<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>automated vehicles &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/automated-vehicles/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Sat, 11 Jun 2022 01:05:19 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (National) Issue 7, 10 September 2021: New term and new Active Travel Minister</title>
		<link>https://www.gobike.org/consultation-digest-national-issue-7-10-september-2021-new-term-and-new-active-travel-minister-15444</link>
		
		<dc:creator><![CDATA[Jim Densham]]></dc:creator>
		<pubDate>Fri, 10 Sep 2021 11:00:00 +0000</pubDate>
				<category><![CDATA[GoBike]]></category>
		<category><![CDATA[active travel]]></category>
		<category><![CDATA[Active Travel Minister]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[funding]]></category>
		<category><![CDATA[parking]]></category>
		<category><![CDATA[Patrick Harvie MSP]]></category>
		<category><![CDATA[Programme for Government]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Scottish Parliament]]></category>
		<category><![CDATA[smart ticketing]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=15444</guid>

					<description><![CDATA[I’m sure by now you will have heard that Glasgow MSP Patrick Harvie has been appointed as the new Active Travel Minister in the Scottish Government &#8211; congratulations to Patrick. The new role was created after a deal was reached between the Scottish Greens and SNP on a form of power-sharing in Government. The agreement &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-national-issue-7-10-september-2021-new-term-and-new-active-travel-minister-15444" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (National) Issue 7, 10 September 2021: New term and new Active Travel Minister"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>I’m sure by now you will have heard that Glasgow MSP Patrick Harvie has been appointed as the new Active Travel Minister in the Scottish Government &#8211; congratulations to Patrick. The new role was created after a deal was reached between the Scottish Greens and SNP on a form of power-sharing in Government. The agreement included a raft of measures which will benefit people who want to cycle including a commitment to boost funding for active travel to £320m by 2024/25, which is 10% of the transport budget.</p>



<span id="more-15444"></span>



<p>Commitments from the deal have been included in the <a href="https://www.gov.scot/publications/fairer-greener-scotland-programme-government-2021-22/documents/" target="_blank" rel="noreferrer noopener">Programme for Government</a>, published this week. Here are some highlights from the PfG:</p>



<div class="wp-block-image is-style-default"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" fetchpriority="high" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/09/PfG-AT-image-2.jpg?resize=277%2C342&#038;ssl=1" alt="" class="wp-image-15446" width="277" height="342" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/09/PfG-AT-image-2.jpg?resize=486%2C600&amp;ssl=1 486w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/09/PfG-AT-image-2.jpg?resize=243%2C300&amp;ssl=1 243w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/09/PfG-AT-image-2.jpg?w=568&amp;ssl=1 568w" sizes="(max-width: 277px) 100vw, 277px" /><figcaption>Graphic from the Programme for Government</figcaption></figure></div>



<ul class="wp-block-list"><li>Spend at least £320&nbsp;million or 10% of the total transport budget goes on active travel by 2024-25</li><li>New Cycling Framework for Active Travel – to be published in 2022</li><li>Establishing an active freeway network for Scotland</li><li>Ensure all appropriate roads in built-up areas have a safer speed limit of 20 mph by 2025</li><li>An online reporting system – a 1‑year pilot project enabling anyone to upload camera footage of dangerous driving.</li><li>Maintaining the Scotland Cycle Repair Scheme</li><li>Produce a route map, by the end of 2021, for achieving the target to reduce the use of cars – measured as ‘car kilometres’ – by 20% by 2030</li><li>Deliver on our vision for “20-minute neighbourhoods”</li><li>Place Based Investment programme, backed with £325&nbsp;million over the next five years.</li></ul>



<p>There&#8217;s only a couple of smallish consultations from Transport Scotland this month. In the coming weeks and months, as the new parliamentary term really gets going, we expect there to be an increase in consultations , some of which will seek opinions on implementing the above policies.</p>



<p></p>



<p><strong>Section 1: Current Consultations</strong></p>



<p>(in date order for responses)</p>



<p>1.1: Transport Scotland &#8211; <a href="https://www.transport.gov.scot/consultation/consultation-on-penalty-charge-notices-for-parking-enforcement/" target="_blank" rel="noreferrer noopener">Consultation on Penalty Charge Notices for Parking Enforcement</a></p>



<p>Illegal and inconsiderate parking is at best an annoyance and at worst a safety risk for cyclists. The government is consulting on parking charges including differentiating between different offences. For example, it makes sense to charge someone more for parking on a double yellow than for overstaying their time in a parking space. As the consultation says ‘For enforcement to be effective, penalty charges for parking in breach of the prohibitions need to be set at an appropriate level.’</p>



<p>Closes 4 October 2021</p>



<p>1.2: Transport Scotland &#8211; <a href="https://www.transport.gov.scot/consultation/membership-of-the-national-smart-ticketing-advisory-board-consultation/" target="_blank" rel="noreferrer noopener">Membership of the National Smart Ticketing Advisory Board Consultation</a></p>



<p>This may be a wee bit niche, however, if like me you agree that public bike share schemes should be part of smart ticketing in Scotland it’s worth a quick response – even if you answer only Question 1 which asks whether disability organisations and active travel organisations should be included on the Board.</p>



<p>Closes 12 October 2021</p>



<p><strong>Section 2: Forthcoming Consultations</strong></p>



<p>No specific consultations expected</p>



<p><strong>Section 3: Consultation Feedback</strong></p>



<p>3.1: Law Commission (&amp; Scottish Law Commission) – <a href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank" rel="noreferrer noopener">Automated Vehicles: A regulatory framework for automated vehicles</a></p>



<p>This was featured in <a href="https://www.gobike.org/consultation-digest-national-issue-5-12-march-2021-transport-projects-for-a-low-carbon-scotland-13390" target="_blank" rel="noreferrer noopener">Consultation Digest (National) Issue 5</a> in March. Here is the response we received to the GoBike submission:</p>



<p>&#8220;Dear All,</p>



<p>The team has spent the last few months reviewing the materials submitted in response to our third consultation which closed in March this year. We are pleased to announce the publication of the summary of responses to our paper. In it we outline the key arguments put to us and direction of travel as we work towards the final report at the end of this year.</p>



<p>We have also put all the responses we received on our website.</p>



<p>Today we are also publishing a draft impact assessment and questions about the impact of our proposed reforms alongside the summary and welcome views.</p>



<p>Between now and the final report we have no further consultations planned but the team will be very happy to hear from you should you wish to bring any developments or ideas to our attention.</p>



<p>The summary of responses and next steps, all consultation responses received and our draft impact assessment are available on our project pages at https://www.lawcom.gov.uk/project/automated-vehicles/ or https://www.scotlawcom.gov.uk/law-reform/law-reform-projects/joint-projects/automated-vehicles/ </p>



<p>Yours sincerely,</p>



<p>Automated Vehicles Team – Law Commissions</p>



<p>&nbsp;Email: automatedvehicles@lawcommission.gov.uk</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">15444</post-id>	</item>
		<item>
		<title>Consultation Digest (National) Issue 5, 12 March 2021: Transport projects for a low-carbon Scotland</title>
		<link>https://www.gobike.org/consultation-digest-national-issue-5-12-march-2021-transport-projects-for-a-low-carbon-scotland-13390</link>
		
		<dc:creator><![CDATA[Jim Densham]]></dc:creator>
		<pubDate>Fri, 12 Mar 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[climate change]]></category>
		<category><![CDATA[holyrood2021]]></category>
		<category><![CDATA[Road safety]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Transport Scotland]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13390</guid>

					<description><![CDATA[There must be an election coming! One of the signs is the reduction in the number of new consultations from the Scottish Government as it wraps up its work programme for this current Parliament. However, before Parliament dissolves and Government goes into purdah there is a petition to sign asking parties to support cycling, and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-national-issue-5-12-march-2021-transport-projects-for-a-low-carbon-scotland-13390" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (National) Issue 5, 12 March 2021: Transport projects for a low-carbon Scotland"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>There must be an election coming! One of the signs is the reduction in the number of new consultations from the Scottish Government as it wraps up its work programme for this current Parliament. However, before Parliament dissolves and Government goes into purdah there is a <a href="https://action.cyclinguk.org/page/75816/petition/1" target="_blank" rel="noreferrer noopener">petition to sign asking parties to support cycling</a>, and the Strategic Transport Project Review consultation to respond to.  </p>



<span id="more-13390"></span>



<p>This month the Digest focuses on Transport Scotland’s  <a rel="noreferrer noopener" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">Strategic Transport Projects Review (STPR2</a>) Phase 1 consultation. STPR2 influences the Scottish Government’s transport investment programme in Scotland over the next 20 years (2022 – 2042). Unlike STPR1 the new review has a big focus on sustainable transport projects and because of this we need to provide as much constructive support as possible. </p>



<p><strong>Section 1: Current Consultations</strong></p>



<p>(in date order for responses)</p>



<p></p>



<p>1.1: Law Commission (&amp; Scottish Law Commission) &#8211; <a href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank" rel="noreferrer noopener">Automated Vehicles: A regulatory framework for automated vehicles</a></p>



<p>This 3<sup>rd</sup> consultation builds on the two previous consultations on safety assurance, allocating legal responsibility, and licensing AVs for passenger services and public transport.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-13220" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=600%2C276&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?w=964&amp;ssl=1 964w" sizes="(max-width: 525px) 100vw, 525px" /></figure>



<p>Tricia Fort has responded to this consultation on behalf of GoBike. Download the document below and use this as a guide to your own response.</p>



<div class="wp-block-file"><a href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-Automated-Vehicles-A-regulatory-framework-for-automated-vehicles-response-100321.pdf">GoBike-Automated-Vehicles-A-regulatory-framework-for-automated-vehicles-response-100321</a><a href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-Automated-Vehicles-A-regulatory-framework-for-automated-vehicles-response-100321.pdf" class="wp-block-file__button" download>Download</a></div>



<p>Closes 18 March 2021</p>



<p></p>



<p>1.2: Cycling UK in Scotland &#8211; <a href="https://action.cyclinguk.org/page/75816/petition/1" target="_blank" rel="noreferrer noopener">Cycling for everyone election petition</a> </p>



<figure class="wp-block-embed-youtube wp-block-embed is-type-video is-provider-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio"><div class="wp-block-embed__wrapper">
<iframe class="youtube-player" width="525" height="296" src="https://www.youtube.com/embed/9OLyx7Vyxbs?version=3&#038;rel=1&#038;showsearch=0&#038;showinfo=1&#038;iv_load_policy=1&#038;fs=1&#038;hl=en-GB&#038;autohide=2&#038;wmode=transparent" allowfullscreen="true" style="border:0;" sandbox="allow-scripts allow-same-origin allow-popups allow-presentation allow-popups-to-escape-sandbox"></iframe>
</div></figure>



<p>Ahead of the election on 6 May, Cycling UK in Scotland is<strong> </strong>aiming&nbsp;to show political parties that there is huge support for cycling from people across Scotland.</p>



<p>Their&nbsp;<a href="https://www.cyclinguk.org/sites/default/files/document/2021/02/cycling_uk_scotland_may_elections_final.pdf" target="_blank" rel="noreferrer noopener">Manifesto for Cycling</a>&nbsp;asks the next Government to:</p>



<ul class="wp-block-list"><li>Invest more money in cycling</li><li>Create safe space for people to cycle, walk and wheel</li><li>Enable people in rural communities to cycle</li></ul>



<p>Add your name in support of the asks&nbsp;&#8211; and increase pressure on parties to improve their commitment to cycling ahead of the election. <a href="https://action.cyclinguk.org/page/75816/petition/1" target="_blank" rel="noreferrer noopener">Sign the petition and share</a> with your friends, family and contacts.</p>



<p>Closes 26 March 2021</p>



<p></p>



<p>1.3: Scottish Government — <a href="https://consult.gov.scot/energy-and-climate-change-directorate/draft-public-engagement-strategy-climate-change/" target="_blank" rel="noreferrer noopener">Draft Public Engagement Strategy for Climate Change</a></p>



<p>This consultation has longer to run than previously advertised so still time to influence this public engagement strategy. </p>



<p>Closes 31 March 2021</p>



<p></p>



<p>1.4:<strong> </strong>Transport Scotland &#8211; <a href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank" rel="noreferrer noopener">Strategic Transport Projects Review (STPR2)</a></p>



<p>STPR2 outlines Transport Scotland’s plans for major transport infrastructure projects in the coming 20 years. Instead of being dominated by major road building projects like STPR1, this phase 1 consultation of STPR2 has a much more sustainable transport focus, including reallocation of road space for active travel, development of Active Freeways, and expansion of 20mph zones.</p>



<div class="wp-block-image is-style-default"><figure class="alignleft size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/STPR2.jpg?resize=272%2C252&#038;ssl=1" alt="" class="wp-image-13221" width="272" height="252"/></figure></div>



<p>Because of Covid STPR2 will be in 2 phases as Government outlines – <em>‘the first of which will make recommendations on transport interventions for investment in the short term, as the world deals with the COVID-19 pandemic and the Scottish Government plans for a green recovery. With Phase 2 reporting in Autumn 2021, STPR2 will then give Scottish Ministers a programme of potential transport investment opportunities for the period 2022-2042.’</em></p>



<p>In responding to this consultation, I would advise GoBike members not to be daunted by the size of the document or all of the detail in appendices and accompanying documents. The most important things to focus on are the <strong>8 themes and 20 interventions </strong>summarised on pdf pages 10 &amp; 11 of the <a rel="noreferrer noopener" href="https://www.transport.gov.scot/media/49128/stpr2-update-and-phase-1-landscape-version-15-feb-2021.pdf" target="_blank">phase 1 report</a>, and the <strong>options</strong> for Phase 2, Appendix A. These are mostly focussed on sustainable transport and should therefore be, on the whole, supported. </p>



<p>Later in the report or in the accompanying appendices you can read in greater detail about each of the 20 interventions. Having said this, these draft recommendations (as they are called) still lack detail of what projects will actually deliver from 2022 onwards. For example, there is no commitment to the number of kilometres of Active Travel Freeways which will be constructed in Scotland. This may come in Phase 2.</p>



<p>For more of an indication of the types of projects that STPR2 will deliver you have to look at the <strong>options being taken forward to Phase 2 for appraisal</strong> &#8211; all listed in Appendix A.  This list includes things such as upgrading the NCN, roll out of public bike hire schemes, segregated active travel routes, and School Streets.</p>



<p>Whilst the 20 interventions proposed cover many positive areas which desperately need funding there may be gaps that you identify when you ready through. One concern is the report&#8217;s focus for the short-term on either AT Freeways (Intervention  No.1) or making Spaces for People (SfP) permanent (No. 7). For a coherent active travel network in Scotland government needs to do more than just creating key segregated routes into cities, and making the good, but limited, SfP interventions permanent.  This, and any other gaps, are worth including in your response as recommendations to enhance STPR2.  Phase 2 may include some of the other projects we want to see as greater detailed interventions are developed.</p>



<p>Here is a shortcut to the Case for Change information for the <a rel="noreferrer noopener" href="https://www.transport.gov.scot/publication/initial-appraisal-case-for-change-glasgow-city-region-stpr2/" target="_blank">Glasgow region</a>. </p>



<p><strong>Providing your feedback</strong>:  The <a rel="noreferrer noopener" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/#section-63222" target="_blank">STPR2 page</a> is confusing because it looks like it has multiple links for feedback. However all questions to provide feedback on themes, interventions, options and the Case for Change are in this <a href="https://ns55.askia.com/WebProd/Interview/8XP2UL7JZIEBZJVE8XP1LBY41U6JK5CY" target="_blank" rel="noreferrer noopener">survey form</a>.</p>



<p>Closes 31 March 2021</p>



<p></p>



<p><strong>Section 2: Forthcoming Consultations</strong></p>



<p>2.2: Scottish Government – Permitted Development Rights (phase 2)</p>



<p>No news yet on Phase 2 of the consultation which will cover permitted development rights for e-bike charging points.</p>



<p></p>



<p><strong>Section 3: Consultation Feedback</strong></p>



<p>3.1: Scottish Parliament &#8211; <a href="https://www.gov.scot/publications/securing-green-recovery-path-net-zero-update-climate-change-plan-20182032/" target="_blank" rel="noreferrer noopener">Climate Change Plan update</a></p>



<div class="wp-block-image is-style-default"><figure class="alignleft size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=327%2C464&#038;ssl=1" alt="" class="wp-image-13018" width="327" height="464" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=422%2C600&amp;ssl=1 422w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=211%2C300&amp;ssl=1 211w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?w=499&amp;ssl=1 499w" sizes="auto, (max-width: 327px) 100vw, 327px" /></figure></div>



<p>Four Committees at Holyrood have scrutinised aspects of the government&#8217;s updated Climate Change Plan and produced reports.  Cycling and transport issues were most closely dealt with by the Rural Economy and Connectivity Committee although the Local Government and Communities received evidence on placemaking and neighbourhoods.</p>



<p><a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.parliament.scot%2FS5_Environment%2FReports%2FECCLR_2021.03.04_OUT_CS_CCPu_Report.pdf%25C2%25A0&amp;data=04%7C01%7Cjim.densham%40cyclinguk.org%7Cad2248f853484179414d08d8e24913f7%7Cda6b1118d522464c91ae44ffddc646d5%7C0%7C0%7C637508150822425576%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata=btaeSMFVrfPWOF3jqRLwej4VKKICEVBeGqOu1pgS%2BQQ%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Environment, Climate Change and Land Use committee</a> report</p>



<p><a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.parliament.scot%2FS5_Rural%2F20210304_EM_to_Cab_Secs_TIC_RET_and_ECCLR_-_CCPu_scrutiny.pdf&amp;data=04%7C01%7Cjim.densham%40cyclinguk.org%7Cad2248f853484179414d08d8e24913f7%7Cda6b1118d522464c91ae44ffddc646d5%7C0%7C0%7C637508150822435573%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata=yDLapUDG0mcI0%2FmE2FM%2Fy5wGI7H5qhgRZ4ygOWsNZbQ%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Rural Economy and Connectivity committee</a>&nbsp;report&nbsp;</p>



<p><a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.parliament.scot%2FS5_EconomyJobsFairWork%2FInquiries%2FEEFW-Final_CCP_response.pdf%25C2%25A0&amp;data=04%7C01%7Cjim.densham%40cyclinguk.org%7Cad2248f853484179414d08d8e24913f7%7Cda6b1118d522464c91ae44ffddc646d5%7C0%7C0%7C637508150822445563%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata=P%2B28rUO6rM1eeQ5t6rR7uPs8XqgozAs%2BXDmf9e1%2Bp34%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Energy, Economy, and Fair Work</a> report</p>



<p><a href="https://eur01.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.parliament.scot%2Fparliamentarybusiness%2FCurrentCommittees%2F116741.aspx%25C2%25A0&amp;data=04%7C01%7Cjim.densham%40cyclinguk.org%7Cad2248f853484179414d08d8e24913f7%7Cda6b1118d522464c91ae44ffddc646d5%7C0%7C0%7C637508150822445563%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&amp;sdata=KHaycfyOF7T%2Fm5imr15ImY7iUuZwkwVxFg2SJ%2F1YQxc%3D&amp;reserved=0" target="_blank" rel="noreferrer noopener">Local Government and Communities Committee</a> report</p>



<p>3.2: Transport Scotland &#8211; <a href="https://www.transport.gov.scot/publication/scotlands-road-safety-framework-to-2030/" target="_blank" rel="noreferrer noopener">Road Safety Framework to 2030</a></p>



<p>Transport Scotland published its new <a href="https://www.transport.gov.scot/publication/scotlands-road-safety-framework-to-2030/" target="_blank" rel="noreferrer noopener">Road Safety Framework</a> last month. The consultation featured in the <a href="https://www.gobike.org/consultation-digest-national-issue-1-13-november-2020-a-few-days-left-to-respond-to-the-infrastructure-investment-plan-12560" target="_blank" rel="noreferrer noopener">November edition</a> of the National Digest. There were some significant improvements to the published document which I outlined in a recent <a href="https://www.cyclinguk.org/blog/consigning-road-deaths-history-books" target="_blank" rel="noreferrer noopener">blog</a> for Cycling UK in Scotland.  </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13390</post-id>	</item>
		<item>
		<title>Consultation Digest (National) Issue 4, 12 February 2021:  Transport projects going green</title>
		<link>https://www.gobike.org/consultation-digest-national-issue-4-12-february-2021-transport-projects-going-green-13217</link>
		
		<dc:creator><![CDATA[Jim Densham]]></dc:creator>
		<pubDate>Fri, 12 Feb 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[climate change]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Transport Scotland]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13217</guid>

					<description><![CDATA[For me, lockdown 2.0 has seen the return of home schooling and child care, and a need for brutal prioritisation of my time. As a result, whilst this digest includes lots of consultations for you to dig into I haven’t been able to provide much of a guide to each this month. Apologies for that. &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-national-issue-4-12-february-2021-transport-projects-going-green-13217" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (National) Issue 4, 12 February 2021:  Transport projects going green"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>For me, lockdown 2.0 has seen the return of home schooling and child care, and a need for brutal prioritisation of my time. As a result, whilst this digest includes lots of consultations for you to dig into I haven’t been able to provide much of a guide to each this month. Apologies for that.</p>



<span id="more-13217"></span>



<p>The big new consultation this month is Transport Scotland’s publication of Phase 1 of the <a rel="noreferrer noopener" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">Strategic Transport Projects Review or STPR2</a> – the big transport projects Government is planning to undertake in the years ahead. STPR2 has a big focus on sustainable transport projects but Government is still planning to spend billions on A9 and A96 dualing so it’s a confusing picture right now. Of course, with an election on 6 May, and all parties making commitments on transport, change could be around the corner.</p>



<p><strong>Section 1: Current Consultations</strong></p>



<p>(in date order for responses)</p>



<p>1.1: <strong>*NEW*</strong> UK Parliament — <a href="https://committees.parliament.uk/work/900/zero-emission-vehicles-and-road-pricing/">Zero emission vehicles and road pricing</a></p>



<p>One with a looming deadline. The UK Parliament’s Transport Committee is looking at the implications of accelerating the shift to zero emission vehicles and the potential for introducing road pricing, or pay-as-you-drive, schemes.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/02/road-traffic.jpg?w=525&#038;ssl=1" alt="" class="wp-image-10071"/></figure>



<p>Closes 17 February 2021</p>



<p></p>



<p>1.2: Scottish Government &#8211; <a href="https://www.gov.scot/publications/scotlands-fourth-national-planning-framework-position-statement/" target="_blank" rel="noreferrer noopener">Fourth National Planning Framework (NPF4): position statement</a></p>



<div class="wp-block-image is-style-default"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/NPF4-cover-image.png?resize=225%2C238&#038;ssl=1" alt="" class="wp-image-13218" width="225" height="238"/></figure></div>



<p>The Scottish Government has issued a position statement on the NPF4 and is seeking our opinions. The main NPF4 is still to come next year so this consultation is asking what we all think about the direction of travel. Achieving climate emission targets is a big theme in this document along with resilient, greener, better communities and places.</p>



<p>Closes 19 February 2021</p>



<p></p>



<p>1.3: *NEW* Scottish Government — <a href="https://consult.gov.scot/energy-and-climate-change-directorate/draft-public-engagement-strategy-climate-change/" target="_blank" rel="noreferrer noopener">Draft Public Engagement Strategy for Climate Change</a></p>



<p>Included for anyone interested on submitting thoughts on engaging the public on climate change.</p>



<p>Closes 17 March 2021</p>



<p></p>



<p>1.4: Law Commission (&amp; Scottish Law Commission) &#8211; <a href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank" rel="noreferrer noopener">Automated Vehicles: A regulatory framework for automated vehicles</a></p>



<p>This 3<sup>rd</sup> consultation builds on the two previous consultations on safety assurance, allocating legal responsibility, and licensing AVs for passenger services and public transport.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-13220" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=600%2C276&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/AVs-2.jpg?w=964&amp;ssl=1 964w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>If you are worried that this consultation may be full of technical ‘legalese’ (I am), there is a summary paper. And keep in mind the principle that for automated vehicles to be safe they need to be able to not just see and recognise cyclists and pedestrians but predict their movements.</p>



<p>During this three-month consultation the Law Commission welcome views on key questions including, the legal meaning of “self-driving”, a GB safety assurance scheme for automated vehicles, the extent of criminal liability, and access to data w to enable the regulatory scheme for AVs to function.</p>



<p>Closes 18 March 2021</p>



<p></p>



<p>1.5:<strong> *NEW*</strong> Transport Scotland &#8211; <a href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank" rel="noreferrer noopener">Strategic Transport Projects Review (STPR2)</a></p>



<p>STPR2 outlines Transport Scotland’s plans for major transport infrastructure projects. Instead of being dominated by major road building projects like STPR1, this phase 1 consultation of STPR2 has a much more sustainable focus, including reallocation of road space for active travel, development of Active Freeways, and expansion of 20mph zones.</p>



<div class="wp-block-image is-style-default"><figure class="alignleft size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/STPR2.jpg?resize=272%2C252&#038;ssl=1" alt="" class="wp-image-13221" width="272" height="252"/></figure></div>



<p>Because of Covid STPR2 will be in 2 phases as Government outlines – <em>‘the first of which will make recommendations on transport interventions for investment in the short term, as the world deals with the COVID-19 pandemic and the Scottish Government plans for a green recovery. With Phase 2 reporting in Autumn 2021, STPR2 will then give Scottish Ministers a programme of potential transport investment opportunities for the period 2022-2042.’</em></p>



<p>Closes 31 March 2021</p>



<p></p>



<p><strong>Section 2: Forthcoming Consultations</strong></p>



<p>2.2: Scottish Government – Permitted Development Rights (phase 2)</p>



<p>No news yet on Phase 2 of the consultation which will cover permitted development rights for e-bike charging points.</p>



<p></p>



<p><strong>Section 3: Consultation Feedback</strong></p>



<p>3.1: Scottish Government &#8211; <a href="https://www.gov.scot/news/gbp-33-billion-investment-in-scotlands-future/" target="_blank" rel="noreferrer noopener">Infrastructure Investment Plan</a></p>



<p>Government has published its £33bn Infrastructure Investment Plan (IIP). We featured this in my <a href="https://www.gobike.org/consultation-digest-national-issue-1-13-november-2020-a-few-days-left-to-respond-to-the-infrastructure-investment-plan-12560" target="_blank" rel="noreferrer noopener">first national consultation</a> digest back in November. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13217</post-id>	</item>
		<item>
		<title>Consultation Digest (National) Issue 3, 8 January 2021: Scottish Government sets target to get people out of their cars.</title>
		<link>https://www.gobike.org/consultation-digest-national-issue-3-8-january-2021-scottish-government-sets-target-to-get-people-out-of-their-cars-13015</link>
		
		<dc:creator><![CDATA[Jim Densham]]></dc:creator>
		<pubDate>Fri, 08 Jan 2021 17:00:00 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Air quality]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[climate change]]></category>
		<category><![CDATA[Planning]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13015</guid>

					<description><![CDATA[Happy New Year to you all. I hope you all had a relaxing festive period. I’ve been well and truly thrown back into work this week reading and digesting the Scottish Government’s Climate Change Plan update. It feels like the policy equivalent of Christmas dinner. Unfortunately, there&#8217;s not time for a snooze in front of &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-national-issue-3-8-january-2021-scottish-government-sets-target-to-get-people-out-of-their-cars-13015" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (National) Issue 3, 8 January 2021: Scottish Government sets target to get people out of their cars."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Happy New Year to you all.  I hope you all had a relaxing festive period. I’ve been well and truly thrown back into work this week reading and digesting the Scottish Government’s Climate Change Plan update. It feels like the policy equivalent of Christmas dinner. Unfortunately, there&#8217;s not time for a snooze in front of the TV &#8211; the Parliamentary Committee scrutinising the transport policy section needs comments by Tuesday 12 January.</p>



<span id="more-13015"></span>



<p>Previous Climate Change Plans have been pretty woeful for action on transport and as a result we’ve seen emissions from the sector remain unchanged for decades. So it was quite a surprise and a turnaround for Government to include a target to cut car traffic by 20% by 2030. Scotland is the first  nation in the UK to aim for this so should be celebrated, but we shouldn’t lose sight of the fact that Government hasn’t yet explained how this will be achieved. We know that greater investment in cycling is key to helping people out of their cars for short journeys so now is the time to make this point to MSPs and Government. &nbsp;</p>



<p><strong>Section 1: Current Consultations</strong></p>



<p>(in date order for responses)</p>



<p>1.1: <strong>*NEW*</strong> <a href="https://yourviews.parliament.scot/recc/e7d9fb7c/" target="_blank" rel="noreferrer noopener">Securing a green recovery on a path to net zero: climate change plan 2018–2032 &#8211; update</a></p>



<p>A few days after the <a href="https://www.gobike.org/consultation-digest-national-issue-2-11-december-2020-will-the-climate-change-plan-be-the-perfect-christmas-gift-12814" target="_blank" rel="noreferrer noopener">December digest</a> the Scottish Government published its <a href="https://www.gov.scot/publications/securing-green-recovery-path-net-zero-update-climate-change-plan-20182032/" target="_blank" rel="noreferrer noopener">Climate Change Plan update</a> (CCPu). &nbsp;Parliament will be scrutinising the CCPu with the Rural Economy and Connectivity Committee taking evidence on the transport section. Their <a href="https://yourviews.parliament.scot/recc/e7d9fb7c/" target="_blank" rel="noreferrer noopener">call for evidence</a> has a <strong>deadline of Tuesday 12 January</strong> so get your skates on if you want to provide your views.</p>



<div class="wp-block-image is-style-default"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=258%2C367&#038;ssl=1" alt="" class="wp-image-13018" width="258" height="367" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=422%2C600&amp;ssl=1 422w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?resize=211%2C300&amp;ssl=1 211w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/CCPU-cover.jpg?w=499&amp;ssl=1 499w" sizes="auto, (max-width: 258px) 100vw, 258px" /></figure></div>



<p>Previous Climate Change Plans have not done nearly enough to present the strong ambitious policies needed to reduce emissions from transport and as a result transport emissions haven’t reduced in 30 years and transport is now the largest contributor to Scotland’s emissions by sector. </p>



<p>In the past Government hasn’t been willing to force people to change their driving habits so it is encouraging that the CCPu includes a headline target for a 20% cut in car kilometres by 2030. This is excellent to see, however, a setting a target on its own isn’t enough so the Government’s promised ‘route map’ to be published this year needs to be strong. We need to ask the RECC Committee to scrutinise Government’s plans.</p>



<p>There’s no extra money for cycling and walking beyond the existing £500m over 5 years commitment, which is disappointing because <a href="https://www.cyclinguk.org/blog/ps500m-cycling-and-walking-scotland-enough">£100m per year is not enough</a> if Government wants cycling to be a realistic solution for people to lower their carbon footprints. &nbsp;</p>



<p>There is a new policy called Active Freeways described as ‘<em>segregated active travel routes on main travel corridors connecting communities and major trip attractors</em>’. There’s really not a lot detail on this in the CCPu so again in your response please urge the Committee to find out more about this emerging policy.</p>



<p>In general, the CCPu is moving Scotland in the right direction, the question is if it&#8217;s fast enough for the planet and does it do enough to encourage more cycling and meet the second aim of supporting a green recovery. <a href="https://www.cyclinguk.org/news/20-cut-scotlands-car-traffic-planned-help-meet-2030-climate-targets" target="_blank" rel="noreferrer noopener">Initial reaction from Cycling UK can be found here.</a></p>



<p>Closes 12 January 2021</p>



<p>1.2: Scottish Government – <a href="https://www.cyclinguk.org/news/20-cut-scotlands-car-traffic-planned-help-meet-2030-climate-targets" target="_blank" rel="noreferrer noopener">Cleaner Air for Scotland 2 – a draft new air quality strategy for Scotland</a></p>



<p>Consultation on a draft new air quality strategy for Scotland, taking into account the recommendations arising from the independent review of the Cleaner Air for Scotland strategy. <a href="https://www.gov.scot/publications/cleaner-air-scotland-2-draft-air-quality-strategy-consultation/pages/13/" target="_blank" rel="noreferrer noopener">Chapter 8</a> is all about transport actions so lots of opportunity to say what we need for active travel. It’s worth looking at and responding, even if you only answer this one question.</p>



<p>Closes 22 January 2021</p>



<p>1.3: <a href="https://www.gov.scot/publications/scotlands-fourth-national-planning-framework-position-statement/pages/2/" target="_blank" rel="noreferrer noopener">Fourth National Planning Framework (NPF4): position statement</a></p>



<div class="wp-block-group"><div class="wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow">
<div class="wp-block-image is-style-default"><figure class="alignleft size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/12/image.png?resize=222%2C235&#038;ssl=1" alt="" class="wp-image-12816" width="222" height="235"/></figure></div>



<p>The Scottish Government has issued a position statement on the NPF4 and is seeking our opinions. The main NPF4 is still to come next year so this consultation is asking what we all think about the direction of travel. Achieving climate emission targets is a big theme in this document along with resilient, greener, better communities and places.</p>
</div></div>



<p>I had promised to analyse this consultation for this digest, however, time has run out so look out for thoughts on this in the February digest, due out on 12 February.</p>



<p>Closes 19 February 2021</p>



<p>1.4: <strong>*NEW*</strong> Law Commission (&amp; Scottish Law Commission) &#8211; <a href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank" rel="noreferrer noopener">Automated Vehicles: A regulatory framework for automated vehicles</a></p>



<div class="wp-block-image is-style-default"><figure class="alignright size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/AVs.jpg?resize=358%2C264&#038;ssl=1" alt="" class="wp-image-13020" width="358" height="264" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/AVs.jpg?resize=600%2C442&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/AVs.jpg?resize=300%2C221&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/AVs.jpg?w=971&amp;ssl=1 971w" sizes="auto, (max-width: 358px) 100vw, 358px" /></figure></div>



<p>This 3<sup>rd</sup> consultation builds on two previous consultations on safety assurance, allocating legal responsibility, and licensing AVs for passenger services and public transport.</p>



<p>If you are worried that this consultation may be full of technical ‘legalese’ (I am), there is a <a href="https://s3-eu-west-2.amazonaws.com/lawcom-prod-storage-11jsxou24uy7q/uploads/2020/12/Summary-AV-CP3-18-12-20-version-2.pdf" target="_blank" rel="noreferrer noopener">summary paper</a>. And keep in mind the principle that for automated vehicles to be safe they need to be able to not just see and recognise cyclists and pedestrians but predict their movements.</p>



<p>During this three-month consultation the Law Commission welcome views on key questions including, the legal meaning of “self-driving”, a GB safety assurance scheme for automated vehicles, the extent of criminal liability, and access to data w to enable the regulatory scheme for AVs to function.</p>



<p>Closes 18 March 2021</p>



<p>1.5: <a href="https://www.surveymonkey.co.uk/r/VJZLKL3">A82 improvements survey</a></p>



<p>The survey set up by Kate Forbes MSP is still open for your opinions on which sections of the A82 Glasgow to Inverness road are in most need of improvement in order to reduce traffic crashes and collisions. <a href="https://www.heraldscotland.com/news/18898374.a82-public-consultation-aims-reduce-accidents/" target="_blank" rel="noreferrer noopener">Read more here</a>.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" loading="lazy" decoding="async" width="352" height="226" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Kate-Forbes.png?resize=352%2C226&#038;ssl=1" alt="" class="wp-image-13016" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Kate-Forbes.png?w=352&amp;ssl=1 352w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Kate-Forbes.png?resize=300%2C193&amp;ssl=1 300w" sizes="auto, (max-width: 352px) 100vw, 352px" /></figure>



<p><strong>Section 2: Forthcoming Consultations</strong></p>



<p>Nothing new here this month &#8211; still waiting on the below consultations.</p>



<p>2.1: Scottish Government – Permitted Development Rights (phase 2)</p>



<p>No news yet on Phase 2 of the consultation which will cover permitted development rights for e-bike charging points.</p>



<p>2.2: Strategic Transport Projects Review (STPR2)</p>



<p>No news either on any further Scottish Government’s STPR2 consultation. See here for more information and links to previous STPR2 documents.</p>



<p><strong>Section 3: Consultation Feedback</strong></p>



<p>3.1: <a href="https://www.transport.gov.scot/publication/national-transport-strategy-nts2-delivery-plan-2020-to-2022/" target="_blank" rel="noreferrer noopener">National Transport Strategy (NTS2) &#8211; Delivery Plan – 2020 to 2022</a></p>



<p>You may have responded to the Scottish Government&#8217;s NTS2 consultation which was held about a year ago. The Scottish Government has released its first Delivery Plan for the NTS2 which provides a little more detail on what actions will be taken to meet the NTS2 outcomes. The Delivery Plan was published just after the Climate Change Plan update and includes the standout policy to cut car kilometres by 20% by 2030.</p>



<figure class="wp-block-image size-large is-style-default"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="276" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/NTS2.jpg?resize=525%2C276&#038;ssl=1" alt="" class="wp-image-13022" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/NTS2.jpg?resize=600%2C315&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/NTS2.jpg?resize=300%2C158&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/NTS2.jpg?w=1200&amp;ssl=1 1200w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/NTS2.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>3.2: The Town and Country Planning (General Permitted Development and Use Classes) (Scotland) Amendment Order 2020</p>



<p>Scottish Government feedback on the consultation, outlined in <a href="https://www.gobike.org/consultation-digest-issue-72-27-october-2020-bike-storage-do-get-your-views-in-to-the-scottish-government-12342" target="_blank" rel="noreferrer noopener">Digest 72, Item 1.5</a> is as follows:</p>



<p><em>‘Thank you for responding to the consultation on the Scottish Government&#8217;s Programme for Reviewing and Extending Permitted Development Rights (PDR) in Scotland Phase 1 Proposals.&nbsp;</em></p>



<p><em>I’m writing to confirm that today (18th December) we published the responses to the consultation, an analysis of those responses and that the above Order was laid in Parliament.</em></p>



<p><em>•&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The analysis of the responses to the consultation on proposals for Phase 1 changes is available at: <a href="https://www.gov.scot/isbn/9781800044814" target="_blank" rel="noreferrer noopener">https://www.gov.scot/isbn/9781800044814</a>. &nbsp;&nbsp;</em></p>



<p><em>•&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The responses have also been published and can be accessed at: <a href="https://consult.gov.scot/planning-architecture/programme-reviewing-extending-pdr" target="_blank" rel="noreferrer noopener">https://consult.gov.scot/planning-architecture/programme-reviewing-extending-pdr</a> &nbsp;</em></p>



<p><em>Alongside the regulations we will shortly publish an explanation of the changes to PDR and how we have responded to the views expressed in the consultation. This will be available at: Work Packages | Transforming Planning. In addition, we propose to prepare a number of pieces of guidance and advice for planning authorities and applicants explaining the changes to PDR when it is proposed that they come into force in April 2021.</em></p>



<p><em>This represents the first Phase in our programme of reviewing and extending Permitted Development Rights and we will now proceed with Phase 2.</em></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13015</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 61, 26 May 2020</title>
		<link>https://www.gobike.org/consultation-digest-issue-61-26-may-2020-11310</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 26 May 2020 17:00:30 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[City Deal]]></category>
		<category><![CDATA[climate change]]></category>
		<category><![CDATA[covid]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[ScotRail]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[survey]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=11310</guid>

					<description><![CDATA[There are 2 new items and the first is news of progress with the redevelopment of Motherwell Train Station, with a nod given to active travel &#8211; let&#8217;s hope it&#8217;s sufficient as more and more people take to walking and cycling and return to public transport, albeit with social distancing, rather than jumping in the &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-61-26-may-2020-11310" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 61, 26 May 2020"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>There are 2 new items and the first is news of progress with the redevelopment of Motherwell Train Station, with a nod given to active travel &#8211; let&#8217;s hope it&#8217;s sufficient as more and more people take to walking and cycling and return to public transport, albeit with social distancing, rather than jumping in the car. Then there is a questionnaire for you.<br>Probably more important, though are Items 1.3 and 1.4 with significant questions on the impact of Covid 19. Do please respond to the well set-out surveys if you wish to see transport and travel improvements.</p>



<span id="more-11310"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>North Lanarkshire, City Deal, Motherwell Town Centre Transport Interchange Planning Application, closes 08 June</li><li>University of Stirling, EU-funded survey on Gender and Transport &#8211; please help, no closing date given</li><li>Scottish Government  &#8211; Just Transmission Commission, closes 30 June</li><li>Scottish Parliament EHRi Committee, Impact of COVID-19 Pandemic on Equalities and Human Rights, open-ended but nominally closes on 01 January 2021</li><li>Scottish Parliament, EEFW Committee, COVID-19 &#8211; impact on Scotland&#8217;s businesses, workers and economy, no closing date </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<p>Still no news for you here.</p>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>North Lanarkshire, City Deal, East Airdrie Link Road, Consultant&#8217;s response to GoBike submission</li><li>UK Government, Results of Law Commissions&#8217; Second Consultation on HARPS</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 North Lanarkshire, City Deal, Motherwell Town Centre Transport Interchange Planning Application, closes 08 June</h6>



<p>We received this email update from North Lanarkshire Council on 20 May:</p>



<p>&#8220;<em>Plans for the Motherwell Town Centre Transport Interchange project are progressing, with a planning application now submitted.<br><br>The application, for change of use of vacant land at Muir Street, sets out how we propose to create a new railway station access road and taxi rank as well as improvements to bus facilities and pedestrian crossings.<br><br>You can find more information about the project and view the planning application at our <a rel="noreferrer noopener" href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDEsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMDA1MjAuMjE4MDE1MDEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zMzUyNyJ9.tmWacJtGNsmItv6i7hTDiO8YcHv2wwli2N5n1dWYR9s/br/78890936481-l" target="_blank">project web page</a>. The planning application reference number is 20/00345/FUL.<br><br>We are delivering this project as part of the <a rel="noreferrer noopener" href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDIsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMDA1MjAuMjE4MDE1MDEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zMTkwMSJ9.yuGyP_H_Srx3I4BUj_0jBuoikEvrwNrj8O0aWqiyeeE/br/78890936481-l" target="_blank">Glasgow City Region City Deal</a>.<br><br>The Motherwell Town Centre Transport Interchange will complement redevelopment work planned by Abellio Scotrail at Motherwell Rail Station. This includes creating an enhanced station building with a brighter, larger concourse and improved ticket sales and passenger facilities.</em>&#8220;</p>



<p>In <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-25-10-january-2019-happy-new-year-with-more-progress-on-the-south-city-way-good-news-about-byres-road-and-feedback-from-argyll-and-bute-and-north-lanarkshire-7286" target="_blank">Digest 25</a>, issued in January 2019, Item 3.7, we included this <a rel="noreferrer noopener" href="https://www.northlanarkshire.gov.uk/index.aspx?articleid=33761" target="_blank">link</a> to details of a consultation, which  we had missed, to proposed improvements around the railway station, quoting &#8220;Improvement to walking and cycling routes&#8221;</p>



<p>Here&#8217;s a link to a <a rel="noreferrer noopener" href="https://www.scotrail.co.uk/about-scotrail/news/motherwell-station-redevelopment-create-gateway-glasgow" target="_blank">ScotRail article</a> about the proposals; it&#8217;s dated 2018 so we aren&#8217;t sure what has happened since. The article mentions improved cycle access  and while the plans submitted with the Planning Application show a 3m cycle lane to the station, there is no other detail.</p>



<p>GoBike has submitted the following comment  of tentative support to the plans but if you support the Planning Application or have concerns, do please follow the links in the North Lanarkshire message to the project web page and use the reference <em>20/00345/FUL</em> to insert your comment.</p>



<p>&#8220;<em>GoBike, the Strathclyde Cycle Campaign, supports the use of the cycle as an everyday means of transport for people of all ages, and, to realise this aim, we need to see good quality dedicated cycl</em>e <em>infrastructure, not simply painted lines on our roads, with adequate parking arrangements at destinations such as railway stations.</em><br><em>We are pleased to support this planning application because it is a step, albeit a very cautious one, in the right direction. We note that currently, or at the time of your public consultation 2 years ago, very few people were cycling to the station. We do not see very much in your proposals to entice more people to use their bikes; we are concerned that although you show a dedicated cycle path to the station on your layout plan, it is directly adjacent to the taxi rank. What is to prevent taxis, their drivers or passengers encroaching on the cycle lane?</em><br><em>During the current pandemic far more people are cycling in Motherwell as they are all around Scotland and, once train services are able to return to more people travelling, although initially allowing for social distancing, we hope that you will be able to encourage far more people to travel to the station by cycle, from all parts of Motherwell and its environs.&#8221;</em></p>



<h6 class="wp-block-heading">1.2 University of Stirling, EU-funded survey on Gender and Transport &#8211; please help, no closing date given</h6>



<p>We received an email recently from a Dr Yvonne Hail and Prof Ron McQuaid from the University of Stirling, who are taking part in an European funded consortium exploring gender and transport (<a rel="noreferrer noopener" target="_blank" href="https://slack-redir.net/link?url=https%3A%2F%2Fdiamond-project.eu%2F">https://diamond-project.eu/</a>)&nbsp;<br><br>“<em>The aim of the project is to evaluate different fairness criteria relating to people’s use of various transport modes, including bike share schemes in order to develop measures to increase the number of women who use the services and to compare and evaluate different fairness criteria. The fairness criteria will be based on an analysis of demographic data, socio-economic data and location to ensure fairness for all in access to bike sharing facilities. </em><br><em>Due to social distancing and the wider societal impacts of COVID19 we are looking for assistance in our data collection campaign and hope you can help us, by sharing our online questionnaire with your networks (users/non-users).</em>&#8220;<br><br>Questionnaire:&nbsp;<a rel="noreferrer noopener" target="_blank" href="https://slack-redir.net/link?url=https%3A%2F%2Fdocs.google.com%2Fforms%2Fd%2Fe%2F1FAIpQLSfecB23Wd4jzApEORNSKbatMZkqJSfgaL3U8sb1c3U3WCUbGg%2Fviewform%3Fusp%3Dsf_link">https://docs.google.com/forms/d/e/1FAIpQLSfecB23Wd4jzApEORNSKbatMZkqJSfgaL3U8sb1c3U3WCUbGg/viewform?usp=sf_link</a></p>



<p>Do help them please by completing the survey &#8211; it&#8217;s a bit clunky, but you should find it of interest &#8211; even if you have never used a hire bike.<br>There&#8217;s no closing date given but do please fill it out before you forget.</p>



<h6 class="wp-block-heading">1.3 Scottish Government &#8211; Just Transmission Commission, closes 30 June</h6>



<figure class="wp-block-image size-large is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C98&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="98" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The details of this consultation were given in our last Digest, <a href="https://www.gobike.org/consultation-digest-issue-60-12-may-2020-the-lockdown-goes-on-but-will-we-learn-from-it-11199" target="_blank" rel="noreferrer noopener">Digest 60</a>, Item 1.1, but here&#8217;s the wording from the Government&#8217;s website:</p>



<p><em>The&nbsp;<a rel="noreferrer noopener" href="http://www.legislation.gov.uk/asp/2019/15/enacted" target="_blank">Climate Change (Emissions Reduction Targets)(Scotland) Act 2019</a>&nbsp;recently passed by the Scottish Parliament contains some of the most ambitious statutory emission reduction targets in the world. The transition required to meet these targets will be one of a number of long-term structural changes to the economy that will require a response and active management from the Scottish Government.<br><br>Against this backdrop of increasingly ambitious emission reduction targets, calls for fairness in climate change action and securing a ‘just transition’ have grown. Originating from the trade union movement, the concept of just transition refers to the need for Governments to take action to reduce emissions in a way which is fair and leaves no-one behind.<br><br>The Just Transition Commission has been established to provide Scottish Ministers with practical, realistic, and affordable recommendations for action that will:</em></p>



<ul class="wp-block-list"><li><em>maximise the economic and social opportunities that the move to a net-zero economy by 2045 offers</em></li><li><em>build on Scotland’s existing strengths and assets</em></li><li><em>understand and mitigate risks that could arise in relation to regional cohesion, equalities, poverty (including fuel poverty), and a sustainable and inclusive labour market</em></li></ul>



<p>If you follow the <a rel="noreferrer noopener" href="https://consult.gov.scot/just-transition-commission/just-transition-commission-call-for-evidence/" target="_blank">link</a> you will be able to respond to the call for evidence &#8211; since most of us have a bit more time at the moment do put your thoughts about maintaining road space for cycling, reducing emissions, etc in the boxes. Please do it for the sake of your health and the nation&#8217;s health.</p>



<h6 class="wp-block-heading">1.4 Scottish Parliament EHRi Committee, Impact of COVID-19 Pandemic on Equalities and Human Rights, nominally closes 01 January 2021</h6>



<p>This open-ended inquiry was covered in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-60-12-may-2020-the-lockdown-goes-on-but-will-we-learn-from-it-11199" target="_blank">Digest 60</a>, Item 1.2 and according to the <a href="https://yourviews.parliament.scot/ehrc/impact-covid-19-pandemic-equalities-human-rights/" target="_blank" rel="noreferrer noopener">parliamentary website</a>:</p>



<p>&#8220;<em><strong>There is no set deadline to submit your views.</strong>&nbsp;The call is open-ended to enable the Committee to monitor any ongoing or emerging equalities and human rights issues, so that steps can be taken to protect those most in need.</em>&#8220;</p>



<p>We have all seen that our streets are emptier, the air is cleaner, more people are walking and cycling; these are the very things we need to see continue and unless we tell the Government we need them to continue, they will just go with the easy option and let cars return. <br>Here&#8217;s more information from the <a href="https://yourviews.parliament.scot/ehrc/impact-covid-19-pandemic-equalities-human-rights/" target="_blank" rel="noreferrer noopener">website</a>:</p>



<p>&#8220;<em>This inquiry seeks to identify the evidence that some groups of people are experiencing disproportionately negative impacts of the coronavirus, and by some of the measures taken to deal with it.<br><br>The inquiry will look at the measures the Scottish Government and other public bodies, including regulatory and oversight bodies, can take to help. It will also examine measures taken by public bodies and the impacts they may have on equality and human rights.<br><br>We want to hear your views on:</em></p>



<ul class="wp-block-list"><li><em>which equality groups are being disproportionately negatively affected by the coronavirus, and by some of the measures taken to deal with it&nbsp;</em></li><li><em>what equality and human rights impacts there have been</em></li><li><em>what the Scottish Government can change or improve to mitigate against these impacts</em>&#8220;</li></ul>



<p>This is your chance to say that people without cars are being given better air to breathe and those of us who choose to walk and cycle now have more space to do that. If things are allowed to revert to what they were before we will all be disadvantaged. Please do respond.</p>



<h6 class="wp-block-heading">1.5 Scottish Parliament, EEFW Committee, COVID-19 &#8211; impact on Scotland&#8217;s businesses, workers and economy, no closing date</h6>



<p>This is the third high-level consultation that was first aired in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-60-12-may-2020-the-lockdown-goes-on-but-will-we-learn-from-it-11199" target="_blank">Digest 60</a>, Item 1.3 and here&#8217;s the <a rel="noreferrer noopener" href="https://www.parliament.scot/parliamentarybusiness/CurrentCommittees/114924.aspx" target="_blank">link to the Parliament&#8217;s website</a>. Again, no closing date is given but if you do run a business or have significant concerns, please do submit your views. The website request you to: <br>&#8220;<em>Please send your response by email to:&nbsp;<a href="mailto:economyenergyandfairwork@parliament.scot?Subject=COVID-19%20%E2%80%93%20impact%20on%20Scotland%E2%80%99s%20businesses%2C%20workers%20and%20economy">economyenergyandfairwork@parliament.scot</a></em>&#8220;</p>



<p>GoBike is grateful to <a rel="noreferrer noopener" href="http://transformscotland.org.uk/" target="_blank">Transform Scotland</a> for bringing these last three Scotland-wide consultations to our attention.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>No, we are not aware of anything at the moment.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 North Lanarkshire, City Deal, East Airdrie Link Road, Consultant&#8217;s response to GoBike submission</h6>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="128" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Car_Headlights_2-North-Lanarkshire-City-Deal.jpg?resize=525%2C128&#038;ssl=1" alt="" class="wp-image-10616" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Car_Headlights_2-North-Lanarkshire-City-Deal.jpg?w=820&amp;ssl=1 820w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Car_Headlights_2-North-Lanarkshire-City-Deal.jpg?resize=300%2C73&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/03/Car_Headlights_2-North-Lanarkshire-City-Deal.jpg?resize=600%2C146&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>We last mentioned the consultation on this in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-59-28-april-2020-social-distancing-we-all-want-to-keep-to-the-guidelines-but-its-tricky-11056" target="_blank">Digest 59</a>, Item 1.2 and we had submitted this <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/04/GoBike-NLC-East-Airdrie-Road-response-140420.pdf" target="_blank">letter of opposition</a> to the new road on 14 April. On 15 May we received this email with a letter from the Consultants, Aecom, who are dealing with this scheme:</p>



<p>&#8220;<em>Thank you for your recent public exhibition response on the above.<br><br>Please find attached a <a href="https://www.gobike.org/wp-content/uploads/2020/05/Aecom-response-to-GoBike-objection-E-Airdrie-link-road.pdf" target="_blank" rel="noreferrer noopener">letter</a> as above which ought to be self-explanatory.<br><br>We had planned to hold a number of specific workshops during Option Development for the East Airdrie Link Road, however, given the current COVID-19 situation this is now not possible.&nbsp; We would however still like to commence some early engagement and would like to invite you to join a virtual workshop through Microsoft Teams with a focus on Active Travel.&nbsp; Please could you let us know if you would be interested in joining us using this approach and we can send on further details in due course.<br><br>Any other queries, please let me know.<br><br>Regards<br><br><strong>Ryan Hutchison</strong>, BSc CEng MICE FCIHT<br>Technical Director, Roads, Scotland &amp; Ireland</em>&#8220;</p>



<p>GoBike member, Derek, has volunteered to join the virtual workshop mentioned in the email so we hope to have more news for you as work progresses.</p>



<h6 class="wp-block-heading">2.2 UK Government, Results of Law Commissions&#8217; Second Consultation on HARPS</h6>



<p>In  <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" target="_blank">Digest 52</a>, Item 1.3 we last gave details of the most recent consultation on this topic and published the <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">GoBike letter of response</a>, dated 06 January. On 20 May we received this update:</p>



<p>&#8220;<em>Dear All,<br><br>The Law Commissions’ automated vehicles team are pleased to share the results from our second consultation on passenger services and public transport.<br><br>People’s responses cover some of the new challenges and opportunities arising from HARPS (Highly Automated Road Passenger Services) like creating safety standards and remote supervision of this new service. Prominent themes include the need to balance national and local governance, the importance of access to data, and to support rather than undermine mass transit.<br><br>We are very grateful for all the input received. You can find all of our published documents, including a 160 page analysis (which includes quotes), a 23 page summary, and the full text of each response listed alphabetically (alongside our original consultation documents) on our website: <a href="https://www.lawcom.gov.uk/project/automated-vehicles/">https://www.lawcom.gov.uk/project/automated-vehicles/</a> .</em><br><br><em>Our consultation closed at the start of February before the impacts of COVID-19 became so widely felt. We hope you and yours are safe and well, and to have the opportunity to reconnect with you as we progress to the next phase of our work. In our third paper (which we aim to launch in the fourth quarter this year) we will go back to the safety assurance framework for automated vehicles, legal responsibility as well as integrating input from this HARPS consultation.<br><br>Please get in touch with us if you have any questions.<br><br>With all best wishes,<br><br>The AV Team</em><br><br><em><strong>Automated Vehicles</strong> | <strong>Law Commission </strong>| Public Law Team<br>1st Floor, Tower,&nbsp;Post Point 1.54, 52 Queen Anne’s Gate,&nbsp;London SW1H 9AG<br>(access via 102 Petty France)<br>Tel: 020 3334&nbsp;3969&nbsp;|&nbsp;Web: <a href="http://www.lawcom.gov.uk/">www.lawcom.gov.uk</a><br>Email: <a href="mailto:automatedvehicles@lawcommission.gov.uk">automatedvehicles@lawcommission.gov.uk</a></em></p>



<p>GoBike gets a couple of mentions in this <a rel="noreferrer noopener" href="https://s3-eu-west-2.amazonaws.com/lawcom-prod-storage-11jsxou24uy7q/uploads/2020/05/AV-CP2-analysis-21-May.pdf" target="_blank">document</a>, though it&#8217;s a bit beyond our normal comfort level for consultations.</p>



<p>They say they are working up to another consultation later this year, so it&#8217;s keeping them busy, at least.</p>



<p>Back in a fortnight &#8211; hopefully!</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">11310</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!</title>
		<link>https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 21 Jan 2020 16:00:32 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[side streets]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9795</guid>

					<description><![CDATA[Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across a side road, a child in Glasgow should be able to too. Secondly, contraflow cycling &#8211; when cars are going too fast or more on-road parking is needed the first line of response is to make a street one-way, even for bikes. What have we done wrong? Why should we have to make big detours? Do read on for the details of all the current issues.</p>



<span id="more-9795"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</li><li>**NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</li><li>**NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li> **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February </li><li> **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>**NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>**NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </li><li> Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February </li><li> Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li> **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</li><li>Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 February</li><li> Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</li><li>Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns. </li><li>Glasgow, Duror Street, Traffic Calming, GCC response to our concerns </li><li>Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month </li><li>Glasgow, Connecting Woodside Update, with news of new Facebook page</li><li>Glasgow Avenues project, George Square and Blythswood Square. </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<h6 class="wp-block-heading">1.1 **NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=525%2C274&#038;ssl=1" alt="" class="wp-image-9833" width="525" height="274" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?w=540&amp;ssl=1 540w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s a message that has been put out by Alison Johnstone, MSP (Green Party), which is pretty clear and self-explanatory. New road construction means less money to build cycle lanes. Please respond.</p>



<p>&#8220;T<em>he  Government look set to spend £120 million on a new spaghetti junction  on              Edinburgh’s bypass. We can stop them though. Government are  consulting on the new junction now. </em><a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Please take a second to object</em></a><em>  and ask them to invest these funds into   public transport and bike lanes  instead. We can’t just keep on pouring public money      into building new  roads like there is no climate emergency.</em><br><br> <a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><strong><em>Take action now</em></strong></a><em><br> &nbsp;<br> By their own admission, the Government expects this scheme to  increase traffic by 5%. Across the world we’ve learnt that if you build  more road capacity it just fills with more cars and causes more  pollution.</em> <br><br> <em>But the same is true with the alternatives. Invest in public  transport, and the buses,       trains and trams fill up. Build cycle lanes,  and people get on their bikes.</em> <br><br> <em>Business as usual is killing the planet, and it’s time for change.  The Government             declared a climate emergency. Sheriffhall spagetthi  junction is the first test of               whether they mean it.</em> <br><br> <em>Lets make this clear and flood them with objections. </em><a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><em>Please take action and share the campaign now</em></a><em>.</em> <br><br> <em>Yours<br> &nbsp;<br> Alison Johnstone, Scottish Green MSP for Lothian </em> <br><br> <a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Take Action Now&nbsp;</em></a> &#8220;</p>



<h6 class="wp-block-heading">1.2 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This has been mentioned once or twice already,  Item 1.13 in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>&nbsp;gave the details for this on-line consultation, do please respond before it closes. Here’s the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>&nbsp;to the City Council’s consultation page where you have to scroll down to find this one. </p>



<p>The survey is quite short, so won&#8217;t take you long to do &#8211; and do try to ignore all the &#8220;typos&#8221; in the information in the Council&#8217;s consultation information!</p>



<p>While this isn&#8217;t one of the city&#8217;s radial routes, which are so important, a good cycle route out to Pollok Park from the city centre should get people to take to their bikes. You might wish to question why the route is two-way on one side of the road rather than 2 lanes, one each side? Another concern is cycle priority at side roads &#8211; including all the driveways!</p>



<h6 class="wp-block-heading">1.3 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>There&#8217;s no reason given as to why this consultation is being extended but here&#8217;s the email that we got on 07 January:</p>



<p>&#8220;<em>Dear All,<br><br>Firstly, we would like to thank all of you who have already provided responses to the consultation. <br><br>Many  of you have also been in contact to request more time to complete your  responses. We are happy to announce an extension to the consultation  period. &nbsp;<br><br></em><strong><em>We now invite you to respond to the paper by 3 February 2020</em></strong><em>. </em><br><br><em>Our  online portal for submitting responses will remain open until midnight  on this date but we also welcome input in any format. Attached is a word  version of the online  portal &#8211; please feel free to use this form if you prefer. &nbsp;<br><br>The consultation paper, summary and more details on how to respond are available on our project page at </em><a href="https://www.lawcom.gov.uk/project/automated-vehicles/"><em>https://www.lawcom.gov.uk/project/automated-vehicles/</em></a><em>&nbsp;<br><br>Yours sincerely,<br><br>Automated Vehicles Team – Law Commissions</em>&#8220;</p>



<p>Note that the word version of the online portal is not given here. GoBike uses WordPress for its website and this does not permit the uploading of word documents. If you wish to have the word version please request one direct or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter of response</a> that GoBike sent in on 06 January. Be afraid, very afraid!</p>



<h6 class="wp-block-heading">1.4  **NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9834" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Glassford Street</figcaption></figure>



<p>The Avenues programme has been quiet for a while but here&#8217;s a recent email that we received last week, headed &#8220;Glasgow Avenues: Glassford Street and Stockwell Street Online and On Street Consultations&#8221;:</p>



<p> &#8220;<em>On 16 Jan 2020, at 19:56, Avenues &lt;</em><a rel="noreferrer noopener" href="mailto:avenues@ironsidefarrar.com" target="_blank"><em>avenues@ironsidefarrar.com</em></a><em>&gt; wrote: <br><br></em><strong><em>Glasgow Avenues – Your Avenues Consultation</em></strong><em><br></em><br><em>A multi-disciplinary design team led by Ironside  Farrar Ltd has been appointed to deliver the second phase (“Block B”) of  the Glasgow Avenues programme which will invest £115m in the public  realm of the City Centre in the next few years,  introducing a network of connected ‘green’ routes across Glasgow’s city  centre.&nbsp; <br><br>Block B includes </em><strong><em>Stockwell Street</em></strong><em>&nbsp;and </em><strong><em>Glassford Street</em></strong><em> Avenues.<br><br>The Design Team are seeking to consult with you &#8211;  local residents, businesses and stakeholders &#8211;&nbsp; on the draft proposals  for these two streets in the following 3 ways:<br><br>1. You are invited to view and comment on the concept designs online at: </em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a><br><br><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>,  helping us understand your perception of the street as it is today. <br><br>3. Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.<br><br>Please feel free to forward this email to other  parties who may be interested in getting involved.&nbsp; The online  consultation is open until 9</em><sup><em>th</em></sup><em> February 2020.<br><br>Thanks in advance for your assistance. <br><br>Kind Regards,<br><br></em><strong><em>Charlie Griffiths</em></strong><em>&#8220;</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9835" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Stockwell Street</figcaption></figure>



<p>From point 1, clicking on the link will get you to the City Council&#8217;s Avenues page. Click on the down arrow at Consultations and then on &#8220;here&#8221; under &#8220;Current Consultation&#8221;.</p>



<p>Or you can  try this quick link:  <a rel="noreferrer noopener" aria-label="link:https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959 (opens in a new tab)" href="https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959" target="_blank">https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959</a></p>



<p>The questionnaire for point 2 is quite curious &#8211; very generic, but you will be able to comment on the dominance of the motor vehicle, particularly with respect to the large areas on Stockwell Street given over to car parking. Why aren&#8217;t they proper parks, with trees and grass and somewhere to sit?</p>



<p>We&#8217;ve been told that the consultants have 2 rickshaws that will be moving about but do look for them at the Argyle Street precinct or further south at the car park area. If you go, do please have your bike with you, or your children, or ageing aunt in a wheelchair &#8211; anything to demonstrate that we should have priority over all the cars in the area.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>The northern part of Ardencraig Road , near Miller Primary School, is proposed for traffic calming</figcaption></figure>



<p>Glasgow City Council now seem to have an alphabetical approach to traffic calming with this and the next 2 schemes that have arrived in the Consultations mailbox this very morning, 21 January. Here is the email and attachments for the first, Ardencraig Road in Castlemilk:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br></em><br><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Ardencraig Road)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong> <br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. </em><br><br><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-<br></em><br><strong>Ardencraig Road</strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>3 sets of 3, 1.9m, 75mm high, speed cushions, </em></li><li><em> 3 sets of 2, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions</em>.</li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>.  <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the attached documents: <a rel="noreferrer noopener" aria-label="Proposals (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals.pdf" target="_blank">Proposals</a>, <a rel="noreferrer noopener" aria-label="Proposals Section 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-1-From-number-76-to-number-38.pdf" target="_blank">Proposals Section 1</a> and <a rel="noreferrer noopener" aria-label="Proposals Section 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-2.pdf" target="_blank">Proposals Section 2</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s the standard approach to high traffic speeds, yet again, by the City Council, which is now proclaiming itself as &#8220;<strong>Glasgow &#8211; proud host of the 26th&nbsp;UN Climate Change Conference (COP26) &#8211; UK2020</strong>&#8221; but where are the cycle lanes to the school?</p>



<h6 class="wp-block-heading">1.6  **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February  </h6>



<p>Moving on to &#8220;B&#8221; and north-west to Cardonald, here&#8217;s the email from earlier today, 21 January, for these 2 residential roads:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Bankfoot Road and Wedderlea Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Bankfoot Road</em></strong></li><li><em> </em><strong><em>Wedderlea Drive</em></strong></li></ul>



<p> <em>Details of the proposed Scheme<br> The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>6 sets of 3, 1.8m, 75mm high, speed cushions, </em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br>Please reply directly to <a href="mailto:LandServices.Mailroom@glasgow.gov.uk">LandServices.Mailroom@glasgow.gov.uk</a>.<br><br><em>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant Jordan  Tracey on 0141 287 9173.<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Bankfoot Road, looking north from Paisley Road West</figcaption></figure>



<p>Here&#8217;s one of the feeder roads on to the cycle lanes we so desperately need on Paisley Road West if we are to achieve the modal split required to save the world. Not many, sorry, not any, apologies for not reaching the target, the aim, no sorry, just an aspiration of 10% of journeys by bike this year, were there? Let&#8217;s look to doing better this decade.</p>



<h6 class="wp-block-heading">1.7   **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9912" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On that long Castlemilk Drive (singing along to <a rel="noreferrer noopener" aria-label="Devil Gate Drive (opens in a new tab)" href="https://www.youtube.com/watch?v=9vFTksaposs" target="_blank">Devil Gate Drive</a>, a classic from Suzy Q!), struggling up to, or coasting down from, the top of the hill and the countryside of South Lanarkshire, motorists are going too fast and so we must suffer yet more speed cushions. Why can&#8217;t such concerns be declared as public realm schemes and then we might get cycle lanes, giving us enough room to wobble up the hill without danger of being clipped by a close-passing motor vehicle? However, money is tight and the COP26 delegates won&#8217;t be encouraged to visit Castlemilk, so we will be stuck with another rash of speed cushions. Here&#8217;s the email received from the City Council today, 21 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Castlemilk Drive)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme</em><br><em>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Castlemilk Drive</em></strong></li></ul>



<p><em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>4 sets of 3, 1.9m, 75mm high speed cushions. </em></li><li><em> The installation of bollards beside the proposed speed cushions</em></li></ul>



<p><em> Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br><em>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;, </em>etc</p>



<p>Here&#8217;s the plan showing the proposed speed cushions: <a href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.79-Castlemilk-Drive-TC-proposals-Full-view-of-proposals.pdf" target="_blank" rel="noreferrer noopener" aria-label="Castlemilk Drive plan (opens in a new tab)">Castlemilk Drive plan</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Note the active-travel friendly parking! GoBike will applaud the aim, but not the method, of reducing traffic speeds here.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> This consultation featured in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council’s consultation page. This consultation is the second item on page 1. We hope to have the GoBike response in our next Digest.</p>



<p>Note that the area it covers is bounded on the south-east by Glassford Street and Stockwell Street.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><br>Here&#8217;s a consultation that GoBike responded to at Stage One &#8211; details further on &#8211; but this is the email for the public consultation that we received on 16 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(SOUTH SIDE CAR CLUB) ORDER 202_</em></strong><em><br><br>Further to my consultation email of 3</em><sup><em>rd</em></sup><em> December 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose  a copy of the press notice of the proposed Order, relevant drawings, statement of reasons and detailed report.<br><br>The  location proposed for Queen Elizabeth Gardens has been removed from  this order and will be included in a future parking control order for  the area.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><strong><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a></strong><em> <br><br>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing  to Group Manager, Sustainable Transport, Neighbourhoods and  Sustainability, Exchange House, 231 George Street, Glasgow, G! 1RX or by  e-mail to </em><strong><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a></strong><em> by Friday 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully,</em>&#8221; etc</p>



<p>Here are the documents referred to in the email above: <a rel="noreferrer noopener" aria-label="Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-CarClub-Consultation-advert-160120.pdf" target="_blank">Advert</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-Car-Club-TRO-Report-Jan-2020.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-CarClub-TRO-SOR_Jan2020.pdf" target="_blank">Statement of Reasons</a>, <a rel="noreferrer noopener" aria-label="Allison Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-001_Allison-St.pdf" target="_blank">Allison Street plan</a>, <a rel="noreferrer noopener" aria-label="Paisley Road West plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-003_PRW.pdf" target="_blank">Paisley Road West plan</a>, <a rel="noreferrer noopener" aria-label="Torrisdale Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-004_Torrisdale.pdf" target="_blank">Torrisdale Street plan</a>, <a rel="noreferrer noopener" aria-label="Kenmure Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-005_Kenmuir.pdf" target="_blank">Kenmure Street plan</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-006-Albert-1.pdf" target="_blank" rel="noreferrer noopener" aria-label="Albert Drive plan (opens in a new tab)">Albert Drive plan</a>.</p>



<p>At Stage One we were given this information by email:</p>



<p>&#8220;<em>Background to the proposed Order<br> This  order is proposed to provide car club and electric parking on the south  side at the locations below in line with the Council’s policy for  sustainable transport and emission reductions.<br><br>Area affected by the proposed Order<br>The area is the south side of the city.<br><br>Details of the proposed Order<br>The order proposes the following restrictions as shown on the attached drawings:</em></p>



<ul class="wp-block-list"><li> <em>Electric charging and car club bays on Alison Street east of Langside Road.</em></li><li><em> Electric charging and car club bays on Queen Elizabeth Gardens north of Old Rutherglen Road.</em></li><li><em> Electric charging and car club bays on Paisley Road West at Cessnock Street.</em></li><li><em> Electric charging and car club bays on Torrisdale Street west of Victoria Road.</em></li><li><em> Electric charging and car club bays on Kenmuir Street north of Albert Drive.</em></li><li><em> Electric charging and car club bays on Albert Avenue north of Queens Drive.</em>&#8220;</li></ul>



<p>You will see that Queen Elizabeth Gardens in the Gorbals has been removed at the Public Consultation stage, presumably because of local lobbying but GoBike objected, see <a rel="noreferrer noopener" aria-label="this letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">this letter</a>, to the inclusion of Paisley Road West. Paisley Road West is a major arterial road connecting the city centre to the outskirts and one of the most heavily cycled roads into the city; kerbside parking obstructs the construction of the cycle lanes we desperately need on this route if we are to meet climate change targets. We have had no response from the City Council to this well-argued letter written by one of our members.</p>



<p>GoBike will be responding to this public consultation but if you support our views do please write in to comment or object to the proposals.</p>



<h6 class="wp-block-heading">1.10 **NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no, or perhaps with, contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The service road is a residential and shopping side road to the busy Carmunnock Road and at the Stage One consultation GoBike was told that &#8220;<em>The Council have been made aware of road safety issues with the existing two-way traffic flow on Carmunnock Road  (Service Road).&nbsp; Therefore, a  questionnaire was posted to the nearby residents to find out if they  supported the introduction of a proposed one way system.&nbsp; The results of  the returned survey were 23 in favour of the  proposals and 6 against.&#8221; </em><br>In its <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a>, GoBike argued strongly that cycling must be exempt from the one-way order. Since receiving the Public Consultation email below, GoBike has emailed the City Council for an answer to the one-way question. However, we now note, from the Detailed Report issued with this public consultation that improved safety may be achieved by &#8221; <em>Providing a single directional route for vehicular travel</em>.&#8221; Note the use of the word &#8220;vehicular&#8221;, which would not normally include cycles?</p>



<p>Here&#8217;s the Public Consultation email received on 17 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (CARMUNNOCK ROAD (SERVICE ROAD))</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 20__ </em></strong><em><br><br>Further to my consultation email of 6</em><sup><em>th</em></sup><em>  December 2019 regarding the above named Traffic Regulation Order, and  in accordance with statutory procedures, I now enclose a copy of the  press  notice of the proposed Order, relevant map, statement of reasons,  detailed report.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person  wishing to object to the proposed Order should send details of the  grounds for objection in writing to Kevin Hamilton, Head of Roads  Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/NoticeOfProposals-CarmunnockRoad-ServiceRoad-190x114mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Carmunnock_Road_-_Plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/08.01-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label="Detailed Report (opens in a new tab)">Detailed Report</a>.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </h6>



<p>You may be aware that we responded last autumn to the Stage One consultation concerning the proposed cycle lanes on Byres Road and submitted detailed questions related to the design of the cycle lanes. A major concern is about side road junctions where, to us, it&#8217;s obvious that all traffic (motor, cycle, pedestrian) has priority over traffic into and out of side roads. Unfortunately, the City Council appears to take a different view. <br><br><br>We informed you in Digest 51 that the 3 TROs for Byres Road had just been published but full details from the City Council arrived just too late for inclusion in that Digest. </p>



<p>Here&#8217;s the email that we received on 06 January, with almost no detail of the cycle lane design:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(BYRES ROAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Road-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P-5114-0000-Byres-Road-TRO.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Draft-Report.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-TRO.pdf" target="_blank">FAQs</a></p>



<p>Some of our members are busy writing our response and our concern at the lack of information on the cycle lane design has been voiced to the City Council.</p>



<h6 class="wp-block-heading">1.12  Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February  </h6>



<p><br>GoBike supports 20mph speed limits in our towns and cities and Byres Road is no exception. We supported this proposal at the Stage One consultation in the autumn and no doubt we will support it now.</p>



<p>Here&#8217;s the email we received on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (BYRES ROAD)</em></strong><em> </em><strong><em>(20MPH SPEED LIMIT ZONE) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs</em>.<br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:ByresRoad20MPH@glasgow.gov.uk"><em>ByresRoad20MPH@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-20Mph-Zone-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P5114-101-Byres-Road-20MPH.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Draft-Report-Byres20MPH.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Byres20MPH.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-20MPH.pdf" target="_blank">FAQs</a>.</p>



<p>The FAQs are certainly not directed at those of us keen on active travel; here&#8217;s one Q and A:<br>&#8220;<em>Can I park / load in the cycle lanes?<br>  Parking / Loading from the cycle lanes is not permitted</em>&#8220;<br>Yes, the motor driver is still seen as the main customer &#8211; the the FAQs are the same for all 3 TROs.</p>



<h6 class="wp-block-heading">1.13  Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February </h6>



<p>Car parking on the streets around Byres Road is not normally a major concern for most of us in GoBike, but if you live in Hillhead you might have a different view or particular concern about this proposal? If so, do email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a> and we can include it in our response. <br>Points we have noted so far include the introduction of a second car parking permit per household (why should that be introduced in a city that&#8217;s trying to reduce car ownership, reduce pollution and will be hosting COP26 in November?) and the ridiculously cheap parking charges (even if they are the same across the city). Surely parking charges should be at least the cost of a return ticket on the Subway or bus and not just 80p per hour? <br>Here&#8217;s the email received from the City Council on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL (HILLHEAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><br><br><em>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp;<br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:HillheadTRO@glasgow.gov.uk"><em>HillheadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>The attached documents are here: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Advert-Hillhead-TRO.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Hillhead-TRO-Publication-plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Report-Hillhead-TRO.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Hillhead-TRO.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Hillhead-TRO.pdf" target="_blank" rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)">FAQs</a>.</p>



<p>This information was included in the Stage One email, but there is far more information within the Report: <br><br>&#8220;<em>Background to the proposed Order<br>The  proposal is to amend the existing Hillhead parking controls from a  Controlled Parking Zone (CPZ) to a Restricted Parking Zone (RPZ).<br>RPZs  are indicated by zone entry signs which have a no waiting roundel to  inform that no waiting is permitted at any time outwith the bays. The  zone entry signs tell you to “park only in signed bays” with a no  waiting roundel which means no waiting at any time. This is the  restriction which applies outwith all the marked bays.<br>This  order will propose the conversion of “residents only” parking bays to  “shared use” bays in order to bring the parking regime in Hillhead into  line with other residential areas within the west-end.&nbsp;Whilst all bays  will become “shared use”, residents will be able to acquire a second  personal permit and visitor permits, fees will be in line with other  zones. Permits will also be usable in adjacent zones. The order will  also include proposals to pedestrianise Ashton Lane / Great George Lane  with service access limited to specific times and controlled by  drop-bollards. Residential access to the rear of Ashton Road will be  maintained. Cresswell Lane will remain pedestrianised.</em>&#8220;</p>



<p>The private car is still at the top of the transport tree, it seems.</p>



<h6 class="wp-block-heading">1.14  **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike member, Emily, alerted us to this consultation, which has a question on &#8220;Do you have any proposals that would improve the <strong>space around our homes</strong> and promote connected places and vibrant communities?&#8221; and the &#8216;vision&#8217; and background refer to lots of relevant stuff about connectivity, walking and cycling, vibrant local areas, climate emergency, air pollution, etc.</p>



<p>Here&#8217;s the link:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a> </p>



<p>Do have a look and let&#8217;s get lots of responses in that mention cycling and active travel.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" width="525" height="245" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Going hand in hand with Item 1.2 above, the on-line consultation on the SWCW extension along St Andrew&#8217;s Drive, is this public consultation event tomorrow, Wednesday 22 January at  St Albert’s Primary School, 36 Maxwell Drive from 3:30 to 7pm. You may see details of the proposals at this&nbsp;<a rel="noreferrer noopener" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>. Do try and get to the event if you can; there will be the opportunity to speak to the staff involved about the proposals.</p>



<h6 class="wp-block-heading">2.2 Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 January</h6>



<p>Mentioned in Item 1.4 above, is this on-street, meet the people event:</p>



<p>&#8220;<em>Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.</em>&#8220;</p>



<p>We don&#8217;t have any more information but it should be quite easy to spot one or other of the 2 rickshaws that the consultants will have. If you are in the town, do look out for the displays; check out the area at the end of the Argyle Street precinct or the car park areas on Stockwell Street.</p>



<h6 class="wp-block-heading">2.3  Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/burrell-collection-pollok-park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7330"/></figure>



<p>On 17 January GoBike received this email from The Transforming Pollok Country Park Project Team within Glasgow Life:</p>



<p>&#8220;<em>Hello, <br><br>Following  previous consultation events, Glasgow City Council and Glasgow Life  would like to invite you to a public meeting on the access proposals  being developed for Pollok Country Park, as  part of the Transforming Pollok Country Park project. <br><br>The  purpose of this meeting is to share the proposals, summarise recent  changes in response to feedback from previous consultations, and outline  current progress ahead of a formal planning submission  later in February 2020. <br><br></em><strong><em>Transforming Pollok Country Park</em></strong><br><br><strong><em>Public Meeting </em></strong><em><br><br></em><strong><em>Tuesday 4 February, 6.30–7.45pm </em></strong><em><br><br></em><strong><em>at Pollokshaws Burgh Hall,</em></strong><em> </em><strong><em>Pollokshaws Road, G43 1NE</em></strong><em><br><br>The meeting will include a presentation lasting up to 45 minutes followed by up to 30 minutes for questions.<br><br>We hope you can join us. If you’re unable to attend but would like to find out more, please email us at </em><a href="mailto:PollokCountryParkTransformation@glasgowlife.org.uk"><em>PollokCountryParkTransformation@glasgowlife.org.uk</em></a><em>. <br><br>Kind regards,  <br>The Transforming Pollok Country Park Project Team&#8221;</em></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p><br><br>Our objection to the proposal to allow taxis and authorised vehicles to use the bus and cycle lanes on this bridge was published in <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)">Digest 50</a>, Item 1.2 We received this acknowledgement on 07 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Tricia Fort<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>I  am writing to confirm receipt of your correspondence regarding the  above named Traffic Regulation Order. Following the publication period,  officers  shall commence an analysis of all correspondence received and issue you  with a considered response in due course. <br><br>Please  note that timescales for preparing and distributing a considered  response can be influenced by the quantity and nature of correspondence  received.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Let&#8217;s hope they are rethinking the proposal, especially since it is so close to the site of the COP26 Conference in November.</p>



<h6 class="wp-block-heading">3.2 Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9628" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 3.10 Our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a>, sent in on 18 December, raised concerns that the GCC response to speeding on this wide road in the north of the city was to yet again install speed cushions with no thought to narrowing the road with cycle lanes etc. Note that no Traffic Regulation Order is required for the installation of speed cushions. The City Council response to our letter, with this email of 08 January, is illuminating as to how the Council currently operates:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY, GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort<br><br>Thank you for your undernoted enquiry.<br><br>Whilst  I appreciate your concerns regarding Ashgill Road not being included as  part of the city’s cycle  network, I can advise that this section is focused on reducing injury  accidents throughout the city. The council has limited funding and  resources available to implement traffic calming schemes and in order to  make sure these resources are directed at the  locations with the greatest potential for casualty reduction, a site  risk assessment is undertaken for each request. This process assesses  the location against criteria including the history of injury accidents,  measured vehicle speeds and the presence of  any local amenities such as being close to a nearby school or nursery</em><br><br><em>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions, however, in this instance we would  consider that the road bends at this location also act as traffic  calming features.<br><br>Whilst  I appreciate that drivers may accelerate and brake between each set of  cushions, the Council are currently seeking to implement mandatory 20mph  city-wide  speed limit restrictions on appropriate roads. Should the restrictions  be introduced, a reduction in the permitted speed limit would encourage  drivers to maintain a reduced speed whilst negotiating speed cushions or  any other form of traffic calming feature.</em><br><br><em>I trust the above information is of assistance, however, should you require any further information please contact (name and phone number removed by GoBike).</em></p>



<h6 class="wp-block-heading">3.3 Glasgow, Duror Street, Traffic Calming, GCC response to our concerns</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9637" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Again, this consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, item 3.13 and we submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> on 18 December. To reduce speeding by motor vehicles on this wide road in the east of the city it seems to be a reasonable suggestion to stop most through motor traffic with a filter to allow only buses (and emergency vehicles) and bikes through but here&#8217;s the reply that we received on 10 January. Note that the installation of speed cushions does not require a traffic regulation order and that a filter, of the type we propose, ie one with rising bollards or similar, would not prevent residents accessing either side of that filter:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY</em></strong><em>, </em><strong><em>GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br>Thank you for your undernoted enquiry.<br><br>I can advise that the introduction of a bus/cycle gate would require the Council to successfully promote a Traffic Regulation Order (TRO). The  legal  process of promoting a TRO is subject to formal consultation and public  advertisement, is open to objection and can take in excess of 12 months  to complete. The promotion of such an order also requires the support  of emergency services and various other road  user groups. It is highly likely that the introduction of a bus/cycle  gate on Duror Street would lead to objections from local residents as  they would be unable to park near to their properties. In view of the  foregoing, there are no plans at present for a  bus/cycle gate to be introduced at this location.<br><br>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions and this recommendation has been  adhered to in the design of this traffic calming proposal.<br><br>I trust the above information is of assistance, however, should you require any further information please contact</em>&#8221; (name and phone number removed by GoBike)</p>



<h6 class="wp-block-heading">3.4 Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=525%2C340&#038;ssl=1" alt="" class="wp-image-9825" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=600%2C389&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike has responded to several consultations about the regeneration of Sighthill, and some might remember that this was a favourite project of the one-time Cycling Czar Councillor Frank McAveety? Who&#8217;s he? Some newer GoBike members might ask. However, the Glasgow (Evening) Times reported on 11 January that construction of the bridge should start in February, be completed in August 2021 and cost £19m. See: <a rel="noreferrer noopener" aria-label="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln (opens in a new tab)" href="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln" target="_blank">https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln</a></p>



<h6 class="wp-block-heading">3.5 Glasgow, Connecting Woodside Update, with news of the  Woodside ‘Making Places’ project </h6>



<p>If you don&#8217;t subscribe direct to the Connecting Woodside updates then you will have missed the free family fun event on Saturday but there is a new Facebook page about the Making Places project that is working in tandem with the active travel team. See <a rel="noreferrer noopener" aria-label="this link (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/01/15/free-family-fun-event-this-saturday!" target="_blank">this link</a> and if you live in the area do get involved. If you would like to ask a question to the project team about this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Free family fun event this Saturday!" target="_blank">sustainabletransport@glasgow.gov.uk</a>. </p>



<h6 class="wp-block-heading">3.6 Glasgow Avenues project, George Square and Blythswood Square.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="352" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=525%2C352&#038;ssl=1" alt="" class="wp-image-9899" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=300%2C201&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=600%2C402&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption> A vision of what Blythswood Square could look like in the future (Herald photo)</figcaption></figure>



<p>News of the Avenues and these 2 squares and yet more consultation in today&#8217;s Herald newspaper; follow this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.heraldscotland.com/news/18174117.plans-hobbit-house-visitor-centre-cafe-25m-project/" target="_blank">link</a> for the details. Let&#8217;s hope for the best that it happens.</p>



<h6 class="wp-block-heading">3.7 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9112" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The Traffic Regulation Order, which we supported, see <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.2, to limit parking in this area near the car showroom, has now been approved, and here&#8217;s the confirmation from East Dunbartonshire Council, received today, 21 January:</p>



<p>&#8220;<em>Dear Sir/Madam   <br><br>The  Traffic Regulation Orders mentioned below has now been made and will become  effective  on  Monday,  23 March 2020. <br><br>Attached are copies of the Order and plan, together with copy of the Notice that is to appear in the edition of the  Milngavie and Bearsden Herald which is published on 24   January 2020.   <br><br>Yours faithfully   </em><br><em>Fiona Stirling   <br>Legal Services, 12 Strathkelvin Place,  Kirkintilloch, G66 1TJ  <br>Telephone 0300 12345 10 (Ext 8012)   <br><br>Note Referred to:-    1. The East Dunbartonshire Council (Killermont Avenue, Rannoch Drive And Woodvale  Avenue,  Bearsden) (No Waiting And No Loading At Any Time       Restrictions) Order 2020.    <br>(See  attached  file:  <a rel="noreferrer noopener" aria-label="200121  Killermont,  etc  - Waiting Time Order 2020.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/200121-Killermont-etc-Waiting-Time-Order-2020.pdf" target="_blank">200121  Killermont,  etc  &#8211; Waiting Time Order 2020.pdf</a>)</em>&#8220;</p>



<p>Good to get something in from outwith the city, but we do hope to get more positive news in before COP26, which will be upon us before we know it. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9795</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders</title>
		<link>https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 07 Jan 2020 11:50:20 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[SWCW]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9679</guid>

					<description><![CDATA[As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so we campaign for it. We receive no public funding, have no paid employees, and are run entirely by volunteers, but we do have enthusiastic members who are pleased to get involved and/or pay our minimum fee of £5 per year (and many pay more). <a rel="noreferrer noopener" aria-label="Do please join us (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank">Do please join us</a> but also read on for the news, including the long-awaited Byres Road TROs, we have for you.</p>



<span id="more-9679"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultation</h6>



<ol class="wp-block-list"><li>Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </li><li>Glasgow, City Centre Strategic Development Framework, closes 17 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>  **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>GoBike ride 05 January, to see what has been done and how much more is needed.</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C98&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="98" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is important, setting the tone for what comes next. If you haven&#8217;t responded to this on-line consultation yet, please do so by 5pm on Friday afternoon. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">link</a> to the survey and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-STPR2-response-060120.pdf" target="_blank">letter</a> that GoBike has also submitted. The survey is easy to do, but do remember to be ambitious; Scotland needs transport systems to match its scenery, ie superb.</p>



<h6 class="wp-block-heading">1.2 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>This consultation finally closes next Thursday; we&#8217;ve been publicising it since <a href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284">Digest 46</a>, Item 1.9 back at the end of October. Here&#8217;s the <a href="https://www.lawcom.gov.uk/project/automated-vehicles/">link to the consultation</a> and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter</a> we have written in to voice concern.  It&#8217;s almost a fantasy world to expect automated vehicles to improve conditions on our roads but do have a look at the consultation for yourself.</p>



<h6 class="wp-block-heading">1.3 Glasgow, City Centre Strategic Development Framework, closes 17 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This high-level document was first featured in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.11 and here is the <a rel="noreferrer noopener" aria-label="link to the City Council's consultation page (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the City Council&#8217;s consultation page</a>. Scroll down to the bottom of the page to find this one.<br>GoBike has submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Draft-City-Centre-SDF-response-060120.pdf" target="_blank">letter</a> outlining our views. Do please add your voice to the consultation.</p>



<h6 class="wp-block-heading">1.4 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This on-line consultation first featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.13 and, as you can see from the screenshot above, there is plenty of room for cycle lanes for a route running from the city centre to Pollok Park. Do please get your views in &#8211; the link to the City Council&#8217;s consultation page is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a> (scroll down to find this one) &#8211; although you might wish to wait until after the consultation event on Wednesday 22nd Jan (see Item 2.1 below) to respond.</p>



<h6 class="wp-block-heading">1.5 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This is a consultation that was confused with Item 1.3, sorry about that, but we featured it in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council&#8217;s consultation page. This consultation is the second item on page 1.</p>



<p>Previously we responded to the Broomielaw  District Regeneration Framework with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Broomielaw-DRF-response-050419.pdf" target="_blank">letter</a> in April 2019 and the St Enoch  District Regeneration Framework in September 2019 with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/08/GoBike-St-Enoch-DRF-response-020919.pdf" target="_blank">letter</a>. The response to this latest consultation will be along similar lines.</p>



<h6 class="wp-block-heading">1.6 **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February</h6>



<div class="wp-block-image"><figure class="alignright is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/cropped-Byres-Road-1-e1517677604466.jpg?resize=357%2C236&#038;ssl=1" alt="" class="wp-image-4151" width="357" height="236"/></figure></div>



<p>We&#8217;ve just found out that the TROs for Byres Road, proposed parking changes, cycle lanes and 20mph are now all on the City Council&#8217;s website, see:  <a href="https://www.glasgow.gov.uk/proposedtro">https://www.glasgow.gov.uk/proposedtro</a> <br>We&#8217;ll be having a close look at these over the next couple of weeks.</p>



<h4 class="wp-block-heading"> Section 2: Forthcoming Consultations </h4>



<h6 class="wp-block-heading">2.1 Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="245" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>As mentioned in Item 1.4 above and in our <a rel="noreferrer noopener" aria-label="Consultation Extra of 29 November (opens in a new tab)" href="https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495" target="_blank">Consultation Extra of 29 November</a>, there will be a consultation event at St Albert&#8217;s Primary School, 36 Maxwell Drive on Wednesday 22 January from 3:30 to 7pm. You may see details of the proposals at this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 GoBike ride 05 January, to see what has been done and how much more is needed.</h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?fit=525%2C295&amp;ssl=1" alt="" class="wp-image-9739" width="642" height="361" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is the route of the 15 miles or so of the GoBike ride on Sunday plus a wee bit from Glasgow Green to the start at the SEC.</p>



<p>Much of the infrastructure that we travelled on has been the topic of consultation and that is shown in bold &#8211; search on our website at <a rel="noreferrer noopener" aria-label="www.gobike.org (opens in a new tab)" href="https://www.gobike.org/" target="_blank">www.gobike.org</a> to find details. From the SEC and travelling clockwise our journey covered:</p>



<ul class="wp-block-list"><li>West City Way (consulted on and constructed before GoBike records were kept on our website)</li><li><strong>Woodside </strong>&#8211; recent and ongoing consultation</li><li><strong>Garscube Road </strong>&#8211; included in the Woodside consultation</li><li>The <strong>Underline </strong>project &#8211; one of the Avenues projects connecting New City Road under the M8</li><li><strong>St George&#8217;s Road </strong>&#8211; to connect Woodside to Sauchiehall Street</li><li><strong>Sauchiehall Street </strong>&#8211; the first of the Avenues projects to be constructed, from Charing Cross to Rose Street</li><li><strong>Renfrew Street, Killermont Street and North Hanover Street </strong>&#8211; a further Avenues project to connect the Sauchiehall Street Avenue to the east of Queen Street Station</li><li><strong>South City Way from King Street via Bridgegate and Gorbals Street to Victoria Road and Queen&#8217;s Park</strong> &#8211; under construction</li><li>Muirend to Queen&#8217;s Park Quiet Way &#8211; advisory cycle lanes</li><li><strong>South West City Way </strong>&#8211; constructed from Commerce Street to St Andrew&#8217;s Drive and currently under consultation for continuation to Pollok Park</li><li>National Cycle Route 756</li></ul>



<p>Well, that was shorter than usual but do try to respond to the consultations listed &#8211; the more voices the authorities hear, the more they will listen. No doubt there will be more in Digest 52 in two weeks time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9679</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East</title>
		<link>https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 26 Nov 2019 17:00:34 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[bus lanes]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[cycle route]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[petition]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[shared footways]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9430</guid>

					<description><![CDATA[Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3, and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3,  and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and North Lanarkshire, East Dunbartonshire and East Renfrewshire as well as the big city.</p>



<span id="more-9430"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Glasgow, Road Satisfaction on-line survey, closes ??</li><li>Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</li><li>East Renfrewshire, Local Development Plan 2, closes 13 December</li><li>**NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</li><li>**NEW** Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ ,  closes 13 December </li><li>East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</li><li>**NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</li><li>**NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li><li> **NEW** Glasgow, City Centre Strategic Development Framework, closes 17 January 2020 </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Scottish Government,  Strategic Transport Projects Review (STPR2) </li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Elmbank Street, we have found an alternative route! </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</li><li>Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</li><li>Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</li><li>Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 **NEW** Glasgow, Road Satisfaction on-line survey, closes ??</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="700" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=525%2C700&#038;ssl=1" alt="" class="wp-image-4243" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?w=756&amp;ssl=1 756w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=225%2C300&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=450%2C600&amp;ssl=1 450w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=357%2C476&amp;ssl=1 357w" sizes="auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px" /></figure>



<p>GoBike members Derek and Neil alerted us to this on-line survey. The City Council is looking for residents&#8217; views of the city&#8217;s roads.  As seems quite standard with these things there is no closing date given, so please try to respond as soon as you can, using this link: <a rel="noreferrer noopener" aria-label="https://www.surveymonkey.co.uk/r/glasgow-city-2 (opens in a new tab)" href="https://www.surveymonkey.co.uk/r/glasgow-city-2" target="_blank">https://www.surveymonkey.co.uk/r/glasgow-city-2</a></p>



<h6 class="wp-block-heading">1.2 Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The publication of these proposals was reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.3 and GoBike fully supports the proposed restriction on parking. We&#8217;ll be writing in later this week confirming our support.</p>



<h6 class="wp-block-heading">1.3 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</h6>



<p>These proposals have been in recent Digests, including <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.4. While we support protected cycle lanes and are concerned about shared footways, we recognise that for those many people who do not wish to cycle on road with all the single occupancy motor commuters at this busy  junction area, these proposals will improve their journey. Our<a rel="noreferrer noopener" aria-label=" letter of response is here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Cluny-Park-A81-Redetermination-letter-111119.pdf" target="_blank"> letter of response is here</a>.</p>



<h6 class="wp-block-heading">1.4 East Renfrewshire, Local Development Plan 2, closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="465" height="260" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=465%2C260&#038;ssl=1" alt="" class="wp-image-9397" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?w=465&amp;ssl=1 465w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=300%2C168&amp;ssl=1 300w" sizes="auto, (max-width: 465px) 100vw, 465px" /></figure>



<p>This was first mentioned in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.5 and we have now started a new channel on Slack for GoBike members who live, work or have a strong interest in East Renfrewshire active travel. Members have been to the Local Consultation events and are busy finding out the issues and concerns about the Local Development Plan 2. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the document and consultation details (opens in a new tab)" href="https://www.eastrenfrewshire.gov.uk/ldp2" target="_blank">link to the document and consultation details</a>. If you would like to get involved, do please contact us. We aim to have a GoBike response ready in good time for 13 December.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Dalmarnock-Railway-Station.jpg?w=525&#038;ssl=1" alt="" class="wp-image-9235"/></figure></div>



<p><br>Yes, this is another that we unwittingly published at the Stage 1 Consultation Stage. Our response, given in Digest 46, Item 1.2, one of support, but also concern about parking being displaced across the river, is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">here</a>. The City Council replied on 12 November with this email:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST) (TRAFFIC REGULATION) ORDER 20__</em></strong><em><br><br>Thank you for your comments on behalf of  GoBike, in relation to the above named Traffic Regulation Order (TRO).<br>I note your comments regarding Shawfield Road and would advise that this falls outwith the Glasgow City  boundary and is not included within the above TRO.<br><br>However, your comments regarding this and your further comments about the National Cycle Route 75, have  been passed to the appropriate team, who will respond to you in due course.&nbsp;  <br><br>I trust this is of assistance, however should you require further information please contact my assistant,  (Name and phone number removed by GoBike). </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-3.png?w=525&#038;ssl=1" alt="" class="wp-image-9436"/></figure>



<p><strong><em>Kevin Hamilton</em></strong><em>, </em><strong><em>Head of Roads</em></strong><em>, </em><strong><em>Neighbourhoods and Sustainability</em></strong>&#8220;</p>



<p>The information now put firmly in the public domain and sent to us with this email on 18 November is here:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST)</em></strong><em> </em><strong><em>(TRAFFIC REGULATION) ORDER 20___</em></strong><em><br><br>Further to my consultation email of 4</em><sup><em>th</em></sup><em> October 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons, detailed report.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Kevin Hamilton, Head of Roads Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 13</em><sup><em>th</em></sup><em> December 2019.<br><br>Yours faithfully</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-4.png?w=525&#038;ssl=1" alt="" class="wp-image-9437"/></figure>



<p><em>Kevin Hamilton, Head of Roads, Neighbourhoods and Sustainability</em>&#8220;</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Dalmarnock_West__TRO-A3_Titlebox_-_Transplan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/NoticeOfProposals-DalmarnockWest-210x85mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Draft Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/09.01-Draft-Report-1.pdf" target="_blank">Draft Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/08-1-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>GoBike will maintain its support for these proposals but will emphasise the points we made before about Cycle Route 75 and our concern about parking transferring to South Lanarkshire, just across the river. Do write in to the Council if these proposals affect you or you have a view on them.</p>



<h6 class="wp-block-heading">1.6 Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ (OFFICIAL), closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="222" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-9449" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=600%2C253&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p><strong>Stage 1, north of the railway</strong><br>GoBike received the initial proposals for this scheme, to restrict parking on a new road (not shown on this map) from the M80 (at the roundabout to the north-west of the new station) to the station itself on 28 October 2019. We replied on 19 November with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Robroyston-M80-Parking-Stage-1-response-191119.pdf" target="_blank">letter</a>, basically saying that we support the parking restrictions but that cycle lanes should be constructed from Robroyston along this new road to the station.</p>



<p>Here&#8217;s the email reply that we received from the City Council on 22 November:</p>



<p>&#8220;<em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY<br><br>Dear Ms Fort,<br><br>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_<br><br>Thank you for your support of the above named Traffic Regulation Order on behalf of GoBike.<br> It  is intended to provide cycle measures on Station Road to connect to  Robroyston Station and this will be subject to future consultation.<br><br>I  trust this is of assistance, however should you require further  information please contact my assistant (name and contact details removed by GoBike).<br><br>Yours sincerely</em>&#8221; etc</p>



<p>Note the intention to &#8220;provide cycle measures&#8221;!</p>



<p><strong>Public consultation 2018, south of the railway</strong><br>This would link in excellently to the proposal we submitted for cycle lanes to be constructed in conjunction with parking restrictions on Station Road  Millerston, linking the new station to the A80 Cumbernauld Road last October. Our final mention of that consultation was Item 1.1 in <a href="https://www.gobike.org/consultation-digest-issue-22-20-november-2018-a-bumper-bundle-of-new-consultations-7056">Digest 22</a>. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of support with comments (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/10/GoBike-Station-Road-Support-and-comments-Letter-171018.pdf" target="_blank">letter of support with comments</a> .</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-6659" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=3264&amp;ssl=1 3264w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Station Road Millerston</figcaption></figure>



<p> For the proposal above, for Station Road, Millerston, it slipped our notice last year that the eastern side of Station Road is in North Lanarkshire, not Glasgow, so residents in the houses on the right-hand side of the road in the photo above might well be plagued by cars left outside their homes once the station opens in a few weeks!</p>



<p><strong>Public Consultation north of the railway</strong><br>This brings us back to the public consultation for the new road north of the railway and this email that we received on 21 November 2019:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br> Dear Sir/Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th</em></sup><em>  October 2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons and  detailed report. Additional corner protection has been added to the  initial draft order at Millersneuk Crescent to ensure safe access for  the local community.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> </em><br><br><em>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing to Group Manager, Technical Services, Neighbourhoods  and Sustainability, Exchange House, 231 George Street, Glasgow, G1 1RX  or by e-mail to </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a><em> by Friday 13</em><sup><em>th</em></sup><em>  December 2019.<br><br>Yours faithfully&#8221;</em> etc</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/RobroystonStation_TRO_Advert_Nov19.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="map/plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/TS-5244-M-000-P-001A.pdf" target="_blank">map/plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-Report-Nov-2019.pdf" target="_blank">Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-SOR.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>We will be repeating our request for cycle lanes on this new road in our response. The overall scheme has the potential of creating good active travel access from Robroyston across to Hogganfield Loch and the <a rel="noreferrer noopener" aria-label="Seven Lochs wetland park (opens in a new tab)" href="https://www.sevenlochs.org/" target="_blank">Seven Lochs wetland park</a> . The east and north of the city has been neglected so far on the active travel front and this is a chance to address that shortfall. Do please write in to support our suggestion!</p>



<p>For these overall works, ie the new road to the north of the railway, the double yellow lining on all the new road and the west side of Station Road south of the railway plus the east side of Station Road at the railway end &#8211; see this <a rel="noreferrer noopener" aria-label="plan from last year (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/The_Glasgow_City_Council_Station_Road_Traffic_Regulation_Order_201_.pdf" target="_blank">plan from last year</a> for the Station Road Millerston proposal, it&#8217;s critical that there is liaison between Glasgow City Council and North Lanarkshire! If you live in Glasgow Ward 17, Robroyston, Glasgow Ward 21, North East or North Lanarkshire Ward 5, Stepps, Chryston &amp; Muirhead do please <a rel="noreferrer noopener" aria-label="contact your councillors (opens in a new tab)" href="https://www.mysociety.org/wehelpyou/contact-your-local-councillor/" target="_blank">contact your councillors</a> to press on them the need for good cycling provision.</p>



<p>One of the councillors for Ward 17 is <a rel="noreferrer noopener" aria-label="Martin McElroy (opens in a new tab)" href="https://www.glasgow.gov.uk/councillorsandcommittees/member.asp?id=1307&amp;t=Councillor+Martin+McElroy" target="_blank">Martin McElroy</a>, who briefly oversaw cycling issues in the previous Glasgow administration and spoke at a GoBike AGM a few years ago. He also cycles regularly, so do please contact him if this is your ward.</p>



<h6 class="wp-block-heading">1.7 East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This was a new public consultation that we publicised in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.6. We commented on the proposal at the initial stage with a view that the gap at the side of the speed tables should be more than 750mm. This hasn&#8217;t been included in the final proposal but we will not object to the scheme overall.</p>



<h6 class="wp-block-heading">1.8 **NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="312" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=312%2C162&#038;ssl=1" alt="" class="wp-image-8162" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?w=312&amp;ssl=1 312w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 312px) 100vw, 312px" /></figure></div>



<p>GoBike member, Derek, posted this on Slack and all those of you who live, work or travel in East Kilbride please do take notice of this. Here is the <a rel="noreferrer noopener" aria-label="link to the proposal (opens in a new tab)" href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank">link to the proposal</a>, with photos and videos plus details of how to respond. </p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=525%2C295&#038;ssl=1" alt="" class="wp-image-9473" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Derek&#8217;s comment on this Stewartfield Way fly through video screenshot is: &#8220;<em>Looks like narrow shared path, not primary cycle route as marked in amended network plan. Huge roundabout in background with few crossings.&#8221;  </em>Certainly, just a quick look at the website link gives the impression that the proposals are to cater for the motor vehicle congestion by building more road, rather than looking for modal change, with the emphasis on public and active travel. Derek gives us another comment, probably from twitter &#8220;<em>consultation on dualling. Narrow shared paths, few crossings but now dressed up like it’s primary route in active travel network</em>.&#8221; </p>



<p>Do please get your views in &#8211; this may be done on-line; see the link given above, and repeated <a href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank" rel="noreferrer noopener" aria-label="here (opens in a new tab)">here</a>.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p>In June 2018 we received the proposals for an experimental TRO to allow taxis and authorised vehicles to use the Finnieston/Clyde Arc/Squinty Bridge for an 18-month period. This was reported in <a rel="noreferrer noopener" aria-label="Digest 11 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-11-going-squinty-about-the-squinty-bridge-byres-road-submission-20mph-parking-etc-etc-5316" target="_blank">Digest 11</a>, Item 1.8 and we were not happy. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of objection (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/06/GoBike-Finnieston-Bridge-Experiment-TRO-Objection-080618.pdf" target="_blank">letter of objection</a> that we submitted on 08 June 2018.</p>



<p>The City Council have apparently decided to make the trial a permanent feature and here&#8217;s the email that we received on 25 November:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><br><br><em>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>The Council propose to consider the introduction of the above named Traffic Regulation Order.<br>Please find enclosed a copy of the press notice of the proposed Order, relevant map, statement of reasons and detailed report.<br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .  <br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Projects Manager, Project Management and Design, Neighbourhoods and Sustainability, 231 George Street, Glasgow G1 1RX  or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by Friday 3</em><sup><em>rd</em></sup><em>  January 2020.<br>Yours faithfully</em>&#8221; etc</p>



<p>The documents referred to in the email are here: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Press-Notice.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Map/Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Relevant-Map.pdf" target="_blank">Map/Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Detailed-Report.pdf" target="_blank">Report</a>.</p>



<p>We are unaware of any improvements that have been made to the active travel regime in the area of this bridge and Fastlink overall, but presumably there have been no incidents reported to Police Scotland in the duration of the temporary TRO. No doubt the taxi operators are delighted with the additional road use they have gained! If you have any views on your experience of using this bridge do please email them to consultations@gobike.org so that they may be reflected in our first message of the New Year to the City Council.</p>



<h6 class="wp-block-heading">1.10 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>This consultation was first given in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and we are hoping that we see the views of those organisations with more insight than us before submitting our response in the New Year. If you do see reviews of this proposal do please send the details to consultations@gobike.org</p>



<h6 class="wp-block-heading">1.11 **NEW**  Glasgow, City Centre Strategic Development Framework, closes 17 January 2020  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike member, Pat, alerted us to this latest in the series of Strategic Development Frameworks for Glasgow. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the consultation (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the consultation</a> and we will be reviewing it over the next few weeks. If you have any specific concerns do please let us know. </p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Scottish Government,  Strategic Transport Projects Review (STPR2) </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p> CyclingUK in Scotland alerted us to this forthcoming consultation and here&#8217;s the email that we got on 18 November:</p>



<p>&#8220;<em>Hi campaigners and supporters<br><br>What’s on your cycling Christmas list? I’m talking  about cycling infrastructure that you want in your area rather than new  tyres for your bike or a thicker pair of gloves! <br><br>Government and their consultants are right now  finalising an online consultation for the Strategic Transport Projects  Review (STPR2) – a kind of spending review of major transport projects  for the next 20 years. See this set of slides abut  STPR2: </em><a href="https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf"><em> https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf</em></a><em> <br></em><br><em>The online consultation is a way of gathering ideas  for consideration in the spending review. It’s massively important that  we use this consultation to say what is needed in Scotland, and use it  to give Government confidence that there  is support for spending money on cycling infrastructure. <br><br>We expect the </em><strong><em>consultation to be launched this month</em></strong><em>  so do look out for it. I want to give you advanced notice so you can  think about how to work with others in your groups, clubs, and networks  to develop ideas. I also want to be  of assistance in helping you and will provide more information when I  know more about the consultation. But please do get in touch if you want  to discuss or if you have questions. </em><br><br><strong><em>This consultation is important</em></strong><em> – STPR2 will  apportion £billions on transport – we need to make the case for  sustainable transport loud and clear and tell Government what we want. </em></p>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&#038;ssl=1" alt="" class="wp-image-9446" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?w=305&amp;ssl=1 305w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p><em>Regards<br><br>Jim<br></em><strong><em>Jim Densham</em></strong><em><br></em><strong><em>Campaigns and Policy Manager &#8211; Scotland</em></strong><em><br></em><strong><em>Cycling UK in Scotland</em></strong><em><br>Email: </em><a href="mailto:jim.densham@cyclinguk.org"><em>jim.densham@cyclinguk.org</em></a>&#8220;<br></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Elmbank Street, we have found an alternative route! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276-600x424.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-7327" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Regular readers of this Digest will surely remember the fury we vented on Glasgow City Council when, as part of the plans for the Sauchiehall Street Avenue and Cycle Lanes project (which we very much support) it became clear that there was to be no easy way to reach Sauchiehall Street from Elmbank Street and the busy area to the south of Bath Street?<br>At a stroke the north part of Elmbank Street was made one-way southbound, and why? To allow car parking on either side! Yes, even though there is a multi-storey car park on Elmbank Crescent to the rear of the King&#8217;s Theatre. Numerous requests were made to the City Council for details of the cycle route from Bath Street to Sauchiehall Street but, we were told, such detail was outwith the remit of the Sauchiehall Street project.</p>



<p>GoBike member, Derek (and note we have 2 very active members with the first name Derek), has now brought it to our attention that Bath Lane, running south to and  parallel to Bath Street has been resurfaced from Elmbank Street to Holland Street. Holland Street, which was made one-way southbound from Sauchiehall Street to Bath Street for the duration of the works, has now reverted to being one-way northbound. Thus there is a feasible route from the two-way section of Elmbank Street, ie <strong>via Bath Lane and Holland Street</strong>.</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="2481" height="3507" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?fit=424%2C600&amp;ssl=1" alt="" class="wp-image-9465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=2481&amp;ssl=1 2481w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=424%2C600&amp;ssl=1 424w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Elmbank Street to Sauchiehall Street, on scrap paper and needing a CAD course!</figcaption></figure>



<p>This route, of course, is not signposted, so won&#8217;t be obvious to the many visitors to our fine city and it does not absolve our City Council of their refusal to allow contraflow cycling and improve permeability for cycle traffic.</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="270" height="186" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/East-Dunbartonshire-Council.jpg?resize=270%2C186&#038;ssl=1" alt="" class="wp-image-9226"/></figure></div>



<p>Back in March we published proposals for parking restrictions in Lenzie and surrounding areas in East Dunbartonshire in <a rel="noreferrer noopener" aria-label="Digest 30 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-30-19-march-2019-get-your-views-in-now-to-the-spt-regional-survey-and-the-get-glasgow-moving-petition-and-is-transformation-possible-8038" target="_blank">Digest 30</a>, Item 1.7. Our <a href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Lenzie-Waiting-Restrictions-support-010419.pdf" target="_blank" rel="noreferrer noopener" aria-label="response (opens in a new tab)">response</a>, supporting the proposals was in <a rel="noreferrer noopener" aria-label="Digest 31 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-31-04-april-2019-featuring-glasgow-east-dunbartonshire-and-north-lanarkshire-8133" target="_blank">Digest 31</a>, Item 1.7. East Dunbartonshire have now approved the TRO and here&#8217;s the email that we received on 12 November:</p>



<p>&#8220;<em>THE EAST DUNBARTONSHIRE COUNCIL (LENZIE)  (WAITING RESTRICTIONS) ORDER   2019<br><br>The  above-mentioned Traffic Regulation Orders has now been made and will become  effective  on  Monday, 6 January 2020. Enclosed are copies of the Order and plan, together with copy of the Notice that is to appear in the   editions  of  the  Kirkintilloch Herald which is published on 13 November   2019.   <br><br>(See   attached   file:   <a rel="noreferrer noopener" aria-label="191112   Lenzie  Area  -  Waiting  and  Loading   Restrictions.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/191112-Lenzie-Area-Waiting-and-Loading-Restrictions.pdf" target="_blank">191112   Lenzie  Area  &#8211;  Waiting  and  Loading   Restrictions.pdf</a>)   <br><br>Regards   <br>Fiona Stirling   <br>Legal Services</em>&#8220;</p>



<h6 class="wp-block-heading">3.3 Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 3.2, Bob Downie&#8217;s petition was heard by the City Council&#8217;s Wellbeing, Empowerment, Community and Citizen Engagement City Policy Committee on 14 November. Here is the <a rel="noreferrer noopener" aria-label="Committee Report (opens in a new tab)" href="http://www.glasgow.gov.uk/councillorsandcommittees/viewDoc.asp?c=P62AFQDN0G81Z30GDX" target="_blank">Committee Report</a> and the recommendations are:<br> &#8220;<em>After consideration, the committee <br>(1) agreed that the issues raised in the petition deserved further attention; and <br>(2) instructed the Executive Director of Neighbourhoods and Sustainability <br>(a) to implement his proposals <br>(i) to develop more robust, clear and visible signage directing cyclists and walkers to the alternative route when temporary closures of the National Cycle Route 75 were required; <br>(ii) to install early warning signs advising of up-coming events; <br>(iii) to arrange that the alternative route via the South embankment of the River Clyde be reviewed and improvements made to the surface and signage to further enhance the diversion; and <br>(iv) to ensure that officers engaged directly with affected groups; and <br>(b) to consider opportunities to consult alongside the major review of  events and public parks. &#8220;</em></p>



<p>So far, so good. We&#8217;ll let you know if and when we hear any more.</p>



<h6 class="wp-block-heading">3.4 Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/20-mph.jpg?resize=525%2C349&#038;ssl=1" alt="" class="wp-image-9456" width="525" height="349"/></figure>



<p>Some of you might remember that back in 2015 Bob Downie presented his <a rel="noreferrer noopener" aria-label="petition (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/20-mph-GCC-Presentation-final.pdf" target="_blank">petition</a> calling for the introduction of a default 20mph speed limit in Glasgow. The petition was well received by Councillors but then fell away and the policy of bit by wee bit was reverted to. Well, a lot has happened since then so we can&#8217;t give Bob all the credit but Glasgow City Council has now agreed to roll out a 20 mph limit across the city, see:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/" target="_blank">https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/</a> </p>



<p>This is good news indeed. GoBike has been supporting every new introduction of a 20 limit in the city but has been appalled at the arbitrary nature of these zones, of which there are now over 80. Yes, that&#8217;s right, over 80. Goodness knows how much all these have cost both in terms of TROs, signage and, of course collisions, as drivers go too fast for the conditions. It will be good to get some standardisation.</p>



<h6 class="wp-block-heading">3.5 Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9466" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=4032&amp;ssl=1 4032w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike members on Slack will be aware that we have been in correspondence with Fairhurst, the Design Consultant for the Barclays Bank development on Clyde Place, about concerns over the South West City Way. GoBike member, Tor, sent in this photo, which is on her daily commute, because vehicle drivers exiting Riverview Gardens, to the right on the photo, appeared to be taking no cognisance of cycle traffic, particularly if it was coming from their left.</p>



<p>The latest news from Fairhurst, is this email, sent today, 26 November:</p>



<p>&#8220;<em>Please find attached our drawing number  <a rel="noreferrer noopener" aria-label="BWHARF-FHS-IN-XX-DR-D-94-151 C01 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/129594-PC-1151.pdf" target="_blank">BWHARF-FHS-IN-XX-DR-D-94-151 C01</a> which shows changes to the road  markings at West St / Riverview Gardens that have been approved by GCC,  following consultation with them.  The edge of carriageway and centre line markings that go through the  cycleway are to be removed to help emphasise that cars are approaching a  junction where they are to give way to cyclists. The Council preferred  to retain give way lines rather than using a  stop line</em>.&#8221; </p>



<p>Lots of good news in the feedback in this Digest. Let&#8217;s hope that it&#8217;s not just a one-off and we have more to tell you in 2 weeks&#8217; time.</p>



<p> </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9430</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 47, 12 November 2019: Good News and Bad News from Glasgow City Council</title>
		<link>https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 12 Nov 2019 15:00:02 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Glasgow Green]]></category>
		<category><![CDATA[Highway Code]]></category>
		<category><![CDATA[one way streets]]></category>
		<category><![CDATA[petition]]></category>
		<category><![CDATA[Queen Margaret Drive]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[shared footways]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[UK government]]></category>
		<category><![CDATA[University Avenue]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9355</guid>

					<description><![CDATA[ANNOUNCEMENTGlasgow City Council have now placed GoBike on the Stage One List of Statutory Consultees. This means that we are provided with details of proposals that the City Council is considering for a future Traffic Regulation Order, but, if the reaction at this first stage is not supportive the Council might not proceed with it.This &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 47, 12 November 2019: Good News and Bad News from Glasgow City Council"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h6 class="wp-block-heading">ANNOUNCEMENT<br>Glasgow City Council have now placed GoBike on the Stage One List of Statutory Consultees. This means that we are provided with details of proposals that the City Council is considering for a future Traffic Regulation Order, but, if the reaction at this first stage is not supportive the Council might not proceed with it.<br>This is very good news for GoBike but if does mean that we have to review our ways of working. We are not allowed to publicise the proposals until they proceed to the formal TRO stage and we are now working on a process for effective Stage One review.</h6>



<p>So that is the good news from Glasgow City Council and the bad news is contained within Item 3.1, a Parking and One-Way Street issue, but do read on for our list of contents and the wide range of issues that we bring to you in this issue:</p>



<span id="more-9355"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>East Dunbartonshire, Draft Local Transport Strategy, closes TODAY, 12 November</li><li>Glasgow, Queen Margaret Drive cycle lanes, closes 15 November</li><li>Glasgow, Belmont Traffic Management Order 2005 Variation No.2) 20__   &#8211; Publication of Proposals, closes 29 November </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road &amp; A81 Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</li><li>**NEW** East Renfrewshire, Local Development Plan 2, closes 13 December</li><li>**NEW** East Dunbartonshire, Proposed Traffic Regulation Order  and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</li><li>Law Commission  Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, University of Glasgow Campus Development Programme &#8211; public meeting, TOMORROW 13 November</li><li>East Dunbartonshire Active Transport Networking Event, 26 November</li><li> CyclingUK:  &#8220;Why the Highway Code should be rewritten &#8221; Forthcoming consultation from the UK Government </li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow, Mount Florida, Parking and One-Way, with no contraflow, discussion</li><li>Glasgow, Council Hearing for GoBike member, Bob Downie&#8217;s petition to keep National Cycle Route 75 through Glasgow Green open during events</li><li>Glasgow, City Centre, Candleriggs, Traffic Management Order, 2010, Variation 20</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<h6 class="wp-block-heading">1.1 East Dunbartonshire, Draft Local Transport Strategy, closes TODAY, 12 November</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="270" height="186" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/East-Dunbartonshire-Council.jpg?resize=270%2C186&#038;ssl=1" alt="" class="wp-image-9226"/></figure></div>



<p>This consultation was previously noted in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215">Digest 45</a>, Item 1.7 and <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.6. We hope that some of you managed to get along to one of the consultation events that have been held and have responded to the consultation? Here&#8217;s the <a rel="noreferrer noopener" aria-label="￼GoBike respons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Local-Transport-Strategy-Letter-111119.pdf" target="_blank"></a><a rel="noreferrer noopener" aria-label="GoBike response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Cluny-Park-A81-Redetermination-letter-111119.pdf" target="_blank"></a><a rel="noreferrer noopener" aria-label="GoBike response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Local-Transport-Strategy-Letter-111119.pdf" target="_blank">GoBike response</a> drawn up with grateful thanks to GoBike member Dave for his review.</p>



<h6 class="wp-block-heading">1.2 Glasgow, Queen Margaret Drive cycle lanes, closes 15 November</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/04/QMD.jpg?w=525&#038;ssl=1" alt="" class="wp-image-4750"/></figure></div>



<p><br>Details of this consultation were in our last issue, <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.7 and our <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Queen-Margaret-Drive-response-281019.pdf" target="_blank">response</a> was in that issue too &#8211; we were quick off the mark!<br>Please do write in if you have views on this proposal, particularly if you support it! It&#8217;s important that support for active travel schemes is voiced, to try to drown out the I-need-my-car-to-go-anywhere lobby. It will only take a minute or two to email land@glasgow.gov.uk to say that you fully support the GoBike response.</p>



<h6 class="wp-block-heading">1.3 Glasgow, Belmont Traffic Management Order 2005 Variation No.2) 20__   &#8211; Publication of Proposals,  closes 29 November  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>If you are thinking that you have seen this in our Digests before, then you are absolutely correct. We were sent details under the Stage One Consultees List and inadvertently, because we had not been told of our new status, we published the consultation details as usual.</p>



<p>Here&#8217;s the email that the City Council sent to us on 01 November:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(BELMONT)</em></strong><em>, </em><strong><em>(TRAFFIC MANAGEMENT) ORDER 2005 (VARIATION NO.2) 20__</em></strong><em><br><br>Further to my consultation email of 17</em><sup><em>TH</em></sup><em>  September 2019 regarding the above named Traffic Regulation Order, and  in accordance with statutory procedures, I now enclose a copy of the  press  notice of the proposed Order, relevant map, statement of reasons,  detailed report.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; </em><br><br><em>As stated in the attached documentation, any  person  wishing to object to the proposed Order should send details of the  grounds for objection in writing to Kevin Hamilton Head of Roads  Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 29</em><sup><em>th</em></sup><em> November 2019.<br><br>Yours faithfully,</em>&#8221; etc</p>



<p>Here are the documents listed in the above message: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/NoticeOfProposals-Belmont-210x85mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Belmont__Hamilton_Gardens-A3_Titlebox_-_Transplan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/08.01-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and the <a href="https://www.gobike.org/wp-content/uploads/2019/11/09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label="Report (opens in a new tab)">Report</a>.</p>



<p>GoBike supported the proposals when we were told about them earlier and we submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Belmont-Hamilton-Gardens-letter-151019.pdf" target="_blank">letter</a> on 15 October. Obstructive and indiscriminate parking of motor vehicles is not something that GoBike can support and we will be repeating our message of support for this TRO.</p>



<h6 class="wp-block-heading">1.4 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road &amp; A81 Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</h6>



<p>All the details for this proposal were in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.8 and we have heard from one of our members, John, who commutes through this area. He tells us &#8220;<em>I use this route when I cycle to work.    It is more pleasant than the main road, if slower.&#8221;</em> Another GoBike member, Dave, declines to use it because it is slower, so doesn&#8217;t this just prove the case for good cycle infrastructure?</p>



<p>Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Cluny-Park-A81-Redetermination-letter-111119.pdf" target="_blank">letter of response</a>.</p>



<h6 class="wp-block-heading">1.5 **NEW** East Renfrewshire, Local Development Plan 2, closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="465" height="260" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=465%2C260&#038;ssl=1" alt="" class="wp-image-9397" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?w=465&amp;ssl=1 465w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=300%2C168&amp;ssl=1 300w" sizes="auto, (max-width: 465px) 100vw, 465px" /></figure>



<p>We heard about this from GoBike member, Meredith and we are still doing some investigation, so if you have any concerns do let us know at consultations@gobike.org Here&#8217;s the <a href="https://www.eastrenfrewshire.gov.uk/ldp2" target="_blank" rel="noreferrer noopener" aria-label="link to the document and consultation details (opens in a new tab)">link to the document and consultation details</a></p>



<h6 class="wp-block-heading">1.6 **NEW** East Dunbartonshire, Proposed Traffic Regulation Order  and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s the email that we received on 08 November from East Dunbartonshire and, again, you might think you have seen this before! We responded to what was apparently the Stage 1 consultation back in January as reported in <a rel="noreferrer noopener" aria-label="Digest 27 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-27-05-february-2019-university-avenue-and-bears-way-under-threat-no-cycle-lanes-for-union-street-glasgow-but-a-wee-bit-of-good-news-as-well-7619" target="_blank">Digest 27</a>, Item 3.4</p>



<p>&#8220;<em>The Council is promoting a Traffic Regulation Order which would introduce a 20 mph speed limit zone in the Maxwell Avenue area of Bearsden and five round top road humps on Maxwell Avenue.  <br>Enclosed are copies of the draft Order, plan and Statement of Reasons for the Traffic Order and the Plan of the location of the humps, together with copies of the Notices that are to appear in the Milngavie &amp; Bearsden Herald which is published on 15 November 2019.     <br>Should you wish to comment on the proposal you must do so in writing by Monday,  16  December  2019.  Your  comments  should  be  sent to Chief Solicitor &amp; Monitoring Officer, Legal Services, 12 Strathkelvin Place,     Kirkintilloch, G66 1TJ.     <br><br>(See  attached  file: <a rel="noreferrer noopener" aria-label="191104 Maxwell Ave Area proposed 20 mph zone.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/191104-Maxwell-Ave-Area-proposed-20-mph-zone.pdf" target="_blank">191104 Maxwell Ave Area proposed 20 mph zone.pdf</a>)      <br>(See attached file: <a rel="noreferrer noopener" aria-label="191107 Maxwell Avenue - Notice &amp; Plan.pdf) (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/191107-Maxwell-Avenue-Notice-Plan.pdf" target="_blank">191107 Maxwell Avenue &#8211; Notice &amp; Plan.pdf)</a></em> &#8220;</p>



<p>It&#8217;s unfortunate that we weren&#8217;t clearly informed of this distinction, but we did generally approve the proposals, with one concern, we would prefer to see more than a 750mm gap either end of the the speed tables to allow clear passage for all cycles. While we don&#8217;t like speed tables we will not be objecting to this scheme.</p>



<h6 class="wp-block-heading">1.7 Law Commission  Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>Details of this UK Government consultation were published in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and repeated here is the last part of the email we received:</p>



<p>&#8220;<strong><em>We invite you to respond to the paper by 16 January 2020</em></strong><em>. We have set up an online portal for submitting responses but welcome input in any format. If you have ideas for consultation events or would like a meeting please get in touch.</em></p>



<p><em>The consultation paper, summary and details for how to respond are available on our project page at&nbsp;<a rel="noreferrer noopener" href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank">https://www.lawcom.gov.uk/project/automated-vehicles/</a>&nbsp;<br><br>Yours sincerely,</em></p>



<p><em>Automated Vehicles Team – Law Commissions</em>&#8220;</p>



<p>GoBike will be reviewing the document but if you do have any views on these automated vehicles do please let us know at consultations@gobike.org</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, University of Glasgow Campus Development Programme &#8211; public meeting, TOMORROW 13 November</h6>



<p>This meeting was publicised in our last Digest, Digest 46, Item 2.2 and here is a further copy of the email that was sent out:</p>



<p>“<em>F</em><strong><em>rom:</em></strong><em>&nbsp;Internal Communications &lt;</em><a href="mailto:communications@glasgow.ac.uk"><em>communications@glasgow.ac.uk</em></a><em>&gt;<br></em><strong><em>Date:</em></strong><em>&nbsp;22 October 2019 at 12:50:48 BST<br></em><strong><em>To:</em></strong><em>&nbsp;Internal Communications &lt;</em><a href="mailto:communications@glasgow.ac.uk"><em>communications@glasgow.ac.uk</em></a><em>&gt;<br></em><strong><em>Subject:University of Glasgow Campus Development Programme – public meeting</em></strong><em><br><br>The University of Glasgow will hold a public meeting on Wednesday 13 November to update about progress on its Campus Development Programme.<br><br>The event will be held in the&nbsp;</em><a href="https://moovitapp.com/index/en-gb/public_transportation-Wolfson_Medical_School_Building-Scotland-site_8144859-402"><em>Wolfson Medical Building</em></a><em>&nbsp;(Gannochy Room), from 18:30 – 20:00. You can register to attend through&nbsp;</em><a href="https://www.eventbrite.com/o/17825920042"><em>Eventbrite</em></a><em>.<br><br>The meeting is open to the public and will focus on the ongoing and upcoming work taking place on the Gilmorehill campus, particularly on the site of the former Western Infirmary.<br><br>The agenda includes presentations from University project managers, as well as construction partners.</em><br><br><em>We intend to update on the following areas, however there will also be the opportunity for questions.</em></p>



<ol class="wp-block-list"><li><em>Infrastructure on University Avenue, University Place, and future demolitions along Church Street;</em></li><li><em>Construction update for the James McCune Smith Learning Hub and the Research Hub;</em></li><li><em>Overview of planning and final design for the Clarice Pears Building (Institute of Health &amp; Wellbeing);</em></li><li><em>Planning and anticipated programme for the Adam Smith Business School and landscaping for the Southern Gateway;</em></li><li><em>A look inside the James McCune Smith Learning Hub, the Research Hub, including community facilities;</em></li><li><em>Community benefits;</em></li><li><em>Q&amp;A.</em></li></ol>



<p><em>Due to a busy agenda, please note the event will start at 18:30 prompt. Refreshments are available in the Atrium of the Wolfson Medical School Building from 18:00.<br><br>Tickets are not required, however attendees are encouraged to&nbsp;</em><a href="https://uofgcampusdevelopment.eventbrite.com/"><em>register</em></a><em>, so that we have an indication of numbers.&nbsp;<br><br>For those who have attended these meeting before, the Gannochy Room is next to the lecture theatre where the sessions are usually held.<br><br>Please direct queries to&nbsp;<a rel="noreferrer noopener" href="mailto:campus-development@glasgow.ac.uk" target="_blank">campus-development@glasgow.ac.uk</a></em>“</p>



<p>Do get to the meeting if you have an interest in what&#8217;s happening at the University.</p>



<p></p>



<h6 class="wp-block-heading">2.2 East Dunbartonshire Active Transport Networking Event, 26 November</h6>



<p>GoBike received this invitation from CyclingUK on 31 October:</p>



<p>&#8220;<em>Cycling UK would like to invite you to their </em><strong><em>Community Cycling and Active Transport Networking Event</em></strong><em><br><br>It would be great if you could join us from </em><strong><em>4pm – 6pm </em></strong><em>on</em><strong><em> Tuesday 26</em><sup><em>th</em></sup><em> November </em></strong><em>at</em><strong><em> Hillhead Community Centre</em></strong><em><br>169 Meiklehill Road, Kirkintilloch, G66 2JT <br><br>You can register for this FREE event at the following link:<br><br></em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.eventbrite.co.uk/e/cycling-uk-community-networking-event-2019-east-dunbartonshire-tickets-79515467905" target="_blank"><em>https://www.eventbrite.co.uk/e/cycling-uk-community-networking-event-2019-east-dunbartonshire-tickets-79515467905</em></a><em><br><br>This  event is for anyone with an interest in walking and cycling in East  Dunbartonshire.&nbsp; We hope to bring  together representatives from East Dunbartonshire Council, Cycling UK,  &nbsp;local grassroots cycling groups, community cycling organisations,  organisations that hosted Big Bike Revival events and Cycling UK  affiliated and Member groups.&nbsp; Our aim is to discuss  cycling and walking provision in the area and look at improving  infrastructure and opportunities. &nbsp;<br><br>Attendees can expect:<br><br>&#8211; A warm welcome with refreshments.<br>&#8211; Introduction from Cycling UK<br>&#8211; Speakers from East Dunbartonshire Council and local cycling organisations<br>&#8211; Potential new local cycling opportunities<br>&#8211; Interactive sessions to share knowledge and ideas<br>&#8211; Opportunities to network and get involved<br><br>Please share with your friends and networks, as well as any walking and/or paths groups who might be interested  in shared initiatives.&nbsp; </em><br><br><em>I look forward to seeing you there!<br><br>If you are unable to make it to the event but would like to take part in future events and discussions  then please feel free to drop me a line <br>Many thanks and best regards<br><br>Eileen <br><br></em><strong><em>Eileen Hamill </em></strong><em><br></em><strong><em>Development Officer – Big Bike Revival Glasgow and West of Scotland</em></strong><em><br></em><strong><em>Cycling UK</em></strong><em><br>Email:eileen.hamill@cyclinguk.org<br>Web: </em><a href="http://www.cyclinguk.org"><em>www.cyclinguk.org</em></a><em>&#8220;</em></p>



<p>This is a great opportunity for GoBike members to find out what is happening in East Dunbartonshire, so do get along if you can.</p>



<h6 class="wp-block-heading">2.3 CyclingUK:  &#8220;Why the Highway Code should be rewritten &#8221; Forthcoming consultation from the UK Government</h6>



<p>All those of us who are Cycling UK members probably received the weekly &#8220;Cycle Clips&#8221; email on Friday 08 November and within it is this article about a forthcoming review of the HIghway Code:</p>



<p>&#8220;<em>Many people have the view  that the Highway Code is largely irrelevant and with 307 rules plus  annexes, it’s just too long,&nbsp;nobody reads it once they’ve passed their  test and few people know the rules. Cycling UK Head of Campaigns Duncan  Dollimore explains why the Highway Code needs to be rewritten so that it  helps to protect vulnerable road users and can promote&nbsp;active travel.</em></p>



<figure class="wp-block-image"><a href="https://www.e-activist.com/ea-action/enclick?ea.url.id=4336399&amp;clid=1689&amp;ea.campaigner.email=97c6GsmKVLuTjgSbKmYgG97cBTh3KwkR&amp;ea.campaigner.id=jTp8csNqe04qJI2ZMf1z3w==&amp;ea_broadcast_target_id=0"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/aaf1a18515da0e792f78-c27fdabe952dfc357fe25ebf5c8897ee.ssl.cf5.rackcdn.com/1689/ctc-fom-blue.jpg?w=525&#038;ssl=1" alt="Find out more"/></a><figcaption><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.cyclinguk.org/cycle-magazine/why-highway-code-should-be-rewritten" target="_blank">https://www.cyclinguk.org/cycle-magazine/why-highway-code-should-be-rewritten</a>&#8220;</figcaption></figure>



<p>It is to be hoped that this review takes place soon and is well informed by the active travel movement.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Mount Florida, Parking and One-Way, with no contraflow, discussion</h6>



<p>This conversation, by email, with Glasgow City Council, has been going on for some time and centres on 2 issues. One is the FACT that one-way streets with no cycle contraflow cut down access/permeability for cycle traffic, and secondly, the FALLACY that businesses need their customers to be able to park their motor vehicle right outside their premises. The initial details were in <a rel="noreferrer noopener" aria-label="Digest 39 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-39-23-july-2019-featuring-a-park-parking-and-avenues-8809" target="_blank">Digest 39</a>, Item 1.4  and in <a rel="noreferrer noopener" aria-label="Digest 44 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-44-24-september-2019-speed-cushions-combined-with-traffic-islands-car-free-school-gates-and-evidence-that-contraflow-cycling-is-not-the-danger-that-some-people-tell-us-9139" target="_blank">Digest 44</a>, Item 3.1 we published an exchange of views between the City Council and ourselves.</p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="latest in the discussion (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Mount-Florida-email-exchange-Nov19.pdf" target="_blank">latest in the discussion</a>, an  email that we received on 30 October and our reply of 11 November. We do hope that after this quite frank exchange of views we will be able to speak to people at the City Council and come to some agreement on future proposals.</p>



<h6 class="wp-block-heading">3.2 Glasgow, Council Hearing for GoBike member, Bob Downie&#8217;s petition to keep National Cycle Route 75 through Glasgow Green open during events</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>105 people supported  Bob Downie&#8217;s <a rel="noreferrer noopener" aria-label="petition (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx" target="_blank">petition</a> (click on &#8220;Search and view all petitions&#8221;) to keep the cycle route by the Clyde through Glasgow Green open during events and it is now to be considered by the Wellbeing, Empowerment, Community and Citizen Engagement City Policy Committee on Thursday 14 November. This is good news indeed, and Tricia from GoBike and Jim from Cycling UK will be going along to support Bob to keep this important cycle route open as much as possible. <br><br>The photo above was taken on 04 November, the day before the 05 November Fireworks and shows that not only can the cycle and walking route be kept open while that event was prepared, but can be open while the Fair was in action, and the benches can be kept in use.<br><br>Let&#8217;s hope we get a good result on Thursday &#8211; we&#8217;ll let you know.</p>



<h6 class="wp-block-heading">3.3 Glasgow, City Centre, Candleriggs, Traffic Management Order, 2010, Variation 20</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="238" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Candleriggs-Screenshot.png?resize=525%2C238&#038;ssl=1" alt="" class="wp-image-9386" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Candleriggs-Screenshot.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Candleriggs-Screenshot.png?resize=300%2C136&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Candleriggs-Screenshot.png?resize=600%2C272&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Candleriggs-Screenshot.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Back in 2017 Glasgow City Coucil published proposals for traffic alterations for Candleriggs in the Merchant City. Here&#8217;s a copy of the Report that we were sent at the time:</p>



<p>&#8220;<em>THE GLASGOW CITY COUNCIL (CITY CENTRE),  (TRAFFIC MANAGEMENT) ORDER 2010<br> (VARIATION No20) (CANDLERIGGS) ORDER 201_<br> Report<br> The Council proposes to amend the current road layout on Candleriggs to support the development of the site bounded by Candleriggs, Trongate, Hutcheson Street and Wilson Street in the Merchant City area of the city centre.<br> The site of the former Goldbergs site has been unoccupied since 1990 and several buildings have been demolished as they had become unsafe.<br> The development of the site was approved for planning in April 2016, and will provide retail, student, lease, residential and hotel accommodation along with new attractive pedestrian access routes through the development linking the city centre.<br> The order will close Candleriggs to all traffic other than pedal cycles between Wilson Street and Bell Street, reverse the current eastbound one way operation of Bell Street between Albion Street and Candleriggs and remove the current prohibition of vehicles between 11pm and 9am on Candleriggs. This will provide access to the development from Albion Street while restricting through traffic and encourage sustainable transport in the city centre.&#8221;</em></p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2017/11/P5056_06_02B_Candleriggs-TRO.pdf" target="_blank">plan</a> that was submitted at the time.</p>



<p>GoBike submitted this <a rel="noreferrer noopener" aria-label="letter of support (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2017/11/GoBike-Candleriggs-Traffic-Mgt-support-111117.pdf" target="_blank">letter of support</a>  on 11 November 2017, to the proposals, drafted by GoBike member Peter, who lives nearby and who is a member of the Merchant City &amp; Trongate Community Council.<br>We have no record of a response to our specific  requests, but on 07 November 2019  we received this confirmation that the proposed changes are approved:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>,  </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br> Dear Sir/Madam</em><br><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>CITY CENTRE (TRAFFIC MANAGEMENT) ORDER 2010</em></strong><em>, </em><strong><em>(VARIATION No20)(CANDLERIGGS) ORDER 2019</em></strong><em><br><br>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have decided under its scheme of delegated functions  to proceed with the proposal as advertised.<br><br>The Order was made on 25</em><sup><em>th</em></sup><em> October 2019 and an advert was placed in the Evening Times on Wednesday 30</em><sup><em>th</em></sup><em> October stating that the Traffic Regulation Order has been made.<br>Should you require any further information on the above named Order please contact my assistant (name and phone number removed by GoBike).<br><br>Yours sincerely</em>&#8220;, etc</p>



<p>A move in the right direction!</p>



<p>Back in 2 weeks with more!</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9355</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 46, 29 October 2019: Queen Margaret Drive and Automated Vehicles are back, plus lots more.</title>
		<link>https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 29 Oct 2019 13:00:25 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Comment]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[BearsWay]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[cycle route]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[event]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Low Emission Zone]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[permeability]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[shared footways]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[Sustrans]]></category>
		<category><![CDATA[University Avenue]]></category>
		<category><![CDATA[winter gritting]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9284</guid>

					<description><![CDATA[There&#8217;s news from Dundee, East Dunbartonshire, North Lanarkshire and South Lanarkshire as well as items from Glasgow, including a Glasgow University public meeting, covering University Avenue and a failure to acknowledge a dimension error, if you get to the very last item, in this wide-ranging mix of cycling interest. Do read on. Contents Section 1: &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 46, 29 October 2019: Queen Margaret Drive and Automated Vehicles are back, plus lots more."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>There&#8217;s news from Dundee, East Dunbartonshire, North Lanarkshire and South Lanarkshire as well as items from Glasgow, including a Glasgow University public meeting, covering University Avenue and a failure to acknowledge a dimension error, if you get to the very last item, in this wide-ranging mix of cycling interest. Do read on.</p>



<span id="more-9284"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, George Square &#8211; is it time for change, closes TOMORROW, 30 October</li><li>Glasgow, Dalmarnock West, Commuter Parking restrictions, closes FRIDAY, 01 November</li><li>**NEW** South Lanarkshire, Filtering Silvertonhill Avenue, Snap Survey, closes?</li><li> **NEW** Dundee, Low Emission Zone, closes?</li><li>**NEW** Glasgow, Sighthill, Mandatory 20 mph Speed Limit Zone Order, closes 11 November </li><li>East Dunbartonshire, Draft Local Transport Strategy, closes 12 November</li><li>**NEW** Glasgow, Queen Margaret Drive cycle lanes, closes 15 November</li><li> **NEW** East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road &amp; A81 Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</li><li>**NEW** Law Commission  Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020 </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> East Dunbartonshire, Draft Local Transport Strategy, public consultation event TOMORROW, 30 October</li><li>Glasgow, University of Glasgow Campus Development Programme &#8211; public meeting, 15 November  &#8211; plus more disruption on University Avenue! </li><li>Glasgow, Skirving Street and Deanston Drive, place-making, 21 November</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue</li><li>North Lanarkshire, Work to start on Horsley Brae junction improvements</li><li>Scotland&#8217;s National Transport Strategy consultation: GoBike submission</li><li>Glasgow, Planning Application for 48 homes, Beith Street, Partick</li><li>East Dunbartonshire Council: LDP Newsletter No.54 </li><li>Glasgow, Winter Gritting Arrangements, now to include some cycle lanes </li><li>Glasgow City Council (Glencairn Drive) Traffic calming scheme</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Glasgow, George Square &#8211; is it time for change, closes TOMORROW, 30 October</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/08/George-Square-2.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5991"/></figure>



<p>We detailed this short survey in <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.5, so do please look at it before the <a rel="noreferrer noopener" aria-label="survey (opens in a new tab)" href="https://www.george-square.com/" target="_blank">survey</a> closes tomorrow. It&#8217;s just a short survey with lots of views already in supporting the removal of motor traffic. Do add to this!</p>



<h6 class="wp-block-heading">1.2 Glasgow, Dalmarnock West, Commuter Parking restrictions, closes FRIDAY, 01 November</h6>



<p>This was a new item in <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a> &#8211; see Item 1.6, where we have detailed the parking chaos to the west of Dalmarnock Station across to the Police Scotland offices, which even spreads to the other side of the river at Shawfield. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">letter</a> GoBike sent in 2 weeks ago &#8211; do please add your support.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Shawfield-Glasgow-Road.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9251" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Shawfield-Glasgow-Road.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Shawfield-Glasgow-Road.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Shawfield-Glasgow-Road.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Shawfield-Glasgow-Road.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h6 class="wp-block-heading">1.3  **NEW** South Lanarkshire, Filtering Silvertonhill Avenue, Snap Survey, closes?</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Image-from-iOS.png?resize=525%2C295&#038;ssl=1" alt="" class="wp-image-9287" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Image-from-iOS.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Image-from-iOS.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Image-from-iOS.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Image-from-iOS.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Here&#8217;s a drawing of the proposal to close the through route from Silvertonhill Avenue to Chestnut Crescent in Hamilton to motor vehicles, but maintain two-way cycle access. Here&#8217;s the information that GoBike member, Derek Y, sent in:<br><br>&#8221; South Lanarkshire Council have proposed a filter at bottom/north of Silvertonhill Avenue with cycle access. This cuts down through traffic on residential streets and makes it easier for children to cross to Woodside Primary School west of Johnstone Road. A shame it keeps 1-way at north without cycle contraflow &#8211; you might wish to suggest this in your response to the Survey (with plans on p2) at&nbsp;<a rel="noreferrer noopener" target="_blank" href="https://slack-redir.net/link?url=https%3A%2F%2Fwww.snapsurveys.com%2Fwh%2Fs.asp%3Fk%3D157053578908">https://www.snapsurveys.com/wh/s.asp?k=157053578908</a>  &#8220;</p>



<p>Derek had tried to improve even further on permeability for cycling in this area so if you know this part of Hamilton do please advise South Lanarkshire Council of what more could be done &#8211; there&#8217;s a space in the survey to add comments.<br><br>This is just the sort of thing  that we&#8217;d love to see more of all over the Greater Glasgow and  Strathclyde area as modal filters make local areas nicer by  discouraging rat-running, short journeys by car more unattractive and  provide alternatives  for people travelling by bicycle. <br><br>There&#8217;s no apparent closing date for the survey so do respond to it quickly. It&#8217;s really easy and very short.</p>



<h6 class="wp-block-heading">1.4  **NEW** Dundee, Low Emission Zone, closes?</h6>



<p><br>This is another quick survey that we have heard about from Friends of the Earth, but there is no indication of a closing date. You might only cycle in Dundee on your hols or travel to the city to visit the V&amp;A or the Discovery but  surely you will want the air to be as clean as it can be?<br><br>Here&#8217;s the email received on 24 October from FoE:</p>



<p>&#8221; <em>Everyone who lives, works or visits Dundee city centre is being exposed  to dangerous air pollution. The Council has a plan that will do little  to change that. That’s why we need everyone in Scotland to speak up.&nbsp;<br><br> Dundee Council are asking for the public’s views on their Low Emission  Zone (LEZ) plans. We have provided a step-by-step guide that will help  you respond quickly and effectively.&nbsp;<a href="https://scot.us2.list-manage.com/track/click?u=187e5daddf74f1b5255f3d9f9&amp;id=d4c4a9d096&amp;e=c037dfa86c" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Click to take action</a><br><br> A Low Emission Zone should restrict the worst polluting vehicles and  protect the health of people who live and work in the area. But Dundee’s  LEZ plans are a tiny zone which ignores Lochee Road &#8211; &nbsp;consistently one  of the most polluted roads in the whole of Scotland!&nbsp;<br><br> This Zone needs to improve air quality for anyone who spends time in  Dundee and that means making sure it cleans up the most polluted areas.&nbsp;</em><br><br> <em>The First Minister, and many councils, have declared a climate  emergency. But we’re still seeing business-as-usual ideas. Climate  emissions from transport are the same now as they were in 1990.&nbsp;<br><br> There is an opportunity for Dundee to show real leadership and move away  from fossil fuelled vehicles. If Dundee Council hear from enough people  demanding more ambition, they will have to pay attention.&nbsp;<br><br> Please take a few minutes to <a rel="noreferrer noopener" aria-label="respond to the consultation now (opens in a new tab)" href="https://consult.dundeecity.gov.uk/limesurvey/index.php/284592/lang/en/newtest/Y" target="_blank">respond to the consultation now</a> </em>&#8220;</p>



<p>I found the various option pictures a wee bit confusing so the FoE guidance was a big help.<br>Do respond to this quick survey and let&#8217;s get Low Emission Zones in all Scotland&#8217;s cities.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Sighthill, Mandatory 20 mph Speed Limit Zone Order, closes 11 November</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" loading="lazy" decoding="async" width="303" height="166" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=303%2C166&#038;ssl=1" alt="" class="wp-image-9300" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?w=303&amp;ssl=1 303w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=300%2C164&amp;ssl=1 300w" sizes="auto, (max-width: 303px) 100vw, 303px" /></figure></div>



<p><br>Sighthill redevelopment continues and Glasgow City Council is looking to introduce a 20mph speed limit for the area. Here&#8217;s the email that we received on 21 October:</p>



<p><br><strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY </em></strong><em><br><br>Dear  Sir / Madam<br>THE GLASGOW CITY COUNCIL, (SIGHTHILL), </em><strong><em>(MANDATORY 20mph SPEED LIMIT ZONE) ORDER 201_</em></strong><em><br><br>The Council propose to consider the introduction of the above named Traffic Regulation Order and I wish to establish the preliminary views of your organisation prior to the publication of these proposals.<br><br>Background to the proposed Order <br>Glasgow City Council are proposing to implement a mandatory 20mph speed limit in Sighthill.&nbsp; </em><br><br><em>The purpose of the Mandatory 20mph Zone is to ensure that vehicle users reduce their speeds to 20mph or less, and therefore improve road safety for pedestrians, cyclists and all other vehicle users.&nbsp; By turn, it is anticipated that this will encourage more people to walk and cycle, which will naturally see improved health benefits.&nbsp;&nbsp;<br><br>Area affected by the proposed Order <br><br>The roads affected by these proposals are bounded by:-<br>The order will affect the residential area generally bounded by St. Rollox Drive to the north,&nbsp; Springburn Road to the east. The M8 motorway to the south and the railway line to the west.</em><br><br><em>The roads affected by the proposals are:<br>Cuddies, Campus Place, Fountainwell Drive, Fountainwell Gardens, Fountainwell Groove, Fountainwell Road, Hopepark Wynd, Hopepark Court, Huntingdon Street, Huntingdon Road, Huntingdon Close, Huttons Drive, Pinkston Road, Pinkston Drive, Pinkston Wynd, Sighthill Avenue, Sighthill Circus, Sighthill Park Gate,&nbsp; Sighthill Park Terrace, Stalk Court, Tower Place.<br><br>Details of the proposed Order <br>The proposed Order (as depicted on the attached plans) will comprise of:-<br><br>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The implementation of a 20mph speed limit.&nbsp; <br><br>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days</em></strong><em> (reply by 11</em><sup><em>th</em></sup><em> November 2019).</em><br><br><em>In the meantime, should you require any further information or clarification on any points arising from the proposals, do not hesitate to contact my assistant (name and phone number removed by GoBike)<br><br>Should the Council proceed with these proposals; a copy of the Notice of the proposed Order will be forwarded to you intimating an opportunity to lodge any objections to the proposals.<br><br>Yours faithfully</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="405" height="113" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/image-2.png?resize=405%2C113&#038;ssl=1" alt="" class="wp-image-9301" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/image-2.png?w=405&amp;ssl=1 405w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/image-2.png?resize=300%2C84&amp;ssl=1 300w" sizes="auto, (max-width: 405px) 100vw, 405px" /></figure>



<p><strong><em>Christine Francis</em></strong><em>, </em><strong><em>Head of Technical Services</em></strong><em>, </em><strong><em>Neighbourhoods and Sustainability</em></strong>&#8220;</p>



<p>The plan mentioned above is <a href="https://www.gobike.org/wp-content/uploads/2019/10/05-Plan-20mph-Zone.pdf" target="_blank" rel="noreferrer noopener" aria-label="here (opens in a new tab)">here</a>.</p>



<p>GoBike will be supporting this proposal, probably the first time such a large area has been covered by a 20mph TRO, our only concern being how compliance will be ensured. If you live in Sighthill or travel through there please do add your support to this move; Sighthill is a residential area where children, and everybody else, should be able to move about without fear of being mowed down by a motor vehicle going too fast.</p>



<h6 class="wp-block-heading">1.6 East Dunbartonshire, Draft Local Transport Strategy, closes 12 November</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="270" height="186" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/East-Dunbartonshire-Council.jpg?resize=270%2C186&#038;ssl=1" alt="" class="wp-image-9226"/></figure></div>



<p>This consultation was featured in <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.7 and there is now just one Consultation Event left to go to &#8211; and that&#8217;s tomorrow!<br><strong>Kirkintilloch Leisure Centre – Wednesday 30 October – 3pm-7pm</strong> </p>



<p>If you can get there please do, and send any views to consultations@gobike.org so that we can include them in our response.</p>



<h6 class="wp-block-heading">1.7  **NEW** Glasgow, Queen Margaret Drive cycle lanes, closes 15 November</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/04/QMDmap.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-4751" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/04/QMDmap.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/04/QMDmap.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/04/QMDmap.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Work on the proposals initiated by local businesses was unfortunately postponed when concerns were raised about the initial proposals for Byres Road, but GoBike received this email on 18 October:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY </em></strong><em><br><br>Dear Sir or Madam, </em><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(QUEEN MARGARET DRIVE), (TRAFFIC REGULATION) ORDER 201_</em></strong><em><br><br>The Council propose to consider the introduction of the above named Traffic Regulation Order. <br>Please find enclosed a copy of the press notice of the proposed Order, relevant plan (drawing 5126-001 A), statement of reasons and detailed report. <br><br>A copy of the draft order, the plan, statement of reasons and report for proposing to make the order are available for inspection at the following locations: <br><br>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Reception, Exchange House, 231 George Street, Glasgow, G1 1RX <br><br>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Hillhead Library, 348 Byres Road, Glasgow, G12 8AP </em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://www.glasgow.gov.uk/proposedtro" target="_blank">www.glasgow.gov.uk/proposedtro</a> .&nbsp; <br><br>As stated in the attached documentation, any person wishing to object to the proposed Order should send details of the grounds for objection in writing to Christine Francis, Head of Technical Services, Exchange House, Glasgow City Council, 231 George Street, Glasgow, G1 1RX or to Christine Francis by e-mail, to <a href="mailto:land@glasgow.gov.uk" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">land@glasgow.gov.uk</a> by Friday 15 November 2019. <br><br>Yours faithfully </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="224" height="62" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/image-1.png?resize=224%2C62&#038;ssl=1" alt="" class="wp-image-9293"/></figure>



<p><em>Christine Francis, Head of Technical Services, Neighbourhoods and Sustainability&#8221; </em></p>



<p>The documents mentioned in the email are here:  copy of the <a rel="noreferrer noopener" aria-label="draft order (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/NoticeOfProposals-QueenMargaretDrive-230x114mm-RTO.pdf" target="_blank">draft order</a>, the <a rel="noreferrer noopener" aria-label="plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/TRO-5126-0001-0003-Rev-A-QMD-MS.pdf" target="_blank">plan</a>, the <a rel="noreferrer noopener" aria-label="statement of reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/QMD-08-Statement-of-Reasons.pdf" target="_blank">statement of reasons</a> and the <a rel="noreferrer noopener" aria-label="report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/QMD-09-Draft-Report.pdf" target="_blank">report</a>.</p>



<p>We have already, 28 October, submitted a clear <a rel="noreferrer noopener" aria-label="GoBike response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Queen-Margaret-Drive-response-281019.pdf" target="_blank">GoBike response</a> , written by Calum, but the main proposals, from the City Council, which you might wish to read before you read the GoBike view are given in the <a href="https://www.gobike.org/wp-content/uploads/2019/10/QMD-09-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">report</a> and are repeated here:</p>



<p>&#8220;<em>The proposed Order (as depicted on the attached plans) will comprise of:-</em></p>



<ol class="wp-block-list"><li> <em>Removal of parking and extension of the existing &#8216;No waiting, no loading at any time&#8217; restrictions on the West kerbline of Queen Margaret Drive between Clouston Street and Kelbourne Street. </em></li><li><em> Proposed segregated two-way cycleway on West footway of Queen Margaret Drive between Hamilton Drive and the existing bus stop located approximately 175m north of Hotspur Street. </em></li><li><em> Existing bus stops to be retained. </em></li><li><em> Existing loading bays to be retained. </em></li><li><em> Existing taxi rank, on East kerbline of Queen Margaret Drive, to be retained. </em></li><li><em> Removal of the existing bus lane on Queen Margaret drive from a point approximately 40m North of Kelbourne Street for a distance of approximately 220m north to accommodate a two-way segregated cycleway. </em>&#8220;</li></ol>



<p>While the proposals will improve things for people cycling on Queen Margaret Drive, we have found that issues we have highlighted on other schemes are repeated here. This is worrying but we have made clear our concerns in our <a href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Queen-Margaret-Drive-response-281019.pdf" target="_blank" rel="noreferrer noopener" aria-label="submission (opens in a new tab)">submission</a>.</p>



<h6 class="wp-block-heading">1. 8  **NEW** East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road &amp; A81 Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December </h6>



<p>Here&#8217;s the email that we received from East Dunbartonshire Council on 23 October:</p>



<p>&#8220;<em>The East Dunbartonshire Council (A81 Milngavie Road and A81 Maryhill Road, Bearsden)(Redetermination Of Means Of Passage To Be By Pedal Cycle And Foot Only) Order.     <br><br>The  Council is promoting the above mentioned Traffic Regulation Order. Enclosed  is a copy of the draft Order together with a copy of the plan indicating  the  locations of the footways and Statement of Reasons for the  proposal.  Also enclosed is a copy of the Notice that is to appear in  the Milngavie and Bearsden Herald that is published on 1st November 2019. Should you wish to comment on the proposal you must do so in writing by Monday,  2  December  2019.  Your  comments  should  be  sent  to Chief     Solicitor  &amp;  Monitoring Officer, 12 Strathkelvin Place, Kirkintilloch, G66 1TJ. (See  attached  file:  <a rel="noreferrer noopener" aria-label="191022  Draft  Redetermination  Order Cluny Park area.pdf) (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/191022-Draft-Redetermination-Order-Cluny-Park-area.pdf" target="_blank">191022  Draft  Redetermination  Order Cluny Park area.pdf)</a>     <br><br>Regards,     <br>Fiona Stirling, Legal Services, 12 Strathkelvin Place, Kirkintilloch, G66 1TJ&#8221;</em></p>



<p>Here&#8217;s a <a rel="noreferrer noopener" aria-label="further copy of the document (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/191022-Draft-Redetermination-Order-Cluny-Park-area.pdf" target="_blank">further copy of the document</a> from East Dunbartonshire Council, which includes a copy of the plan and the redetermination proposal.</p>



<p>This proposal is very near to the area where GoBike has supported the earlier proposal, see <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.2, to introduce parking and loading restrictions at the south end of Rannoch Drive.<br>It appears to be a move to ameliorate potential collisions and near misses at the junction of the A81 and the Switchback, by allowing people to cycle on the footway. It would have been better all round if the extension south of the Bears Way had been built.<br>GoBike will be submitting a response but if you do have views please get them to us, by emailing consultations@gobike.org </p>



<h6 class="wp-block-heading">1.9  **NEW** Law Commission  Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020 </h6>



<p><br>Here&#8217;s an interesting email that we received on 16 October from the UK Law Commission:</p>



<p>&#8220;<em>Dear All,<br><br>We  are pleased to announce the publication of the second consultation  paper in our three-year review of the UK’s regulatory framework for  automated vehicles. This launches  a three-month public consultation.</em><br><br><em>This  paper looks at the regulation of self-driving vehicles which could  travel empty or only with passengers, without a human driver or  user-in-charge. We focus on  self-driving vehicles providing mobility services to the public, which  we refer to as Highly Automated Road Passenger Services, HARPS. Today’s  paper builds on the work in our first consultation on safety assurance  and allocating legal responsibility. <br><br></em><strong><em>We invite you to respond to the paper by 16 January 2020</em></strong><em>.  We have set up an online  portal for submitting responses but welcome input in any format. If you  have ideas for consultation events or would like a meeting please get  in touch.</em><br><br><em>The consultation paper, summary and details for how to respond are available on our project page at <a aria-label=" (opens in a new tab)" rel="noreferrer noopener" href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank">https://www.lawcom.gov.uk/project/automated-vehicles/</a>  <br><br>Yours sincerely,</em><br><br><em>Automated Vehicles Team – Law Commissions<br><br></em><strong><em>Automated Vehicles</em></strong><em> | </em><strong><em>Law Commission </em></strong><em>| Public Law Team<br> 1st Floor, Tower, Post Point 1.54, 52 Queen Anne’s Gate, London SW1H 9AG</em>&#8220;</p>



<p>We weren&#8217;t too impressed with the first consultation on this topic, see <a rel="noreferrer noopener" aria-label="Digest 27 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-27-05-february-2019-university-avenue-and-bears-way-under-threat-no-cycle-lanes-for-union-street-glasgow-but-a-wee-bit-of-good-news-as-well-7619" target="_blank">Digest 27</a>, Item 1.1<br>The banner picture above is from their email so they do acknowledge that these driverless vehicles will be operating near people walking or cycling. We&#8217;ll be conferring with other organisations as to their views, but if you have any do let us know.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  East Dunbartonshire, Draft Local Transport Strategy, public consultation TOMORROW, 30 October </h6>



<p>This event, tomorrow, mentioned also in Item 1.6 above, is the last in a series of public meetings about the Local Transport Strategy:</p>



<p><strong>Kirkintilloch Leisure Centre – Wednesday 30 October – 3pm-7pm</strong></p>



<p>Do please get there if you can.</p>



<h6 class="wp-block-heading">2.2 Glasgow, University of Glasgow Campus Development Programme &#8211; public meeting, 15 November &#8211; plus more disruption on University Avenue!</h6>



<p><br><br><br>GoBike member, Derek M, told us about this meeting that might just be of interest? Here&#8217;s the email he forwarded to us:</p>



<p></p>



<p>&#8220;<em>F</em><strong><em>rom:</em></strong><em> Internal Communications &lt;</em><a href="mailto:communications@glasgow.ac.uk"><em>communications@glasgow.ac.uk</em></a><em>&gt;<br></em><strong><em>Date:</em></strong><em> 22 October 2019 at 12:50:48 BST<br></em><strong><em>To:</em></strong><em> Internal Communications &lt;</em><a href="mailto:communications@glasgow.ac.uk"><em>communications@glasgow.ac.uk</em></a><em>&gt;<br></em><strong><em>Subject:University of Glasgow Campus Development Programme &#8211; public meeting</em></strong><em><br><br>The  University of Glasgow will hold a public meeting on Wednesday 13  November to update about progress on its Campus Development Programme.<br><br>The event will be held in the </em><a href="https://moovitapp.com/index/en-gb/public_transportation-Wolfson_Medical_School_Building-Scotland-site_8144859-402"><em> Wolfson Medical Building</em></a><em> (Gannochy Room), from 18:30 &#8211; 20:00. You can register to attend through&nbsp;</em><a href="https://www.eventbrite.com/o/17825920042"><em>Eventbrite</em></a><em>.<br><br>The  meeting is open to the public and will focus on the ongoing and  upcoming work taking place on the Gilmorehill campus, particularly on  the site of the former Western Infirmary.<br><br>The agenda includes presentations from University project managers, as well as construction partners.</em><br><br><em>We intend to update on the following areas, however there will also be the opportunity for questions.</em></p>



<ol class="wp-block-list"><li> <em>Infrastructure on University Avenue, University Place, and future demolitions along Church Street;</em></li><li><em> Construction update for the James McCune Smith Learning Hub and the Research Hub;</em></li><li><em> Overview of planning and final design for the Clarice Pears Building (Institute of Health &amp; Wellbeing);</em></li><li><em> Planning and anticipated programme for the Adam Smith Business School and landscaping for the Southern Gateway;</em></li><li><em> A look inside the James McCune Smith Learning Hub, the Research Hub, including community facilities;</em></li><li><em> Community benefits;</em></li><li><em> Q&amp;A.</em></li></ol>



<p> <em>Due  to a busy agenda, please note the event will start at 18:30 prompt.  Refreshments are available in the Atrium of the Wolfson Medical School  Building from 18:00.<br><br>Tickets are not required, however attendees are encouraged to&nbsp;</em><a href="https://uofgcampusdevelopment.eventbrite.com/"><em>register</em></a><em>, so that we have  an indication of numbers.&nbsp;<br><br>For  those who have attended these meeting before, the Gannochy Room is next  to the lecture theatre where the sessions are usually held.<br><br>Please direct queries to&nbsp;<a href="mailto:campus-development@glasgow.ac.uk" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">campus-development@glasgow.ac.uk</a></em>&#8220;</p>



<p>Item 1 could keep the discussion going for quite a while! Do get along if you are studying or working at the university or if you have been involved in the campaign for good cycle infrastructure on University Avenue.</p>



<p>PLUS, just in case you don&#8217;t find negotiating University Avenue traumatic enough, here&#8217;s news of services works, that we received on 26 October:<br><br>&#8220;<em>I’m writing to let you know we will shortly be starting our project to upgrade the gas network in University Avenue, Glasgow. This essential work involves the replacement of old, metal gas mains with new plastic pipe to ensure a continued safe and reliable gas supply. </em><br><em>Following discussions with Glasgow City Council our project will start on Monday 4 November and last approximately ten weeks. We’ll be carrying out the work over two phases to help minimise disruption. </em><br><br><em>Each phase is described below. </em><br><br><em>Phase one – approximately five weeks </em><br><em>On Monday 4 November, we’ll begin working in University Avenue between Kelvin Way and Hillhead Street. During this phase, most of our work will be taking place on the footpath however, cycle lanes may be closed to allow pedestrian access. </em><br><br><em>Phase two – approximately five weeks</em><br><em>From Monday 6 January 2020, we’ll be working in University Avenue between Hillhead Street and University Gardens. During this phase, we’ll also be installing temporary three-way traffic lights in University Avenue at its junction with Hillhead Street. The lights will be manually controlled during peak hours to help minimise inconvenience as much as possible.We’ll be posting regular updates on our website&nbsp;<a rel="noreferrer noopener" target="_blank" href="https://slack-redir.net/link?url=https%3A%2F%2Fone.network%2F%3F112401221">https://one.network/?112401221</a>&nbsp;and using social media and traffic bulletins to keep residents and motorists informed. </em><br><em>Please feel free to share this information with your stakeholders and anyone else who may be impacted by our work.</em></p>



<figure class="wp-block-image"><img decoding="async" src="https://slack-imgs.com/?c=1&amp;o1=wi32.he32.si&amp;url=https%3A%2F%2Fone.network%2Fapple-touch-icon-57x57.png" alt="one.network"/></figure>



<p><em>one.network</em><strong><a rel="noreferrer noopener" target="_blank" href="https://one.network/?112401221"><em>one.network</em></a></strong><em>One platform to plan, monitor, communicate and analyse traffic disruptions.&#8221;</em></p>



<p>No mention of temporary cycle lanes or cycle phases in the temporary traffic lights, but good that they will be keeping &#8220;motorists informed&#8221;!</p>



<p>If you attend the event on the 15th, you might wish to ask about this?<em> </em></p>



<h6 class="wp-block-heading">2.3  Glasgow, Skirving Street and Deanston Drive, place-making, 21 November </h6>



<p>GoBike member, Alasdair, has told us about this Sustrans event to be held in Shawlands:</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="745" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?resize=525%2C745&#038;ssl=1" alt="" class="wp-image-9316" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?w=1748&amp;ssl=1 1748w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?resize=211%2C300&amp;ssl=1 211w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?resize=423%2C600&amp;ssl=1 423w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Skirving-St-Deanston-Drive.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<h4 class="wp-block-heading">Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9112" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike supported moves to prohibit parking and loading around the car showrooms in this area, see our last <a href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank" rel="noreferrer noopener" aria-label="Digest, Issue 45 (opens in a new tab)">Digest, Issue 45</a>, Item 1.2 and we have now received this acknowledgement from East Dunbartonshire Council:</p>



<p>&#8220;<em>Good morning Tricia <br>Thank you for responding. A copy of your email with attached letter has been forwarded to the Council&#8217;s  Roads and Transportation. <br>Regards Fiona Stirling, Legal Services</em>&#8220;</p>



<p>This now appears to be part of moves to improve active travel in this part of Bearsden &#8211; see also Item 1.8 above.</p>



<h6 class="wp-block-heading">3.2 North Lanarkshire, Work to start on Horsley Brae junction improvements</h6>



<p>GoBike gets very little information from North Lanarkshire but we doubt that the forthcoming changes to this area make an improvement for cycling. They will certainly speed up northbound through traffic and extend the potential conflict with merging motor traffic southbound. Read on for the message we received on 21 October:</p>



<h1 class="wp-block-heading">&#8220;<em>Work to start at Horsley Brae junction</em></h1>



<p><em>Work starts from today (21 October) on </em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDEsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAxOTEwMjEuMTE3ODY2MTEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zNDYzOCJ9.QD-jmdw4-5BW8_ODROj2e0CMGTVevZI6fy_BwxuiWos/br/70367778592-l" target="_blank"><em>improvements to the road layout</em></a><em> at the A71 Horsley Brae junction with the B7011 Brownlee Road. <br><br>North  and South Lanarkshire Councils and Strathclyde Partnership for  Transport (SPT) are investing a total of £1.6 million in the project  which aims to reduce congestion at the busy junction.</em><br><br><em>The  A71 will be widened to create a right-turn lane northbound, for traffic  turning on to Brownlee Road, and a merging lane for traffic travelling  south on Brownlee Road and joining the A71.<br><br>A  contractor JH Civil Engineering Ltd has been appointed to carry out the  work, which is expected to take approximately 26 weeks. <br><br>Traffic  management will be used to allow vehicles to continue using the A71  during the majority of the works, however during certain phases of the  proposed works, it is expected that road closures will be necessary. The  most effcieint diversion routes will be advised in advance of the  closure.<br><br>“This  is a very busy junction particularly at morning and evening peak times,  with traffic queuing to turn right which leads to delays and congestion  back to the Garrion Bridge roundabout,” said Councillor Michael McPake,  Convener of the Environment and Transportation Committee.</em><br><br>“<em>By  creating a right-turn lane with capacity for approximately 14 cars, we  will reduce the queue of northbound cars while the southbound merging  lane will improve traffic flow away from the junction.<br><br>“Improvements will also be made to pedestrian routes across the junction to make the popular Clyde walkway safer.<br><br>“We  appreciate that the roadworks will cause delays over the coming months  but, when complete, we will see significant improvements in traffic flow  and road safety for drivers and pedestrians.”<br><br>Information about the project will be on the </em><a rel="noreferrer noopener" href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDIsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAxOTEwMjEuMTE3ODY2MTEiLCJ1cmwiOiJodHRwczovL3d3dy5ub3J0aGxhbmFya3NoaXJlLmdvdi51ay9pbmRleC5hc3B4P2FydGljbGVpZD0zNDYzOCJ9.RQanDQHURgq258Zi99wtQBeXpSM-o5-jJo1onAS0bqU/br/70367778592-l" target="_blank"><em>web site</em></a><em> and updates posted on Facebook and Twitter @nlcpeople.<br><br>SPT are investing £800,000 in the project with both councils contributing £400,000 each.&#8221;</em></p>



<p>No mention of people cycling there and probably no allowance will be made for bikes during the works &#8211; although we live in hope &#8211; so do take care if you are out and about in this area.</p>



<h6 class="wp-block-heading">3.3 Scotland&#8217;s National Transport Strategy consultation: GoBike submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p>This consultation closed on 23 October &#8211; details have been in our last few Digests &#8211; and our well-considered <a rel="noreferrer noopener" aria-label="submission (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-National-Transport-Strategy-response-211019.pdf" target="_blank">submission</a> was sent in on 21 October. <a rel="noreferrer noopener" aria-label="Here it is (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-National-Transport-Strategy-response-211019.pdf" target="_blank">Here it is</a>, and we are very grateful to Brenda for giving it so much thought and investigation.</p>



<p>And we received this automatic reply:</p>



<p>&#8220;<em>Thank you for submitting your response to the draft National Transport Strategy consultation.&nbsp; An analysis of all responses will be carried out to allow us to shape the Strategy and help us all to achieve better outcomes for Scotland’s  citizens, communities and businesses.&nbsp; The results of the consultation  will be published on the Transport Scotland website by the end of 2019.&nbsp;  Once published, you will be notified by email and  an update on the next stage will be provided. <br><br>If you have any questions, please contact &nbsp;</em><strong><em><a href="mailto:NTS2@transport.gov.scot" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">NTS2@transport.gov.scot</a></em></strong>&#8220;</p>



<h6 class="wp-block-heading">3.4 Glasgow, Planning Application for 48 homes, Beith Street, Partick</h6>



<p>GoBike joined many others in opposing a residential development in the green space between Beith Street and the Expressway. Our objection was published in <a aria-label="Digest 42 (opens in a new tab)" rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-42-03-september-2019-we-take-the-hump-in-a-tale-of-two-cities-8966" target="_blank">Digest 42</a>, Item 3.6 and we have now been sent this message, dated 23 October:</p>



<p>&#8220;<em>Dear Sir/Madam</em></p>



<figure class="wp-block-table"><table><tbody><tr><td> <strong><em>GLASGOW CITY COUNCIL PLANNING LOCAL REVIEW COMMITTEE</em></strong><em> </em></td></tr></tbody></table></figure>



<figure class="wp-block-table"><table><tbody><tr><td> <em>APPELLANT:</em> </td><td> <strong><em>Clydeside BSW Developments Ltd</em></strong><em> </em></td></tr><tr><td> <em>PLANNING REFERENCE: </em></td><td> <strong><em>19/02063/PPP</em></strong><em> </em></td></tr><tr><td> <em>REVIEW REFERENCE: </em></td><td> <strong><em>19/00080/LOCAL</em></strong><em> </em></td></tr><tr><td> <em>REVIEW ADDRESS: </em></td><td> <strong><em>Site To The South Of Crawford Street/Rosevale Street/ Beith Street Glasgow&nbsp; </em></strong><em> </em></td></tr><tr><td> <em>REVIEW PROPOSAL: </em></td><td> <strong><em>Erection of residential development (48 units)</em></strong><em> </em></td></tr></tbody></table></figure>



<p><em>I refer to representations made by you regarding the above application for Planning Permission.<br><br>I am writing to advise  you that Glasgow Planning Local Review Committee has received a request  to review the decision taken by the Appointed Officer under delegated  powers.<br><br>The Committee will take  into account your previous representations during its deliberations. Any  further representations you wish to make on the review should be  submitted to the address below within 14 days of  the date of this letter, quoting the review reference number. A copy of  the representations will be sent to the applicant for comment.</em><br><br><em>Planning Local Review Committee<br>Development &amp; Regeneration Services<br>231 George Street<br>Glasgow, G1 1RX<br>E-mail: </em><a href="mailto:onlineplanning@glasgow.gov.uk"><em>onlineplanning@glasgow.gov.uk</em></a><em>&nbsp; <br><br>A review of the case by  virtue of Section 43A(8) of the Town and Country Planning (Scotland) Act  1997 (as amended) will be conducted by the Council’s Planning Local  Review Committee. Details of the date, time  and place of the meeting will be forwarded to you as soon as possible  after all the relevant information has been received. At that meeting,  the Planning Local Review Committee will consider if the review  documents provide sufficient information to enable  it to determine the review and may determine the review without further  procedure.</em><br><br><em>However, the Committee may determine that the review is to be conducted by one of, or a combination of the following:-</em><br></p>



<ul class="wp-block-list"><li><em> by means of written submissions</em><ul><li><em> by the holding of one or more hearing sessions; and</em></li></ul><ul><li><em> by means of an inspection of the land to which the review relates</em></li></ul></li></ul>



<p><em>If the Committee decide to hold a hearing you will be contacted again and given the opportunity to attend.<br><br></em><strong><em>All the documentation relating to the review is available to view online at </em><a href="http://www.glasgow.gov.uk/onlineplanning"><em>www.glasgow.gov.uk/onlineplanning</em></a><em>. </em></strong><em><br><br>Please note that parties to a review will be expected to meet their own administration costs.</em>&#8220;</p>



<p>Let&#8217;s hope that in the face of well over 100 objections that this is the end of the road for such an anti-active-travel proposal that would destroy green space and bring more motor vehicles to this residential street.</p>



<h6 class="wp-block-heading">3.5 East Dunbartonshire Council: LDP Newsletter No.54</h6>



<p>We received East Dunbartonshire&#8217;s LDP Newsletter 54 on 17 October with this explanatory email:</p>



<p>&#8220;<em>Please find attached the latest newsletter from East Dunbartonshire Council&#8217;s Land Planning Policy team. This edition includes details of the following:    <br>Local Development Plan 2 &#8216;Main Issues Report&#8217; consultation    <br>Draft Local Transport Strategy consultation</em> &#8220;</p>



<h6 class="wp-block-heading">3.6 Glasgow, Winter Gritting Arrangements, now to include some cycle lanes</h6>



<p>GoBike&#8217;s co-Convenor, John, has been involved in discussions about the gritting of cycle lanes and now GoBike members, Derek M and Alasdair, have sent this link to the arrangements for this coming winter:</p>



<p><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=d383df28e39d48b294e66826d2c1456d" target="_blank">https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=d383df28e39d48b294e66826d2c1456d</a></p>



<p>Do take care, though, when you are out and about.</p>



<h6 class="wp-block-heading">3.7 Glasgow City Council (Glencairn Drive) Traffic calming scheme</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Glencairn-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9076" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Glencairn-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Glencairn-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Glencairn-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Glencairn-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>In <a href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank" rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)">Digest 45</a>, Item 3.2 we published the reply sent by Glasgow City Council to our concerns about the proposed traffic calming scheme for Glencairn Drive near Maxwell Park, along with our response.<br>On 28 October this further reply was received, showing absolutely no acknowledgement of the concern that there appeared to be a mistake on one of their drawings!</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY, </em></strong><em> </em><strong><em>GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort<br><br>Thank you for your undernoted e-mail, I can advise that your comments will be taken on board  for future proposals.</em><br><br><em>As  previously advised, the responsibility for the installation of speed  cameras lies with  Safety Cameras Scotland, who have their own criteria for the  installation of speed cameras, which is stricter than our criteria for  the installation of traffic calming.<br><br>I  trust the above information is of assistance, however, should you  require any further information please contact (name and phone number removed by GoBike).</em><br><br><strong><em>Michael Brady</em></strong><em>, </em><strong><em>Group Manager – Traffic and Road Safety</em></strong><em>, </em><strong><em>Neighbourhoods and Sustainability</em></strong></p>



<p><strong><em>From:</em></strong><em> Tricia Fort [</em><a href="mailto:consultations@gobike.org"><em>mailto:consultations@gobike.org</em></a><em>] <br> </em><strong><em>Sent:</em></strong><em> 11 October 2019 16:04<br> </em><strong><em>To:</em></strong><em> Mailroom, Land Services (NS) &lt;</em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>&gt;<br> </em><strong><em>Subject:</em></strong><em> Re: FW: The Glasgow City Council (Glencairn Drive) Traffic calming scheme &#8211; Mail id no 393585</em><br><br><em>Dear Mr Brady,<br><br>Thank you for replying to our letter of 17  September and your response to some of the points made therein. For your  reference I attach one of the drawings issued as part of this TRO,  which clearly shows a gap of 0.55m between cushion  and kerb. The GoBike response was based on this drawing. Will you  please issue the correct version of the drawing?</em><br><br><em>I also attach a screenshot showing a view of the  road that shows the setts in the gutter, which do not form an  acceptable cycling surface. However, I note your comment about the space  between the middle cushions and we have to hope that  people will be confident enough to use this gap when they are cycling  on this road.<br><br>It is unfortunate, in our view, that the City  Council does not take a more global view when there are concerns  expressed about speeding. Rather than maintain this wide road, and  others, as one primarily for motor vehicles we would prefer  a move towards streets for people. It is also a curious policy that you  continue to spend public money to restrain motor drivers who choose to  break speed limits, rather than requesting that speed cameras be  installed. Thank you, though for the clarification  on speed cameras and the link to the relevant website.<br><br>We maintain our support for the reduction of  dangerous speeds but object to the proposed method of achieving your  aims at this location.</em><br><br><em>Tricia Fort<br>for Consultations, GoBike, Strathclyde Cycle Campaign, <a href="http://www.gobike.org">www.gobike.org</a></em>&#8220;</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="280" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Screenshot-Glencairn-Drive-Drg-3-west-end.png?resize=525%2C280&#038;ssl=1" alt="" class="wp-image-9238" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Screenshot-Glencairn-Drive-Drg-3-west-end.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Screenshot-Glencairn-Drive-Drg-3-west-end.png?resize=300%2C160&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Screenshot-Glencairn-Drive-Drg-3-west-end.png?resize=600%2C320&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Screenshot-Glencairn-Drive-Drg-3-west-end.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>A telephone call to the City Council has elicited the information that the drawing issued, with the critical dimension shown above, was incorrect, but who knows what the final as-built arrangement will be?</p>



<p>Almost world-wide news in this edition, but we hope you have found it of interest.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9284</post-id>	</item>
	</channel>
</rss>
