<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>swcw &#8211; GoBike</title>
	<atom:link href="https://www.gobike.org/tag/swcw/feed" rel="self" type="application/rss+xml" />
	<link>https://www.gobike.org</link>
	<description>Strathclyde Cycle Campaign</description>
	<lastBuildDate>Tue, 01 Mar 2022 12:58:50 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
<site xmlns="com-wordpress:feed-additions:1">67217435</site>	<item>
		<title>Consultation Digest (Local) Issue 81, 2 March 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 02 Mar 2021 18:00:58 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[Calderbank]]></category>
		<category><![CDATA[Chapelhall]]></category>
		<category><![CDATA[ECW]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[GUSM74]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[NCN75]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[stockingfield junction]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Waverley Park]]></category>
		<category><![CDATA[yorkhill]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13315</guid>

					<description><![CDATA[New consultations from the Southside and elsewhere in the city, plus more from North Lanarkshire. In this Digest there are consultations for a few parts of the Southside and traffic orders for a few City Ways. Also, surveys and events on traffic and town hubs in North Lanarkshire. If you&#8217;re in the city, see Andy&#8217;s &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-81-2-march-2021-13315" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 81, 2 March 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">New consultations from the Southside and elsewhere in the city, plus more from North Lanarkshire.</h2>



<p>In this Digest there are consultations for a few parts of the Southside and traffic orders for a few City Ways. Also, surveys and events on traffic and town hubs in North Lanarkshire. </p>



<p>If you&#8217;re in the city, see <a rel="noreferrer noopener" href="https://www.gobike.org/not-1-but-3-infrastructure-rides-for-january-12877" target="_blank">Andy&#8217;s three infrastructure routes</a> around Glasgow to take in  Spaces for People infrastructure. Part of the Southern route includes the SfP <a href="https://www.glasgowtimes.co.uk/news/19122786.cyclists-criticise-glasgow-city-council-dangerous-dumbreck-road-cycle-lane/" target="_blank" rel="noreferrer noopener">&#8216;pop-up&#8217; bike lane on Dumbreck Road, which was recently removed &#8220;by mistake&#8221; but then reinstated</a>. </p>



<p>Andy has also started to inform GoBike about closures and diversions; if you hear of any please do let us know.</p>



<p>Looking further ahead towards spring, and an election, <a href="https://pedalonparliament.org/" target="_blank" rel="noreferrer noopener">Pedal on Parliament</a> have news about their events in April.</p>



<span id="more-13315"></span>



<p>This Digest includes links in the Contents page so you can jump straight to a topic if you want to.</p>



<h3 class="wp-block-heading" id="block-85aea166-a937-4431-9c26-67f7a1578d90"><strong>Contents</strong><br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list" id="block-2af108c2-4f2f-4df8-805c-19a1363036c6"><li><a href="#one-one">Glasgow City Council –&nbsp;St Andrews Drive (Sustainable Transport Route) Order</a> –&nbsp;closes Sunday 7 March</li><li><strong><a href="#one-two">North Lanarkshire Council – Town hub community engagement events</a></strong> <strong>–&nbsp;events from 8–18 March</strong></li><li><a href="#one-three">Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</a>&nbsp;– closes Friday 12 March</li><li><a href="#one-four">Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</a> – closes Friday 12 March</li><li><strong><a href="#one-five">Scottish Canals –&nbsp;Stockingfield public meeting</a> –&nbsp;Thursday 18 March</strong></li><li><a href="#one-six">Glasgow Harbour Ltd – Yorkhill Quay Phase 2</a> –&nbsp;closes Friday 19 March</li><li><strong><a href="#one-seven">North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall</a> – closes Sunday 21 March</strong></li><li><strong><a href="#one-eight">Waverley Park Collective –&nbsp;Liveable Streets Waverley Park</a></strong></li><li><strong><a href="#one-nine">Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park survey</a></strong></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<p>None this time</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Urban Roots – Malls Mire Newsletter February 2021</a></li><li><a href="#three-two"><span style="font-size: 1rem;">Sustrans –&nbsp;Glasgow Cycle Counters</span> (revisited)</a></li></ol>



<h3 class="wp-block-heading" id="block-0125b34a-9552-43d2-a260-4228dcb21664"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council –&nbsp;St Andrews Drive (Sustainable Transport Route) Order –Sunday 7 March</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?resize=525%2C296&#038;ssl=1" alt="St Andrews Drive at Maxwell Park" class="wp-image-13330" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?resize=1536%2C864&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Dr_8515_1920px.jpg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption>St Andrews Drive –&nbsp;South West City Way extension is due go on eastern side of road, next to Maxwell Park</figcaption></figure>



<p><a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-four" target="_blank" rel="noreferrer noopener">Digest 80 covered the St Andrews Drive TRO</a> to extend the South West City Way. The order deals mainly with parking to clear the way for the route. </p>



<p>Further details about the route are still available on the original <a rel="noreferrer noopener" href="http://www.glasgow.gov.uk/swcw" target="_blank">consultation website</a> (from 2019/2020) including a &#8216;Storymap&#8217; and links to PDFs of technical plans. The existing SWCW is 2-way (bi-directional), with both lanes on one side of the road. The extension will be too but using &#8216;cycle lane separators&#8217; (a.k.a. zebras/orcas/armadillos) instead of kerbs. </p>



<p>A <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/02/GoBike-SWCW-extension-letter-290120.pdf" target="_blank">GoBike response to the SWCW extension plans</a> was sent to Glasgow City Council in late January 2020. An <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/02/GoBike-St-Andrews-Drive-STR-response-270221.pdf" target="_blank">updated GoBike response</a> supports the order but notes that the other design issues haven&#8217;t been addressed. </p>



<p>There&#8217;s a consultation period for the TRO with a deadline of 7 March. Since it involves car parking, there are likely to be objections. Supportive emails may help to counter those. See the GCC website at&nbsp;<a target="_blank" href="http://www.glasgow.gov.uk/proposedtro" rel="noreferrer noopener">www.glasgow.gov.uk/proposedtro</a>.</p>



<h4 class="wp-block-heading" id="one-two">1.2: North Lanarkshire Council – Town hub community engagement events</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/nlc_town-hub-community-events_pic-only.jpeg?resize=525%2C263&#038;ssl=1" alt="North Lanarkshire Council – Town hub visualisation" class="wp-image-13320" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/nlc_town-hub-community-events_pic-only.jpeg?resize=600%2C300&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/nlc_town-hub-community-events_pic-only.jpeg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/nlc_town-hub-community-events_pic-only.jpeg?w=800&amp;ssl=1 800w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption>North Lanarkshire&#8217;s hubs may or may not have&nbsp;lots of steps and some aircraft hangars</figcaption></figure>



<p>More from North Lanarkshire Council for the second Digest in a row. This consultation isn&#8217;t strictly cycling-related but is relevant to the eight places in NLC&#8217;s <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#two-one" target="_blank">Town Visions plans (Digest 80)</a>. </p>



<p>NLC have <em>&#8220;ambition to replace every school not replaced or remodelled since 1996, our vision is to make these places for the whole community rather than only the school community. To do this, hubs will be places where education is delivered alongside other council and community services. Hubs will have a form and facilities based on the needs of the local community.&#8221;</em> </p>



<p>Those needs should include access by active travel. Schools are also where Bikeability training (formerly Cycling Proficiency) takes place and some already have fleets of bicycles.  NLC&#8217;s website has <a href="https://www.northlanarkshire.gov.uk/regeneration-and-investment/towns-and-communities/place-vision/town-and-community-hubs" target="_blank" rel="noreferrer noopener">further background information on the town hubs</a>. </p>



<p>An email from NLC said: <em>&#8220;We are carrying out online engagement with our communities throughout March about potential locations for new town hubs in North Lanarkshire.&#8221;</em></p>



<ul class="wp-block-list"><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-kilsyth-tickets-141407454503" target="_blank" rel="noreferrer noopener">Kilsyth</a>&nbsp;– Monday 8th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-cumbernauld-tickets-141409651073" target="_blank" rel="noreferrer noopener">Cumbernauld</a>&nbsp;– Tuesday 9th March &#8211; 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-airdrie-tickets-141409925895" target="_blank" rel="noreferrer noopener">Airdrie</a>&nbsp;– Wednesday 10th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-coatbridge-tickets-141448750019" target="_blank" rel="noreferrer noopener">Coatbridge</a>&nbsp;– Thursday 11th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-bellshill-tickets-141410445449" target="_blank" rel="noreferrer noopener">Bellshill</a>&nbsp;&#8211; Monday 15th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-motherwell-tickets-141417875673" target="_blank" rel="noreferrer noopener">Motherwell</a>&nbsp;&#8211; Tuesday 16th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-wishaw-tickets-141447652737" target="_blank" rel="noreferrer noopener">Wishaw</a>&nbsp;– Wednesday 17th March – 6:30pm</li><li><a href="https://www.eventbrite.co.uk/e/town-and-community-hub-programme-public-briefing-shotts-tickets-141448322741" target="_blank" rel="noreferrer noopener">Shotts</a>&nbsp;– Thursday 18th March – 6:30pm</li></ul>



<p>The link for each town goes to an Eventbrite sign-up page to register for the event. </p>



<h4 class="wp-block-heading" id="one-three">1.3: Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order&nbsp;– Friday 12 March</h4>



<p>The <a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-five" target="_blank" rel="noreferrer noopener">East City Way traffic order was covered in Digest 80</a>. Phase 1 is currently under construction on London Rd and Hamilton Rd around Mount Vernon train station. The order prepares the ground for it hopefully being finished soon. A <a href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-ECW-Phase-1-response-260221.pdf" target="_blank" rel="noreferrer noopener">new GoBike response about ECW</a> went to Glasgow City Council, referencing our points from our response at the draft stage. Mostly about the switch between 1-way and 2-way cycle lanes and the banned turn. The order will be on <a href="http://www.glasgow.gov.uk/proposedtro" target="_blank" rel="noreferrer noopener">GCC&#8217;s Proposed TRO webpage</a> for comment until Friday 12 March.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order – Friday 12 March</h4>



<p>The <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179#one-six" target="_blank">London Road/Hamilton Road 30mph Speed Limit was also in Digest 80</a>. It lowers the speed limit all the way along London Rd and Hamilton Rd between Dewar&#8217;s distillery and the Dog&#8217;s Trust. Again, we sent a <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-Hamilton-Road-30mph-response-260221.pdf" target="_blank">new GoBike response supportin</a><a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-Hamilton-Road-30mph-response-260221.pdf" target="_blank">g</a><a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2021/03/GoBike-London-Road-Hamilton-Road-30mph-response-260221.pdf" target="_blank"> the change of speed limit</a> and the order is up for comment until Friday 12 March.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Scottish Canals –&nbsp;Stockingfield public meeting –&nbsp;Thursday 18 March</h4>



<p>Scottish Canals maintain and develop canals, towpaths and bridges, including the major works at the Stockingfield junction on the Forth &amp; Clyde canal. This is the canal t-junction without a bridge, where you had to cross by going down through a narrow road tunnel on Lochburn Rd with no pavements or bike path. The plans for a large 3-span canal bridge were approved in March 2020 and works started in autumn. Parts of the towpath will be closed and won&#8217;t re-open until later in 2022. Further information about the project is on the <a rel="noreferrer noopener" href="https://www.scottishcanals.co.uk/stockingfield-bridge/" target="_blank">Stockingfield page on the Scottish Canals website</a>. If you have questions about issues, like diversions or the new bike-only signals on Lochburn Rd, Scottish Canals are having an online meeting about the project on Thursday 18 March. </p>



<figure class="wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Following the success of our last Stockingfield public meeting, we agreed to hold a follow up in early 2021. <br><br>The next public meeting will take place on March 18th at 7pm via Microsoft Teams. If you would like to attend please email communications@scottishcanals.co.uk <a href="https://t.co/A9HOpLWxn4">pic.twitter.com/A9HOpLWxn4</a></p>&mdash; Scottish Canals (@scottishcanals) <a href="https://twitter.com/scottishcanals/status/1365607625992384513?ref_src=twsrc%5Etfw">February 27, 2021</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow Harbour Ltd – Yorkhill Quay Phase 2 –&nbsp;closes Friday 19 March</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="525" height="322" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?resize=525%2C322&#038;ssl=1" alt="Yorkhill Quay Phase 2 map" class="wp-image-13350" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?resize=600%2C368&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?resize=300%2C184&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?resize=1536%2C943&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?resize=2048%2C1257&amp;ssl=1 2048w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/YQ_Location-Plan-for-Web-1-scaled-1.jpg?w=1050&amp;ssl=1 1050w" sizes="(max-width: 525px) 100vw, 525px" /><figcaption>Red dotted line shows Phase 2 site –&nbsp;eastern end plus current path/Expressway verge and new Riverside path. Note: proposed Govan–Partick footbridge has been added in map but not Kelvin footbridge.</figcaption></figure>



<p>This development first appeared on our radar in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-73-10-november-2020-good-news-on-a-protected-junction-survey-and-sad-news-for-pollok-park-12455" target="_blank">Digest 73, Item 1.1</a>. It had a brief consultation which swiftly disappeared from the company&#8217;s website (as we noted in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#one-three" target="_blank" rel="noreferrer noopener">Digest 74, Item 1.3</a>). That was to do with a pre-application about the masterplan for the site. Apparently, <em>&#8220;a Proposal of Application Notice (PoAN) associated with the development was submitted to Glasgow City Council on 20th November 2020&#8221;.</em> So, this consultation about the eastern side of the site is part of the 12-week pre-application period before plans go in. </p>



<p>The developer&#8217;s <a href="http://yorkhillquay.com/" target="_blank" rel="noreferrer noopener">Yorkhill Quay website</a> has new visualisations (which look very plastic) and <a href="http://yorkhillquay.com/wp-content/uploads/2021/02/2021-02-18-Yorkhill-Quay-Public-Consultation-Boards-FINAL.pdf" target="_blank" rel="noreferrer noopener">reworked PDF plans</a>. It&#8217;s not clear from the plans what will happen to the current path behind the site, between the Riverside Museum and the distillery. Nor how wide the new riverfront path will be (but it seems to have street furniture and trees splitting it up). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="503" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay-plan-path-section.jpg?resize=525%2C503&#038;ssl=1" alt="Yorkhill Quay site plans" class="wp-image-13351" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay-plan-path-section.jpg?resize=600%2C575&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay-plan-path-section.jpg?resize=300%2C287&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay-plan-path-section.jpg?w=1430&amp;ssl=1 1430w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Yorkhill-Quay-plan-path-section.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Plans of the Yorkhill Quay site – ample <em>space for car parking</em> but will paths have enough room?</figcaption></figure>



<p>The <a rel="noreferrer noopener" href="http://yorkhillquay.com/next-steps-and-feedback" target="_blank">Next Steps and Feedback page</a> has a webform you can use to send comments. Or you can email: yorkhillquay@iceniprojects.com by Friday 19 March.</p>



<h4 class="wp-block-heading" id="one-seven">1.7: North Lanarkshire Council – Consultations on traffic issues in Calderbank and Chapelhall – Sunday 21 March</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?resize=525%2C263&#038;ssl=1" alt="Calderbank and Chapelhall map" class="wp-image-13340" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?resize=600%2C300&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?resize=1536%2C768&amp;ssl=1 1536w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Calderbank-Chapelhall-map.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Map showing Calderbank and Chapelhall villages</figcaption></figure>



<p>Back in North Lanarkshire, the council is consulting about traffic in the villages of Calderbank and Chapelhall, between Airdrie and the M8. Their email says:</p>



<p><em>&#8220;In response to road safety concerns raised by local residents, the council undertook a series of detailed surveys to assess traffic conditions through both villages. Information from these surveys will be included in the reports.</em></p>



<p><em>The public consultation, which will run until 21 March, will give both communities the opportunity to provide feedback on a range of potential road safety improvements.</em></p>



<p><em>The reports and online consultation are available from 24 February on our website at&nbsp;<a rel="noreferrer noopener" target="_blank" href="https://lnks.gd/l/eyJhbGciOiJIUzI1NiJ9.eyJidWxsZXRpbl9saW5rX2lkIjoxMDEsInVyaSI6ImJwMjpjbGljayIsImJ1bGxldGluX2lkIjoiMjAyMTAyMjQuMzU4NjA1OTEiLCJ1cmwiOiJodHRwOi8vd3d3Lm5vcnRobGFuYXJrc2hpcmUuZ292LnVrL3RyYWZmaWMtc3R1ZGllcyJ9.0QfSsx4Yg7q41rn_QhCn9OePx5cD6pCQD7jQsr8QSe8/s/946610161/br/98280400374-l">www.northlanarkshire.gov.uk/traffic-studies</a>.&#8221;</em></p>



<p>The <a href="https://storymaps.arcgis.com/stories/1bcf196100854629b3b0d5fbc32a5d58" target="_blank" rel="noreferrer noopener">Chapelhall Traffic Study</a>, in the &#8216;Potential Improvements&#8217; section, suggests speed tables and mini-roundabouts. The <a href="https://storymaps.arcgis.com/stories/fec286268a3c4ee0994aa71aecbd84e5" target="_blank" rel="noreferrer noopener">Calderbank Traffic Study</a> proposes mini-roundabouts too but also includes a new crossing on Main St. Each study has a survey link at the end. If you know the areas you have until Sunday 21 March to respond.</p>



<h4 class="wp-block-heading" id="one-eight">1.8: Waverley Park Collective –&nbsp;Liveable Streets Waverley Park</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="333" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Waverley-Park-Liveable-Streets-map.jpg?resize=525%2C333&#038;ssl=1" alt="Waverley Park map" class="wp-image-13342" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Waverley-Park-Liveable-Streets-map.jpg?resize=600%2C380&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Waverley-Park-Liveable-Streets-map.jpg?resize=300%2C190&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/Waverley-Park-Liveable-Streets-map.jpg?w=1083&amp;ssl=1 1083w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Waverley Park consultation map</figcaption></figure>



<p>Waverley Park is an area of Shawlands in the Southside of Glasgow (where the streets are named after characters in Walter Scott novels). The <a rel="noreferrer noopener" href="https://www.waverleyparkcollective.org/get-involved" target="_blank">Waverley Park Collective</a> are a grassroots group of residents who&#8217;ve previously organised community events for children as well as things like cycling training. They&#8217;ve recently won funding to plan changes to local streets and set up the <a rel="noreferrer noopener" href="https://www.waverleyparkstreets.com/" target="_blank">Liveable Streets Waverley Park consultation</a>. If you know the area, you can add a pin to the map. No obvious closing date for this one (seems to be open-ended).</p>



<h4 class="wp-block-heading" id="one-nine">1.9: Glasgow Urban Sports –&nbsp;GUSM74 Urban Sports Sculpture Park</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="185" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GUSM74_1.jpg?resize=525%2C185&#038;ssl=1" alt="GUSM74 visualisation" class="wp-image-13344" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GUSM74_1.jpg?resize=600%2C211&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GUSM74_1.jpg?resize=300%2C105&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GUSM74_1.jpg?w=1425&amp;ssl=1 1425w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/GUSM74_1.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>GUSM74 –&nbsp;a visualisation of how the skatepark could look under the motorway looking from Falfield St</figcaption></figure>



<p>This item is about a different kind of cycling to your average GoBike ride! The <a href="https://glasgowurbansports.co.uk/" target="_blank" rel="noreferrer noopener">Glasgow Urban Sports</a> group want to bring land under the M74 extension into productive use as a park for &#8216;urban sports&#8217; – BMX, skateboarding, inline skating, parkour, etc. The area is between the back of West St Subway station and Eglinton St (a few blocks from Batley&#8217;s cash &amp; carry warehouse). The idea for the project originally came up around 2014 (as a legacy of the Commonwealth Games). </p>



<p>Recently, GUS have come up with a <a rel="noreferrer noopener" href="https://www.surveymonkey.co.uk/r/glasgowurban" target="_blank">new survey</a> to try and demonstrate support for the project. It&#8217;s mainly aimed at skaters, or their families, to find out how often they/their relatives might use the park, etc. If you&#8217;re not likely to be down there yourself grinding any rails then feel free to share it with friends or family who might. No obvious closing date.</p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<p>None this time. </p>



<h3 class="wp-block-heading"><strong>Section 3:</strong> <strong>Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Urban Roots – Malls Mire Newsletter February 2021</h4>



<p>Malls Mire was first covered (under its current name) in <a href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#three-four" target="_blank" rel="noreferrer noopener">Digest 74, Item 3.4</a>. The latest <a href="https://www.gobike.org/wp-content/uploads/2021/03/Malls-Mire-Newsletter-February-2021_reduced.pdf" target="_blank" rel="noreferrer noopener">February issue of the Malls Mire newsletter</a> reached us this week. It has a few updates about progress and related projects like Polmadie Plots Community Garden.</p>



<h4 class="wp-block-heading" id="three-two">3.2: Sustrans –&nbsp;Glasgow Cycle Counters (revisited)</h4>



<p>In <a href="https://www.gobike.org/consultation-digest-local-issue-79-2-february-2021-13147#three-three" target="_blank" rel="noreferrer noopener">Digest 79, Item 3.3</a> we bade farewell to the public cycle counter near Saltmarket in Glasgow Green as it was switched off. We were assured that <em>&#8220;two replacement cycle counters were installed in the following locations:&nbsp;NCN75 at St. Andrew’s Suspension Bridge&nbsp;and NCN75 at Cuningar Loop Footbridge&#8221;</em>. Turns out the new counters aren&#8217;t like-for-like replacements&#8230;</p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="296" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/cycle-counter-ncn75-st-andrews-bridge.jpg?resize=525%2C296&#038;ssl=1" alt="St Andrew's Bridge cycle counter" class="wp-image-13353" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/cycle-counter-ncn75-st-andrews-bridge.jpg?resize=600%2C338&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/cycle-counter-ncn75-st-andrews-bridge.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/03/cycle-counter-ncn75-st-andrews-bridge.jpg?w=960&amp;ssl=1 960w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>The grey box on the right of the photo is the new, not so public, cycle counter at St Andrew&#8217;s Bridge</figcaption></figure>



<p>The new counter feeds back figures to Sustrans/the council only. While that is fair enough for collecting data, it&#8217;s not so good for campaigning. The public counter used to prove how many people cycled past, which could be useful to point out to doubters of cycling/active travel. It would be a shame if Sustrans had moved away from public counters altogether. When will we see the Saltmarket counter&#8217;s LED like again&#8230;?</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13315</post-id>	</item>
		<item>
		<title>Consultation Digest (Local) Issue 80, 16 February 2021</title>
		<link>https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179</link>
		
		<dc:creator><![CDATA[Derek Y]]></dc:creator>
		<pubDate>Tue, 16 Feb 2021 18:00:15 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[30mph]]></category>
		<category><![CDATA[Ardrossan]]></category>
		<category><![CDATA[cathedral st]]></category>
		<category><![CDATA[East City Way]]></category>
		<category><![CDATA[ECW]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Hamilton Rd]]></category>
		<category><![CDATA[high st]]></category>
		<category><![CDATA[learning quarter]]></category>
		<category><![CDATA[London Rd]]></category>
		<category><![CDATA[motherwell]]></category>
		<category><![CDATA[north kelvin]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[Queens Cross Housing Association]]></category>
		<category><![CDATA[Ravenscraig]]></category>
		<category><![CDATA[south west city way]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=13179</guid>

					<description><![CDATA[Events and updates from the city and future plans for North Lanarkshire. In this Digest there are consultation events for areas either side of the M8. There’s a return to pre-pandemic plans for a few City Ways. Also, adding paths and removing the precinct in Motherwell. If you&#8217;re in the city, see Andy&#8217;s three infrastructure &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-local-issue-80-16-february-2021-13179" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest (Local) Issue 80, 16 February 2021"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">Events and updates from the city and future plans for North Lanarkshire. </h2>



<p>In this Digest there are consultation events for areas either side of the M8. There’s a return to pre-pandemic plans for a few City Ways. Also, adding paths and removing the precinct in Motherwell. </p>



<p>If you&#8217;re in the city, see <a rel="noreferrer noopener" href="https://www.gobike.org/not-1-but-3-infrastructure-rides-for-january-12877" target="_blank">Andy&#8217;s three infrastructure routes</a> around Glasgow to take in  Spaces for People infrastructure. He’s also started to inform GoBike about closures and diversions; if you hear of any please do let us know.</p>



<p>Looking further ahead towards spring, and an election, <a href="https://pedalonparliament.org/" target="_blank" rel="noreferrer noopener">Pedal on Parliament</a> have news about their events in April.</p>



<span id="more-13179"></span>



<p>This Digest includes links in the Contents page so you can jump straight to a topic if you want to.</p>



<h3 class="wp-block-heading" id="block-85aea166-a937-4431-9c26-67f7a1578d90"><strong>Contents</strong><br>(new consultations in <strong>bold</strong>)</h3>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li><a href="#one-one">Glasgow City Council – (Y)our Districts Online Ideas Workshops – &#8216;Learning Quarter&#8217;</a>, rescheduled online sessions Thursday 18th February</li><li><strong><a href="#one-two">North Lanarkshire Council –&nbsp;Ravenscraig Active Travel Links</a> – Friday 19 February</strong></li><li><span style="font-size: 1rem;"><a href="#one-three">Queens Cross Housing Association –&nbsp;Woodside Making Places</a>:&nbsp;updated masterplan and online public meeting – Thursday</span> <span style="font-size: 1rem;">25 February</span></li><li><strong><a href="#one-four">Glasgow City Council –&nbsp;St Andrews Drive (Sustainable Transport Route) Order</a> –&nbsp;Sunday 7 March</strong></li><li><strong><a href="#one-five">Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order</a>&nbsp;– Friday 12 March</strong></li><li><strong><a href="#one-six">Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order</a> – Friday 12 March</strong></li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li><strong><a href="#two-one">North Lanarkshire Council –&nbsp;Town Visions</a></strong></li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li><a href="#three-one">Glasgow City Council – North Kelvin and North Woodside (Traffic Management &amp; Parking Controls) Order</a></li><li><a href="#three-two">North Ayrshire Council –&nbsp;Ardrossan Connections</a></li></ol>



<h3 class="wp-block-heading" id="block-0c48c015-e0b5-420c-8469-113cc5898c46"><strong>Section 1: Current Consultations<br></strong>(in date order for responses)</h3>



<h4 class="wp-block-heading" id="one-one">1.1: Glasgow City Council – (Y)our Districts Online Ideas Workshops – &#8216;Learning Quarter&#8217;</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="351" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Learning-Quarter-District.jpg?resize=525%2C351&#038;ssl=1" alt="'Learning Quarter' District" class="wp-image-13128" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Learning-Quarter-District.jpg?resize=600%2C401&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Learning-Quarter-District.jpg?resize=300%2C200&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/01/Learning-Quarter-District.jpg?w=900&amp;ssl=1 900w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>The &#8216;Learning Quarter&#8217; area around Cathedral St, <em>High St</em> and Castle St </figcaption></figure>



<p>GCC&#8217;s ongoing <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#two-one" target="_blank">Districts consultations featured i</a><a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#two-one" target="_blank">n</a><a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-78-19-january-2021-13078#two-one" target="_blank"> Digest 78</a>, including this one for the &#8216;Learning Quarter&#8217;. The <a rel="noreferrer noopener" href="https://yourcitycentre2020.commonplace.is/news/2021/02/02/rescheduled-your-learning-quarter-ideas-workshop-:-thursday,-18th-february" target="_blank">rescheduled workshops are on Thursday 18th February</a>. There&#8217;s an <a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/rescheduled-your-learning-quarter-ideas-workshop-afternoon-session-tickets-139476252225" target="_blank">afternoon session</a> (2–4pm) and an <a rel="noreferrer noopener" href="https://www.eventbrite.co.uk/e/rescheduled-your-learning-quarter-ideas-workshop-evening-session-tickets-139482753671" target="_blank">evening session</a> (6–8pm) both online. </p>



<p>You can still comment on the <a rel="noreferrer noopener" href="https://yourcitycentre2020.commonplace.is/" target="_blank">Districts Commonplace map</a>. Other relevant consultations about the wider area appeared in <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604" target="_blank">Digest 74</a>, including <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-74-24-november-2020-12604#two-one" target="_blank">Strathclyde Uni&#8217;s proposed active travel project</a>. There&#8217;s also the <a rel="noreferrer noopener" href="https://www.reglasgow.com/work-to-start-on-additional-people-friendly-avenues-on-edge-of-city-centre-in-2023/" target="_blank">Avenues Plus project for Duke St/John Knox St</a> in a few years time.</p>



<h4 class="wp-block-heading" id="one-two">1.2: North Lanarkshire Council –&nbsp;Ravenscraig Active Travel Links</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="205" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Ravenscraig_view-to-sports-centre_crop.jpg?resize=525%2C205&#038;ssl=1" alt="" class="wp-image-13278" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Ravenscraig_view-to-sports-centre_crop.jpg?w=554&amp;ssl=1 554w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Ravenscraig_view-to-sports-centre_crop.jpg?resize=300%2C117&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Visualisation of proposed route to Ravenscraig Regional Sports Facility (top left)</figcaption></figure>



<p>An email from North Lanarkshire Council on 15 February is about a very short consultation period for active travel routes into part of the Ravenscraig site in Motherwell. It says: </p>



<p><em>&#8220;Proposals for new cycling and walking routes through Ravenscraig are being published for the public to give their views.</em></p>



<p><em>We are working with Sustrans and Ravenscraig Limited to improve connections between Ravenscraig and neighbouring communities and to expand the active travel network.</em></p>



<p><em>An online consultation, including a short survey, will run from Monday 8 February for two weeks. It is available at <a href="https://www.northlanarkshire.gov.uk/regeneration-and-investment/ravenscraig-active-travel-links" target="_blank" rel="noreferrer noopener">www.northlanarkshire.gov.uk/regeneration-and-investment/ravenscraig-active-travel-links</a></em></p>



<p><em>The two key elements of the project are:</em></p>



<ul class="wp-block-list"><li><em>a south-north link to connect Craigneuk, via “The Castings” housing development, off Meadowhead Road, with the Regional Sports Facility (RSF) and new public park, and</em></li><li><em>an east-west link to connect Craigneuk, via “The Castings” housing development, to New College Lanarkshire Motherwell Campus.</em></li></ul>



<p><em>It’s proposed the paths will have lighting, seating, landscaping with wildflower areas and woodland planting, play features along the route, fencing and CCTV where possible.</em></p>



<p><em>“As the Ravenscraig site develops with new housing, business, retail, schools and leisure, we want the area to be accessible for everyone for walking, cycling and wheeling,” said Jonathan Speed, Senior Project Manager at North Lanarkshire Council.</em></p>



<p><em>“These active travel routes will provide direct, off-road links from the south to the facilities within Ravenscraig, as well as connecting to a wider network of paths to Motherwell, Wishaw and Carfin.</em></p>



<p><em>“The project is an important part of the Ravenscraig masterplan, and we would like to hear from as many people as possible during our consultation to ensure the proposals meet the need of residents.”</em></p>



<p><em>The project is being funded by Transport Scotland and Sustrans, through their ‘Places for Everyone’ programme.</em></p>



<p><em>Feedback from the consultation will inform the final plans for the project, then the council will apply for planning permission. Subject to the necessary approvals and securing funding, it is anticipated work to construct the first of the two active travel routes would start later this year.&#8221;</em></p>



<p>This seems to have been taken over by the council from Central Scotland Green Network (CSGN) who started the project. While an active travel route is welcome, this only covers the south-east corner of a vast area. This route is in contrast to the <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-two" target="_blank">Ravenscraig Access Infrastructure (RAI) Project from Digest 75, Item 1.2</a> – a dual carriageway with shared pavement. While there are road links in all directions there are no active travel links to the west of the site (behind Dalzell Works) towards the town centre. We can only hope something comes out of item 2.1, below, to improve the situation.</p>



<p>Deadline is this week, Friday 19 February. If you know the area at all, please fill in the <a href="https://www.surveymonkey.co.uk/r/RavenscraigActiveTravelLinks" target="_blank" rel="noreferrer noopener">survey</a>.</p>



<h4 class="wp-block-heading" id="one-three">1.3: Queens Cross Housing Association –&nbsp;Woodside Making Places:&nbsp;updated masterplan and online public meeting – 25 February</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="539" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Woodside-Making-Places_ScreenShot-2021-02-14.jpg?resize=525%2C539&#038;ssl=1" alt="Woodside Making Places map" class="wp-image-13236" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Woodside-Making-Places_ScreenShot-2021-02-14.jpg?resize=584%2C600&amp;ssl=1 584w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Woodside-Making-Places_ScreenShot-2021-02-14.jpg?resize=292%2C300&amp;ssl=1 292w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Woodside-Making-Places_ScreenShot-2021-02-14.jpg?w=1080&amp;ssl=1 1080w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Woodside Making Places map –&nbsp;showing comments/updates from team</figcaption></figure>



<p>This <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-79-2-february-2021-13147#one-four" target="_blank">featured in Digest 79</a> about the Woodside area, between Maryhill Rd and Garscube Rd. It could become an important link along N Woodside Rd and St George&#8217;s Rd to the segregated cycleway being completed on Garscube Rd (A81). The consultation map is on the&nbsp;<a class="" rel="noreferrer noopener" target="_blank" href="https://www.woodsidemakingplaces.org.uk/">updated Woodside Making Places website</a>. There is an <a rel="noreferrer noopener" href="https://www.woodsidemakingplaces.org.uk/events" target="_blank">online public meeting</a> on Thursday 25th February.</p>



<h4 class="wp-block-heading" id="one-four">1.4: Glasgow City Council – St Andrews Drive (Sustainable Transport Route) Order – Sunday 7 March</h4>



<p>GoBike first reported on plans for St Andrews Drive in a <a href="https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495" target="_blank" rel="noreferrer noopener">Consultation Extra</a> in late November 2019. The route would extend the South West City Way (SWCW), the segregated cycleway along Shields Rd. It currently ends at a crossing on St Andrews Drive. The extension would roughly double the length of the SWCW and create a segregated route from the &#8216;Squiggly&#8217; Bridge, all the way past Maxwell Park to Pollok Country Park. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="St Andrews Drive" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Glasgow City Council have now announced a Traffic Regulation Order for the length of the <a href="https://www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Drive-sustainable-travel-route-TRO.pdf" target="_blank" rel="noreferrer noopener">St Andrews Dr route</a>. There&#8217;s also a <a href="https://www.gobike.org/wp-content/uploads/2021/02/NoticeOfProposals-StAndrewsDrive-SustainableTransport-220x85mm.pdf" target="_blank" rel="noreferrer noopener">SAD notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Drive-sustainable-travel-route-information-report.pdf" target="_blank" rel="noreferrer noopener">SAD report</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/02/St-Andrews-Drive-sustainable-travel-route-statement-of-reasons.pdf" target="_blank" rel="noreferrer noopener">SAD wee Statement of Reasons</a>. These seem to deal with parking to clear the way for the route. </p>



<p>Further details are still available on the <a href="http://www.glasgow.gov.uk/swcw" target="_blank" rel="noreferrer noopener">consultation website</a> from late 2019/early 2020. It includes a long &#8216;Storymap&#8217; and links to PDFs of technical plans for the route (starting at Shields Rd): <a href="https://ago-item-storage.s3.us-east-1.amazonaws.com/e52f74790737453aa753e4f948a85690/GA1.pdf?X-Amz-Security-Token=IQoJb3JpZ2luX2VjEC0aCXVzLWVhc3QtMSJHMEUCIQDkhB78kIrrlxYGxPdgEYgxTDY1mves8O87wFMmncOHnAIgV7Y9mJ88qpZEt5z5cOCLhHe%2Byxlt%2FBEUoGSDhImbsSoqtAMINRAAGgw2MDQ3NTgxMDI2NjUiDEGV0yfQ6m22G5WlyyqRA6D08Yfv7xAHOqn3vhezLIJC92bdGASxR4SfY6NoDIJG2LUaBbv%2FQX7Lsfwt12UDEjOW7TSHy3YmMGwdR4SD3GwHZGmRHMf8DVe2MWIzlmmiPGQokSXNsEbqqEpDiWxIN1D7W%2BAYmGKlHmxkt7uwWEK6yH8hVxvoPsUkn4gzPG0TyQ864UpMGmwgyEqYEuWyh6colKKQqbacW%2FEQq2I94JQiZb0%2BG7L8svmDU%2BUOzWVewUmEnrroJeE6MwMYiQ8D2p4NYya48rmS0nZi2DkRWhkL6qUQ8xajQUGSX5gE4d%2FK98Ol4LxTzbhi2LGEMpUircoEXwPJQs2wsoAhj4ukDrWeV4lnLfJiR%2FEKJ%2B9tJydmUH2hYUnGTWFWxswlpOb4P8F%2F2PpOYh7sTycFXr0GjHwmGFNSJPGjm7oYJiKBev5EwO5HCNVOgfeZJKtq7A7mvEOZbOpZHJSKGrddhAgnwZbnhlNURIDsB1cKfnTvXDTqroF6SokHtBRPwnYwwlu3vvXt5%2Bg0FDY6lBCd9qt4QshnMLuoq4EGOusBhNaRa54rQsPLFAf2nZIEKoT4h7NaouqgDf61jiEACGHudKYrLdd9gws4Q%2FhkyZlt8M3wGGx82nXX90qj46ePNUJv%2FLp1nHyr8ztLDCjJtVOBOZ4iAqoGNwyMBjsCBqzyqqJdN3Kw5F3beprBjdAMWENKfoIvqK7q74y3G2IMcEKtt0g6nye5rqCzmoO00gVEiCyRcMcMxAQhEdPsV24mhtc6zwMfPmny3sIMCM8%2FR5aPr%2FShnQ1ULId4rpYuHGwsHRC%2F6vzAkeLX7Dk%2B7RyrlimtAhN3jnOqSPmu5EuBTbCr0Q0Q7V9CB8rHVQ%3D%3D&amp;X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Date=20210215T211913Z&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Expires=300&amp;X-Amz-Credential=ASIAYZTTEKKE7TMJIKV3%2F20210215%2Fus-east-1%2Fs3%2Faws4_request&amp;X-Amz-Signature=f6f9d05cd81228dc39eb4ac19ca4c39f009bcf518e93284e2f5724eb34c084b0" target="_blank" rel="noreferrer noopener">sections 1–3</a>, <a href="https://ago-item-storage.s3.us-east-1.amazonaws.com/0237283a7ae5429290f0cafe777a4f33/GA2.pdf?X-Amz-Security-Token=IQoJb3JpZ2luX2VjEC0aCXVzLWVhc3QtMSJGMEQCIBWm%2BYVofmU89jekFQbRTUUjoy2aIWe%2FJEeohl82B4QrAiA7wgnTpIcQi22nIIJSo2%2FYMa7CXFZReiAv525mvCrW4yq0Awg1EAAaDDYwNDc1ODEwMjY2NSIMYDKkHIHREdgJ%2FjObKpEDmlNuFEZaw%2BGMycili5G1Ucceftipjoze6VkQ6auCDpxlKydiTjKxk3YGWip57%2BL2fHqoI7Ww1vq2yAHqIdIJjmD8UkoxX9Ju9PdN%2Fmc5MLEyFkEqMzGqXmHu%2F%2FHVZW8cWy8h0lmoKNLEO0dmXE%2Bq9sd7MZ%2Fd1bY7fSiRM6SQK48iINDy8Sr8ATqhT3ciLk75DxmzcX2tQ3qpVe1u1jpVKKFAblkPi1hv65dskfYkwE%2BZaCG9Lz%2BsHeDFVFlcZR4nWd1G%2BCS1C68b56s1LuNd9yMIyDa%2FJ4wseULPuLSxr%2FTCCBkD6nKOq2BfXvgFOaJBQ7T%2B9rHspDeAPealkLhh60Su61Ds7GGBVX5afYXP93juZ%2FXqiikPl%2BbfltHfsjlznFv0MBpQ4jXPbIcJ9QpY80vx%2FTlqciZ%2FpjKWqtaDkXCnndTyD%2FB8hE%2F9qXof%2FNMbWUHZURB%2F7wqq0JWKJjz8yu1F0vJdFw7r3jZQz2A3LBicfd%2Bhp09c4fGgde2x1afMdEYD5umiXbPoRcvFUy1bI%2FkwkK%2BrgQY67AHKpzgynPPlAZEP0HL5INMkwOhlO8yYPil5RLkwtirDZ%2BQBjrLpRMLTXCVSkJvQQxwxqSBrvMgLfP5VrpfQrC7N3zS8S80b0RYpuDaNTPVrEbheIqoWkna%2BJfvHKINYBACWW1RwgD8i%2FwXAxH1MGUvDTXFctjO4WxUGAIMjh8PwEB1M0FSvu1hY83U%2F6%2Bl0mnE9lxreJHVOmUOcdFSiHkYusU6QOMP16Pg2OHNQ4fWKv0wPSSZobz0%2FS1c9De2Hypi2%2BRFKO7sgRVL1u2rogItvAuWmmNFVZMuWmt6jLRwtuh0ZFhozom1YiL%2BfAw%3D%3D&amp;X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Date=20210215T213155Z&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Expires=300&amp;X-Amz-Credential=ASIAYZTTEKKE5GGLNERG%2F20210215%2Fus-east-1%2Fs3%2Faws4_request&amp;X-Amz-Signature=508f2b220a359e7ec5616836968f9719e4725311b27c54540514d77c0efc87a6" target="_blank" rel="noreferrer noopener">sections 4–6</a>, <a href="https://ago-item-storage.s3.us-east-1.amazonaws.com/d6496326ac0e48219e9ed3b88b51f07c/GA3.pdf?X-Amz-Security-Token=IQoJb3JpZ2luX2VjEC0aCXVzLWVhc3QtMSJHMEUCIQCnqwEzlqv%2BVwz0MGiyrovSI33EOx5lnXBi2B06P3PU1wIgO8fFQ43i91pVYD6kTNhLghE8K5iDK1cBO5dnQ7DeTa4qtAMINhAAGgw2MDQ3NTgxMDI2NjUiDKNE%2BkQba8H7Z3UaNCqRA8dER7mumfA7WK740zH0T34Y9vsDVjIFTVfMsuJYl0EuMt91VhMoCKaDJaMM4QHKgPsp%2BY4lUWr1dsGe049rCtcIKXWwDmMVU9raoa3CzVK5LS%2FwWf%2BS5CjqhRVtb5KNEvrFTMWkWTZ%2FRYCqKmkjOCThMbZPNBplsnH53LkNogoa9mfZuyRthUUIJtGXimG8pyq4dV%2BUCHCKtwbnLL4moR0fSGv%2FZtHwSUu%2FAE8zK7vTHhlOGvJqq3Kel2Rq0mFnH25Ioabx1ZcxYqh%2BVsmc%2FYgBSWm0CfvjBELeAuOjgjhtGMy341U9lysXtG04eTwAVG%2BVXNhMlRRi6dDcBYNaA29aU6x9E6ClLV%2FPJPIDFaWbpgantfdhqZjWjEcWfrrLOkXubgl2LJUknvOAnp3ponoPgW8QXdhXwNSutkQjEtNVDFK6n4441kDhyRx4cqKBrM%2Bv%2FB03F5YwQmkQOifNfW9jwHy4gNXtAeXM05OiaGHMVr87JcdkV1MNLIYkpy%2F6g705KQ7V7Ze4NTCB72Kk0IRrMMyyq4EGOusB3TY3GdUegWCVTwiCGVAEuKPVL18nZavTUwJksnjpx%2Bcyw2f7ce8RIuFjExk2k8bsUBAml%2FX7ViU1FuSKYeo34Cer%2Fwx5%2Bv4n610PVUj2wagrRVuq04Nt6hMPa0J99kgT6C%2FQX5lB8eMpW68%2BW%2Fzlm6MPMW5zN64%2BMwATfri3Jc%2FzlcqEyVrLAqJt1aB4pmK4qFQ%2FZ9YbXe7pvcnwokSzzBpJlyNjMNPYw7LPc1PrJesb2iOJE%2B98Xf3zZ3VE%2Fo5MDKIE9%2BySC2Bdbkwc1k8wcVrVM1XMvyPY6ezCJe9iSzC3R5SY1xdjtT18Uw%3D%3D&amp;X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Date=20210215T213314Z&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Expires=300&amp;X-Amz-Credential=ASIAYZTTEKKE7ZBVFREM%2F20210215%2Fus-east-1%2Fs3%2Faws4_request&amp;X-Amz-Signature=5e9d45907d77796c9968c6fdfe69bd8d36d62f7bc6a3c44bd227f121fa19abb9" target="_blank" rel="noreferrer noopener">sections 7–9</a>, <a href="https://ago-item-storage.s3.us-east-1.amazonaws.com/9dd7e861fb984a18a0e51e61fc33f6d7/GA4.pdf?X-Amz-Security-Token=IQoJb3JpZ2luX2VjEC0aCXVzLWVhc3QtMSJHMEUCIGJND0LgdBJSKCHPhrAkxn6wsisQYG2CMkXMbZNZbRhxAiEAsb5DN7F2Xya7OgcBSMKlhpH7Uf4I%2BotVIr4FW3LzzbQqtAMINhAAGgw2MDQ3NTgxMDI2NjUiDNIOadnbG1%2B3fN994iqRA2oNk8pmJ8UvD1nob%2FI%2BZGFqgdeu1CcR1qko5bhpc9LuA8uO5Y3W7Tv%2Fs7xQQtv0D5J9w1wwyqz5cJsIGRPlfeDu11pcV5CGhzW75a66u%2B7s49dyeo%2FQcqgLxUlHcRuOCfDjmUxUhvZULQlLO0JicnogITGRzFv3BxatRPCjs3%2Bk%2BJuhdgvOPHSzBl0C7WcB3YjU%2FfFDjJBSJdZqiUNcdxRWQPf8PLBZdhGvQvPb903ZgMhsPIFiHyJmqYe5iu8uYZBYLT0Ovgt8b7u%2F8lViNGhQQ7X2XiouZaUeHIPQd0RgXCtClv1kfPz1PmViwkzFFaBsMCMEUeT43uSGgotO3JXuZvUvIck3n1mX9VTEDPxT7Qq28o0MxJUq7AMy08ngwN6YQP%2BmmBUnrcfdHIQLf%2FjZtGkv5zCnGHpX3n5EGT%2FOXf89USzdIxqnjRs753l8Bw1FIdCuWAnMha7VjIMqgDXBjg7ize5RyVISjpjGcVSl6wEVYhWmvYhFTdJFUdKUX%2Fb882nScSeaIUod6vZVcguRMLe8q4EGOusBDYg%2FDjveOtPH5IggGCJr5AHOecvLa18yPGzRyfVHf5hJ9ELY7YMMyg6X1bIk6XcJWPqDKMXq3XMBrWeAERUysQ6aIKxD8yWxXFWb%2FTCI9DKK8KpCIELhnR7o6cb6xE%2FSdXUKUiJMvuegMCgqFpu6yR82%2FAXhQZoHpmwiljqw%2BZqkRVb9RuED1Iq2aCc1k6rEWJiIJGFipTeW7Xf2HDZr%2BchutVnTokr78%2FJ4n5%2Fm%2BY1OVs2Be1zn83nNTuPfp0GcdbsIUufd1CjGnMpRPPjYPv3LzLSxT0IkBbCG4lBUgaElXl1NILfZS6Ak4Q%3D%3D&amp;X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Date=20210215T213410Z&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Expires=300&amp;X-Amz-Credential=ASIAYZTTEKKE4FHQMYSL%2F20210215%2Fus-east-1%2Fs3%2Faws4_request&amp;X-Amz-Signature=d64a39330675e9363881f9ee9332b2622d1a7f83bc2c04d01ce3bad270d99fd7" target="_blank" rel="noreferrer noopener">sections 10–12</a> and <a href="https://ago-item-storage.s3.us-east-1.amazonaws.com/d47cfb70413c4b369bb334e4d7b3d797/GA5.pdf?X-Amz-Security-Token=IQoJb3JpZ2luX2VjEC0aCXVzLWVhc3QtMSJHMEUCIEBj2Tin1rLErh1eu%2FdIp4AkNKwXrMzdW%2FHofCVfcVRKAiEA081renwUUboTZAeS7X%2F6nQyqUogU6B8S%2BoZcNHEECLMqtAMINhAAGgw2MDQ3NTgxMDI2NjUiDMWNo7AnmgROY%2BBKkSqRA6JdqI4nC%2BKObji9xry6p4VuW9o6Z7edazV6JO0TeSOy8s%2FpikDIlwiOpy1AiTmWxyK%2BhCK7J9Jx%2BsUGTg%2FSwI%2BQiryh7tzvzMr2Bahl%2BbUZ4Uk0NnAVJTKc4Ag0LI2VhitiaY9iT%2BRWyJD5nh8l0TxtCV9XG1Yr2zeuim%2FVij%2Brfn2vDqguSy5IWUV7bzRej0gR4HV8gEOlK3cdswFbH9rBZKOjh6Eueqp0SOd7%2BZuFUXIBXZCRqw6ADxld%2BLZgV53l1vn0aAdGz5sIUdxiHB0uf13tVnAz5TthWcHp8GKJX9g7CayINkKADRft85MJ%2F6Y1kaYgGBGecn0m%2B3bKi4CzlmzXM2NNxDyYJW2YWoqo2pQ4Q%2B%2Fikso2ZzWd%2BFmEjOB6gKpaRR4cIForKUqMHqLUR7RksWGH7h%2FulyZwwWl6gYKqPNPCGVv8%2BVfSngLry%2F%2BsrlvQapZ5D6VjNcSi9F1LlEFXEEQmWi0F7Su6cf98oBExtk3FuOH56jJhGjgdftpnYesfAqL4PhDZNKOLbhE3MOPAq4EGOusBlQFlZ24vcVt3nODDh139JnHnsVTqNwHdOKRUSJRlwMKBsArFcAOrvEJpTmYHJZhnGRrr2ydYPB1c47scULlKLK%2BfApV3XQ6KTuUg4gwUO0jUmSYDF9pykytctbpJJpJJqPrH1ZhTx9zFwSKUD6YbNwsLbEhJgeiu6yhrm58LA9D%2F1lZMA%2B%2Bbk0we1o4YgefYP4ZZzcET7xx8LTX6PKWZErC38IDVyrJWZs9A6cgvw7nQSt68uey7SHX1yYDYcKcUcptacCj9xq%2BCqDGCgYUpgZAtS2XXDQN939FSBx0H%2F7wtSrTx6GUjtVkLSQ%3D%3D&amp;X-Amz-Algorithm=AWS4-HMAC-SHA256&amp;X-Amz-Date=20210215T213500Z&amp;X-Amz-SignedHeaders=host&amp;X-Amz-Expires=300&amp;X-Amz-Credential=ASIAYZTTEKKEZ75V2UL2%2F20210215%2Fus-east-1%2Fs3%2Faws4_request&amp;X-Amz-Signature=3ad1234f69187a3a2e04a4c13d7024b0adee62f2c66e7c183e73d1ae8a6a3ecb" target="_blank" rel="noreferrer noopener">section 13</a> (Dumbreck/Haggs/Titwood Rd junction).</p>



<p>The existing South West City Way is 2-way (bi-directional) with both lanes on one side of the road.  The extension would be the same but, instead of using kerbs as segregation, it would use black and white &#8216;cycle lane separators&#8217; (also known as zebras/orcas/armadillos). These had already been used on Archerhill Rd, Knightswood. Since then we&#8217;ve become more used to seeing them on many of Glasgow&#8217;s Spaces for People routes during 2020. </p>



<p>A <a href="https://www.gobike.org/wp-content/uploads/2021/02/GoBike-SWCW-extension-letter-290120.pdf" target="_blank" rel="noreferrer noopener">GoBike response to the SWCW extension plans</a> was sent to Glasgow City Council in late January 2020. It covered points about the choice of route, side road junctions, design elements, 2-way provision, speed limits and implementation. It also gave detailed feedback about parts of the route, especially junctions, like at Dumbreck/Haggs/Titwood Road at Pollok Park. </p>



<p>It&#8217;s not clear whether GoBike&#8217;s points have been taken on board or if designs have been amended. Nor is there any detail about when construction might start. However, it could mean GCC are trying to do some of it during March, before the end of Financial Year. There&#8217;s a consultation period for the TRO with a deadline of 7 March. See the GCC website at&nbsp;<a target="_blank" href="http://www.glasgow.gov.uk/proposedtro" rel="noreferrer noopener">www.glasgow.gov.uk/proposedtro</a>.</p>



<h4 class="wp-block-heading" id="one-five">1.5: Glasgow City Council –&nbsp;East City Way Phase 1 (London Drive to Daldowie Road) Order&nbsp;– Friday 12 March</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="263" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/GBMount_Vernon_Junction.jpg?resize=525%2C263&#038;ssl=1" alt="" class="wp-image-6371" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/GBMount_Vernon_Junction.jpg?resize=600%2C301&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/GBMount_Vernon_Junction.jpg?resize=300%2C150&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/GBMount_Vernon_Junction.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/09/GBMount_Vernon_Junction.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Consultation image of Mount Vernon junction (2018)</figcaption></figure>



<p>East City Way, Phase 1 had a consultation event over two years ago, as mentioned in a <a href="https://www.gobike.org/consultation-extra-glasgow-east-city-way-6349" target="_blank" rel="noreferrer noopener">Consultation Extra from October 2018</a>. Preparations for work to begin on the ECW weren&#8217;t announced until March 2020 and were then halted by the COVID-19 pandemic. However, <a href="https://www.gobike.org/wp-content/uploads/2021/02/TS-5125-M-000-P-014-ECW-Phase1-TRO.pdf" target="_blank" rel="noreferrer noopener">GoBike put in a response to the draft plans</a> shortly afterwards. Work eventually started near Mount Vernon station in late summer 2020 (after a <a href="https://www.glasgowtimes.co.uk/news/18665484.glasgow-councillor-slams-east-city-way-delays/" target="_blank" rel="noreferrer noopener">further delay which angered a local Tory councillor</a>). </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-in-prog_7667_1000px.jpg?resize=525%2C295&#038;ssl=1" alt="East City Way work in progress – London Road, Glasgow" class="wp-image-13258" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-in-prog_7667_1000px.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-in-prog_7667_1000px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-in-prog_7667_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Work in progress – East City Way on London Road, Glasgow <em>(December 2020 –&nbsp;still a wee bit to do!)</em></figcaption></figure>



<p>A new order from Glasgow City Council suggests Phase 1 might finally be completed soon. The TRO covers the section that&#8217;s been under construction between London Drive and Daldowie Road (next to the Dog&#8217;s Trust). An email to GoBike says: </p>



<p><em>&#8220;I now enclose a copy of the <a href="https://www.gobike.org/wp-content/uploads/2021/02/EastCityWay-Ph1-Advert-11-Feb-21.pdf" target="_blank" rel="noreferrer noopener">press notice</a> of the proposed Order, relevant <a href="https://www.gobike.org/wp-content/uploads/2021/02/TS-5125-M-000-P-014-ECW-Phase1-TRO.pdf" target="_blank" rel="noreferrer noopener">map</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/02/EastCityWay-Ph1-TRO-SOR.pdf" target="_blank" rel="noreferrer noopener">statement of reasons</a> and detailed <a href="https://www.gobike.org/wp-content/uploads/2021/02/ECW-Phase1-TRO-Report.pdf" target="_blank" rel="noreferrer noopener">report</a>.</em></p>



<p><em>Details of the proposals will also be available on the Glasgow City Council website at&nbsp;<a target="_blank" href="http://www.glasgow.gov.uk/proposedtro" rel="noreferrer noopener">www.glasgow.gov.uk/proposedtro</a>&nbsp;.&nbsp;</em></p>



<p><em>As stated in the attached documentation, any person wishing to object to the proposed Order should send details of the grounds for objection in writing to Group Manager, Technical Services, Neighbourhoods and Sustainability, Exchange House, 231 George&nbsp;Street, Glasgow, G1 1RX&nbsp;or email&nbsp;<strong>SustainableTransport@glasgow.gov.uk</strong>&nbsp;and it must be&nbsp;<strong>received</strong>&nbsp;by Friday 12th&nbsp;March 2021.&#8221;</em></p>



<p>Although it&#8217;s taken a long time, Phase 1 of the East City Way is welcome. It turns the former filter lane into 2-way bike lanes and should make the junction under the railway bridge safer for pedestrians as well as people cycling. While it&#8217;s a neat solution for the junction, it&#8217;s unfortunate that it doesn&#8217;t match up with the existing 1-way segregated lanes on Hamilton Rd. Some cyclists will have to cross over at the lights to continue their journey eastbound while others might choose to stay on the road all the way. </p>



<p>It remains to be seen if smooth new tarmac might tempt them into the cycle lane, away from London Road&#8217;s usual roughcast road surface. At the western end there are nearly 2 miles until you reach the Spaces for People lanes at the Shell petrol station. This stretch was traditionally a main route into Glasgow and had a higher speed limit to match. However, that is about to change…</p>



<h4 class="wp-block-heading" id="one-six">1.6: Glasgow City Council –&nbsp;London Road/Hamilton Road (30mph Speed Limit) Order – Friday 12 March</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-SfP-Aug2020_5709_1000px.jpg?resize=525%2C295&#038;ssl=1" alt="Spaces for People cycle lane, London Rd, Glasgow, August 2020" class="wp-image-13260" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-SfP-Aug2020_5709_1000px.jpg?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-SfP-Aug2020_5709_1000px.jpg?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/LondonRd-SfP-Aug2020_5709_1000px.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>A 40mph section of <em>London Rd</em>, at the eastern end of Spaces for People cycle lanes (August 2020)</figcaption></figure>



<p>Closely related to the previous item is this order to change the speed limit on a long stretch of London Rd and Hamilton Rd. Since the M74 extension was built, London Rd has become less well used as a trunk road (apart from on Celtic matchdays). The new limit starts near the Premier Inn on Hamilton Rd (A74/A721), goes past the Dog&#8217;s Trust and Mt Vernon then all the way along London Rd to join the current 30mph limit at Dewar&#8217;s distillery.  It&#8217;s a distance of about 3.5 miles on a very rough road surface that isn&#8217;t very cycling friendly. While it&#8217;s unlikely to become heaven for cycling any time soon, it is a step in the right direction. </p>



<p>GoBike received an almost identical message to the London Rd/Hamilton Rd one, above, so it&#8217;s not worth repeating. Here&#8217;s the <a href="https://www.gobike.org/wp-content/uploads/2021/02/LondonRd-Hamilton-Rd-Advert-11-Feb-21.pdf" target="_blank" rel="noreferrer noopener">30mph notice</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/02/TS-5125-M-000-P-013-30mph-Speed-Limit-TRO.pdf" target="_blank" rel="noreferrer noopener">30mph map</a>, <a href="https://www.gobike.org/wp-content/uploads/2021/02/LondonRd-HamiltonRd-TRO-Report.pdf" target="_blank" rel="noreferrer noopener">30mph report</a> and <a href="https://www.gobike.org/wp-content/uploads/2021/02/LondonRd_Hamilton-Rd-30mph-TRO-SOR.pdf" target="_blank" rel="noreferrer noopener">30mph Statement of Reasons</a>. </p>



<h3 class="wp-block-heading"><strong>Section 2: Forthcoming Consultations</strong></h3>



<h4 class="wp-block-heading" id="two-one">2.1: North Lanarkshire Council –&nbsp;Town Visions</h4>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="483" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Mwell-Town-Visions-sketch-2021-02-01.jpg?resize=525%2C483&#038;ssl=1" alt="Outline plan of future of Motherwell town centre" class="wp-image-13178" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Mwell-Town-Visions-sketch-2021-02-01.jpg?resize=600%2C552&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Mwell-Town-Visions-sketch-2021-02-01.jpg?resize=300%2C276&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2021/02/Mwell-Town-Visions-sketch-2021-02-01.jpg?w=1000&amp;ssl=1 1000w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Early plan for Motherwell town centre includes demolishing its shopping arcade and swimming pool</figcaption></figure>



<p>North Lanarkshire Council have been consulting about their town centres for a few years using various methods, including the <a rel="noreferrer noopener" href="https://www.placestandard.scot/" target="_blank">Place Standard tool</a>. During 2020, NLC rebranded these processes as &#8216;Town Visions&#8217;. This covers eight towns: Airdrie, Bellshill, Coatbridge, Cumbernauld, Kilsyth, Motherwell, Shotts and Wishaw. </p>



<p>The plans shown so far range from relatively minor changes in Shotts to demolishing large parts of Motherwell town centre and building a few new railway bridges (see image above). By the way, these are different ones to the <a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-local-issue-75-8-december-2020-12699#one-two" target="_blank">demolitions and new railway &#8216;underbridge&#8217; covered in Digest 75</a>. The main issue driving these is economic development, since there will be less retail in town centres in future, but active travel is part of the mix too.</p>



<p>NLC have been consulting with local stakeholders ahead of further public consultation due later in the year. See the <a rel="noreferrer noopener" href="http://www.ironsidefarrar.com/nlc/nlc-town-visions.html" target="_blank">Town Visions webpage</a> for links to PDFs of each current town plan. </p>



<h3 class="wp-block-heading"><strong>Section 3: Consultation Feedback</strong></h3>



<h4 class="wp-block-heading" id="three-one">3.1: Glasgow City Council – North Kelvin and North Woodside (Traffic Management &amp; Parking Controls) Order</h4>



<p>This order featured back in <a href="https://www.gobike.org/consultation-digest-issue-55-03-march-2020-gobike-asks-for-your-views-and-your-money-plus-much-much-more-10280" target="_blank" rel="noreferrer noopener">Digest 55 (Item 1.5)</a>. It covers a large area on the northern edge of the Woodside project featured above (Item 1.2) and west of Maryhill Rd. Along similar lines to previous schemes in Partick and other areas, it establishes a Restricted Parking Zone (RPZ). An RPZ marks car parking bays on roads throughout the area and charges for them both hourly through parking meters or annually through residents permits. However, all spaces are available on a &#8216;first come first served&#8217; basis. </p>



<p>GoBike had commented on the draft plans and a few amendments were made by the council. To refresh your memory of the plans, see: <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW_RPZ_Publication_Area_A.pdf" target="_blank">relevant map A</a>,&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW-RPZ-Publication-Area-B.pdf" target="_blank">relevant map B</a>,&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/NKNW-RPZ-Publication-Area-C.pdf" target="_blank">relevant map C</a>,&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/08.01-Statement-of-Reasons.pdf" target="_blank">statement of reasons</a>,&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/09.01-Draft-Report.pdf" target="_blank">detailed report</a> and <a rel="noreferrer noopener" href="https://www.gobike.org/wp-content/uploads/2020/03/09.02-Frequently-Asked-Questions.pdf" target="_blank">frequently asked questions (FAQs)</a>.</p>



<p>GoBike&#8217;s response to these RPZ proposals was sent on 24 March 2020. On 8 February 2021 we received a reply:</p>



<p><em>&#8220;I note your comments regarding end-on and angled bay parking. During the design phase of the project parallel parking bays were preferred over end-on and angled bays. Where possible we have aimed to avoid end-on and angled bays with only a minimal amount included within the plans. Unfortunately the Council cannot control driving behaviours and preferences when it comes to parking.</em></p>



<p><em>I can confirm that another team in the Council is working on sustainable transport and cycle projects within the area, and I will pass on your noted comments for their consideration.</em></p>



<p><em>Your comments will be considered and included within the final report which will inform the decision. Once a decision has been taken in regards to these proposals I shall write to you again and advise of the outcome.&#8221;</em></p>



<p>So, we can look forward to future correspondence on this one (on or before January 2022?). </p>



<h4 class="wp-block-heading" id="three-two">3.2: North Ayrshire Council –&nbsp;Ardrossan Connections</h4>



<p>GoBike have been sent a follow-up email after the initial Ardrossan Connections consultation finished earlier in the month. There&#8217;s an <a href="https://ardrossanconnections.commonplace.is/news/2021/02/05/recording-of-launch-event-and-first-workshop?utm_campaign=NewsPost&amp;utm_content=Launch+Event+recording+now+available" target="_blank" rel="noreferrer noopener">update on the project website</a>, including a recording of parts of the launch event (with automatic subtitles if you want a laugh). Further online consultation events are due in March.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">13179</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!</title>
		<link>https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 21 Jan 2020 16:00:32 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[fastlink]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[parks]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[side streets]]></category>
		<category><![CDATA[speed cushions]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9795</guid>

					<description><![CDATA[Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-52-21-january-2020-byres-road-back-in-the-news-plus-glasgow-takes-an-alphabetical-approach-to-traffic-calming-9795" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 52, 21 January 2020: Byres Road back in the news plus Glasgow takes an alphabetical approach to traffic calming!"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Quite a bumper bundle for you today, but 2 of our significant concerns have raised their heads again. Firstly, side roads on cycle lanes &#8211; we need cycle lanes to continue across side roads, just as in the feature photo with this Digest. If a child in the Netherlands is able to cycle safely across a side road, a child in Glasgow should be able to too. Secondly, contraflow cycling &#8211; when cars are going too fast or more on-road parking is needed the first line of response is to make a street one-way, even for bikes. What have we done wrong? Why should we have to make big detours? Do read on for the details of all the current issues.</p>



<span id="more-9795"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</li><li>**NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</li><li>**NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</li><li> **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February </li><li> **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>**NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</li><li>**NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no contraflow, closes 14 February</li><li>Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </li><li> Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February </li><li> Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February</li><li> **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li> Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</li><li>Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 February</li><li> Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</li><li>Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns. </li><li>Glasgow, Duror Street, Traffic Calming, GCC response to our concerns </li><li>Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month </li><li>Glasgow, Connecting Woodside Update, with news of new Facebook page</li><li>Glasgow Avenues project, George Square and Blythswood Square. </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<h6 class="wp-block-heading">1.1 **NEW** Scottish Government propose to build &#8220;spaghetti junction&#8221; at Sheriffhall Roundabout on the A720, Edinburgh Bypass, closes 31 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=525%2C274&#038;ssl=1" alt="" class="wp-image-9833" width="525" height="274" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?w=540&amp;ssl=1 540w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sheriffhall-Roundabout.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s a message that has been put out by Alison Johnstone, MSP (Green Party), which is pretty clear and self-explanatory. New road construction means less money to build cycle lanes. Please respond.</p>



<p>&#8220;T<em>he  Government look set to spend £120 million on a new spaghetti junction  on              Edinburgh’s bypass. We can stop them though. Government are  consulting on the new junction now. </em><a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Please take a second to object</em></a><em>  and ask them to invest these funds into   public transport and bike lanes  instead. We can’t just keep on pouring public money      into building new  roads like there is no climate emergency.</em><br><br> <a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><strong><em>Take action now</em></strong></a><em><br> &nbsp;<br> By their own admission, the Government expects this scheme to  increase traffic by 5%. Across the world we’ve learnt that if you build  more road capacity it just fills with more cars and causes more  pollution.</em> <br><br> <em>But the same is true with the alternatives. Invest in public  transport, and the buses,       trains and trams fill up. Build cycle lanes,  and people get on their bikes.</em> <br><br> <em>Business as usual is killing the planet, and it’s time for change.  The Government             declared a climate emergency. Sheriffhall spagetthi  junction is the first test of               whether they mean it.</em> <br><br> <em>Lets make this clear and flood them with objections. </em><a href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682"><em>Please take action and share the campaign now</em></a><em>.</em> <br><br> <em>Yours<br> &nbsp;<br> Alison Johnstone, Scottish Green MSP for Lothian </em> <br><br> <a rel="noreferrer noopener" href="https://members.greens.scot//srv/members/public/sites/all/modules/civicrm/extern/url.php?u=9862&amp;qid=6283682" target="_blank"><em>Take Action Now&nbsp;</em></a> &#8220;</p>



<h6 class="wp-block-heading">1.2 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This has been mentioned once or twice already,  Item 1.13 in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>&nbsp;gave the details for this on-line consultation, do please respond before it closes. Here’s the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>&nbsp;to the City Council’s consultation page where you have to scroll down to find this one. </p>



<p>The survey is quite short, so won&#8217;t take you long to do &#8211; and do try to ignore all the &#8220;typos&#8221; in the information in the Council&#8217;s consultation information!</p>



<p>While this isn&#8217;t one of the city&#8217;s radial routes, which are so important, a good cycle route out to Pollok Park from the city centre should get people to take to their bikes. You might wish to question why the route is two-way on one side of the road rather than 2 lanes, one each side? Another concern is cycle priority at side roads &#8211; including all the driveways!</p>



<h6 class="wp-block-heading">1.3 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation period now extended to 03 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>There&#8217;s no reason given as to why this consultation is being extended but here&#8217;s the email that we got on 07 January:</p>



<p>&#8220;<em>Dear All,<br><br>Firstly, we would like to thank all of you who have already provided responses to the consultation. <br><br>Many  of you have also been in contact to request more time to complete your  responses. We are happy to announce an extension to the consultation  period. &nbsp;<br><br></em><strong><em>We now invite you to respond to the paper by 3 February 2020</em></strong><em>. </em><br><br><em>Our  online portal for submitting responses will remain open until midnight  on this date but we also welcome input in any format. Attached is a word  version of the online  portal &#8211; please feel free to use this form if you prefer. &nbsp;<br><br>The consultation paper, summary and more details on how to respond are available on our project page at </em><a href="https://www.lawcom.gov.uk/project/automated-vehicles/"><em>https://www.lawcom.gov.uk/project/automated-vehicles/</em></a><em>&nbsp;<br><br>Yours sincerely,<br><br>Automated Vehicles Team – Law Commissions</em>&#8220;</p>



<p>Note that the word version of the online portal is not given here. GoBike uses WordPress for its website and this does not permit the uploading of word documents. If you wish to have the word version please request one direct or email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a></p>



<p>Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter of response</a> that GoBike sent in on 06 January. Be afraid, very afraid!</p>



<h6 class="wp-block-heading">1.4  **NEW** Glasgow Avenues – Your Avenues Consultation, on-line, closes 09 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9834" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Glassford-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Glassford Street</figcaption></figure>



<p>The Avenues programme has been quiet for a while but here&#8217;s a recent email that we received last week, headed &#8220;Glasgow Avenues: Glassford Street and Stockwell Street Online and On Street Consultations&#8221;:</p>



<p> &#8220;<em>On 16 Jan 2020, at 19:56, Avenues &lt;</em><a rel="noreferrer noopener" href="mailto:avenues@ironsidefarrar.com" target="_blank"><em>avenues@ironsidefarrar.com</em></a><em>&gt; wrote: <br><br></em><strong><em>Glasgow Avenues – Your Avenues Consultation</em></strong><em><br></em><br><em>A multi-disciplinary design team led by Ironside  Farrar Ltd has been appointed to deliver the second phase (“Block B”) of  the Glasgow Avenues programme which will invest £115m in the public  realm of the City Centre in the next few years,  introducing a network of connected ‘green’ routes across Glasgow’s city  centre.&nbsp; <br><br>Block B includes </em><strong><em>Stockwell Street</em></strong><em>&nbsp;and </em><strong><em>Glassford Street</em></strong><em> Avenues.<br><br>The Design Team are seeking to consult with you &#8211;  local residents, businesses and stakeholders &#8211;&nbsp; on the draft proposals  for these two streets in the following 3 ways:<br><br>1. You are invited to view and comment on the concept designs online at: </em><a href="http://www.glasgow.gov.uk/avenues"><strong><em>www.glasgow.gov.uk/avenues</em></strong></a><br><br><em>2. Complete the Scottish Government ‘Place Standard’ tool online at: &nbsp;</em><a href="http://www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street"><strong><em>www.placestandard.scot/start/glasgow-avenues-glassford-street-stockwell-street</em></strong></a><em>,  helping us understand your perception of the street as it is today. <br><br>3. Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.<br><br>Please feel free to forward this email to other  parties who may be interested in getting involved.&nbsp; The online  consultation is open until 9</em><sup><em>th</em></sup><em> February 2020.<br><br>Thanks in advance for your assistance. <br><br>Kind Regards,<br><br></em><strong><em>Charlie Griffiths</em></strong><em>&#8220;</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9835" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Stockwell-Street.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption>Stockwell Street</figcaption></figure>



<p>From point 1, clicking on the link will get you to the City Council&#8217;s Avenues page. Click on the down arrow at Consultations and then on &#8220;here&#8221; under &#8220;Current Consultation&#8221;.</p>



<p>Or you can  try this quick link:  <a rel="noreferrer noopener" aria-label="link:https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959 (opens in a new tab)" href="https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959" target="_blank">https://glasgowgis.maps.arcgis.com/apps/MapJournal/index.html?appid=94c1feae990244afb5650b928f14c959</a></p>



<p>The questionnaire for point 2 is quite curious &#8211; very generic, but you will be able to comment on the dominance of the motor vehicle, particularly with respect to the large areas on Stockwell Street given over to car parking. Why aren&#8217;t they proper parks, with trees and grass and somewhere to sit?</p>



<p>We&#8217;ve been told that the consultants have 2 rickshaws that will be moving about but do look for them at the Argyle Street precinct or further south at the car park area. If you go, do please have your bike with you, or your children, or ageing aunt in a wheelchair &#8211; anything to demonstrate that we should have priority over all the cars in the area.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Ardencraig Road Traffic Calming Scheme, closes 11 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="218" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=525%2C218&#038;ssl=1" alt="" class="wp-image-9909" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=300%2C125&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?resize=600%2C249&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-map-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>The northern part of Ardencraig Road , near Miller Primary School, is proposed for traffic calming</figcaption></figure>



<p>Glasgow City Council now seem to have an alphabetical approach to traffic calming with this and the next 2 schemes that have arrived in the Consultations mailbox this very morning, 21 January. Here is the email and attachments for the first, Ardencraig Road in Castlemilk:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br></em><br><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Ardencraig Road)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong> <br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. </em><br><br><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-<br></em><br><strong>Ardencraig Road</strong><em><br><br>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li><em>3 sets of 3, 1.9m, 75mm high, speed cushions, </em></li><li><em> 3 sets of 2, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions</em>.</li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>.  <br><br>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br><br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the attached documents: <a rel="noreferrer noopener" aria-label="Proposals (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals.pdf" target="_blank">Proposals</a>, <a rel="noreferrer noopener" aria-label="Proposals Section 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-1-From-number-76-to-number-38.pdf" target="_blank">Proposals Section 1</a> and <a rel="noreferrer noopener" aria-label="Proposals Section 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.75-Ardencraig-Road-TC-proposals-Section-2.pdf" target="_blank">Proposals Section 2</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9910" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Ardencraig-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>It&#8217;s the standard approach to high traffic speeds, yet again, by the City Council, which is now proclaiming itself as &#8220;<strong>Glasgow &#8211; proud host of the 26th&nbsp;UN Climate Change Conference (COP26) &#8211; UK2020</strong>&#8221; but where are the cycle lanes to the school?</p>



<h6 class="wp-block-heading">1.6  **NEW** Glasgow, Bankfoot Road and Wedderlea Drive Traffic Calming Scheme,  closes 11 February  </h6>



<p>Moving on to &#8220;B&#8221; and north-west to Cardonald, here&#8217;s the email from earlier today, 21 January, for these 2 residential roads:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Bankfoot Road and Wedderlea Drive)</em></strong><em>, </em><strong><em>Traffic Calming Scheme </em></strong><br><br><em>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme<br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Bankfoot Road</em></strong></li><li><em> </em><strong><em>Wedderlea Drive</em></strong></li></ul>



<p> <em>Details of the proposed Scheme<br> The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>6 sets of 3, 1.8m, 75mm high, speed cushions, </em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br>Please reply directly to <a href="mailto:LandServices.Mailroom@glasgow.gov.uk">LandServices.Mailroom@glasgow.gov.uk</a>.<br><br><em>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant Jordan  Tracey on 0141 287 9173.<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully</em>&#8221; etc</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="221" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=525%2C221&#038;ssl=1" alt="" class="wp-image-9916" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=300%2C126&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?resize=600%2C252&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Bankfoot-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Bankfoot Road, looking north from Paisley Road West</figcaption></figure>



<p>Here&#8217;s one of the feeder roads on to the cycle lanes we so desperately need on Paisley Road West if we are to achieve the modal split required to save the world. Not many, sorry, not any, apologies for not reaching the target, the aim, no sorry, just an aspiration of 10% of journeys by bike this year, were there? Let&#8217;s look to doing better this decade.</p>



<h6 class="wp-block-heading">1.7   **NEW** Glasgow, Castlemilk Drive Traffic Calming Scheme, closes 11 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9912" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>On that long Castlemilk Drive (singing along to <a rel="noreferrer noopener" aria-label="Devil Gate Drive (opens in a new tab)" href="https://www.youtube.com/watch?v=9vFTksaposs" target="_blank">Devil Gate Drive</a>, a classic from Suzy Q!), struggling up to, or coasting down from, the top of the hill and the countryside of South Lanarkshire, motorists are going too fast and so we must suffer yet more speed cushions. Why can&#8217;t such concerns be declared as public realm schemes and then we might get cycle lanes, giving us enough room to wobble up the hill without danger of being clipped by a close-passing motor vehicle? However, money is tight and the COP26 delegates won&#8217;t be encouraged to visit Castlemilk, so we will be stuck with another rash of speed cushions. Here&#8217;s the email received from the City Council today, 21 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Castlemilk Drive)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation. <br><br></em><strong><em>Please note that these proposals have also been released to the public by displaying on-street notices within the affected area.</em></strong><em><br><br>Background to the proposed Scheme</em><br><em>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br>The list of roads affected by these proposals are:-</em></p>



<ul class="wp-block-list"><li> <strong><em>Castlemilk Drive</em></strong></li></ul>



<p><em>Details of the proposed Scheme<br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>4 sets of 3, 1.9m, 75mm high speed cushions. </em></li><li><em> The installation of bollards beside the proposed speed cushions</em></li></ul>



<p><em> Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 11 February 2020)</em></strong><em>. </em><br><br><em>Please reply directly to </em><a href="mailto:LandServices.Mailroom@glasgow.gov.uk"><em>LandServices.Mailroom@glasgow.gov.uk</em></a><em>.<br>In  the meantime, should you require any further information or  clarification on any points arising from the proposals, do not hesitate  to contact my assistant (name and phone number removed by GoBike).<br><br>Should the Council proceed with these proposals; I will write to you again and confirm this.<br><br>Yours faithfully&#8221;, </em>etc</p>



<p>Here&#8217;s the plan showing the proposed speed cushions: <a href="https://www.gobike.org/wp-content/uploads/2020/01/RS.19.79-Castlemilk-Drive-TC-proposals-Full-view-of-proposals.pdf" target="_blank" rel="noreferrer noopener" aria-label="Castlemilk Drive plan (opens in a new tab)">Castlemilk Drive plan</a></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9913" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Castlemilk-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Note the active-travel friendly parking! GoBike will applaud the aim, but not the method, of reducing traffic speeds here.</p>



<h6 class="wp-block-heading">1.8 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p> This consultation featured in&nbsp;<a rel="noreferrer noopener" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council’s consultation page. This consultation is the second item on page 1. We hope to have the GoBike response in our next Digest.</p>



<p>Note that the area it covers is bounded on the south-east by Glassford Street and Stockwell Street.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, South Side Car Club Traffic Regulation Order, closes 14 February</h6>



<p><br>Here&#8217;s a consultation that GoBike responded to at Stage One &#8211; details further on &#8211; but this is the email for the public consultation that we received on 16 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF SUSTAINABILITY AND TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(SOUTH SIDE CAR CLUB) ORDER 202_</em></strong><em><br><br>Further to my consultation email of 3</em><sup><em>rd</em></sup><em> December 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose  a copy of the press notice of the proposed Order, relevant drawings, statement of reasons and detailed report.<br><br>The  location proposed for Queen Elizabeth Gardens has been removed from  this order and will be included in a future parking control order for  the area.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><strong><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a></strong><em> <br><br>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing  to Group Manager, Sustainable Transport, Neighbourhoods and  Sustainability, Exchange House, 231 George Street, Glasgow, G! 1RX or by  e-mail to </em><strong><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a></strong><em> by Friday 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully,</em>&#8221; etc</p>



<p>Here are the documents referred to in the email above: <a rel="noreferrer noopener" aria-label="Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-CarClub-Consultation-advert-160120.pdf" target="_blank">Advert</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-Car-Club-TRO-Report-Jan-2020.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/South-Side-CarClub-TRO-SOR_Jan2020.pdf" target="_blank">Statement of Reasons</a>, <a rel="noreferrer noopener" aria-label="Allison Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-001_Allison-St.pdf" target="_blank">Allison Street plan</a>, <a rel="noreferrer noopener" aria-label="Paisley Road West plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-003_PRW.pdf" target="_blank">Paisley Road West plan</a>, <a rel="noreferrer noopener" aria-label="Torrisdale Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-004_Torrisdale.pdf" target="_blank">Torrisdale Street plan</a>, <a rel="noreferrer noopener" aria-label="Kenmure Street plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-005_Kenmuir.pdf" target="_blank">Kenmure Street plan</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/TS-5048-M-000-P-006-Albert-1.pdf" target="_blank" rel="noreferrer noopener" aria-label="Albert Drive plan (opens in a new tab)">Albert Drive plan</a>.</p>



<p>At Stage One we were given this information by email:</p>



<p>&#8220;<em>Background to the proposed Order<br> This  order is proposed to provide car club and electric parking on the south  side at the locations below in line with the Council’s policy for  sustainable transport and emission reductions.<br><br>Area affected by the proposed Order<br>The area is the south side of the city.<br><br>Details of the proposed Order<br>The order proposes the following restrictions as shown on the attached drawings:</em></p>



<ul class="wp-block-list"><li> <em>Electric charging and car club bays on Alison Street east of Langside Road.</em></li><li><em> Electric charging and car club bays on Queen Elizabeth Gardens north of Old Rutherglen Road.</em></li><li><em> Electric charging and car club bays on Paisley Road West at Cessnock Street.</em></li><li><em> Electric charging and car club bays on Torrisdale Street west of Victoria Road.</em></li><li><em> Electric charging and car club bays on Kenmuir Street north of Albert Drive.</em></li><li><em> Electric charging and car club bays on Albert Avenue north of Queens Drive.</em>&#8220;</li></ul>



<p>You will see that Queen Elizabeth Gardens in the Gorbals has been removed at the Public Consultation stage, presumably because of local lobbying but GoBike objected, see <a rel="noreferrer noopener" aria-label="this letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-South-Side-Car-Club-letter-121219.pdf" target="_blank">this letter</a>, to the inclusion of Paisley Road West. Paisley Road West is a major arterial road connecting the city centre to the outskirts and one of the most heavily cycled roads into the city; kerbside parking obstructs the construction of the cycle lanes we desperately need on this route if we are to meet climate change targets. We have had no response from the City Council to this well-argued letter written by one of our members.</p>



<p>GoBike will be responding to this public consultation but if you support our views do please write in to comment or object to the proposals.</p>



<h6 class="wp-block-heading">1.10 **NEW** Glasgow, Carmunnock Road Service Road, TRO, One-Way with no, or perhaps with, contraflow, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="243" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=525%2C243&#038;ssl=1" alt="" class="wp-image-9862" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=300%2C139&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Carmunnock-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>The service road is a residential and shopping side road to the busy Carmunnock Road and at the Stage One consultation GoBike was told that &#8220;<em>The Council have been made aware of road safety issues with the existing two-way traffic flow on Carmunnock Road  (Service Road).&nbsp; Therefore, a  questionnaire was posted to the nearby residents to find out if they  supported the introduction of a proposed one way system.&nbsp; The results of  the returned survey were 23 in favour of the  proposals and 6 against.&#8221; </em><br>In its <a rel="noreferrer noopener" aria-label="response (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Carmunnock-Road-Stage-One-letter-100120.pdf" target="_blank">response</a>, GoBike argued strongly that cycling must be exempt from the one-way order. Since receiving the Public Consultation email below, GoBike has emailed the City Council for an answer to the one-way question. However, we now note, from the Detailed Report issued with this public consultation that improved safety may be achieved by &#8221; <em>Providing a single directional route for vehicular travel</em>.&#8221; Note the use of the word &#8220;vehicular&#8221;, which would not normally include cycles?</p>



<p>Here&#8217;s the Public Consultation email received on 17 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (CARMUNNOCK ROAD (SERVICE ROAD))</em></strong><em>, </em><strong><em>(TRAFFIC REGULATION) ORDER 20__ </em></strong><em><br><br>Further to my consultation email of 6</em><sup><em>th</em></sup><em>  December 2019 regarding the above named Traffic Regulation Order, and  in accordance with statutory procedures, I now enclose a copy of the  press  notice of the proposed Order, relevant map, statement of reasons,  detailed report.</em><br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person  wishing to object to the proposed Order should send details of the  grounds for objection in writing to Kevin Hamilton, Head of Roads  Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 14</em><sup><em>th</em></sup><em> February 2020.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/NoticeOfProposals-CarmunnockRoad-ServiceRoad-190x114mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Carmunnock_Road_-_Plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/08.01-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/09.01-Draft-Report.pdf" target="_blank" rel="noreferrer noopener" aria-label="Detailed Report (opens in a new tab)">Detailed Report</a>.</p>



<h6 class="wp-block-heading">1.11 Glasgow, Byres Road, Byres Road  Traffic Management and Parking Controls, includes cycle lanes, closes 14 February </h6>



<p>You may be aware that we responded last autumn to the Stage One consultation concerning the proposed cycle lanes on Byres Road and submitted detailed questions related to the design of the cycle lanes. A major concern is about side road junctions where, to us, it&#8217;s obvious that all traffic (motor, cycle, pedestrian) has priority over traffic into and out of side roads. Unfortunately, the City Council appears to take a different view. <br><br><br>We informed you in Digest 51 that the 3 TROs for Byres Road had just been published but full details from the City Council arrived just too late for inclusion in that Digest. </p>



<p>Here&#8217;s the email that we received on 06 January, with almost no detail of the cycle lane design:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>(BYRES ROAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>ByresRoadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Road-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P-5114-0000-Byres-Road-TRO.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Draft-Report.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-TRO.pdf" target="_blank">FAQs</a></p>



<p>Some of our members are busy writing our response and our concern at the lack of information on the cycle lane design has been voiced to the City Council.</p>



<h6 class="wp-block-heading">1.12  Glasgow, Byres Road, 20mph Speed Limit Zone, closes 14 February  </h6>



<p><br>GoBike supports 20mph speed limits in our towns and cities and Byres Road is no exception. We supported this proposal at the Stage One consultation in the autumn and no doubt we will support it now.</p>



<p>Here&#8217;s the email we received on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (BYRES ROAD)</em></strong><em> </em><strong><em>(20MPH SPEED LIMIT ZONE) ORDER 20_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs</em>.<br><br><em>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:ByresRoad20MPH@glasgow.gov.uk"><em>ByresRoad20MPH@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Here are the documents referred to: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Byres-Rd-20Mph-Zone-Advert.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/P5114-101-Byres-Road-20MPH.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Draft-Report-Byres20MPH.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Byres20MPH.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Byres-Rd-20MPH.pdf" target="_blank">FAQs</a>.</p>



<p>The FAQs are certainly not directed at those of us keen on active travel; here&#8217;s one Q and A:<br>&#8220;<em>Can I park / load in the cycle lanes?<br>  Parking / Loading from the cycle lanes is not permitted</em>&#8220;<br>Yes, the motor driver is still seen as the main customer &#8211; the the FAQs are the same for all 3 TROs.</p>



<h6 class="wp-block-heading">1.13  Glasgow, Byres Road, Hillhead Traffic Management and Parking Controls, closes 14 February </h6>



<p>Car parking on the streets around Byres Road is not normally a major concern for most of us in GoBike, but if you live in Hillhead you might have a different view or particular concern about this proposal? If so, do email <a rel="noreferrer noopener" aria-label="consultations@gobike.org (opens in a new tab)" href="consultations@gobike.org" target="_blank">consultations@gobike.org</a> and we can include it in our response. <br>Points we have noted so far include the introduction of a second car parking permit per household (why should that be introduced in a city that&#8217;s trying to reduce car ownership, reduce pollution and will be hosting COP26 in November?) and the ridiculously cheap parking charges (even if they are the same across the city). Surely parking charges should be at least the cost of a return ticket on the Subway or bus and not just 80p per hour? <br>Here&#8217;s the email received from the City Council on 06 January:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL (HILLHEAD)</em></strong><em> </em><strong><em>(TRAFFIC MANAGEMENT AND PARKING CONTROLS) ORDER 20_</em></strong><br><br><em>Further to my consultation email of 28</em><sup><em>th </em></sup><em>October  2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons,  detailed report and FAQs.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp;<br><br>As stated in the attached documentation, any  person wishing to object to the proposed Order should send details of  the grounds for objection in writing to Christine Francis, Head of  Technical Services or by e-mail to </em><a href="mailto:HillheadTRO@glasgow.gov.uk"><em>HillheadTRO@glasgow.gov.uk</em></a><em> by Friday 14 February 2020<br><br>Yours faithfully</em>&#8221; etc</p>



<p>The attached documents are here: <a rel="noreferrer noopener" aria-label="Press Advert (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Advert-Hillhead-TRO.pdf" target="_blank">Press Advert</a>, <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Hillhead-TRO-Publication-plan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Report-Hillhead-TRO.pdf" target="_blank">Report</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/Statement-of-Reasons-Hillhead-TRO.pdf" target="_blank">Statement of Reasons</a> and <a href="https://www.gobike.org/wp-content/uploads/2020/01/FAQs-Hillhead-TRO.pdf" target="_blank" rel="noreferrer noopener" aria-label="FAQs (opens in a new tab)">FAQs</a>.</p>



<p>This information was included in the Stage One email, but there is far more information within the Report: <br><br>&#8220;<em>Background to the proposed Order<br>The  proposal is to amend the existing Hillhead parking controls from a  Controlled Parking Zone (CPZ) to a Restricted Parking Zone (RPZ).<br>RPZs  are indicated by zone entry signs which have a no waiting roundel to  inform that no waiting is permitted at any time outwith the bays. The  zone entry signs tell you to “park only in signed bays” with a no  waiting roundel which means no waiting at any time. This is the  restriction which applies outwith all the marked bays.<br>This  order will propose the conversion of “residents only” parking bays to  “shared use” bays in order to bring the parking regime in Hillhead into  line with other residential areas within the west-end.&nbsp;Whilst all bays  will become “shared use”, residents will be able to acquire a second  personal permit and visitor permits, fees will be in line with other  zones. Permits will also be usable in adjacent zones. The order will  also include proposals to pedestrianise Ashton Lane / Great George Lane  with service access limited to specific times and controlled by  drop-bollards. Residential access to the rear of Ashton Road will be  maintained. Cresswell Lane will remain pedestrianised.</em>&#8220;</p>



<p>The private car is still at the top of the transport tree, it seems.</p>



<h6 class="wp-block-heading">1.14  **NEW** Scottish Government, Housing to 2040: consultation on outline policy options, closes 28 February</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike member, Emily, alerted us to this consultation, which has a question on &#8220;Do you have any proposals that would improve the <strong>space around our homes</strong> and promote connected places and vibrant communities?&#8221; and the &#8216;vision&#8217; and background refer to lots of relevant stuff about connectivity, walking and cycling, vibrant local areas, climate emergency, air pollution, etc.</p>



<p>Here&#8217;s the link:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/" target="_blank">https://www.gov.scot/publications/housing-2040-consultation-outline-policy-options/pages/3/</a> </p>



<p>Do have a look and let&#8217;s get lots of responses in that mention cycling and active travel.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Glasgow, South West City Way, St Andrews Drive extension, consultation event TOMORROW, 22 January</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" width="525" height="245" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Going hand in hand with Item 1.2 above, the on-line consultation on the SWCW extension along St Andrew&#8217;s Drive, is this public consultation event tomorrow, Wednesday 22 January at  St Albert’s Primary School, 36 Maxwell Drive from 3:30 to 7pm. You may see details of the proposals at this&nbsp;<a rel="noreferrer noopener" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>. Do try and get to the event if you can; there will be the opportunity to speak to the staff involved about the proposals.</p>



<h6 class="wp-block-heading">2.2 Glasgow Avenues, <strong>Stockwell Street</strong>&nbsp;and <strong>Glassford Street</strong> Avenue, 25 January</h6>



<p>Mentioned in Item 1.4 above, is this on-street, meet the people event:</p>



<p>&#8220;<em>Drop-in to our on-street consultation: look out for out friendly </em><strong><em>rickshaw displays on Saturday 25</em><sup><em>th</em></sup><em> January</em></strong><em>, where staff will be on hand to discuss the emerging design thinking and to record your opinion on the concept designs.</em>&#8220;</p>



<p>We don&#8217;t have any more information but it should be quite easy to spot one or other of the 2 rickshaws that the consultants will have. If you are in the town, do look out for the displays; check out the area at the end of the Argyle Street precinct or the car park areas on Stockwell Street.</p>



<h6 class="wp-block-heading">2.3  Glasgow, Transforming Pollok Country Park &#8211; Public Meeting, 04 February </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/burrell-collection-pollok-park.jpg?w=525&#038;ssl=1" alt="" class="wp-image-7330"/></figure>



<p>On 17 January GoBike received this email from The Transforming Pollok Country Park Project Team within Glasgow Life:</p>



<p>&#8220;<em>Hello, <br><br>Following  previous consultation events, Glasgow City Council and Glasgow Life  would like to invite you to a public meeting on the access proposals  being developed for Pollok Country Park, as  part of the Transforming Pollok Country Park project. <br><br>The  purpose of this meeting is to share the proposals, summarise recent  changes in response to feedback from previous consultations, and outline  current progress ahead of a formal planning submission  later in February 2020. <br><br></em><strong><em>Transforming Pollok Country Park</em></strong><br><br><strong><em>Public Meeting </em></strong><em><br><br></em><strong><em>Tuesday 4 February, 6.30–7.45pm </em></strong><em><br><br></em><strong><em>at Pollokshaws Burgh Hall,</em></strong><em> </em><strong><em>Pollokshaws Road, G43 1NE</em></strong><em><br><br>The meeting will include a presentation lasting up to 45 minutes followed by up to 30 minutes for questions.<br><br>We hope you can join us. If you’re unable to attend but would like to find out more, please email us at </em><a href="mailto:PollokCountryParkTransformation@glasgowlife.org.uk"><em>PollokCountryParkTransformation@glasgowlife.org.uk</em></a><em>. <br><br>Kind regards,  <br>The Transforming Pollok Country Park Project Team&#8221;</em></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Fastlink Route, (Finnieston Bridge to Whitefield Road) Order 2015, Amendment No.1 20__, acknowledgement of GoBike objection</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p><br><br>Our objection to the proposal to allow taxis and authorised vehicles to use the bus and cycle lanes on this bridge was published in <a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank" rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)">Digest 50</a>, Item 1.2 We received this acknowledgement on 07 January:</p>



<p><br>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Tricia Fort<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>I  am writing to confirm receipt of your correspondence regarding the  above named Traffic Regulation Order. Following the publication period,  officers  shall commence an analysis of all correspondence received and issue you  with a considered response in due course. <br><br>Please  note that timescales for preparing and distributing a considered  response can be influenced by the quantity and nature of correspondence  received.<br><br>Yours faithfully</em>&#8221; etc</p>



<p>Let&#8217;s hope they are rethinking the proposal, especially since it is so close to the site of the COP26 Conference in November.</p>



<h6 class="wp-block-heading">3.2 Glasgow, Ashgill Road Traffic Calming, GCC response to our concerns.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="224" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=525%2C224&#038;ssl=1" alt="" class="wp-image-9628" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 3.10 Our <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a>, sent in on 18 December, raised concerns that the GCC response to speeding on this wide road in the north of the city was to yet again install speed cushions with no thought to narrowing the road with cycle lanes etc. Note that no Traffic Regulation Order is required for the installation of speed cushions. The City Council response to our letter, with this email of 08 January, is illuminating as to how the Council currently operates:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY, GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort<br><br>Thank you for your undernoted enquiry.<br><br>Whilst  I appreciate your concerns regarding Ashgill Road not being included as  part of the city’s cycle  network, I can advise that this section is focused on reducing injury  accidents throughout the city. The council has limited funding and  resources available to implement traffic calming schemes and in order to  make sure these resources are directed at the  locations with the greatest potential for casualty reduction, a site  risk assessment is undertaken for each request. This process assesses  the location against criteria including the history of injury accidents,  measured vehicle speeds and the presence of  any local amenities such as being close to a nearby school or nursery</em><br><br><em>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions, however, in this instance we would  consider that the road bends at this location also act as traffic  calming features.<br><br>Whilst  I appreciate that drivers may accelerate and brake between each set of  cushions, the Council are currently seeking to implement mandatory 20mph  city-wide  speed limit restrictions on appropriate roads. Should the restrictions  be introduced, a reduction in the permitted speed limit would encourage  drivers to maintain a reduced speed whilst negotiating speed cushions or  any other form of traffic calming feature.</em><br><br><em>I trust the above information is of assistance, however, should you require any further information please contact (name and phone number removed by GoBike).</em></p>



<h6 class="wp-block-heading">3.3 Glasgow, Duror Street, Traffic Calming, GCC response to our concerns</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="223" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=525%2C223&#038;ssl=1" alt="" class="wp-image-9637" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Again, this consultation was detailed in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, item 3.13 and we submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> on 18 December. To reduce speeding by motor vehicles on this wide road in the east of the city it seems to be a reasonable suggestion to stop most through motor traffic with a filter to allow only buses (and emergency vehicles) and bikes through but here&#8217;s the reply that we received on 10 January. Note that the installation of speed cushions does not require a traffic regulation order and that a filter, of the type we propose, ie one with rising bollards or similar, would not prevent residents accessing either side of that filter:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF MICHAEL BRADY</em></strong><em>, </em><strong><em>GROUP MANAGER – TRAFFIC AND ROAD SAFETY</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br>Thank you for your undernoted enquiry.<br><br>I can advise that the introduction of a bus/cycle gate would require the Council to successfully promote a Traffic Regulation Order (TRO). The  legal  process of promoting a TRO is subject to formal consultation and public  advertisement, is open to objection and can take in excess of 12 months  to complete. The promotion of such an order also requires the support  of emergency services and various other road  user groups. It is highly likely that the introduction of a bus/cycle  gate on Duror Street would lead to objections from local residents as  they would be unable to park near to their properties. In view of the  foregoing, there are no plans at present for a  bus/cycle gate to be introduced at this location.<br><br>I  can advise that the Local Transport Note for Traffic Calming (LTN  1/07), which gives guidance on the design, effectiveness and  installation of traffic calming  measures, states that “Distances between cushions, or cushions and the  kerb, should not generally exceed 1200mm, with 1000mm as an ideal  maximum. These dimensions are designed to deter drivers of small  vehicles from attempting to drive in the gap.” The Local  Transport Note also recommends a maximum spacing distance of 70 metres  between each set of speed cushions and this recommendation has been  adhered to in the design of this traffic calming proposal.<br><br>I trust the above information is of assistance, however, should you require any further information please contact</em>&#8221; (name and phone number removed by GoBike)</p>



<h6 class="wp-block-heading">3.4 Glasgow, construction of Sighthill pedestrian/cycle bridge to start next month</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="340" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=525%2C340&#038;ssl=1" alt="" class="wp-image-9825" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=300%2C194&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Sighthill-Bridge.jpg?resize=600%2C389&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike has responded to several consultations about the regeneration of Sighthill, and some might remember that this was a favourite project of the one-time Cycling Czar Councillor Frank McAveety? Who&#8217;s he? Some newer GoBike members might ask. However, the Glasgow (Evening) Times reported on 11 January that construction of the bridge should start in February, be completed in August 2021 and cost £19m. See: <a rel="noreferrer noopener" aria-label="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln (opens in a new tab)" href="https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln" target="_blank">https://www.glasgowtimes.co.uk/news/18153032.development-sighthill-bridge-cost-19m/?ref=ebln</a></p>



<h6 class="wp-block-heading">3.5 Glasgow, Connecting Woodside Update, with news of the  Woodside ‘Making Places’ project </h6>



<p>If you don&#8217;t subscribe direct to the Connecting Woodside updates then you will have missed the free family fun event on Saturday but there is a new Facebook page about the Making Places project that is working in tandem with the active travel team. See <a rel="noreferrer noopener" aria-label="this link (opens in a new tab)" href="https://connectingwoodside.commonplace.is/news/2020/01/15/free-family-fun-event-this-saturday!" target="_blank">this link</a> and if you live in the area do get involved. If you would like to ask a question to the project team about this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Free family fun event this Saturday!" target="_blank">sustainabletransport@glasgow.gov.uk</a>. </p>



<h6 class="wp-block-heading">3.6 Glasgow Avenues project, George Square and Blythswood Square.</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="352" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=525%2C352&#038;ssl=1" alt="" class="wp-image-9899" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?w=650&amp;ssl=1 650w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=300%2C201&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/Blythswood-Square.jpg?resize=600%2C402&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /><figcaption> A vision of what Blythswood Square could look like in the future (Herald photo)</figcaption></figure>



<p>News of the Avenues and these 2 squares and yet more consultation in today&#8217;s Herald newspaper; follow this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.heraldscotland.com/news/18174117.plans-hobbit-house-visitor-centre-cafe-25m-project/" target="_blank">link</a> for the details. Let&#8217;s hope for the best that it happens.</p>



<h6 class="wp-block-heading">3.7 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Killermont Avenue, Rannoch Drive and Woodvale Avenue, Bearsden &#8211; Waiting &amp; Loading Restrictions, approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9112" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Killermont-Drive-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The Traffic Regulation Order, which we supported, see <a rel="noreferrer noopener" aria-label="Digest 45 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-45-15-october-2019-commuter-parking-byres-road-delay-speed-cameras-and-a-gobike-members-petition-feature-in-this-issue-9215" target="_blank">Digest 45</a>, Item 1.2, to limit parking in this area near the car showroom, has now been approved, and here&#8217;s the confirmation from East Dunbartonshire Council, received today, 21 January:</p>



<p>&#8220;<em>Dear Sir/Madam   <br><br>The  Traffic Regulation Orders mentioned below has now been made and will become  effective  on  Monday,  23 March 2020. <br><br>Attached are copies of the Order and plan, together with copy of the Notice that is to appear in the edition of the  Milngavie and Bearsden Herald which is published on 24   January 2020.   <br><br>Yours faithfully   </em><br><em>Fiona Stirling   <br>Legal Services, 12 Strathkelvin Place,  Kirkintilloch, G66 1TJ  <br>Telephone 0300 12345 10 (Ext 8012)   <br><br>Note Referred to:-    1. The East Dunbartonshire Council (Killermont Avenue, Rannoch Drive And Woodvale  Avenue,  Bearsden) (No Waiting And No Loading At Any Time       Restrictions) Order 2020.    <br>(See  attached  file:  <a rel="noreferrer noopener" aria-label="200121  Killermont,  etc  - Waiting Time Order 2020.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/200121-Killermont-etc-Waiting-Time-Order-2020.pdf" target="_blank">200121  Killermont,  etc  &#8211; Waiting Time Order 2020.pdf</a>)</em>&#8220;</p>



<p>Good to get something in from outwith the city, but we do hope to get more positive news in before COP26, which will be upon us before we know it. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9795</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders</title>
		<link>https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 07 Jan 2020 11:50:20 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SCW]]></category>
		<category><![CDATA[SWCW]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[Avenues]]></category>
		<category><![CDATA[Byres Road]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9679</guid>

					<description><![CDATA[As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-51-07-january-2020-a-very-happy-new-year-to-all-our-readers-and-a-few-reminders-9679" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 51, 07 January 2020: A Very Happy New Year to All Our Readers, and a few reminders"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>As our Digest enters not only its second half-century, but a new decade, this seems a good time to encourage any of you out there who are not yet GoBike members to join us. GoBike is only as strong as its members. We are people who recognise the need for good cycle infrastructure and so we campaign for it. We receive no public funding, have no paid employees, and are run entirely by volunteers, but we do have enthusiastic members who are pleased to get involved and/or pay our minimum fee of £5 per year (and many pay more). <a rel="noreferrer noopener" aria-label="Do please join us (opens in a new tab)" href="https://membermojo.co.uk/gobike" target="_blank">Do please join us</a> but also read on for the news, including the long-awaited Byres Road TROs, we have for you.</p>



<span id="more-9679"></span>



<h4 class="wp-block-heading">Contents</h4>



<h6 class="wp-block-heading">Section 1: Current Consultation</h6>



<ol class="wp-block-list"><li>Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </li><li>Glasgow, City Centre Strategic Development Framework, closes 17 January</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</li><li>Glasgow, Central District Regeneration Framework, closes 14 February</li><li>  **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>GoBike ride 05 January, to see what has been done and how much more is needed.</li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Transport Scotland, Second Strategic Transport Projects Review (STPR2), CLOSES THIS FRIDAY, 10 JANUARY</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C98&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="98" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is important, setting the tone for what comes next. If you haven&#8217;t responded to this on-line consultation yet, please do so by 5pm on Friday afternoon. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">link</a> to the survey and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-STPR2-response-060120.pdf" target="_blank">letter</a> that GoBike has also submitted. The survey is easy to do, but do remember to be ambitious; Scotland needs transport systems to match its scenery, ie superb.</p>



<h6 class="wp-block-heading">1.2 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January </h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Automated-Vehicles-600x95.png?resize=525%2C83&#038;ssl=1" alt="" class="wp-image-9305" width="525" height="83"/></figure>



<p>This consultation finally closes next Thursday; we&#8217;ve been publicising it since <a href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284">Digest 46</a>, Item 1.9 back at the end of October. Here&#8217;s the <a href="https://www.lawcom.gov.uk/project/automated-vehicles/">link to the consultation</a> and here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-HARPS-response-060120.pdf" target="_blank">letter</a> we have written in to voice concern.  It&#8217;s almost a fantasy world to expect automated vehicles to improve conditions on our roads but do have a look at the consultation for yourself.</p>



<h6 class="wp-block-heading">1.3 Glasgow, City Centre Strategic Development Framework, closes 17 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This high-level document was first featured in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.11 and here is the <a rel="noreferrer noopener" aria-label="link to the City Council's consultation page (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the City Council&#8217;s consultation page</a>. Scroll down to the bottom of the page to find this one.<br>GoBike has submitted this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2020/01/GoBike-Draft-City-Centre-SDF-response-060120.pdf" target="_blank">letter</a> outlining our views. Do please add your voice to the consultation.</p>



<h6 class="wp-block-heading">1.4 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This on-line consultation first featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.13 and, as you can see from the screenshot above, there is plenty of room for cycle lanes for a route running from the city centre to Pollok Park. Do please get your views in &#8211; the link to the City Council&#8217;s consultation page is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a> (scroll down to find this one) &#8211; although you might wish to wait until after the consultation event on Wednesday 22nd Jan (see Item 2.1 below) to respond.</p>



<h6 class="wp-block-heading">1.5 Glasgow, Central District Regeneration Framework, closes 14 February</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>This is a consultation that was confused with Item 1.3, sorry about that, but we featured it in <a rel="noreferrer noopener" aria-label="Digest 50 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" target="_blank">Digest 50</a>, Item 1.7 and here is the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a>, again, to the City Council&#8217;s consultation page. This consultation is the second item on page 1.</p>



<p>Previously we responded to the Broomielaw  District Regeneration Framework with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Broomielaw-DRF-response-050419.pdf" target="_blank">letter</a> in April 2019 and the St Enoch  District Regeneration Framework in September 2019 with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/08/GoBike-St-Enoch-DRF-response-020919.pdf" target="_blank">letter</a>. The response to this latest consultation will be along similar lines.</p>



<h6 class="wp-block-heading">1.6 **NEW** Glasgow, Byres Road, 3 TROs now published on Glasgow City Council&#8217;s website, close 14 February</h6>



<div class="wp-block-image"><figure class="alignright is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/cropped-Byres-Road-1-e1517677604466.jpg?resize=357%2C236&#038;ssl=1" alt="" class="wp-image-4151" width="357" height="236"/></figure></div>



<p>We&#8217;ve just found out that the TROs for Byres Road, proposed parking changes, cycle lanes and 20mph are now all on the City Council&#8217;s website, see:  <a href="https://www.glasgow.gov.uk/proposedtro">https://www.glasgow.gov.uk/proposedtro</a> <br>We&#8217;ll be having a close look at these over the next couple of weeks.</p>



<h4 class="wp-block-heading"> Section 2: Forthcoming Consultations </h4>



<h6 class="wp-block-heading">2.1 Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="245" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>As mentioned in Item 1.4 above and in our <a rel="noreferrer noopener" aria-label="Consultation Extra of 29 November (opens in a new tab)" href="https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495" target="_blank">Consultation Extra of 29 November</a>, there will be a consultation event at St Albert&#8217;s Primary School, 36 Maxwell Drive on Wednesday 22 January from 3:30 to 7pm. You may see details of the proposals at this <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://storymaps.arcgis.com/stories/ca2b07aefa0346e1843bfc8e60908a53" target="_blank">link</a>.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 GoBike ride 05 January, to see what has been done and how much more is needed.</h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?fit=525%2C295&amp;ssl=1" alt="" class="wp-image-9739" width="642" height="361" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2020/01/GoBike-ride-050120-1.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is the route of the 15 miles or so of the GoBike ride on Sunday plus a wee bit from Glasgow Green to the start at the SEC.</p>



<p>Much of the infrastructure that we travelled on has been the topic of consultation and that is shown in bold &#8211; search on our website at <a rel="noreferrer noopener" aria-label="www.gobike.org (opens in a new tab)" href="https://www.gobike.org/" target="_blank">www.gobike.org</a> to find details. From the SEC and travelling clockwise our journey covered:</p>



<ul class="wp-block-list"><li>West City Way (consulted on and constructed before GoBike records were kept on our website)</li><li><strong>Woodside </strong>&#8211; recent and ongoing consultation</li><li><strong>Garscube Road </strong>&#8211; included in the Woodside consultation</li><li>The <strong>Underline </strong>project &#8211; one of the Avenues projects connecting New City Road under the M8</li><li><strong>St George&#8217;s Road </strong>&#8211; to connect Woodside to Sauchiehall Street</li><li><strong>Sauchiehall Street </strong>&#8211; the first of the Avenues projects to be constructed, from Charing Cross to Rose Street</li><li><strong>Renfrew Street, Killermont Street and North Hanover Street </strong>&#8211; a further Avenues project to connect the Sauchiehall Street Avenue to the east of Queen Street Station</li><li><strong>South City Way from King Street via Bridgegate and Gorbals Street to Victoria Road and Queen&#8217;s Park</strong> &#8211; under construction</li><li>Muirend to Queen&#8217;s Park Quiet Way &#8211; advisory cycle lanes</li><li><strong>South West City Way </strong>&#8211; constructed from Commerce Street to St Andrew&#8217;s Drive and currently under consultation for continuation to Pollok Park</li><li>National Cycle Route 756</li></ul>



<p>Well, that was shorter than usual but do try to respond to the consultations listed &#8211; the more voices the authorities hear, the more they will listen. No doubt there will be more in Digest 52 in two weeks time.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9679</post-id>	</item>
		<item>
		<title>Looking forward to a Brexit New Year? NO? Then cycle out with GoBike on 05 January and see what we should be campaigning on in 2020.</title>
		<link>https://www.gobike.org/looking-forward-to-a-brexit-new-year-no-then-cycle-out-with-gobike-on-05-january-and-see-what-we-should-be-campaigning-on-in-2020-9666</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 31 Dec 2019 16:00:07 +0000</pubDate>
				<category><![CDATA[Cycle Rides]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Woodside]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9666</guid>

					<description><![CDATA[Join us on the monthly GoBike ride on Sunday 05 January, look at what we&#8217;ve got and see how much more we need. Here are the details: Sunday 5 January 2020&#160;– 2020 VisionFor our annual tour of cycle infrastructure, we will be taking a trip around various works both north and south of the river. &#8230; <p class="link-more"><a href="https://www.gobike.org/looking-forward-to-a-brexit-new-year-no-then-cycle-out-with-gobike-on-05-january-and-see-what-we-should-be-campaigning-on-in-2020-9666" class="more-link">Continue reading<span class="screen-reader-text"> "Looking forward to a Brexit New Year? NO? Then cycle out with GoBike on 05 January and see what we should be campaigning on in 2020."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p><br>Join us on the monthly GoBike ride on Sunday 05 January, look at what we&#8217;ve got and see how much more we need. Here are the details:</p>



<span id="more-9666"></span>



<p><strong>Sunday 5 January 2020&nbsp;– 2020 Vision<br></strong>For our annual tour of cycle infrastructure, we will be taking a trip around various works both north and south of the river. We’ll start by heading to Woodside to see the latest on the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/article/21802/Connecting-Woodside" target="_blank">Connecting Woodside</a>&nbsp;project, then cross the city centre by way of&nbsp;<a rel="noreferrer noopener" href="https://www.glasgowcitycentrestrategy.com/project/city-centre-avenues" target="_blank">Sauchiehall Street</a>, to the Merchant City from where we’ll follow the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/scw" target="_blank">South City Way</a>. We’ll continue south through Battlefield, then turn at Muirend to head for Queen’s Park, the&nbsp;<a rel="noreferrer noopener" href="https://www.glasgow.gov.uk/CHttpHandler.ashx?id=31865&amp;p=0" target="_blank">South West City Way</a>, and the Stobcross Bridge.<br>16 miles, ending back at Kelvingrove in time for lunch.<br><em>Meet 10am Bell’s Bridge, Congress Road, Glasgow.</em></p>



<p>See <a href="https://www.gobike.org/about-us/cycle-rides" target="_blank" rel="noreferrer noopener" aria-label="here on our website (opens in a new tab)">here on our website</a> for further details.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9666</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 50, 24 December 2019: 2 on-line consultations for you to do and a variety of consultations from around the area.</title>
		<link>https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 24 Dec 2019 11:59:22 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[bus lanes]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[Renfrewshire]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<category><![CDATA[Transport Scotland]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9568</guid>

					<description><![CDATA[We object to the permanent introduction of taxis to all 4 lanes of the Finnieston/Squinty/Clyde Arc Bridge &#8211; where is the active travel space? &#8211; and we learn that traffic calming schemes are a one-stage consultation with no Traffic Regulation Order. Plus, as desks are cleared for the holidays &#8211; a break for some &#8211; &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-50-24-december-2019-2-on-line-consultations-for-you-to-do-and-a-variety-of-consultations-from-around-the-area-9568" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 50, 24 December 2019: 2 on-line consultations for you to do and a variety of consultations from around the area."</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>We object to the permanent introduction of taxis to all 4 lanes of the Finnieston/Squinty/Clyde Arc Bridge &#8211; where is the active travel space? &#8211; and we learn that traffic calming schemes are a one-stage consultation with no Traffic Regulation Order. Plus, as desks are cleared for the holidays &#8211; a break for some &#8211; we have a stack of feedback for you.</p>



<span id="more-9568"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h4 class="wp-block-heading">Section 1: Current Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, Sighthill, Mandatory 20mph Limit Speed Zone, closes 27 December</li><li>Glasgow, Finnieston Bridge, taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</li><li>Transport Scotland, Second Strategic Transport Projects Review (STPR2), closes 10 January 2020</li><li>Law Commission, HIghly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li><li> Glasgow, City Centre Strategic Development Framework, closes 17 January 2020</li><li>Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February 2020</li><li>Glasgow, Central District Regeneration Framework, closing date 14 February 2020</li></ol>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<ol class="wp-block-list"><li>Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January 2020</li></ol>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<ol class="wp-block-list"><li>Glasgow, Belmont Traffic Management Order, parking, GoBike submission</li><li>East Dunbartonshire, Proposed TRO and road humps, Maxwell Avenue area, Bearsden, GoBike submission</li><li>Glasgow, Dalmarnock West TRO parking restrictions, GoBike submission and GCC response</li><li>Glasgow, Robroyston Station, parking restrictions, GoBike submission and GCC response</li><li>Glasgow, Garscube Road, parking changes approved</li><li>Glasgow, Connecting Woodside update, construction to start on Cycle Lanes</li><li>Glasgow, Beith Street, developer wins appeal to build flats</li><li>Glasgow, North Kelvin, North Woodside and Woodlands, Mandatory 20mph speed limit zone approved </li><li>East Renfrewshire Proposed Local Development Plan 2 Representation, ERC response</li><li>Renfrewshire, City Deal, GAIA Construction Update</li><li>GoBike met GCC, 13 December </li><li>Glasgow, Ashgill Road traffic calming scheme</li><li>Glasgow, Duror Street, another traffic calming scheme</li><li>Glasgow, Gartnavel Hospital Site Active Travel Meeting 18 December  </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 Glasgow, Sighthill, Mandatory 20mph Limit Speed Zone, closes 27 December</h6>



<div class="wp-block-image"><figure class="alignright is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=259%2C142&#038;ssl=1" alt="" class="wp-image-9300" width="259" height="142" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?w=303&amp;ssl=1 303w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Sighthill-regeneration.jpg?resize=300%2C164&amp;ssl=1 300w" sizes="auto, (max-width: 259px) 100vw, 259px" /></figure></div>



<p>This proposal first featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.9 and here&#8217;s the <a rel="noreferrer noopener" aria-label="GoBike letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Sighthill-Stage-2-response-Letter-121219.pdf" target="_blank">GoBike letter</a> supporting the proposal. Please add your voice, if you have time, particularly if you live, work or cycle in Sighthill.</p>



<h6 class="wp-block-heading">1.2 Glasgow, Finnieston Bridge, taxis and authorised vehicles to use bus and cycle lanes TRO closes 03 January 2020</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p>This consultation was brand new in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.9 and it just makes Fastlink worse if possible. Taxis and authorised vehicles are now able to use all four lanes of this bridge on a permanent basis after a &#8220;trial&#8221; for 18 months. The trial was to check whether the inclusion of taxis slowed buses down, but since the main hold-up for buses is on Lancefield Quay, we are now told that there has been no deterioration, so taxis may stay. The change puts active travel back, not forward and this won&#8217;t look good when COP26, the UN Climate Change Conference, comes to Glasgow next year. Here&#8217;s the <a href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Fastlink-Finnieston-Whitefield-Road-TRO-Objection-191219.pdf">GoBike letter of objection</a>. Do put in your own letter/email of objection &#8211; unless you are a taxi-driver &#8230;&#8230;</p>



<h6 class="wp-block-heading">1.3 Transport Scotland, Second Strategic Transport Projects Review (STPR2) closes 10 January 2020</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=525%2C99&#038;ssl=1" alt="" class="wp-image-8352" width="525" height="99" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This important consultation was Item 1.11 in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a> and, if you haven&#8217;t already, do respond to the survey if you have time over Christmas and the New Year. Here&#8217;s a link to the <a rel="noreferrer noopener" aria-label="survey (opens in a new tab)" href="https://www.transport.gov.scot/our-approach/strategy/strategic-transport-projects-review-2/" target="_blank">survey</a>.</p>



<h6 class="wp-block-heading">1.4 Law Commission, HIghly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>We first mentioned this UK consultation back in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and the information and consultation details are <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.lawcom.gov.uk/project/automated-vehicles/" target="_blank">here</a>. Do have a look and see if you find anything that is reassuring!</p>



<h6 class="wp-block-heading">1.5  Glasgow, City Centre Strategic Development Framework, closes 17 January 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="333" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C333&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This consultation appeared in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.11 but was then excluded from Digest 49 in favour of the Central District Regeneration Framework (see Item 1.7 below). Apologies for the confusion but we do have 2 city centre consultations at the same time! This is the higher level document and our in-house expert has been looking at it. The GoBike response should be in the next Digest, appearing in the New Year.</p>



<p>These high-level documents can seem quite vague but more detailed policy is based on them, so it&#8217;s important that we look at them. The link to this one is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a>, although the link is to a list of current consultations and this one is on page 2!</p>



<h6 class="wp-block-heading">1.6 Glasgow, South West City Way, St Andrews Drive extension on-line consultation, closes 03 February 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="242" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=525%2C242&#038;ssl=1" alt="" class="wp-image-9541" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=300%2C138&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?resize=600%2C277&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Andrews-Drive-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Item 1.13 in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a> gave the details for this on-line consultation and, although it&#8217;s open for over a month, do please respond before you forget. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link</a> to the City Council&#8217;s consultation page where you have to scroll down to find this one.</p>



<p>Done well, the South West City Way, running all the way from the City Centre to Pollok Park, could be a significant boost for cycling in Glasgow.</p>



<h6 class="wp-block-heading">1.6 Glasgow, Central District Regeneration Framework, closing date 14 February 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-9543" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?w=800&amp;ssl=1 800w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Central-DRF.jpeg-.jpg?resize=600%2C425&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>We featured this in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.14 and we are working on our response. The link, which is the same as the last two items is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">here</a> &#8211; scroll down to the correct document. It&#8217;s similar to the previous Regeneration Frameworks that we have reviewed, more detailed than the  City Centre Strategic Development Framework in Item 1.5 above, but still not a lot of specifics.</p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1 Glasgow, South West City Way, St Andrews Drive extension, consultation event 22 January 2020</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="245" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=525%2C245&#038;ssl=1" alt="" class="wp-image-9573" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?resize=600%2C280&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/St-Alberts-Primary.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Featured in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 2.2 this consultation event will be held at  St Albert&#8217;s Primary School,&nbsp; 36 Maxwell Drive, on Wednesday the 22nd of January 2020 between 3.30pm and 7pm.</p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Belmont Traffic Management Order, parking, GoBike submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>GoBike supported the proposal, first featured in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.3, to restrict commuter parking with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Belmont-Hamilton-Gardens-Stage-2-letter-281119.pdf" target="_blank">letter</a> on 28 November.</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire, Proposed TRO and road humps, Maxwell Avenue area, Bearsden, GoBike submission</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This consultation, which closed on 16 December, was first featured in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.6. We aren&#8217;t too happy with the speed tables, which only leave a narrow gap at the side for cycling &#8211; here&#8217;s the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Maxwell-Avenue-Letter-121219.pdf" target="_blank">letter</a> we submitted on 12 December.</p>



<h6 class="wp-block-heading">3.3 Glasgow, Dalmarnock West TRO parking restrictions, GoBike submission and GCC response</h6>



<p><br>GoBike supported the consultation, which closed on 13 December, to control the chaotic commuter parking around Dalmarnock Station and the Police Scotland offices, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">letter</a> on 15 December. All the details were first given in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.5.</p>



<p>On  19 December we received this reply from GCC:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>, </em><strong><em>HEAD OF ROADS</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort <br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST)(TRAFFIC REGULATION) ORDER 20___</em></strong><br><br><em>Thank you for your correspondence regarding the above named Traffic Regulation Order.<br><br>I  note your comments regarding Shawfield Road and would reiterate that  this falls outwith the Glasgow City boundary, however, I can confirm  that an  officer will contact South Lanarkshire Council to raise your concerns. <br><br>Your  support will be considered and included within the final report which  will inform the decision. Once a decision has been taken in regards to  these  proposals I shall write to you again and advise of the outcome.<br><br>Yours sincerely</em>&#8220;, etc</p>



<p>So, good news that the two neighbouring councils will speak to each other!</p>



<h6 class="wp-block-heading">3.4 Glasgow, Robroyston Station, parking restrictions, GoBike submission and GCC response</h6>



<p>The TRO to prohibit parking on the new road from the M80 to the new Robroyston Railway Station was first featured in <a rel="noreferrer noopener" aria-label="Digest 48 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" target="_blank">Digest 48</a>, Item 1.6. We supported the ban and strongly suggested that now is the time to construct cycle lanes, with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Robroyston-M80-Parking-Stage-2-response-121219.pdf" target="_blank">letter</a>, dated 12 December.</p>



<p>On  18 December this reply was received from Glasgow City Council:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>,  </em><strong><em>(ROBROYSTON STATION) </em></strong><em> </em><strong><em>(TRAFFIC REGULATION) ORDER 201_</em></strong><br><br> <em>Thank you for your correspondence regarding the above named Traffic Regulation Order on behalf of GoBike.<br><br>As  previously advised it is intended to provide cycle measures on Station  Road to connect to Robroyston Station and this will be subject to future  consultation which you  will be advised of when progressed.<br><br>Your  support will be considered and included within the final report which  will inform the decision. Once a decision has been taken in regards to  these proposals I shall  write to you again and advise of the outcome.<br><br>Yours sincerely</em>&#8221; etc</p>



<p>We live in hope that this will be both the original Station Road from Cumbernauld Road to the station and the new road from Robroyston and the M80 junction!</p>



<h6 class="wp-block-heading">3.5 Glasgow, Garscube Road, parking changes approved</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="230" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=525%2C230&#038;ssl=1" alt="" class="wp-image-8684" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1920&amp;ssl=1 1920w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=300%2C131&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?resize=600%2C263&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/06/Screenshot-Garscube-Road.png?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Back in June, and featured in <a rel="noreferrer noopener" aria-label="Digest 36 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-36-12-june-2019-exciting-proposals-for-pollokshields-preparation-for-separated-cycle-lane-on-garscube-road-and-less-exciting-matters-8665" target="_blank">Digest 36</a>, Item 1.4 we were sent proposals for parking restrictions and a two-way cycle lane on Garscube Road, to which we responded with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/07/GoBike-Garscube-Road-response-010719.pdf" target="_blank">letter</a>. We were sent this email on 04 December:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (GARSCUBE ROAD, (TRAFFIC REGULATION AND PARKING CONTROLS) 2019</em></strong><em><br></em><br><em>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have decided under its scheme of delegated functions to proceed with the  proposal with changes as specified below:-<br><br>·&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;  Provision of on-street short-term pay and display parking on the west side of Firhill Road.<br><br>The Order was made on 11</em><sup><em>th </em></sup><em>November  2019 and an advert was placed in the Evening Times on 22November 2019  stating that the Traffic Regulation Order has been made.<br><br>Should you require any further information on the above named Order please email </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em> SustainableTransport@glasgow.gov.uk</em></a><em><br><br>Yours sincerely</em>&#8221; etc</p>



<p>See the next item for news of the cycle lanes!</p>



<h6 class="wp-block-heading">3.6 Glasgow, Connecting Woodside update, construction to start on Cycle Lanes</h6>



<p>The latest Connecting Woodside update, received on 17 December:</p>



<figure class="wp-block-table"><table><tbody><tr><td>&#8220;<em>New update available:</em></td></tr><tr><td><em>Connecting Woodside end of year update!</em></td></tr><tr><td><a href="http://url8988.commonplace.is/wf/click?upn=stvKIyhiQVtFIL7BreuPmcfPlb6okvWLSXKRED3Co6BajT9bNORx0GcbiFvKFKNTojhNvtZeWwwsXmEWrsOUCiG0ghD3B8wv-2Bm1jFxG7CJikpHX0v2knXDLOUmgBOsk0-2FE7AyI8kT-2BeGVzzwxCs3aQ-3D-3D_wITdTelLcNTF6i-2FMjy9FWN-2BgT7vbMdE9Nz2nqO3kw4MxhJWd07t0DLL51XSV7CofOChdVG6U0h9oP9F4GUoNsfhZxRtHYhz3F3lYV58LHEq-2BZSr6oA3o7GvjGtt2VK2D-2B3y-2BCxVoT47tGQMbAxp0tWNqjOyzdFyCQc3SEBabxXLS6ukz7qCdeTZUUaDhHpRXdXTzmBCCHpTP7Q-2BJLW-2BoxDzNLDqptSRVEAPsLNWch8WVSLpjbA92UamLWKQ2OTq7p6osK8PCiRu-2FaMD1SipX24ZR9Pr9EbRD5QMPO5hBhp3z7XVYVIsPpxqh19zVAC1RKuWfJ3F62fYGqgX9-2BmjbbA4-2FAckY5NpU7BQnm62l0AI-3D" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Read update</a></td></tr><tr><td><em>Button does not work? Try this </em><a rel="noreferrer noopener" target="_blank" href="http://url8988.commonplace.is/wf/click?upn=stvKIyhiQVtFIL7BreuPmcfPlb6okvWLSXKRED3Co6BajT9bNORx0GcbiFvKFKNTojhNvtZeWwwsXmEWrsOUCiG0ghD3B8wv-2Bm1jFxG7CJikpHX0v2knXDLOUmgBOsk0-2FE7AyI8kT-2BeGVzzwxCs3aQ-3D-3D_wITdTelLcNTF6i-2FMjy9FWN-2BgT7vbMdE9Nz2nqO3kw4MxhJWd07t0DLL51XSV7CofOChdVG6U0h9oP9F4GUoNsfhZxRtHYhz3F3lYV58LHEq-2BZSr6oA3o7GvjGtt2VK2D-2B3y-2BCxVoT47tGQMbAxp0tWNqjOyzdFyCQc3SEBabxXLS6ukz7qCdeTZUUaDhHpRX0LdsYqAx4kvIbVdSn3VjII6S0tIkSymDmeK56pVhNKJD06u3nqcaTTKZqXKlbleSGDNNQOzCY3yKYMRHxk1m4xZHEenXJ6mnG89lSlPTaA8kv5k6t5rYkp5x0TymnT-2BAVhmT34E8bk54UfLOQC2Hl7qD9eRgHd63J0K9PKQo9Ew-3D"><em>link</em></a><em>. Like to ask a question to the project team about </em><br><em>this update or the project? Email <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="mailto:sustainabletransport@glasgow.gov.uk?subject=Re: Connecting Woodside end of year update!" target="_blank">sustainabletransport@glasgow.gov.uk</a>.</em>&#8220;</td></tr></tbody></table></figure>



<p>And here&#8217;s the headline news: &#8221; <strong><em>Construction on the first phase of the Connecting Woodside project will begin in early 2020!</em></strong><em> This is a segregated cycle route on Garscube Road, from Firhill Road to the underpass at Dobbie’s Loan.</em> &#8220;</p>



<h6 class="wp-block-heading">3.7 Glasgow, Beith Street, developer wins appeal to build flats</h6>



<p>This is the saddest and most disgraceful news we have had in a long time. In the face of 160 objections, from local residents, from Patrick Harvie, MSP (Green Party) and GoBike, planning permission has now been granted to the developer who wishes to build 48 flats on the green space shown here, adjacent to the shared cycle/foot path that is National Cycle Route 7.<br>Details of the <a rel="noreferrer noopener" aria-label="planning application are here (opens in a new tab)" href="https://publicaccess.glasgow.gov.uk/online-applications/applicationDetails.do?activeTab=neighbourComments&amp;keyVal=PUBY3QEXH3Q00&amp;neighbourCommentsPager.page=3" target="_blank">planning application are here</a> and here are the details of the final outcome: <a rel="noreferrer noopener" aria-label="https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/ (opens in a new tab)" href="https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/" target="_blank">https://reglasgow.com/flats-plan-for-yellow-ribbon-partick-open-space-gets-go-ahead/</a></p>



<h6 class="wp-block-heading">3.8 Glasgow, North Kelvin, North Woodside and Woodlands, Mandatory 20mph speed limit zone approved </h6>



<p>A 20mph speed limit has now been approved for this area. Here&#8217;s the email we received on 04 December:</p>



<p><strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Ms Fort,</em><br><br><strong><em>THE GLASGOW CITY COUNCIL, (NORTH KELVIN, NORTH WOODSIDE AND WOODLANDS)</em></strong><em> </em><strong><em>(MANDATORY 20MPH SPEED LIMIT ZONE)</em></strong><em> 2</em><strong><em>019</em></strong><em><br><br>I  refer to your support of the above named Traffic Regulation Order and  can advise that your support was reported and considered. The Council  have decided under its scheme of delegated functions to proceed with the  proposal.<br><br>The Order was made on 11</em><sup><em>th </em></sup><em>November 2019 and an advert was placed in the Evening Times on 22</em><sup><em>nd</em></sup><em> November 2019 stating that the Traffic Regulation Order has been made.<br><br>Should you require any further information on the above named Order please email </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em> SustainableTransport@glasgow.gov.uk</em></a><em>.<br><br>Yours sincerely</em>,&#8221; etc</p>



<h6 class="wp-block-heading">3.9 East Renfrewshire Proposed Local Development Plan 2 Representation, ERC response</h6>



<p>GoBike responded to the consultation on the LDP2 with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-ERC-LDP2-response-081219.pdf" target="_blank">letter</a>, as reported in <a rel="noreferrer noopener" aria-label="Digest 49 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-49-10-december-2019-highest-number-yet-of-current-consultations-and-surveys-with-one-closing-at-5pm-today-time-for-a-tea-break-9512" target="_blank">Digest 49</a>, Item 1.3 and we received this response on 12 December:</p>



<p>&#8220;<em>GoBike <br>Dear Sir / Madam  <br></em><strong><em>East Renfrewshire Proposed Local Development Plan 2 (LDP2) and Strategic Environmental Assessment Environmental Report (October 2019)</em></strong><em> <br>Your Reference LDP2/174 <br><br>Thank you for your representation (s) in respect of the above documents.  The Council will aim to resolve issues raised by representations prior to submission of the Proposed LDP2 to Scottish Ministers.  You may be contacted for further information or clarification if required.   Following the close of the consultation a report will be produced summarising all representations received and detailing the Council&#8217;s response.  This will be reported to Council and made available on the Council&#8217;s website.<br><br>If there are unresolved representations the Scottish Ministers will appoint an independent Reporter to examine the Proposed Plan. The Reporter appointed will consider all matters and make recommendations to the Council and to Scottish</em> <em>Ministers on any changes that should be made to the Plan. The Council must incorporate these recommendations prior to adopting the Plan. Once adopted, the Plan has a legal status and is used for the assessment of planning applications and will guide development within East Renfrewshire. <br><br>Please quote reference number LDP2/174 in all future correspondence.  <br>Please do not hesitate to contact the Strategy Team on 577 3001 or email </em><a href="mailto:ldp2@eastrenfrewshire.gov.uk"><em>ldp2@eastrenfrewshire.gov.uk</em></a><em> if you have any further queries.    <br><br>Yours sincerely,     <br>Gillian McCarney  Strategic Services Manager</em>&#8221;  </p>



<h6 class="wp-block-heading">3.10 Renfrewshire, City Deal, GAIA Construction Update</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=525%2C244&#038;ssl=1" alt="" class="wp-image-9627" width="525" height="244" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=600%2C279&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?resize=300%2C140&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?w=1132&amp;ssl=1 1132w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Renfrewshire-City-Deal.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s the latest on what&#8217;s happening out near Glasgow (Renfrew?!) Airport:</p>



<figure class="wp-block-table"><table><tbody><tr><td>&#8221; <em>We wanted to draw your attention to the following updates on two of our City Deal </em><br><em>projects&#8230; </em><br><em><br>As  construction progresses at our Glasgow Airport Investment Area (GAIA)  project, <br>our contractor&nbsp;Wills Bros Civil Engineering, have issued the  first GAIA newsletter <br>which provides an update on progress of  construction works on the project. You can <br>view this from the related  document section of our GAIA webpage at <br></em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=4927c87ea6&amp;e=046567d752" target="_blank"><em>www.renfrewshire.gov.uk/gaia</em></a><em>.</em><br> <br> <em>As part of advance works for the </em><a rel="noreferrer noopener" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=f52195dd0e&amp;e=046567d752" target="_blank"><em>Clyde Waterfront and Renfrew Riverside</em></a><em>  (CWRR) <br>project, our demolition contractor Daltons Demolitions  facilitated a site visit from a <br>group of S5 and S6 pupils preparing for  life in the construction sector. Further details <br>of this visit can be  found on our </em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=9a8cb82a66&amp;e=046567d752" target="_blank"><em>website</em></a><em>.      </em>                                                                     </td></tr></tbody></table></figure>



<figure class="wp-block-table"><table><tbody><tr><td> <em>The 1st official newsletter for the Glasgow Airport Investment Area (GAIA) project. <br>This newsletters, which will be&nbsp;the first in a series updates&nbsp;as the project progresses, <br>includes: Project overview; Traffic management including lane closures required to <br>allow construction to progress; Wright Street bridge update; Protection of Marine Life; and Community updates. <br>You can download the newsletter from the related documents section of&nbsp;our GAIA <br>project page at </em><a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://renfrewshire.us13.list-manage.com/track/click?u=d02f87f46188a80b76b3baef1&amp;id=4aa8f60fb8&amp;e=046567d752" target="_blank"><em>www.renfrewshire.gov.uk/gaia</em></a><em>.           </em>                                                                 </td></tr></tbody></table></figure>



<h6 class="wp-block-heading">3.11 GoBike met GCC, 13 December </h6>



<p>As we advised in Digest 49, Item 2.1, Ali, Brenda and Tricia from GoBike cycled out to the new Glasgow City Council offices on London Road, to meet Kevin Hamilton, Michael Brady and one of their team who all deal with parking and traffic calming.<br>We had a good discussion and hope to meet again. <br>On parking our main concern is the removal of two-way cycling to allow adequate space for the parking that local residents claim they need, even when commuter parking is being removed by the City Council. We heard that there is a plethora of documents, and opinions, that do or do not support contraflow cycling and the Council is understandably concerned to keep our streets as safe as they think they can.<br>On traffic calming and the universal use of speed cushions, we heard that there is pressure from residents and City Councillors to act quickly to reduce dangerous motor  traffic speeds. Speed cushions certainly do the job but do not necessarily answer our concerns about making streets active-travel-friendly. Unfortunately a decision is made early in the process about which box a proposal fits and currently something that requires speed reduction does not get to be a cycle scheme. Funding is critical too.</p>



<h6 class="wp-block-heading">3.12  Glasgow, Ashgill Road traffic calming scheme </h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?fit=525%2C224&amp;ssl=1" alt="" class="wp-image-9628" width="646" height="276" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?resize=600%2C256&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Continuing from the item above, Ashgill Road is one that we discussed with the City Council. As you can see from the photo, Ashgill Road is wide and lends itself to high speeds requiring a crash barrier on the bend outside the Community Centre, preventing people from crossing the road to get direct access.</p>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i2.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?fit=525%2C311&amp;ssl=1" alt="" class="wp-image-9633" width="648" height="384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?w=1064&amp;ssl=1 1064w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?resize=300%2C178&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Ashgill-Road-map2.png?resize=600%2C355&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Ashgill Road is in the north of the city but has not been designated as a cycle route, even though it connects to Balmore Road, a significant arterial road and is near railway stations. We were given to understand that traffic calming schemes are a 2-part process and the notice we received on 28 November proposing speed cushions was the Stage One consultation. We replied with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Ashgill-Road-Stage-1-response-181219.pdf" target="_blank">letter</a> on 18 December.</p>



<p>We have since learnt that traffic calming using speed cushions does not need a Traffic Regulation Order and that there is local consultation at the same time as the statutory consultees are notified. Here are the plans of the speed cushion locations we were sent on 29 November: <a rel="noreferrer noopener" aria-label="Full proposal (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Full-scheme-proposals.pdf" target="_blank">Full proposal</a>, <a rel="noreferrer noopener" aria-label="Plan 1 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Section-1-btwn-no-275-and-301.pdf" target="_blank">Plan 1</a>, <a rel="noreferrer noopener" aria-label="Plan 2 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/RS.19.97-Ashgill-Road-TC-proposals-Section-2-btwn-Ornsay-St-and-opp-no-353.pdf" target="_blank">Plan 2</a>.</p>



<p>We&#8217;ll be on the ball in future!</p>



<h6 class="wp-block-heading">3.13  Glasgow, Duror Street, another traffic calming scheme</h6>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i2.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?fit=525%2C223&amp;ssl=1" alt="" class="wp-image-9637" width="647" height="275" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=300%2C128&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?resize=600%2C255&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-view.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Here&#8217;s another wide road, in Shettleston, and the residents are concerned about the high speeds of motor vehicles. Here&#8217;s the email that we received on 29 November:</p>



<p> &#8220;<strong><em>MESSAGE SENT ON BEHALF OF KEVIN HAMILTON</em></strong><em>,  </em><strong><em>HEAD OF ROADS</em></strong><em>,  </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br>Dear Sir / Madam<br><br></em><strong><em>The Glasgow City Council</em></strong><em>, </em><strong><em>(Duror Street)</em></strong><em> </em><strong><em>Traffic Calming Scheme </em></strong><em><br><br>The  Council propose to consider the introduction of the above named Traffic  Calming Scheme and I wish to establish the views of your organisation.<br><br>Background to the proposed Scheme<br><br>The scheme is aimed at improving road safety by reducing vehicle speeds.<br><br>Roads affected by the proposed Scheme<br><br>The list of roads affected by these proposals are:-<br></em><br><em> </em><strong><em>Duror Street</em></strong><em><br><br>Details of the proposed Scheme<br><br>The proposed Scheme (as depicted on the attached plan) will comprise of:-</em></p>



<ul class="wp-block-list"><li> <em>5 sets of 4, 1.9m, 75mm high, speed cushions.</em></li><li><em> The installation of bollards beside the proposed speed cushions.</em></li></ul>



<p><em>Please provide any comments you wish to make on these proposals within </em><strong><em>21 days (Reply by 20 December 2019)</em></strong><em>.&#8221; </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9638" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/12/Duror-Street-map.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This is the <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/12/GoBike-Duror-Streer-response-181219.pdf" target="_blank">letter</a> submitted on 18 December, suggesting that the road be stopped up to motor traffic midway. As with the item above, from now on, traffic calming proposals will be published in these Digests soon after receipt. However, if you become aware of moves to reduce motor speeds in your locality do let GoBike know and do let your local council know that you want something better than speed cushions or tables.</p>



<h6 class="wp-block-heading">3.14 Glasgow, Gartnavel Hospital Site Active Travel Meeting 18 December </h6>



<p><strong>Notes from Gartnavel Active Travel Route Meeting 18.12.2019</strong> from GoBike member Caroline:<br>&#8220;<em>The meeting was held to discuss plans to improve cycling conditions within the Gartnavel Hospital site.<br>Second Next Bike station, sited in close proximity to Hyndland Train Station exit &#8211; highly likely to be installed.<br>Additional covered bike parking requested, it was advised that there may be additional facilities required e.g. showers to promote cycle commuting to staff.<br>Connectivity with QEUH &#8211; it was advised that this will be reviewed as part of a wider NHSGG strategy to improve access to sites.   Sustrans advised that they would welcome a Glasgow-wide application for matched funding.<br>Widening the existing path from Hyndland Station was touted as a possibility by Sustrans, but their rep was reminded of the conflict this could lead to between pedestrians and those on bikes.<br>Site visit- highlighted need for design improvements at the Great Western Road (GWR) junction and to connect the shared use path that runs parallel to GWR (continuing on road past the restaurant),  desire lines across grass, asked why path wasn&#8217;t continued here &#8211; GCC were too late with funding, allegedly. Also Hughenden residents objected to cycle route running past their homes.<br>Second desire line running alongside steps down to Hyndland Station &#8211; Sustrans rep requested that a ramp be installed here. ScotRail have been consulted about installing</em> <em>a Falco ramp on the Underpass steps at Hyndland Station, but they might object as the stairway width is insufficient. The need for improved signage and wayfinding on proposed routes was highlighted, and it was requested that the access from Claythorn be improved to better accommodate non-standard bikes e.g. tag-alongs/ trikes. I asked what the longer-term strategy was to improve the hostile cycling conditions bordering the hospital site.  Crow Road has been prioritised for 20mph limit, however Sustrans  advised it&#8217;s unlikely to be implemented any time soon, improvements will be made to the Southbrae Drive/ Crow Road junction and access to Jordanhill Station but the future of cycling on Great Western Road remains unknown. I asked if GCC have an interim Transport Strategy to aid decision-making until the Transport Strategy is completed in 2021 but they don&#8217;t; Sustrans stated they are still using the Transport Strategy that related to the Commonwealth Games, which doesn&#8217;t contain much relating to those </em> commutes starting outwith the city-centre.&#8221;&nbsp;</p>



<p>That&#8217;s a lot of information, but Caroline does make the point that Crow Road and Great Western Road are still not attractive cycling routes.</p>



<p>______________________________________________</p>



<p> Enjoy yourself over Christmas and the New Year. Your next Digest will be with you in January.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9568</post-id>	</item>
		<item>
		<title>Consultation Extra, 29 November 2019: South West City Way Extension &#8211; St. Andrew&#8217;s Drive</title>
		<link>https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Fri, 29 Nov 2019 15:54:50 +0000</pubDate>
				<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[SWCW]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[swcw]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9495</guid>

					<description><![CDATA[News just in, Friday afternoon, from Glasgow City Council, via email, South West City Way to be extended to Pollok Park: &#8220;MESSAGE SENT ON BEHALF, NEIGHBOURHOODS AND SUSTAINABILITY, SUSTAINABLE TRANSPORT Dear Go-Bike, Neighbourhoods and Sustainability are seeking to gain the views and comments of the local community and wider public with regards proposals to extend &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-extra-29-november-2019-south-west-city-way-extension-st-andrews-drive-9495" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Extra, 29 November 2019: South West City Way Extension &#8211; St. Andrew&#8217;s Drive"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>News just in, Friday afternoon, from Glasgow City Council, via email, South West City Way to be extended to Pollok Park:</p>



<span id="more-9495"></span>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF, NEIGHBOURHOODS AND SUSTAINABILITY, SUSTAINABLE TRANSPORT</em></strong><em><br><br>Dear Go-Bike, <br><br>Neighbourhoods and Sustainability are seeking to  gain the views and comments of the local community and wider public with  regards proposals to extend the South-West City Way active travel  route.&nbsp; The proposals will link the existing route  at Shields Road, along St Andrews Drive to Pollok Country Park.  &nbsp;Current proposals include a segregated cycle route, footway  improvements, upgraded pedestrian crossings, improved Bus / Public  Transport access as well as major junction works to improve active  travel &nbsp;journeys.</em><br><br><em>As part of this work an information gathering event is proposed at St Alberts Primary School,&nbsp; 36 Maxwell Drive, on Wednesday  the 22nd of January 2020 between 3.30pm and 7pm, where the public will  be able to view proposed designs for infrastructure upgrades and make  comments on the proposals.<br><br>In addition to the event a webpage will be  available from the 2nd of December 2019 for a period of 2 months.  Visitors to this website can view drawings of the proposed design and  provide comments through an online feedback process. The  address for the Webpage is </em><a href="http://www.glasgow.gov.uk/swcw"><em>www.glasgow.gov.uk/swcw</em></a><em>. </em><strong><em>This website will go live on the 2</em><sup><em>nd</em></sup><em> of December 2019.</em></strong><em> &nbsp;<br><br>I trust this information is of assistance.<br><br>Kind Regards.&#8221;</em></p>



<p>Lots to look forward to &#8211; see you on the 22nd January.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9495</post-id>	</item>
		<item>
		<title>Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East</title>
		<link>https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430</link>
		
		<dc:creator><![CDATA[Tricia Fort]]></dc:creator>
		<pubDate>Tue, 26 Nov 2019 17:00:34 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[Consultation digest]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[20mph]]></category>
		<category><![CDATA[automated vehicles]]></category>
		<category><![CDATA[bus lanes]]></category>
		<category><![CDATA[car parking]]></category>
		<category><![CDATA[Contraflow cycling]]></category>
		<category><![CDATA[cycle route]]></category>
		<category><![CDATA[East Dunbartonshire]]></category>
		<category><![CDATA[East Renfrewshire]]></category>
		<category><![CDATA[glasgow]]></category>
		<category><![CDATA[North Lanarkshire]]></category>
		<category><![CDATA[petition]]></category>
		<category><![CDATA[Scottish Government]]></category>
		<category><![CDATA[Segregated cycle lanes]]></category>
		<category><![CDATA[shared footways]]></category>
		<category><![CDATA[South Lanarkshire]]></category>
		<category><![CDATA[survey]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[taxis]]></category>
		<category><![CDATA[traffic calming]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=9430</guid>

					<description><![CDATA[Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3, and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and &#8230; <p class="link-more"><a href="https://www.gobike.org/consultation-digest-issue-48-26-november-2019-petitions-special-and-potential-for-cycle-lanes-in-glasgow-north-east-9430" class="more-link">Continue reading<span class="screen-reader-text"> "Consultation Digest Issue 48, 26 November 2019: Petitions special and potential for cycle lanes in Glasgow North-East"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Good news in this issue with the roll-out of 20mph in Glasgow, the National Cycle Route in Glasgow Green and the South West City Way, see Section 3,  and we look forward to cycle lanes to Glasgow&#8217;s newest railway station at Robroyston, but do read on for lots, lots more with mention of South and North Lanarkshire, East Dunbartonshire and East Renfrewshire as well as the big city.</p>



<span id="more-9430"></span>



<h4 class="wp-block-heading">Contents:</h4>



<h6 class="wp-block-heading">Section 1: Current Consultations</h6>



<ol class="wp-block-list"><li>**NEW** Glasgow, Road Satisfaction on-line survey, closes ??</li><li>Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</li><li>East Renfrewshire, Local Development Plan 2, closes 13 December</li><li>**NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</li><li>**NEW** Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ ,  closes 13 December </li><li>East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</li><li>**NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</li><li>**NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</li><li>Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</li><li> **NEW** Glasgow, City Centre Strategic Development Framework, closes 17 January 2020 </li></ol>



<h6 class="wp-block-heading">Section 2: Forthcoming Consultations</h6>



<ol class="wp-block-list"><li>Scottish Government,  Strategic Transport Projects Review (STPR2) </li></ol>



<h6 class="wp-block-heading">Section 3: Consultation Feedback</h6>



<ol class="wp-block-list"><li>Glasgow, Elmbank Street, we have found an alternative route! </li><li>East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</li><li>Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</li><li>Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</li><li>Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </li></ol>



<h4 class="wp-block-heading">Section 1: Current Consultations, in date order for responses</h4>



<h6 class="wp-block-heading">1.1 **NEW** Glasgow, Road Satisfaction on-line survey, closes ??</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="700" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=525%2C700&#038;ssl=1" alt="" class="wp-image-4243" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?w=756&amp;ssl=1 756w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=225%2C300&amp;ssl=1 225w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=450%2C600&amp;ssl=1 450w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/02/ILOH-Kilmarnock-Road.jpg?resize=357%2C476&amp;ssl=1 357w" sizes="auto, (max-width: 706px) 89vw, (max-width: 767px) 82vw, 740px" /></figure>



<p>GoBike members Derek and Neil alerted us to this on-line survey. The City Council is looking for residents&#8217; views of the city&#8217;s roads.  As seems quite standard with these things there is no closing date given, so please try to respond as soon as you can, using this link: <a rel="noreferrer noopener" aria-label="https://www.surveymonkey.co.uk/r/glasgow-city-2 (opens in a new tab)" href="https://www.surveymonkey.co.uk/r/glasgow-city-2" target="_blank">https://www.surveymonkey.co.uk/r/glasgow-city-2</a></p>



<h6 class="wp-block-heading">1.2 Glasgow, Belmont Traffic Management Order 2005 (Variation No. 2) 20__-Publication of Proposals, closes 29 November</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9146" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=600%2C311&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/09/Hamilton-Gardens-map.png?w=632&amp;ssl=1 632w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>The publication of these proposals was reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.3 and GoBike fully supports the proposed restriction on parking. We&#8217;ll be writing in later this week confirming our support.</p>



<h6 class="wp-block-heading">1.3 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; A81 Milngavie Road and Maryhill Road Redetermination of passage to be by Pedal Cycle and foot only, closes 02 December</h6>



<p>These proposals have been in recent Digests, including <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.4. While we support protected cycle lanes and are concerned about shared footways, we recognise that for those many people who do not wish to cycle on road with all the single occupancy motor commuters at this busy  junction area, these proposals will improve their journey. Our<a rel="noreferrer noopener" aria-label=" letter of response is here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Cluny-Park-A81-Redetermination-letter-111119.pdf" target="_blank"> letter of response is here</a>.</p>



<h6 class="wp-block-heading">1.4 East Renfrewshire, Local Development Plan 2, closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="465" height="260" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=465%2C260&#038;ssl=1" alt="" class="wp-image-9397" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?w=465&amp;ssl=1 465w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/LDP2-LOGO2.jpg?resize=300%2C168&amp;ssl=1 300w" sizes="auto, (max-width: 465px) 100vw, 465px" /></figure>



<p>This was first mentioned in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.5 and we have now started a new channel on Slack for GoBike members who live, work or have a strong interest in East Renfrewshire active travel. Members have been to the Local Consultation events and are busy finding out the issues and concerns about the Local Development Plan 2. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the document and consultation details (opens in a new tab)" href="https://www.eastrenfrewshire.gov.uk/ldp2" target="_blank">link to the document and consultation details</a>. If you would like to get involved, do please contact us. We aim to have a GoBike response ready in good time for 13 December.</p>



<h6 class="wp-block-heading">1.5 **NEW** Glasgow, Dalmarnock West TRO parking restrictions, closes 13 December</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/Dalmarnock-Railway-Station.jpg?w=525&#038;ssl=1" alt="" class="wp-image-9235"/></figure></div>



<p><br>Yes, this is another that we unwittingly published at the Stage 1 Consultation Stage. Our response, given in Digest 46, Item 1.2, one of support, but also concern about parking being displaced across the river, is <a rel="noreferrer noopener" aria-label="here (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/10/GoBike-Dalmarnock-West-Letter-151019.pdf" target="_blank">here</a>. The City Council replied on 12 November with this email:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST) (TRAFFIC REGULATION) ORDER 20__</em></strong><em><br><br>Thank you for your comments on behalf of  GoBike, in relation to the above named Traffic Regulation Order (TRO).<br>I note your comments regarding Shawfield Road and would advise that this falls outwith the Glasgow City  boundary and is not included within the above TRO.<br><br>However, your comments regarding this and your further comments about the National Cycle Route 75, have  been passed to the appropriate team, who will respond to you in due course.&nbsp;  <br><br>I trust this is of assistance, however should you require further information please contact my assistant,  (Name and phone number removed by GoBike). </em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-3.png?w=525&#038;ssl=1" alt="" class="wp-image-9436"/></figure>



<p><strong><em>Kevin Hamilton</em></strong><em>, </em><strong><em>Head of Roads</em></strong><em>, </em><strong><em>Neighbourhoods and Sustainability</em></strong>&#8220;</p>



<p>The information now put firmly in the public domain and sent to us with this email on 18 November is here:</p>



<p>&#8220;<strong><em>THE GLASGOW CITY COUNCIL, (DALMARNOCK WEST)</em></strong><em> </em><strong><em>(TRAFFIC REGULATION) ORDER 20___</em></strong><em><br><br>Further to my consultation email of 4</em><sup><em>th</em></sup><em> October 2019 regarding the above named Traffic Regulation Order, and in accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons, detailed report.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .&nbsp; <br><br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Kevin Hamilton, Head of Roads Neighbourhoods and Sustainability or by e-mail to </em><a href="land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by 13</em><sup><em>th</em></sup><em> December 2019.<br><br>Yours faithfully</em></p>



<figure class="wp-block-image"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/image-4.png?w=525&#038;ssl=1" alt="" class="wp-image-9437"/></figure>



<p><em>Kevin Hamilton, Head of Roads, Neighbourhoods and Sustainability</em>&#8220;</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Dalmarnock_West__TRO-A3_Titlebox_-_Transplan.pdf" target="_blank">Plan</a>, <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/NoticeOfProposals-DalmarnockWest-210x85mm.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Draft Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/09.01-Draft-Report-1.pdf" target="_blank">Draft Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/08-1-Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>GoBike will maintain its support for these proposals but will emphasise the points we made before about Cycle Route 75 and our concern about parking transferring to South Lanarkshire, just across the river. Do write in to the Council if these proposals affect you or you have a view on them.</p>



<h6 class="wp-block-heading">1.6 Glasgow City Council (Robroyston Station) Traffic Regulation Order 201_ (OFFICIAL), closes 13 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="222" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=525%2C222&#038;ssl=1" alt="" class="wp-image-9449" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1366&amp;ssl=1 1366w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=300%2C127&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?resize=600%2C253&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-map.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p><strong>Stage 1, north of the railway</strong><br>GoBike received the initial proposals for this scheme, to restrict parking on a new road (not shown on this map) from the M80 (at the roundabout to the north-west of the new station) to the station itself on 28 October 2019. We replied on 19 November with this <a rel="noreferrer noopener" aria-label="letter (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/GoBike-Robroyston-M80-Parking-Stage-1-response-191119.pdf" target="_blank">letter</a>, basically saying that we support the parking restrictions but that cycle lanes should be constructed from Robroyston along this new road to the station.</p>



<p>Here&#8217;s the email reply that we received from the City Council on 22 November:</p>



<p>&#8220;<em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS, HEAD OF TECHNICAL SERVICES, NEIGHBOURHOODS AND SUSTAINABILITY<br><br>Dear Ms Fort,<br><br>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_<br><br>Thank you for your support of the above named Traffic Regulation Order on behalf of GoBike.<br> It  is intended to provide cycle measures on Station Road to connect to  Robroyston Station and this will be subject to future consultation.<br><br>I  trust this is of assistance, however should you require further  information please contact my assistant (name and contact details removed by GoBike).<br><br>Yours sincerely</em>&#8221; etc</p>



<p>Note the intention to &#8220;provide cycle measures&#8221;!</p>



<p><strong>Public consultation 2018, south of the railway</strong><br>This would link in excellently to the proposal we submitted for cycle lanes to be constructed in conjunction with parking restrictions on Station Road  Millerston, linking the new station to the A80 Cumbernauld Road last October. Our final mention of that consultation was Item 1.1 in <a href="https://www.gobike.org/consultation-digest-issue-22-20-november-2018-a-bumper-bundle-of-new-consultations-7056">Digest 22</a>. Here&#8217;s our <a rel="noreferrer noopener" aria-label="letter of support with comments (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/10/GoBike-Station-Road-Support-and-comments-Letter-171018.pdf" target="_blank">letter of support with comments</a> .</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-6659" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=3264&amp;ssl=1 3264w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/10/IMG_2030.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Station Road Millerston</figcaption></figure>



<p> For the proposal above, for Station Road, Millerston, it slipped our notice last year that the eastern side of Station Road is in North Lanarkshire, not Glasgow, so residents in the houses on the right-hand side of the road in the photo above might well be plagued by cars left outside their homes once the station opens in a few weeks!</p>



<p><strong>Public Consultation north of the railway</strong><br>This brings us back to the public consultation for the new road north of the railway and this email that we received on 21 November 2019:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><em><br><br> Dear Sir/Madam<br><br></em><strong><em>THE GLASGOW CITY COUNCIL, (ROBROYSTON STATION), (TRAFFIC REGULATION) ORDER 201_</em></strong><em><br><br>Further to my consultation email of 28</em><sup><em>th</em></sup><em>  October 2019 regarding the above named Traffic Regulation Order, and in  accordance with statutory procedures, I now enclose a copy of the press  notice of the proposed Order, relevant map, statement of reasons and  detailed report. Additional corner protection has been added to the  initial draft order at Millersneuk Crescent to ensure safe access for  the local community.<br><br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> </em><br><br><em>As  stated in the attached documentation, any person wishing to object to  the proposed Order should send details of the grounds for objection in  writing to Group Manager, Technical Services, Neighbourhoods  and Sustainability, Exchange House, 231 George Street, Glasgow, G1 1RX  or by e-mail to </em><a href="mailto:SustainableTransport@glasgow.gov.uk"><em>SustainableTransport@glasgow.gov.uk</em></a><em> by Friday 13</em><sup><em>th</em></sup><em>  December 2019.<br><br>Yours faithfully&#8221;</em> etc</p>



<p>Here are the documents referred to in the email: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/RobroystonStation_TRO_Advert_Nov19.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="map/plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/TS-5244-M-000-P-001A.pdf" target="_blank">map/plan</a>, <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-Report-Nov-2019.pdf" target="_blank">Report</a> and <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Robroyston-Station-TRO-SOR.pdf" target="_blank">Statement of Reasons</a>.</p>



<p>We will be repeating our request for cycle lanes on this new road in our response. The overall scheme has the potential of creating good active travel access from Robroyston across to Hogganfield Loch and the <a rel="noreferrer noopener" aria-label="Seven Lochs wetland park (opens in a new tab)" href="https://www.sevenlochs.org/" target="_blank">Seven Lochs wetland park</a> . The east and north of the city has been neglected so far on the active travel front and this is a chance to address that shortfall. Do please write in to support our suggestion!</p>



<p>For these overall works, ie the new road to the north of the railway, the double yellow lining on all the new road and the west side of Station Road south of the railway plus the east side of Station Road at the railway end &#8211; see this <a rel="noreferrer noopener" aria-label="plan from last year (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/The_Glasgow_City_Council_Station_Road_Traffic_Regulation_Order_201_.pdf" target="_blank">plan from last year</a> for the Station Road Millerston proposal, it&#8217;s critical that there is liaison between Glasgow City Council and North Lanarkshire! If you live in Glasgow Ward 17, Robroyston, Glasgow Ward 21, North East or North Lanarkshire Ward 5, Stepps, Chryston &amp; Muirhead do please <a rel="noreferrer noopener" aria-label="contact your councillors (opens in a new tab)" href="https://www.mysociety.org/wehelpyou/contact-your-local-councillor/" target="_blank">contact your councillors</a> to press on them the need for good cycling provision.</p>



<p>One of the councillors for Ward 17 is <a rel="noreferrer noopener" aria-label="Martin McElroy (opens in a new tab)" href="https://www.glasgow.gov.uk/councillorsandcommittees/member.asp?id=1307&amp;t=Councillor+Martin+McElroy" target="_blank">Martin McElroy</a>, who briefly oversaw cycling issues in the previous Glasgow administration and spoke at a GoBike AGM a few years ago. He also cycles regularly, so do please contact him if this is your ward.</p>



<h6 class="wp-block-heading">1.7 East Dunbartonshire, Proposed Traffic Regulation Order and road humps &#8211; Maxwell Avenue Area, Bearsden, closes 16 December</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="272" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=525%2C272&#038;ssl=1" alt="" class="wp-image-9376" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?w=632&amp;ssl=1 632w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=300%2C156&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Maxwell-Avenue.png?resize=600%2C311&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>This was a new public consultation that we publicised in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 1.6. We commented on the proposal at the initial stage with a view that the gap at the side of the speed tables should be more than 750mm. This hasn&#8217;t been included in the final proposal but we will not object to the scheme overall.</p>



<h6 class="wp-block-heading">1.8 **NEW** South Lanarkshire, Stewartfield Way proposed upgrade, closes 20 December</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="312" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=312%2C162&#038;ssl=1" alt="" class="wp-image-8162" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?w=312&amp;ssl=1 312w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/south-lanarkshire.png?resize=300%2C156&amp;ssl=1 300w" sizes="auto, (max-width: 312px) 100vw, 312px" /></figure></div>



<p>GoBike member, Derek, posted this on Slack and all those of you who live, work or travel in East Kilbride please do take notice of this. Here is the <a rel="noreferrer noopener" aria-label="link to the proposal (opens in a new tab)" href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank">link to the proposal</a>, with photos and videos plus details of how to respond. </p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="295" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=525%2C295&#038;ssl=1" alt="" class="wp-image-9473" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1334&amp;ssl=1 1334w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=300%2C169&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?resize=600%2C337&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Stewartfield-Way.png?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>Derek&#8217;s comment on this Stewartfield Way fly through video screenshot is: &#8220;<em>Looks like narrow shared path, not primary cycle route as marked in amended network plan. Huge roundabout in background with few crossings.&#8221;  </em>Certainly, just a quick look at the website link gives the impression that the proposals are to cater for the motor vehicle congestion by building more road, rather than looking for modal change, with the emphasis on public and active travel. Derek gives us another comment, probably from twitter &#8220;<em>consultation on dualling. Narrow shared paths, few crossings but now dressed up like it’s primary route in active travel network</em>.&#8221; </p>



<p>Do please get your views in &#8211; this may be done on-line; see the link given above, and repeated <a href="https://www.southlanarkshire.gov.uk/info/200232/roads_lighting_and_pavements/1830/stewartfield_way_proposed_upgrade" target="_blank" rel="noreferrer noopener" aria-label="here (opens in a new tab)">here</a>.</p>



<h6 class="wp-block-heading">1.9 **NEW** Glasgow, Finnieston Bridge taxis and authorised vehicles to use bus and cycle lanes TRO, closes 03 January 2020</h6>



<div class="wp-block-image"><figure class="alignleft"><img data-recalc-dims="1" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2018/06/Clyde-Arc-Bridge.jpg?w=525&#038;ssl=1" alt="" class="wp-image-5336"/></figure></div>



<p>In June 2018 we received the proposals for an experimental TRO to allow taxis and authorised vehicles to use the Finnieston/Clyde Arc/Squinty Bridge for an 18-month period. This was reported in <a rel="noreferrer noopener" aria-label="Digest 11 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-11-going-squinty-about-the-squinty-bridge-byres-road-submission-20mph-parking-etc-etc-5316" target="_blank">Digest 11</a>, Item 1.8 and we were not happy. Here&#8217;s the <a rel="noreferrer noopener" aria-label="letter of objection (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2018/06/GoBike-Finnieston-Bridge-Experiment-TRO-Objection-080618.pdf" target="_blank">letter of objection</a> that we submitted on 08 June 2018.</p>



<p>The City Council have apparently decided to make the trial a permanent feature and here&#8217;s the email that we received on 25 November:</p>



<p>&#8220;<strong><em>MESSAGE SENT ON BEHALF OF CHRISTINE FRANCIS</em></strong><em>, </em><strong><em>HEAD OF TECHNICAL SERVICES</em></strong><em>, </em><strong><em>NEIGHBOURHOODS AND SUSTAINABILITY</em></strong><br><br><em>Dear Sir or Madam,<br><br></em><strong><em>THE GLASGOW CITY COUNCIL</em></strong><em>, </em><strong><em>FASTLINK ROUTE</em></strong><em>, </em><strong><em>(FINNIESTON BRIDGE TO WHITEFIELD ROAD) ORDER 2015</em></strong><em>, </em><strong><em>AMENDMENT No.1 20__</em></strong><em><br><br>The Council propose to consider the introduction of the above named Traffic Regulation Order.<br>Please find enclosed a copy of the press notice of the proposed Order, relevant map, statement of reasons and detailed report.<br>Details of the proposals will also be available on the Glasgow City Council website at </em><a href="http://www.glasgow.gov.uk/proposedtro"><em>www.glasgow.gov.uk/proposedtro</em></a><em> .  <br>As stated in the attached documentation, any person  wishing to object to the proposed Order should send details of the grounds for objection in writing to Projects Manager, Project Management and Design, Neighbourhoods and Sustainability, 231 George Street, Glasgow G1 1RX  or by e-mail to </em><a href="mailto:land@glasgow.gov.uk"><em>land@glasgow.gov.uk</em></a><em> by Friday 3</em><sup><em>rd</em></sup><em>  January 2020.<br>Yours faithfully</em>&#8221; etc</p>



<p>The documents referred to in the email are here: <a rel="noreferrer noopener" aria-label="Press Notice (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Press-Notice.pdf" target="_blank">Press Notice</a>, <a rel="noreferrer noopener" aria-label="Map/Plan (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Relevant-Map.pdf" target="_blank">Map/Plan</a>, <a rel="noreferrer noopener" aria-label="Statement of Reasons (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Statement-of-Reasons.pdf" target="_blank">Statement of Reasons</a> and <a rel="noreferrer noopener" aria-label="Report (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/Detailed-Report.pdf" target="_blank">Report</a>.</p>



<p>We are unaware of any improvements that have been made to the active travel regime in the area of this bridge and Fastlink overall, but presumably there have been no incidents reported to Police Scotland in the duration of the temporary TRO. No doubt the taxi operators are delighted with the additional road use they have gained! If you have any views on your experience of using this bridge do please email them to consultations@gobike.org so that they may be reflected in our first message of the New Year to the City Council.</p>



<h6 class="wp-block-heading">1.10 Law Commission, Highly Automated Road Passenger Services, HARPS, public consultation, closes 16 January 2020</h6>



<p>This consultation was first given in <a rel="noreferrer noopener" aria-label="Digest 46 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-46-29-october-2019-queen-margaret-drive-and-automated-vehicles-are-back-plus-lots-more-9284" target="_blank">Digest 46</a>, Item 1.9 and we are hoping that we see the views of those organisations with more insight than us before submitting our response in the New Year. If you do see reviews of this proposal do please send the details to consultations@gobike.org</p>



<h6 class="wp-block-heading">1.11 **NEW**  Glasgow, City Centre Strategic Development Framework, closes 17 January 2020  </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="334" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=525%2C334&#038;ssl=1" alt="" class="wp-image-9458" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?w=1007&amp;ssl=1 1007w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=300%2C191&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Draft_City_Centre_Development_Framework_Consultation-Draft-Nov2019a-1.jpg?resize=600%2C381&amp;ssl=1 600w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike member, Pat, alerted us to this latest in the series of Strategic Development Frameworks for Glasgow. Here&#8217;s the <a rel="noreferrer noopener" aria-label="link to the consultation (opens in a new tab)" href="https://www.glasgowconsult.co.uk/KMS/dmart.aspx?strTab=PublicDMartCurrent&amp;NoIP=1" target="_blank">link to the consultation</a> and we will be reviewing it over the next few weeks. If you have any specific concerns do please let us know. </p>



<h4 class="wp-block-heading">Section 2: Forthcoming Consultations</h4>



<h6 class="wp-block-heading">2.1  Scottish Government,  Strategic Transport Projects Review (STPR2) </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="517" height="97" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=517%2C97&#038;ssl=1" alt="" class="wp-image-8352" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?w=517&amp;ssl=1 517w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/04/Scottish-Government.png?resize=300%2C56&amp;ssl=1 300w" sizes="auto, (max-width: 517px) 100vw, 517px" /></figure>



<p> CyclingUK in Scotland alerted us to this forthcoming consultation and here&#8217;s the email that we got on 18 November:</p>



<p>&#8220;<em>Hi campaigners and supporters<br><br>What’s on your cycling Christmas list? I’m talking  about cycling infrastructure that you want in your area rather than new  tyres for your bike or a thicker pair of gloves! <br><br>Government and their consultants are right now  finalising an online consultation for the Strategic Transport Projects  Review (STPR2) – a kind of spending review of major transport projects  for the next 20 years. See this set of slides abut  STPR2: </em><a href="https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf"><em> https://transformscotland.org.uk/wp/wp-content/uploads/2018/06/STPR2-Presentation-1st-May-2018.pdf</em></a><em> <br></em><br><em>The online consultation is a way of gathering ideas  for consideration in the spending review. It’s massively important that  we use this consultation to say what is needed in Scotland, and use it  to give Government confidence that there  is support for spending money on cycling infrastructure. <br><br>We expect the </em><strong><em>consultation to be launched this month</em></strong><em>  so do look out for it. I want to give you advanced notice so you can  think about how to work with others in your groups, clubs, and networks  to develop ideas. I also want to be  of assistance in helping you and will provide more information when I  know more about the consultation. But please do get in touch if you want  to discuss or if you have questions. </em><br><br><strong><em>This consultation is important</em></strong><em> – STPR2 will  apportion £billions on transport – we need to make the case for  sustainable transport loud and clear and tell Government what we want. </em></p>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="300" height="162" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&#038;ssl=1" alt="" class="wp-image-9446" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?resize=300%2C162&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/CyclingUK-in-Scotland.png?w=305&amp;ssl=1 305w" sizes="auto, (max-width: 300px) 100vw, 300px" /></figure></div>



<p><em>Regards<br><br>Jim<br></em><strong><em>Jim Densham</em></strong><em><br></em><strong><em>Campaigns and Policy Manager &#8211; Scotland</em></strong><em><br></em><strong><em>Cycling UK in Scotland</em></strong><em><br>Email: </em><a href="mailto:jim.densham@cyclinguk.org"><em>jim.densham@cyclinguk.org</em></a>&#8220;<br></p>



<h4 class="wp-block-heading">Section 3: Consultation Feedback</h4>



<h6 class="wp-block-heading">3.1 Glasgow, Elmbank Street, we have found an alternative route! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="371" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276-600x424.jpg?resize=525%2C371&#038;ssl=1" alt="" class="wp-image-7327" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=600%2C424&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?resize=300%2C212&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/Elmbank-Street-e1546714824276.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>Regular readers of this Digest will surely remember the fury we vented on Glasgow City Council when, as part of the plans for the Sauchiehall Street Avenue and Cycle Lanes project (which we very much support) it became clear that there was to be no easy way to reach Sauchiehall Street from Elmbank Street and the busy area to the south of Bath Street?<br>At a stroke the north part of Elmbank Street was made one-way southbound, and why? To allow car parking on either side! Yes, even though there is a multi-storey car park on Elmbank Crescent to the rear of the King&#8217;s Theatre. Numerous requests were made to the City Council for details of the cycle route from Bath Street to Sauchiehall Street but, we were told, such detail was outwith the remit of the Sauchiehall Street project.</p>



<p>GoBike member, Derek (and note we have 2 very active members with the first name Derek), has now brought it to our attention that Bath Lane, running south to and  parallel to Bath Street has been resurfaced from Elmbank Street to Holland Street. Holland Street, which was made one-way southbound from Sauchiehall Street to Bath Street for the duration of the works, has now reverted to being one-way northbound. Thus there is a feasible route from the two-way section of Elmbank Street, ie <strong>via Bath Lane and Holland Street</strong>.</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="2481" height="3507" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?fit=424%2C600&amp;ssl=1" alt="" class="wp-image-9465" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=2481&amp;ssl=1 2481w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=212%2C300&amp;ssl=1 212w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?resize=424%2C600&amp;ssl=1 424w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Bath-Lane.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /><figcaption>Elmbank Street to Sauchiehall Street, on scrap paper and needing a CAD course!</figcaption></figure>



<p>This route, of course, is not signposted, so won&#8217;t be obvious to the many visitors to our fine city and it does not absolve our City Council of their refusal to allow contraflow cycling and improve permeability for cycle traffic.</p>



<h6 class="wp-block-heading">3.2 East Dunbartonshire, Proposed Traffic Regulation Order &#8211; Lenzie Waiting Restrictions</h6>



<div class="wp-block-image"><figure class="alignright"><img data-recalc-dims="1" loading="lazy" decoding="async" width="270" height="186" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/10/East-Dunbartonshire-Council.jpg?resize=270%2C186&#038;ssl=1" alt="" class="wp-image-9226"/></figure></div>



<p>Back in March we published proposals for parking restrictions in Lenzie and surrounding areas in East Dunbartonshire in <a rel="noreferrer noopener" aria-label="Digest 30 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-30-19-march-2019-get-your-views-in-now-to-the-spt-regional-survey-and-the-get-glasgow-moving-petition-and-is-transformation-possible-8038" target="_blank">Digest 30</a>, Item 1.7. Our <a href="https://www.gobike.org/wp-content/uploads/2019/04/GoBike-Lenzie-Waiting-Restrictions-support-010419.pdf" target="_blank" rel="noreferrer noopener" aria-label="response (opens in a new tab)">response</a>, supporting the proposals was in <a rel="noreferrer noopener" aria-label="Digest 31 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-31-04-april-2019-featuring-glasgow-east-dunbartonshire-and-north-lanarkshire-8133" target="_blank">Digest 31</a>, Item 1.7. East Dunbartonshire have now approved the TRO and here&#8217;s the email that we received on 12 November:</p>



<p>&#8220;<em>THE EAST DUNBARTONSHIRE COUNCIL (LENZIE)  (WAITING RESTRICTIONS) ORDER   2019<br><br>The  above-mentioned Traffic Regulation Orders has now been made and will become  effective  on  Monday, 6 January 2020. Enclosed are copies of the Order and plan, together with copy of the Notice that is to appear in the   editions  of  the  Kirkintilloch Herald which is published on 13 November   2019.   <br><br>(See   attached   file:   <a rel="noreferrer noopener" aria-label="191112   Lenzie  Area  -  Waiting  and  Loading   Restrictions.pdf (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/191112-Lenzie-Area-Waiting-and-Loading-Restrictions.pdf" target="_blank">191112   Lenzie  Area  &#8211;  Waiting  and  Loading   Restrictions.pdf</a>)   <br><br>Regards   <br>Fiona Stirling   <br>Legal Services</em>&#8220;</p>



<h6 class="wp-block-heading">3.3 Glasgow, Bob Downie&#8217;s petition to keep National Cycle Route 75 open through Glasgow Green during events</h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9384" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?w=640&amp;ssl=1 640w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/IMG_0462.jpg?resize=600%2C450&amp;ssl=1 600w" sizes="auto, (max-width: 525px) 100vw, 525px" /></figure>



<p>As reported in <a rel="noreferrer noopener" aria-label="Digest 47 (opens in a new tab)" href="https://www.gobike.org/consultation-digest-issue-47-12-november-2019-good-news-and-bad-news-from-glasgow-city-council-9355" target="_blank">Digest 47</a>, Item 3.2, Bob Downie&#8217;s petition was heard by the City Council&#8217;s Wellbeing, Empowerment, Community and Citizen Engagement City Policy Committee on 14 November. Here is the <a rel="noreferrer noopener" aria-label="Committee Report (opens in a new tab)" href="http://www.glasgow.gov.uk/councillorsandcommittees/viewDoc.asp?c=P62AFQDN0G81Z30GDX" target="_blank">Committee Report</a> and the recommendations are:<br> &#8220;<em>After consideration, the committee <br>(1) agreed that the issues raised in the petition deserved further attention; and <br>(2) instructed the Executive Director of Neighbourhoods and Sustainability <br>(a) to implement his proposals <br>(i) to develop more robust, clear and visible signage directing cyclists and walkers to the alternative route when temporary closures of the National Cycle Route 75 were required; <br>(ii) to install early warning signs advising of up-coming events; <br>(iii) to arrange that the alternative route via the South embankment of the River Clyde be reviewed and improvements made to the surface and signage to further enhance the diversion; and <br>(iv) to ensure that officers engaged directly with affected groups; and <br>(b) to consider opportunities to consult alongside the major review of  events and public parks. &#8220;</em></p>



<p>So far, so good. We&#8217;ll let you know if and when we hear any more.</p>



<h6 class="wp-block-heading">3.4 Glasgow, Bob Downie&#8217;s petition to bring in a default 20mph speed limit in Glasgow</h6>



<figure class="wp-block-image is-resized"><img data-recalc-dims="1" loading="lazy" decoding="async" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/20-mph.jpg?resize=525%2C349&#038;ssl=1" alt="" class="wp-image-9456" width="525" height="349"/></figure>



<p>Some of you might remember that back in 2015 Bob Downie presented his <a rel="noreferrer noopener" aria-label="petition (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/20-mph-GCC-Presentation-final.pdf" target="_blank">petition</a> calling for the introduction of a default 20mph speed limit in Glasgow. The petition was well received by Councillors but then fell away and the policy of bit by wee bit was reverted to. Well, a lot has happened since then so we can&#8217;t give Bob all the credit but Glasgow City Council has now agreed to roll out a 20 mph limit across the city, see:  <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/" target="_blank">https://stv.tv/news/west-central/1442576-glasgow-roads-set-for-20mph-speed-limit-over-next-four-years/</a> </p>



<p>This is good news indeed. GoBike has been supporting every new introduction of a 20 limit in the city but has been appalled at the arbitrary nature of these zones, of which there are now over 80. Yes, that&#8217;s right, over 80. Goodness knows how much all these have cost both in terms of TROs, signage and, of course collisions, as drivers go too fast for the conditions. It will be good to get some standardisation.</p>



<h6 class="wp-block-heading">3.5 Glasgow, South West City Way at Buchanan Wharf (Clyde Place and West Street), progress! </h6>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="394" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=525%2C394&#038;ssl=1" alt="" class="wp-image-9466" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=4032&amp;ssl=1 4032w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/11/Riverview-Gardens.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>GoBike members on Slack will be aware that we have been in correspondence with Fairhurst, the Design Consultant for the Barclays Bank development on Clyde Place, about concerns over the South West City Way. GoBike member, Tor, sent in this photo, which is on her daily commute, because vehicle drivers exiting Riverview Gardens, to the right on the photo, appeared to be taking no cognisance of cycle traffic, particularly if it was coming from their left.</p>



<p>The latest news from Fairhurst, is this email, sent today, 26 November:</p>



<p>&#8220;<em>Please find attached our drawing number  <a rel="noreferrer noopener" aria-label="BWHARF-FHS-IN-XX-DR-D-94-151 C01 (opens in a new tab)" href="https://www.gobike.org/wp-content/uploads/2019/11/129594-PC-1151.pdf" target="_blank">BWHARF-FHS-IN-XX-DR-D-94-151 C01</a> which shows changes to the road  markings at West St / Riverview Gardens that have been approved by GCC,  following consultation with them.  The edge of carriageway and centre line markings that go through the  cycleway are to be removed to help emphasise that cars are approaching a  junction where they are to give way to cyclists. The Council preferred  to retain give way lines rather than using a  stop line</em>.&#8221; </p>



<p>Lots of good news in the feedback in this Digest. Let&#8217;s hope that it&#8217;s not just a one-off and we have more to tell you in 2 weeks&#8217; time.</p>



<p> </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">9430</post-id>	</item>
		<item>
		<title>How the other 50% gets around</title>
		<link>https://www.gobike.org/how-the-other-50-gets-around-7586</link>
		
		<dc:creator><![CDATA[John Donnelly]]></dc:creator>
		<pubDate>Sun, 03 Feb 2019 08:30:41 +0000</pubDate>
				<category><![CDATA[GoBike]]></category>
		<category><![CDATA[infrastructure]]></category>
		<category><![CDATA[maintenance]]></category>
		<category><![CDATA[NCN7]]></category>
		<category><![CDATA[scw]]></category>
		<category><![CDATA[swcw]]></category>
		<category><![CDATA[Transport Poverty]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=7586</guid>

					<description><![CDATA[GoBike calls for a drastic overhaul on gritting priorities from Glasgow City Council. Almost 50% of Glaswegians don&#8217;t have access to a private car. For them walking and cycling is not active travel, but is how they get around. Transport Poverty is a real factor to a number of people in this city. Last week &#8230; <p class="link-more"><a href="https://www.gobike.org/how-the-other-50-gets-around-7586" class="more-link">Continue reading<span class="screen-reader-text"> "How the other 50% gets around"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>GoBike calls for a drastic overhaul on gritting priorities from Glasgow City Council.  Almost 50% of Glaswegians don&#8217;t have access to a private car.  For them  walking and cycling is not active travel, but is how they get around.  Transport Poverty is a real factor to a number of people in this city.</p>



<p>Last week saw ice return to Glasgow.  At the same time the focus of getting Glaswgians to participate in active travel seemed to go out of the window. Footpath and cycle lanes were ice rinks.  In the light of lots of disquiet from our members about the unjust priorities the council have set for gritting, we have decided it is time for action.</p>



<span id="more-7586"></span>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="416" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/IMG_20190124_083656.jpg?resize=525%2C416&#038;ssl=1" alt="" class="wp-image-7639"/><figcaption>Glasgow&#8217;s 2nd busiest cycle route on Thursday 24th January at 8.36am</figcaption></figure>



<h2 class="wp-block-heading">Priorities</h2>



<p>Glasgow City Council are actively encouraging people to move from private cars to active travel.  This would appear to be only for those days where ice is not forecast.  On those days it would appear that the priority is to get the cars moving around Glasgow.</p>



<p>Many of our members tweeted the dire conditions they faced while trying to undertake their daily commute.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
https://twitter.com/JohnChivall/status/1088371505484959744
</div></figure>



<p>Leaving the bike and walking wasn&#8217;t really an option either.  Those on foot were not fairing much better.  Many had to resort to walking on the gritted roads as the foot ways were unsafe.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Treacherous pavements everywhere this morning so people were forced to walk on the carriageway (where gritting kept cars mobile, obvs).  <br><br>Pavement and cycle track were beyond use.  Does <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> forget that half the city&#39;s households don&#39;t have access to a car? <a href="https://t.co/JNUgEFZwhB">pic.twitter.com/JNUgEFZwhB</a></p>&mdash; Ernie Marples <img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f1ea-1f1fa.png" alt="🇪🇺" class="wp-smiley" style="height: 1em; max-height: 1em;" /><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3f4-e0067-e0062-e0073-e0063-e0074-e007f.png" alt="🏴󠁧󠁢󠁳󠁣󠁴󠁿" class="wp-smiley" style="height: 1em; max-height: 1em;" /><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f1ee-1f1ea.png" alt="🇮🇪" class="wp-smiley" style="height: 1em; max-height: 1em;" /> (@ErnieMarples) <a href="https://twitter.com/ErnieMarples/status/1088361192366710784?ref_src=twsrc%5Etfw">January 24, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p>It seems unfair to encourage people to move from their car to walking or cycling, then abandon them as soon as the ice comes to town. For those whose New Year resolution was to leave the car and walk or cycle, I am sure they are having second thoughts now. To enable people to commit to walking or cycling to work, school or the shops, this needs to be an option all year round. </p>



<h2 class="wp-block-heading">Deja Vu</h2>



<p>It was a similar situation during the cold snap in December.  There were multiple crashes on key cycle routes, including the South West City Way and the NCR 7 beside the transport museum.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">So the predicted ice came to fruition and the expected skating rink on SWCW also raised it&#39;s ugly head, also as predicted. <a href="https://twitter.com/GoBikeGlasgow?ref_src=twsrc%5Etfw">@GoBikeGlasgow</a> <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> <a href="https://twitter.com/AnnaLangside?ref_src=twsrc%5Etfw">@AnnaLangside</a> GCC it&#39;s not good enough. This route was treacherous with ice and unrideable. Despite riding slow, I fell on the ice.</p>&mdash; Graeme C (@gjcookie69) <a href="https://twitter.com/gjcookie69/status/1069874637478219776?ref_src=twsrc%5Etfw">December 4, 2018</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Gutted to see this. Sending well wishes to the injured person. <a href="https://t.co/DSVhc99qP5">https://t.co/DSVhc99qP5</a></p>&mdash; GoBike (@GoBikeGlasgow) <a href="https://twitter.com/GoBikeGlasgow/status/1069910834728570881?ref_src=twsrc%5Etfw">December 4, 2018</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<h2 class="wp-block-heading">Financial Impacts</h2>



<p>Slips, trips and falls are the most common types of accident in life generally, but snow and ice increase this. For most falls on snow or ice result in minor bumps and bruises.  If you are cycling usually the first thought is &#8220;how is the bike?&#8221;.</p>



<p>However, hundreds each year are less fortunate. They are admitted to hospital after suffering more serious injuries after falls during wintry weather.The cost of these admissions is considerable. Falls that result in a hospital admission cost an average of £5,000 each time. For older people this rises to £8,600. While a hip fracture costs the whole care system almost £40,000. </p>



<p>There needs to be a balancing of the cost of public health measures like gritting, with the healthcare costs associated with falls. The economic burden of falls on ice is substantial.  Keeping footpaths and cycle lanes free from ice should be a public health priority.</p>



<figure class="wp-block-image"><img data-recalc-dims="1" loading="lazy" decoding="async" width="525" height="307" src="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/02/MVIMG_20190130_085151.jpg?resize=525%2C307&#038;ssl=1" alt="" class="wp-image-7638"/><figcaption>Glasgow&#8217;s busiest cycle route at 8.50am on Wednesday 30th January.</figcaption></figure>



<h2 class="wp-block-heading">Transport Poverty</h2>



<p>Glasgow has always had a low car ownership level.  Within those areas of Glasgow with traditionally lower incomes the number of people with access to a private car drops even further. For them  walking and cycling is not active travel, but is how they get around.  </p>



<p>Transport Poverty is a real factor to a number of people who have limited options.  They don&#8217;t get duvet or snow days.  They need to get to their work or they will not get paid.  However, if trying to get to their work results in a fall and injury they often don&#8217;t get sick pay either.</p>



<p>Areas like Parkhead and Dalmarnock have 50% of children living in poverty.  Access to work is a key factor in getting people out of poverty. Removing the ability for them to get to work safely is morally reprehensible.<br></p>



<h2 class="wp-block-heading">Harder on Pedestrians than Drivers</h2>



<p>Alastair Dalton&#8217;s piece from last year is still relevant today.  He highlighted how pedestrians and cyclists are hit hardest when it snows.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">A timely reminder to <a href="https://twitter.com/GlasgowCC?ref_src=twsrc%5Etfw">@GlasgowCC</a> <a href="https://twitter.com/AnnaLangside?ref_src=twsrc%5Etfw">@AnnaLangside</a> from <a href="https://twitter.com/GoBikeGlasgow?ref_src=twsrc%5Etfw">@GoBikeGlasgow</a>. My take on it last year in <a href="https://twitter.com/TheScotsman?ref_src=twsrc%5Etfw">@TheScotsman</a>: <a href="https://t.co/j7qUkLBI1f">https://t.co/j7qUkLBI1f</a> <a href="https://t.co/EOqNea5Zjp">https://t.co/EOqNea5Zjp</a></p>&mdash; Alastair Dalton (@AlastairDalton) <a href="https://twitter.com/AlastairDalton/status/1088396672269537280?ref_src=twsrc%5Etfw">January 24, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p>We strongly agree with what Alastair wrote back then, in particular this:</p>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p><em>There is never going to be enough money to clear every road and pavement, but there seems to be a clear inequity in how they are tackled.</em></p></blockquote>



<h2 class="wp-block-heading">Call For Action </h2>



<p>Glasgow City Council, as a matter of urgency can not neglect their moral responsibility to reduce Transport Poverty and provide safe routes for people to walk and cycle.</p>



<p>We echo Chris Boardman’s request, that basic maintenance is provided on our foot paths and cycle lanes. We call for action from Glasgow City Council for a drastic reprioritisation of the winter maintenance policy that more fairly reflects the right for all people to get around, not just those who have access to a car.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="525" data-dnt="true"><p lang="en" dir="ltr">Another topic for the list: basic servicing and maintenance,, in line with what we do for Motor traffic as a minimum seems reasonable. <a href="https://t.co/RSq0AGQFA3">https://t.co/RSq0AGQFA3</a></p>&mdash; Chris Boardman (@Chris_Boardman) <a href="https://twitter.com/Chris_Boardman/status/1090603836975312896?ref_src=twsrc%5Etfw">January 30, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7586</post-id>	</item>
		<item>
		<title>**UPDATE** South West City Way Repairs</title>
		<link>https://www.gobike.org/update-south-west-city-way-repairs-7454</link>
		
		<dc:creator><![CDATA[Iona Shepherd]]></dc:creator>
		<pubDate>Mon, 21 Jan 2019 12:05:28 +0000</pubDate>
				<category><![CDATA[Campaign]]></category>
		<category><![CDATA[GoBike]]></category>
		<category><![CDATA[GoBike Board of Shame]]></category>
		<category><![CDATA[SWCW]]></category>
		<category><![CDATA[board of shame]]></category>
		<category><![CDATA[gcc]]></category>
		<category><![CDATA[glasgow city council]]></category>
		<category><![CDATA[south west city way]]></category>
		<category><![CDATA[swcw]]></category>
		<guid isPermaLink="false">https://www.gobike.org/?p=7454</guid>

					<description><![CDATA[Following our GoBike Board of Shame stunt on the SWCW in December, Glasgow City Council have started moving into action on effecting the required repairs and improving the standard of maintenance on the segregated cycle lanes of the South West City Way. Since our last update, the gritting on the lanes had been much improved &#8230; <p class="link-more"><a href="https://www.gobike.org/update-south-west-city-way-repairs-7454" class="more-link">Continue reading<span class="screen-reader-text"> "**UPDATE** South West City Way Repairs"</span></a></p>]]></description>
										<content:encoded><![CDATA[
<p>Following our<a href="https://www.gobike.org/the-gobike-board-of-shame-the-south-west-city-way-7185"> GoBike Board of Shame stunt on the SWCW </a>in December, Glasgow City Council have started moving into action on effecting the required repairs and improving the standard of maintenance on the segregated cycle lanes of the South West City Way.</p>



<p>Since our last update, the gritting on the lanes had been much improved and more effective, and we are thankful for the action on that. The repair action is now moving slowly. The first repair began on one of the Shields Road bus stops but was unfortunately then halted for five days with a full blockage of the cycle path remaining in place during that time. It seems that the understanding for the respect for our main commuting route from Glasgow City Council still has some way to go. </p>



<figure class="wp-block-image is-resized"><img loading="lazy" decoding="async" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2019/01/SWCW4.jpg?fit=445%2C600&amp;ssl=1" alt="" class="wp-image-7457" width="334" height="450" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/SWCW4.jpg?w=1518&amp;ssl=1 1518w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/SWCW4.jpg?resize=222%2C300&amp;ssl=1 222w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/SWCW4.jpg?resize=445%2C600&amp;ssl=1 445w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/SWCW4.jpg?w=1050&amp;ssl=1 1050w" sizes="auto, (max-width: 334px) 100vw, 334px" /></figure>



<p>This work is now complete though, and we hope that the drainage will be improved there from now on. Elsewhere, near the other Shields Road bus stop, the flooding was drained but swiftly returned, demonstrating that a more permanent repair was required. We have been continuing to ensure that GCC are working on moving forward with the SWCW repairs, and have some of the following info to share with you:</p>



<blockquote class="wp-block-quote is-style-default is-layout-flow wp-block-quote-is-layout-flow"><p>To GCC from GoBike:</p><p>We&#8217;ve been sent on info from an FOI on the flooding on SWCW that suggests that the bridge would first need strengthening by Network Rail before the required resurfacing can take place. We would imagine that the timeline for this would actually be really significant, and so if this is indeed the case, we would like to suggest the requirement for a program of flooding maintenance at the site until this permanent repair can happen. We have also been made aware though, that heavy machinery such as (&#8230;..) vehicles have routinely been seen working on the bridge. Can you explain this?</p><p>The FOI also illustrates that there were 13 fault reports specifically on the flooding to the council over a period of a year and a half until the first investigative site visit happened in August 2018. Injuries have occurred at this site due to the neglect to attend to the repair timeously. This week repairs started at the other bus stop on Monday the 7th, which closed off the full cycle lane with barriers blocking cycle lane access, yet no signage and no diversion in place, just a ramp useful only to people with prams and wheelchairs. Work then ceased, incomplete, after the 7th, and the barriers still remain in place, now six days later. I attach an image to illustrate. Frankly, for a flagship route, one of the only truly safe routes we have in the city for people on bikes, the priority for it&#8217;s upkeep within the council is quite clearly insufficient.</p></blockquote>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p>To GoBike from GCC:</p><p>Thank you for your email regarding the South West City Way Cycle route.<br> &nbsp;<br> We  are currently investigating what options are available to resolve the  issues with the surfacing on the bridge, taking account  of the weight restrictions and &nbsp;work operations that are permitted to  be undertaken on the bridge due to its condition.&nbsp; Vehicles should not  be using the cycleway and thank you for bringing this to our attention.&nbsp;  I &nbsp;will arrange for this issue to be raised  with  (&#8230;.) at the next Roads Authorities and Utilies Committee  (RAUC) meeting.&nbsp; The Council is also currently reviewing how these  initial complaints were initially dealt with.<br> <strong>&nbsp;</strong><br> I can confirm repairs at the bus stop south of the railway bridge started on site on 7<sup>th</sup>  January 2019. The works were  to amend the drainage channel inlets, open them up to allow more flow  of surface water and make future maintenance more accessible. The  contractor has been made aware of the importance of maintaining the  traffic management at all times and to resurface the  ramp as a priority. I can only apologise it’s taken longer than  expected.<br> &nbsp;<br> The  bus stop north (see image) of the railway bridge with the drainage  issues has been investigated by LES and the contractor Mac  Asphalt Ltd who were involved with the works to resolve the drainage.  Due to the lack of existing drainage gullies on Shields Road a further  investigation was undertaken on the existing gullies and manholes to  allow for an additional 3No. gullies are to be  installed within the cycle lane. Work is due to commence on site &nbsp;on  Monday 21st January 2019. The cycle lane from the start of Shields Road  at St Andrews Drive to the railway bridge will be closed for 7 working  days to allow for the drainage to be installed.  An alternative route using the footway will be signposted.<br> &nbsp;<br> I hope this is of assistance.</p></blockquote>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="2016" height="1512" src="https://i1.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?fit=525%2C394&amp;ssl=1" alt="" class="wp-image-7456" srcset="https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?w=2016&amp;ssl=1 2016w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?resize=300%2C225&amp;ssl=1 300w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?resize=600%2C450&amp;ssl=1 600w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?w=1050&amp;ssl=1 1050w, https://i0.wp.com/www.gobike.org/wp-content/uploads/2019/01/20190108_131055_resized.jpg?w=1575&amp;ssl=1 1575w" sizes="auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px" /></figure>



<p>So that work is due to start today, which is positive. Please let us know whether the diversion is adequate.</p>



<p>Thanks again to the council for working to get this sorted although it is unfortunate that it took such action before anything was done, when the issue had been so widely reported. We have been sent details of just how many reports were made <a href="https://www.whatdotheyknow.com/request/query_as_to_surface_water_draina">in this FOI</a> sent in from a super helpful member which makes for very interesting reading. But we hope that from here, the council will appreciate the importance of keeping our safe cycling spaces (which as we know, are few and far between) clear, working, maintained, and well&#8230;. safe.</p>



<p>Perhaps next, we can look at the issue of parking in the segregated cycle lanes too eh? We will be watching the repairs unfold and wont be resting easy &#8211; we already have our next target in mind for the GoBike Board of Shame. Watch this space.</p>



<p></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">7454</post-id>	</item>
	</channel>
</rss>
