The improvements that are being explored in the project area will provide significant value to the extended community. By aligning this project with other projects being delivered by Glasgow City Council, &#8216;Creating People-First Infrastructure in a City Centre Campus&#8217; will also benefit a range of other people who live, work and travel through the city centre.&nbsp;The&nbsp;<a target="_blank" href="https://www.glasgow.gov.uk/avenues" rel="noreferrer noopener">Avenues Programme</a>&nbsp;and&nbsp;<a target="_blank" href="https://www.glasgow.gov.uk/spacesforpeople" rel="noreferrer noopener">Spaces for People</a>&nbsp;are examples of Glasgow City Council’s ambitions to rebalancing streets in favour of people walking cycling or wheeling in the city centre.</em></p>



<p><em>The key routes to be enhanced in the learning quarter as part of this project have been identified through a feasibility and options appraisal process and are shown in the figure below.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=525%2C371&#038;ssl=1" alt="Map of proposed active travel routes to north-east of George Square" class="wp-image-12607" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?w=1141&amp;ssl=1 1141w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/learning-quarter-routes.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Route A –&nbsp;Glasgow Queen St. Station –&nbsp;Cathedral Square; <br>Route B –&nbsp;Buchanan Bus Station/Glasgow Caledonian University –&nbsp;Merchant City; <br>Route C –&nbsp;Sighthill Bridge –&nbsp;Cathedral St; <br>Route D –&nbsp;High St. Station –&nbsp;&#8216;Heart of the Campus&#8217; (Rottenrow); <br>Other Routes in Study (Minor Upgrades); <br>Avenues Programme and Intervention (delivered by other projects).</figcaption></figure>



<p><em>&#8220;In the next few weeks we will be launching a public consultation website to present and receive feedback on proposals developed for the learning quarter so far. This site will be updated as the project progresses, proving an important resource. We hope that you will be able to contribute to this consultation to help shape the project for your local community by viewing proposals, leaving feedback and sharing the consultation website with your networks.</em></p>



<p><em>For any further information in the meantime please contact the project team at&nbsp;<a href="mailto:PfEGlasgow@stantec.com" target="_blank" rel="noreferrer noopener">PfEGlasgow@stantec.com</a></em></p>



<p><em>Kind regards, <br>The Project Team&#8221;</em></p>



<p>This may be of interest to current and former students of the universities/colleges in this area. It sounds quite wide-ranging but seems to emphasise walking rather than cycling. A lot of change is due in the next few years, including Strathclyde Uni demolishing the current &#8216;Strathy Union&#8217; on John St as part of their ongoing campus redevelopment (see their <a rel="noreferrer noopener" href="https://www.strath.ac.uk/whystrathclyde/campusupdate/" target="_blank">Campus Update</a> for more details). </p>



<p>This consultation is also relevant to the &#8216;(Y)our Learning Quarter&#8217; district consultation due soon. Nearby streets are earmarked as &#8216;Avenues&#8217; and the <a rel="noreferrer noopener" href="https://reglasgow.com/work-to-start-on-additional-people-friendly-avenues-on-edge-of-city-centre-in-2023/" target="_blank">&#8216;Avenues Plus&#8217; project</a> (due to be built between 2023–25). So, there&#8217;s a lot of potential to transform the area north-east of George Square. Once Stantec update us about the website, we&#8217;ll pass on the link.</p>



<h3 class="wp-block-heading"><strong>Section 3: Consultations Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council – Maxwell Park area, Traffic Calming Scheme</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="229" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=525%2C229&#038;ssl=1" alt="map of the Maxwell Park area" class="wp-image-11993" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=600%2C262&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/08/Maxwell-Park-area-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>We have a few more responses from the city council about traffic calming. Firstly, this one for the Maxwell Park area was first covered in <a href="https://www.gobike.org/consultation-digest-issue-68-01-september-2020-humps-all-the-way-in-glasgow-and-in-north-lanarkshire-its-roads-roads-and-more-roads-11968">Digest 68</a>, Item 1.8. I wonder if GCC have changed their mind about the speed cushions?</p>



<p>&#8220;<em>Further to my preliminary email of 25<sup>th</sup>&nbsp;August 2020, I can confirm that it is my intention to proceed with the introduction of the above named Traffic Calming Scheme.</em></p>



<p><em>I can confirm that there has been no changes to the original proposed scheme which will comprise of:</em></p>



<ul class="wp-block-list"><li><em>5 sets of 3,&nbsp;2m wide 75mm high, speed cushions on Dolphin Road,</em></li><li><em>6 sets of 3, 2m wide 75mm high, speed cushions on Fotheringay Road,</em></li><li><em>11 sets of 3, 2m wide 75mm&nbsp;high, speed cushions on Springkell Avenue</em></li><li><em>The installation of 44 bollards</em></li></ul>



<p><em>Roads affected by the proposed Scheme:</em></p>



<ul class="wp-block-list"><li><em><strong>Dolphin Road</strong></em></li><li><em><strong>Fotheringay Road</strong></em></li><li><em><strong>Springkell Avenue</strong></em></li></ul>



<p><em>I enclose a plan of the scheme.</em></p>



<p><em>Should you require any further information or clarification, please e-mail&nbsp;<a href="mailto:LESTraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">LESTraffic@glasgow.gov.uk</a>.&#8221;</em></p>



<p>Nope, nothing has changed despite GoBike&#8217;s letter of objection. The previous plans were in Digest 68, as above if you want to see them. </p>



<h4 class="wp-block-heading" id="three-two">3.2: Glasgow City Council – Ryehill Road, Traffic Calming Scheme</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="303" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=525%2C303&#038;ssl=1" alt="map of the area around Ryehill Road" class="wp-image-12074" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=600%2C346&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?resize=300%2C173&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/09/Ryehil-Road-map.png?w=885&amp;ssl=1 885w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s another one from the following <a href="https://www.gobike.org/consultation-digest-issue-69-15-september-2020-what-price-public-opinion-12044">Digest 69</a>, Item 1.9. Maybe this response will be the one where GCC have a &#8216;road to Damascus&#8217;-style revelation and change their minds?</p>



<p><em>&#8220;Further to my preliminary email of 10<sup>th</sup>&nbsp;September 2020, I can confirm that it is my intention to proceed with the introduction of the above named Traffic Calming Scheme.</em></p>



<p><em>I can confirm that there has been no changes to the original proposed scheme which will comprise of:</em></p>



<ul class="wp-block-list"><li><em>The installation of 12 speed cushions</em></li><li><em>The supply and installation of 8 bollards</em></li></ul>



<p><em>I enclose a plan of the scheme.</em></p>



<p><em>Should you require any further information or clarification, please e-mail&nbsp;<a href="mailto:LESTraffic@glasgow.gov.uk" target="_blank" rel="noreferrer noopener">LESTraffic@glasgow.gov.uk</a>.&#8221;</em></p>



<p>Nope, no changes there either. Again, see Digest 69 to pore over the unchanged plans. </p>



<h4 class="wp-block-heading" id="three-three">3.3 East Dunbartonshire Council –&nbsp;LDP2 November Newsletter</h4>



<p>On the subject of councils not changing their minds about things, here are EDC again with a nice <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/East-Dunbarton-LDP-Newsletter-61-November-2020.docx.pdf" target="_blank">LDP2 newsletter, November edition</a> (PDF).&nbsp;Previous issues on EDC&#8217;s <a rel="noreferrer noopener" href="https://www.eastdunbarton.gov.uk/residents/planning-and-building-standards/planning-policy/newsletter" target="_blank">LDP2 Newsletters</a> webpage in case you want some light reading for the winter nights.</p>



<h4 class="wp-block-heading" id="three-four">3.4: Urban Roots –&nbsp;Malls Mire/Toryglen Greenspace &amp; Active Travel Project</h4>



<p>GoBike received an email from Dr Gemma Jennings at Urban Roots about an ongoing project: </p>



<p><em>&#8220;Dear All, <br>I am excited to share with you the latest news from the the North Toryglen Greenspace &amp; Active Travel Project, which following our community consultation has been rebranded simply as &#8216;Malls Mire&#8217;. Work begins on site this week and will run until summer 2021 &#8211; please find attached the first Malls Mire newsletter from Clyde Gateway for details. I have also attached details of path closures and diversions that will be in place for the first phase of works.&nbsp;<br>We will share ongoing project updates on social media via our Malls Mire facebook and twitter pages &#8211; both @MallsMire.&#8221;</em></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="293" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=525%2C293&#038;ssl=1" alt="Malls Mire map" class="wp-image-12657" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=600%2C335&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?resize=300%2C167&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-map.jpg?w=914&amp;ssl=1 914w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Malls Mire site</figcaption></figure>



<p>Malls Mire is the name of the greenspace between Rutherglen and Toryglen. While it&#8217;s possible to trudge your bike over the hill next to the woods, upgrading the paths will make a big difference to the area. As mentioned, Urban Roots sent us drawings of closures and diversions – <a href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-Site-Sketch-017-Rev001-201120.pdf" target="_blank" rel="noreferrer noopener">works on the west of Malls Mire</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-site-sketch-018-161120.pdf" target="_blank" rel="noreferrer noopener">works on the east of Malls Mire</a>. There&#8217;s also a short <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/11/Malls-Mire-Newsletter-Nov2020-reduced.pdf" target="_blank">newsletter about the Malls Mire project</a>.</p>



<p></p>



<p>Hope you like the changes in this Digest. New editor, new improved ideas, says the previous editor!</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">12604</post-id>	</item>
	</channel>
</rss>
